rdf10 arb presentation session5 ogsoto - itu · 2010-12-06 · cairo, egypt, december 2010...
TRANSCRIPT
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010
Oscar González SotoITU Consultant Expert
Spain [email protected]
ITU-D Regional Development Forums 2010 on NGN and Broadband for the Arab Region“NGN and Broadband, Opportunities and
Challenges”
NGN Migration Strategies and Scenarios per Network Segment
Cairo, Egypt, 13 to 15 December 2010
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 2
Agenda
• Technology migration issues
• Migration strategies per network segment
• Main steps for IMS and NGSS
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 3
NGN Migration Strategy Issues for migration planning
• Where to start migration?
• Which topologies and connectivity are required?
• How network segments change in access , local and c ore?
• Which level of protection to assure?
• Where to locate new functionalities?
• How to ensure service continuity?
• Others …..
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 4
NGN Migration Strategy Modeling issues for NGN design
New models needed to represent multiservice flows
New dimensioning methods for resources handling
multimedia services with QoS
New measurement procedures for aggregated multi-
service traffics
New procedures to ensure interoperability and end-to-
end performance across multiple domains
Redefinition of network segments at the new structure
and for QoS quota assignment
New units to define dimensioning and costing for
interconnection
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 5
Network segments: Historical reference configurations
LD circuit TransTransmission
circuit
AN Voice PSTN LE
Customers
CPEvoice
CPE data
Transmissiondata
LD data transData BRAS
AN AggregDSLAM
PSTN TE
DATA TR
PSTN Transit
DATA Transit
Metro/Regional
Circuit Trans
Metro/Regional data trans
CPE to Transit network
Access network Local network Metro/Regional
networkTransit network
- Double network in circuit and packet modes
- Frequently with separated physical media, transmission and energy
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 6
Network segments: Target full NGN reference configurations
- Integrated network at all layers NGN based on IPv6 network with carrier grade QoS
Core NGN netTransmission
edge
IP Integrated AN
NGN Edge
RouterCustomersMultiple play
Application servers
equipment
IP Multiservice
CPE Access Transmi
ssionLD integrated
Trans
Edge/Metro/Aggregation network
Core network
NGN Customer to Transit network
Access networkHome networking
Sense for IP mode deployment in NGN
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 7
Network segments: Migration from historical to target NGN
LD circuit TransTransmission
circuit
AN Voice PSTN LE
Customers
CPEvoice
CPE data Transmissiondata
LD data transData BRASAN AggregDSLAM
PSTN TE
DATA TR
PSTN Transit
DATA Transit
Metro/Regional
Circuit Trans
Metro/Regional data trans
CPE to Transit network
Access network Local network Metro/Regional network Transit network
Core NGN netTransmissionedge
IP Integrated AN NGN Edge
Router
CustomersMultiple play
Application servers equipment
IP Multiservice CPE Access
Transmission LD integrated Trans
Edge/Metro/Aggregation network
Core network
NGN Customer to Transit network
Access networkHome networking
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 8
Agenda
• Technology migration issues
• Migration strategies per network segment
• Main steps for IMS and NGSS
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 9
Architecture migration: Topology
What changes from current scenario towards target network ?
OtherNetworks
DLC
Control
Transport/Media Distributed Switching
DSL
Wirelessgateway
Softswitch
OSS Services
PacketNetwork
IP/MPLS/CAC
Accessgateway
Accessgateway
Accessgateway
Trunkgateway
SCP
TDM
POTS ISDN
RSU
LEX/TEX
LEX
PCM
DataATM/IP
MUX/DSLAM
NMC
SS7
HDSL/XDSL
NAS
MobIN
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 10
NGN: Topology migration strategies
• Migration in overlay :• At transit and international levels• At local level• At access level
• Migration in island (substitution/extension)
• At transit and international levels• At local level• At access level
• Hybrid migration: overlay and island combination:• By network levels• By geographical regions • By obsolescence level
Network topology change is more difficult and needs more time that just system substitution
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 11
Structure and Topology
Simplification
Network Architecture towards NGNArchitecture Consolidation: Topology
TRANSIT NETWORKTRANSIT NETWORK
NATIONAL LAYERNATIONAL LAYER
REGIONAL LAYERREGIONAL LAYER
AccessLAYER
LEXLAYER
CustomersLAYER
Single-layered
CORE NETWORK
Single-layered
CORE NETWORKNATIONAL/REGIONAL
LAYER
NATIONAL/REGIONAL
LAYER
AccessLAYER
LEX/GW/EDGELAYER
CustomersLAYER
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 12
Local Exchanges
Remote Units
LEX LayerLEX Layer
Trunking gateway in each regional site
Packet mode
networkIP links
short distance
Regional LevelRegional Level
Softwitches /MGCs
in few sites
Topology reconfiguration for Core
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 13
Local Exchanges
Remote Units
LEX LayerLEX Layer
Trunking gateway in each local site
Packet mode
network
IP links Long
distance
National Regional layer
National Regional layer
Softswitches/MGCs located in few sites
Topology reconfiguration for Core
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 14
Core: migration strategy
Dominated by high capacity and protection level
• Overlay deployment for full coverage in all regions
• Quick deployment needed for homogeneous end to end connections (2 to 3 years)
• Strong requirements for high quality, protection and survivability
• Importance of the optimization for location and interconnection
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 15
Local/Edge level migration: grow with NGN
Access gateway
LEX LayerLEX Layer
Packet mode
network
Trunking gateway
IP links
Exchange A subscriber “Growth”
Trunking gateway
Exchange A
Access gateway
TEX LayerTEX Layer
Softwitches/ MGCs located in few sites
Cored and edge routers
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 16
Local/Edge level migration: substitute with NGN
Obsolete TDM LEXs
Packet mode
network
Access gateway
Access equipment
Rest of the TDM network
Trunk gateways
Access gateways
IP links
Softswitches/MGCs
Cored and edge routers
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 17
Vision by the Metro Ethernet Forum for LAN to LAN network:
Metro-Ethernet
Customer’sEthernet LAN
Telco Central OfficeTelco Central Office
Traditional Telco Network
CSU/DSCsRouters
Copper Serial Input
Copper Local Loop
ATMMUXSonet ADM
Voice-oriented connectivity
CSU/DSCsRouters
Copper Serial Input
ATM MUXSonet ADM
Copper Local Loop
Customer’sEthernet LAN
Optical IP Network
Managed Switch located in building telco closet
Optical Gigabit Ethernet throughput
Managed Switch GB WAN
Router
GB WAN Router
Long Haul Fiber Metro Fiber RingMetro Fiber Ring Customer’sEthernet LAN
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 18
Local/Edge network migration
Dominated by functions migration investment and interoperability
• Move from joint switching and control to separated control and media GW
• Introduce Multimedia Services at all areas
• Optimize number, location of nodes and interfaces among existing and new network
• Requires longer time and higher investments due to variety of geo- scenarios and geographical distribution
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 19
Access Network Migration:Physical network today
Structure of the OSP Access Network in most scenar ios
SDF
SDF
SDF
FDF
FDF
main cable
branching cablesdrop line
MDF
.
.
.
.
SDF
drop line..
.
.
.
.
RegionalExchange
Core/Local network Primary OSP network Distribution OSP network
NTBA
LocalExchange
MDF Main Distribution FrameFDF Feeder Distribution FrameDSLAM Digital Subscriber Line Access ModuleMSAN Multiservive Access NodeSDF Subscriber Distribution Frame
SDF
ISDNbasic rate
FOOpticalInterface
AN:DLCDSLAMMSAN
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 20
Access Network Migration:Physical network evolution
Typical trend for Access Network infrastructure evo lution
Core/Local Primary OSP network Distribution OSP network
SDF
SDF
SDF
AN
branching cablesdrop line
OpticalInterface
.
.
.
...
NTBA
LEX/GW
LEX Local ExchangeGW GatewayMDF Main Distribution FrameAN Access Node SDF Subscriber Distribution FrameFO Fiber Optic
AN
ANdrop line .
.
FO
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 21
Network Architecture towards NGNArchitecture Consolidation: Access
Access dominated by physical infrastructure cost and deployment time:
“ first to start and later to finish”
• Quick deployment of DSL and Multimedia Services
• FO closer to customer when implementing new outside plant or renovating existing one
• New Wireless technologies for low density customer scenarios
• Shorter LL length than classical network to be prepared for high bandwidth Multimedia services
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 22
Where to start and how to co-ordinate migration?
Network “consolidation” for topologyCost Optimisation of the network
- Reducing nodes and increase their capacity- Deployment of ADSL and multiservice access
Network expansionNGN solution :
- Cap and Grow; this means keeping the existing PSTN network as it is, and grow demand with NGN equipment
Network replacementReplacement of out-phased (end of life) TDM equipment
- gradual replacement : this means coexistence of the two technologies - full accelerated replacement with a short transition period
Need to optimize overall network evolution: technic ally and economically
Topology migration: combined segments
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 23
Local/Edge level/Core migration: Cap & grow with NGN
Access gatewayLEX/EDGE
LayerLEX/EDGE
Layer
Packet mode
network
Trunking gateway
IP links
Subscriber “Growth”
conventional services
Trunking gateway
Exchange A
Access gateway
TEX /CORE Layer
TEX /CORE Layer
Softwitches/ MGCs located in few sitesIMS
New subscribers and
new all IP services
ASs
Advanced IMS option
Conservative SSW option
Core and edge routers
Obsolete TDM LEXs
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 24
Overall Network Structure Architecture at transition stage
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 25
Agenda
• Technology migration issues
• Migration strategies per network segment
• Main steps for IMS and NGSS
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 26
Network Architecture towards NGN: IMS Architecture
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 27
- First advantage is the higher flexibility of the IM S functionality to adapt to the customer services , irrespective of the technology they use and the access method to reach the network.
- Saving in effort and time for the development and deployment of a new service is considerably reduced once the architecture is ready at the network, implying economic savings and better Time to Market for a given service provider in a competitive market.
- Efficient introduction on new services at a lower co st will increase the service provider revenues and ARPU which is the major business driver for the healthy operation, market grow and financial results.
- Higher utilization of services and better personali zation of functions to specific requirements from the end customers’ point of view, a common use and feel for all services and applications
Network Architecture towards NGN: IMS Benefits
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 28
Evolution to IMS: Phases
Convergence to NGN infrastructure
Current Servicefunctionality
Partial IMS functionality and/or coverage
Full IMS coverage
Full HSS, P2P video, Service broker, Service blending,
RACF, ICD, etc.
Convergence to IMS services
PSTN
NGN IP core
End to End NGN
PSTN Architecture
Pre - IMSPSTN emulation/simulation
Full IMS “SIP” ServicesOpen Service Architecture, Basic HSS, VoIP, LBS, PBS,
IM, PtS, etc.
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 29
Evolution to converged OSS/BSS: Classical requirements
- Inventory management,
- Network engineering,
- Order management,
- Network elements supervision,
- Application monitoring,
- Traffic measurement and post processing,
- Capacity augmentation,
- Routing planning,
- Trouble ticketing,
- Repair management,
- Workforce management,
- Service activation,
- Service creation,
- Customer Relations Management (CRM),
- Rating,
- Billing,
- Invoicing,
- Performance supervision,
- Accounting management,
- Pricing agreements,
- SLA management
- Support to Marketing & Sales, etc
Typical functions for the OSS and BSS imply a vast set of activities in current networks like:
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 30
Evolution to converged OSS/BSS: New requirements
- In addition to conventional typical functions, new requirements and higher relevance for existing tasks are needed in the NGN IP mode technology as follows:
- Managing support to multimedia services with voice, data, video and multiple play
- Security policy management,- Content management,- Managing inter-domain operational activities - Managing functionalities for the coexistence of legacy and newtechnologies
- Implementing new business procedures associated to bundled offers
- Manage multimedia/multiparty charging application- Service Level Agreements (SLA) management,- Service creation and upgrading management,
- Focus on common processes to all support functions and technologies
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 31
ITU specs for the NMS functions in NGN
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 32
Generic eTOM architecture: operations
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 33
Generic eTOM architecture
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 34
Overall eTOM architecture
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 35
Evolution to converged OSS/BSS: Phases
Separated OSS, BSS and Platforms
Integrated OSS/BSS inCommon Platform
BSS
PSTN
DATA
MOBILE
OS
S A
pplic
atio
n 1
OS
S A
pplic
atio
n 2
OS
S A
pplic
atio
n n
BSS/OSS
PSTN
DATA
MOBILE
OSS Applications
OSS Middleware
Integrated IT Platform
Migration from legacy support systems in vertical piles towards integrated OSS/BSS in an IT platform per network type
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 36
Evolution to converged OSS/BSS: Phases
Integrated OSS/BSS inCommon Platform Full Integrated NGSS platform interworking with
IMS
BSS/OSS
PSTN/DATA
MOBILE
OSS Applications
OSS Middleware
Integrated IT Platform
NGSSbased on
(SOA)
BS
S/O
SS
App
licat
ions
Transport Stratum
Service Stratum
Third Party Applications
Transport Functions
Transport Control Functions
Service Control Functions
IMS
Applic. Support Functions
IMS Architecture
Migration from IT platforms per network type towards New Generation OSS/BSS for an NGN multiservice network with IMS functionality
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 37
Matching evolution to NGN, IMS and NGSS
Convergence to NGN infrastructure
Separated OSS and BSS platforms for PSTN,
Mobile,& Data
OSS/BSS Integration forPSTN and Data
Full Integrated platformFixed + Mobile & federated with IMS
Convergence to Integrated OSS/BSS
PSTN
NGN IP core
End to End NGN
PSTN Architecture
Pre - IMSCoexistence for PSTN and NGN
Full IMS “SIP” Services- Open Service Architecture- Integration of OSS and BSS
functionalities
- NGSS based on “SOA”Incorporation of new operations
for IMS new services
InternationalTelecommunicationUnionMigration towards NGN - OGSCairo, Egypt, December 2010 38
NGN Migration Strategy: Conclusions
Network Topology migration is the base for architecture modernization and requires an
overall re-design
Different timings apply to 5 network areas: Access, Core, Local/Edge, Services and
OSS/BSS
Per country coordination is required for Migration at each area: Migration
Operation Center