rd-road dsr 2010.11
DESCRIPTION
dTRANSCRIPT
-
5/26/2018 Rd-road dsr 2010.11
1/18
170
Cutting down trees including trunks andbranches and stacking the materials neatly
with a lead of 50 m as directed with girthsabove 30 cm. to 60 cm. etc. complete asdirected by Engineer in charge.
Spec.No.: Rd.1 Page No. 179.
Cutting down trees including trunks and
branches and stacking the materials neatly
with a lead of 50 m. as directed with girths
above 60 cm. to 90 cm. etc. complete asdirected by Engineer in charge.
Spec. No.: Rd.1 Page No. 179..
Cutting down trees including trunks andbranches and stacking the materials neatly
with a lead of 50 m. as directed with girths
above 90 cm. to 180 cm. etc. complete asdirected by Engineer in charge.
Spec.No.: Rd.1 Page No. 179
Cutting down trees including trunks andbranches and stacking the materials neatly
with a lead of 50 m. as directed with girthsabove 180 cm. to 270 cm.etc. complete as
directed by Engineer in charge.
Spec.No.: Rd. 1 Page No. 179.
Cutting down trees including trunks andbranches and stacking the materials neatly
with a lead of 50 m as directed with girths
above 270 cm. to 450 cm.etc. complete asdirected by Engineer in charge.
Spec. No.: Rd. 1 Page no. 179,
Cutting down trees including trunks andbranches and stacking the materials neatly
with a lead of 50 m as directed with girths
above 450 cm. etc. complete as directed byEngineer in charge.
Spec. No.: Rd. 1 Page no. 179.
PART - II
RD : ROAD WORKS
624RD 1A
625RD 1B
626RD 1C
627RD 1D
628RD 1E
629RD 1F
NO.
NO.
NO.
NO.
NO.
NO.
188.00
271.00
475.00
1,710.00
3500.00
5,400.00
131.0
161.0
223.0
265.0
290.0
325.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
2/18
171
Cutting down the road side thorny bushes(Wali babule etc.) having grith from 5 cm to
20 cm including removing their roots, stack-ing and conveying the materials upto 1.00
km, removing vegetation including levelling
the ground as directed for both sides of road
etc. complete.
Excavation for road way in earth soil of allsorts sand, gravel, soft murumincludingdressing section to the required grade, cam-
ber and side slopes and conveying the exca-
vated materials with all lifts and spreadingfor embankment or stacking etc. as directed
by Engineer in charge.
Spec. No.: Rd. 2 Page No. 180.
Excavation for road way in hard murumin-cluding dressing section to the required
grade, camber and side slope and convey-
ing the excavated materials with all lifts and
leads upto a lead of 50 m. and spreading for
embankment or stacking etc. Complete as
directed by Engineer in charge.Spec. No.: Rd. 3 Page No. 183
Excavation for road way in hard murum andboulders including dressing section to therequired grade, camber and side slope and
conveying the excavated materials with all
lifts and leads upto a lead of 50 m. and
spreading for embankment or stacking etc.
Complete as directed by Engineer in charge.
Spec. No.: Rd. 4. Page No. 184.
Excavation for road way in Soft rock, includ-ing dressing section to the required grade,
camber and side slope and conveying the
excavated materials with all lifts and leads
up to a lead of 50 m. and spreading for em-
bankments or stacking etc. complete as di-
rected by Engineer in charge.
630ADL
631RD 2A
632RD 3
633RD 4
634RD 5
SQ.M.
CU.M.
CU.M.
CU.M.
CU.M.
5.50
42.00
50.00
55.00
118.00
5.5
42.0
50.0
55.0
95.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
3/18
172
Spec. No. Rd. 5 Page No. 184.
Excavation for road way in hard rock byblasting including dressing section to therequired grade, camber and side slope and
conveying the excavated materials with all
lifts and leads upto a lead of 50 m. and
spreading for embankingment or stacking
etc. complete as directed by Engineer in
charge.
Spec. No.: Rd. 6 Page No. 185
Excavation for road way in hard rock by con-trolled blasting wedging chiseling or linedrilling including dressing section to therequired grade, camber and side slopes and
conveying the excavated materials with all
lifts, upto a lead of 50 m. and spreading for
embankment or stacking etc. complete as
directed by Engineer in charge.
Spec. No.: Rd. 7 Page No. 186
Excavation for road way in laterite rockin-
cluding dressing section to the requiredgrade, camber and side slopes and convey-
ing the excavated materials with all lifts, upto
a lead of 50 m. and spreading for embank-
ments or stacking as directed by Engineer
in charge.
Spec. No.: Rd.8. Page No. 186.
Excavation for catch/road side water gut-ter/ jungle gutterin all sorts of soils stratato the specified section including stacking
the excavated stuff in a regular bund and
disposing of unsuitable or excess stuff be-
yond 50 m. from place of excavation as di-
rected by Engineer in charge
Excavation for catch/ side water gutter inhard murum stratato the specified sectionincluding stacking the excavated stuff in a
635RD 6
636RD 7
637
RD 8
6389A
639RD 9B
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
260.00
333.00
247.00
44.00
56.00
89.0
303.0
227.0
35.0
50.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
4/18
173
regular bund and disposing of unsuitable
or excess stuff beyond 50 m. from place of
excavation as directed by Engineer incharge.
Spec. No.: Rd. 9 Page No. 187.
Excavation for catch/ side water gutter in
soft rock strata to the specified section in-
cluding stacking the excavated stuff in a
regular bund and disposing of unsuitable
of excess stuff beyond 50 m. from place of
excavation as directed by Engineer in
charge.
Spec. No.: Rd. 9 Page No. 187.
Excavation for catch/ side water gutter inhard rock stratato the specified section in-
cluding stacking the excavated stuff in a
regular bund and disposing of unsuitable
of excess stuff beyond 50 m. from place of
excavation as directed by Engineer in
charge.
Spec. No.: Rd. 9 Page No. 187.
Excavation for catch/ side water gutter inhard murum and boulders strata to thespecified section including stacking the ex-
cavated stuff in a require bund and dispos-
ing of unsuitable of excess stuff beyond 50
m. from place of excavation as directed by
Engineer in charge.
Spec. No.: Rd. 9 Page No. 187.
Watering and compacting embankment
formed of materials obtained from road cut-
ting within lead of 50 m. (with ordinary roll-
ing) after laying them in layers of 20 to 30
cm.
Watering and compacting embankment to95% of standard proctor density after lay-ing them in layers of 20 cm. to 30 cm. with
640RD 9C
641Rd 9D
642RD 9E
643
RD 10
644RD 10B
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
140.00
322.00
91.00
24.00
36.00
129.0
280.0
75.0
7.0
9.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
5/18
174
vibratory rolleretc.
Providing earth work in embankment withapproved materials obtained from excava-
tion from departmental land or othersourcesincluding all lifts and leads upto 50m. laying in layers of 20 cm. to 30 cm. thick-
ness breaking clods, dressing to the re-
quired lines, curves, grade and section, wa-
tering and compaction to 95% of standardproctor densityetc. Complete as directed
by Engineer in charge.Spec. No.: Rd. 12 Page No. 189.
A) With Power RollerB) With Vibratory Roller
Providing hard murum of CBR not less than10% in embankment obtained by depart-mental land or other sources including all
lifts and leads upto 50 m laying in layers of
20 to 30 cm. thickness, breaking clouds,
dressing to the required lines, curves, gradeand section watering and compaction with
vibratory roller etc. complete.
Spec. No.: Rd 12 Page No. 189
Conveying materials, obtained from roadcutting, including all lifts, laying in layersbreaking clods, dressing to the required
lines, curve, grades and sections for a leadof over 300 m. to 500 m. inclusive fromthe site of excavation to the site of deposi-
tion etc. complete. as directed by Engineer
in charge.
Spec. No.: Rd. 18 Page No. 197.
Supplying 15 cm. to 23 cm. trap / gran-
ite/ quartzite/ gneiss stone rubbleat theroad side for soling including conveying and
stacking etc. complete as directed by Engi
645RD12A
646RD 12
647RD 18B
648RD 19
CU.M.
CU.M.
CU.M
CU.M.
CU.M.
51.00
58.00
60.00
21.00
130.00
5.0
5.0
5.0
16.0
94.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
6/18
175
neer in charge (by Blasting)
Spec. No.: Rd.19 Page No. 197
Supplying 15 cm. to 23 cm. trap/ gran-
ite/ quartzite/ gneiss stone rubble solingat the road side including conveying and
stacking etc. complete as directed by Engi-
neer in charge. (By breaking boulders).
Spec. No. Rd. 19 Page No. 197.
Supplying 60 mm. trap/ granite/ quartz-ite/ gneiss stone oversize metalat the roadside including conveying and stacking etc.
complete as directed by Engineer in charge.
(including blasting if necessary).
Spec. No.: Rd.20 Page No. 200.
Supplying 60 mm. trap/ granite/ quartz-ite/ gneiss stone oversize metalat the roadside including conveying and stacking etc.
complete as directed by Engineer in charge.
By breaking boulders.
Spec. No.: Rd.20. Page No. 200.
Supplying 40 mm. trap/ granite/ quartz-ite gneiss stone size metalat the road side,including conveying and stacking etc. com-
plete as directed by Engineer in charge. (in-cluding blasting)Spec. No.: Rd.22 Page No. 201.
Supplying 40 mm. trap/granite/quartzite/gneiss stone size metalat the road side in-
cluding conveying and stacking etc. com-plete as directed by Engineer in charge. (By
breaking boulders).
Spec. No.: Rd. 22 Page No. 201.
Supplying hard murum/kankar at the roadside including conveying and stacking etc.complete as directed by Engineer in charge.
Spec. No.: Rd. 23 Page No. 202.
649RD 20
650RD 20A
651RD 20A
652RD 22
653RD 22A
654RD 23
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
102.00
160.00
130.00
175.00
150.00
50.00
92.0
92.0
94.0
98.0
107.0
38.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
7/18
176
Supplying Soft murum at the road side,including conveying and stacking etc. Com-
plete as directed by Engineer in charge.Spec. No.: Rd. 24 Page No. 203.
Supplying sand/gravel at the road side,in-
cluding conveying and stacking etc. Com-
plete as directed by Engineer in charge for
G.S.B. sand drain.
Spec. No.: Rd. 25 Page No. 203.
Laying 15 cm. to 23 cm. trap/granite/quartzite/gneiss rubble soling includinghand packing with rubble chips etc. com-
plete as directed by Engineer in charge (ex-
cluding the cost of material)
Spec. No. Rd. 27 Page No. 204.
Spreading gravel sand/soft murum/hardmurumetc. complete as directed by Engi-neer in charge.
Spec. No. Rd. 28, 30, 31 Page No. 205.
Spreading 40 mm. to 60 mm. metal in-cluding sectioning etc. Complete as directed
by Engineer in charge.
Spec. No.: Rd. 29 Page No. 205 & Rd. 34
Page No. 208.
Providing, laying, spreading and compact-
ing specified graded sand, gravel or any
other course material in subbase course in-
cluding pre-mixing the material at OMC in
mechanical mixer (Pug Mill) manually car-
riage of mixed material, spreading in uni-
form layers with Mortar grader on a prepared
base and compacting to achieve the desired
density including all material, labour, ma-
chinery, lighting, guarding barricating and
maintenance of diversions complete.
655RD 24
656RD 25
657RD 27
658RD 28
659RD 29
660
CU.M.
CU.M.
CU.M.
CU.M.
CU.M.
42.00
89.00
22.00
12.00
19.00
34.0
78.0
18.0
10.
18.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
8/18
177
Providing and laying spreading and compact-
ing graded stone aggregate to wet mix mac-
adam specification including premixing the
material with water at OMC in mechanical
mix plant carriage of mixed material by tiper
to site, laying in uniform layers with paver
in sub base/base course on well prepared
surface and compacting with vibratory rollerto achieve the desired density.
Picking the water bound macadam roadsurface including sectioning etc. completeas directed by the Engineer in charge.
Spec. No.: Rd. 33 Page No. 208.
Compacting the sub grade/ gravel/ 60 mm.oversize metal (200 mm. loose) / 40 mm.
size metal (100 mm. loose) layers upto 2.00m. widewith power roller including neces-sary, labour, materials and artificial water-
ing etc. Complete as directed by Engineer
662MORT&
H Cl.
NO.406
663RD 33
664
RD 35
CU.M
SQ.M.
938.00
3.50
110.
2.9
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
(a) By Mechanical means with vibratary roller(b) By Manual means with vibratary roller
CU.M.
CU.M.
500.00
250.00
110.
110.
in charge.
Spec. No.: Rd. 35 Page No. 209.
A) With Power Roller
B) With Vibratory Roller
SQ.M.
SQ.M.
9.30
11.00
2.0
2.00
-
5/26/2018 Rd-road dsr 2010.11
9/18
178
Compacting the sub grade/ gravel/ 60 mm.oversize metal (200 mm. loose) / 40 mm.
size metal (100 mm. loose) layers upto 2.00m. to 7 m. widewith power roller includingnecessary, labour, materials and artificial
watering etc. Complete as directed by Engi-
neer in charge.
Spec. No.: Rd. 32 and 35 Page No. 206 and
209.
A) With Power Roller
B) With Vibratory Roller
Compacting the hard murum kankar inlayers of thickness upto 20 cm. with powerroller including necessary labour, materi-als, artificial watering etc. Complete as di-
rected by Engineer in charge.
Spec. No.: Rd. 38 Page No. 211.
Supplying crusher broken 25 mm. of trap/
granite/ quartzite/ gneiss stone metalatthe quarry site including conveying and
stacking for use in bituminous road sur-facework etc. complete as directed by Engi-neer in charge.
Spec. No.: Rd. 41 Page No. 215.
Supplying crusher broken 20 mm. trap/granite/ quartzite/ gneiss stone metal atthe quarry site including conveying and
stacking for use in bituminous road sur-
facework etc. complete as directed by Engi-neer in charge.
665RD
32 &35A
666RD 38
667
RD 41A
668RD 41B
SQ.M.
SQ.M.
SQ.M.
CU.M.
CU.M.
8.20
10.00
3.80
400.00
485.00
2.0
2.0
1.2
150.
160.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
Spec. No.: Rd. 41 Page No. 215.
-
5/26/2018 Rd-road dsr 2010.11
10/18
179
Supplying crusher broken 10 and 12 mm.trap/ granite/ quartzite/ gneiss stonemetal at the quarry siteincluding convey-
ing and stacking for use in bituminous roadsurfacework etc. complete as directed byEngineer in charge.
Spec. No.: Rd. 41 Page No. 215.
Breaking and removing the existing bitu-men pavementto full width and depth anddisposal of the material to 2 km, compac-
tion with power roller etc. complete.
MORTH 2001 Clause No.202.3 Page 45.
Supplying crusher broken 6 mm. trap/granite/ quartzite/ gneiss stone metal atthe quarry site including conveying andstacking for use in bituminous road sur-facework etc. complete as directed by Engi-neer in charge.
Spec. No.: Rd. 41 Page No. 215.
Providing 50 mm thick semi grout bitu-minous road surface including supplyingall materials, preparing the existing road sur-
face, laying the required thickness of metal
layer, heating and spraying bitumen, spread-
ing chips, laying seal coat and compacting
complete as directed by Engineer in charge.
Spec. No.: Rd 60 Page No. 232.
(By Using Bulk Asphalt 60/70 grade)
Providing and laying 75 mm thick com-pacted bituminous bound macadam on theexisting WBM surfaceincluding picking theexisting WBM surface and throughly clean-
ing to receive the bituminous bound mac-
adam by approved equipments as directed
by Engineer in charge, immediately spread
669RD 41C
670MORTH
2001
Clause
No.202.3
671RD 41D
672RD 60B
673
CU.M.
CU.M.
CU.M.
SQ.M.
CU.M.
450.00
455.00
400.00
165.00
2000.00
160.0
410.0
165.0
20.0
335.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
11/18
180
ing 40 mm size hand broken metal at the
rate of 9 cum/ 100 sqm by making panels
compacting it suitably till it forms the stablesurface spreading bitumen at the rate of 200
kg/100 sqm using sprayers attached to the
bouzer spreading 12 mm metal at the rate
of 1.80 cum/100 sqm and final compaction
with power roller etc. complete & finishing
in accordance with the requirement in close
confirmity with grade, lines, cross section
and thickness as per approved drawing etc
compete as directed by Engineer in charge.
(Using bulk asphalt 60/70 grade )
Providing and laying 50 mm thick com-pacted bituminous bound macadam on the
existing B.T surface including throughlycleaning the surface by using mechanical
broom or approved equipment as directed
by Engineer in charge, providing and ap-
plying tack coat at the rate of 30 kg /100
sqm as per MORTH clause, No 503 and im-
mediately spreading 40 mm size hand bro-
ken metal at the rate of 6 cum/ 100 sqm bymaking panels compacting it suitable till it
forms the stable surface and spreading bi-
tumen at the rate of 175 kg / 100 sqm us-
ing sprayers attached to the bouzer, spread-
ing 12 mm metal at the rate of 1.80 cum /
100 sqm and final compaction with power
roller etc complete and finishing in accor-
dance with the requirement in close
confirmity with grade lines, cross section and
thickness as per approved drawing etc com-
plete as directed by Engineer in charge (Us-ing bulk asphalt 60/70 grade)
Providing & Laying 20 mm thick open graded
premix bituminous carpet, including sup-
plying all materials including as directed
preparing and cleaning the base, heating
bitumen and chips mixing bitumen and
674
675MORTH
SQ.M.
SQ.M.
150.00
119.00
20.0
13.
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
12/18
181
chips in hotmix plant, applying tack coat 30
kg/100 sqm laying the carpet layer and
compcting without seal coat on black topsurface with paver finisher (Hot mix hot laid)
etc complete as directed by Engineer in
charge.(Using bulk bitumen 60/70 grade)
Spec. No.: MORTH 2001 Cl. No. 511 Page
No. 192
Providing & Laying 20 mm thick premix
bitumous carpet including supplying all
materials, preparing and cleaning the base,
heating bitumen, applying tack coat at speci-
fied rate of 97.50 kg/100 sqm mixing hotbitumen and chips, laying the carpet and
compacting complete over exising water
bound macadam surface etc compete as di-
rected by Engineer in charge.( By using bulk
bitumen 60/70 grade)
Spec. No.: RD 63 Page No. 233
Providing 20 mm. thick premix bitumi-nous carpetincluding supplying all materi-
als, preparing and cleaning the base, heat-ing bitumen, applying tack coat at 73 kg./
100 sqm. rate mixing hot bitumen andchips, laying the carpet and compacting
complete over existing Black top surfaceetc. complete as directed by Engineer in
charge.
Spec. No.: Rd. 63 Page No. 233.
Providing & Laying single coat surface
dressing including supplying all materials
cleaning the road surface, heating and ap-plying, bitumen by self propelled pressure
sprayers at the rate of 18 kg/10 sqm to the
water bound macadam road surface, spread-
ing chips at the rate of 0.15 cum/10 sqm,
by using necessary tools, plant and equip-
ment and rolling etc complete as directed
by Engineer in charge. (By using bulk bitu
676RD 63
677RD 63
678RD 64
SQ.M.
SQ.M.
SQ.M.
140.00
118.00
96.00
13.
13.
10.
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
13/18
182
men 60/70 grade )Spec. No.: RD 64 Page No. 233
Providing & Laying single coat surfacedressingincluding supplying all materials ,cleaning the road surface, heating and ap-
plying bitumen by self propelled pressure
sprayers at the rate of 12.50 kg /10 sqm to
the black top road surface spreading chips
at the rate of 0.105 cum/10 sqm, by using
necessary tools and plant and equipments
and rolling etc complete as directed by En-gineer in charge. (By using bulk bitumen
60/70 grade)
Spec. No. RD 64 Page No. 233.
Providing & Laying two coat bituminoussurface dressing including supplying all ma-terials cleaning the road surface, heating and
applying bitumen at the rate of 29 kg / 10
sqm to the road surface, spreading 13.20
mm size chips at the of 0.15 cum / 10 sqm.
and 11.20 mm size chips at the rate of 0.10
cum. / 10 sqm. and rolling etc complete as
directed by Engineer in charge. (By using
bulk bitumen 60/70 grade )
Spec. No.: 65 RD 65 Page No. 233.
Providing & Laying bitumious liquid sealcoat to the black topped surfaceincludingsupplying all materials preparing existing
road surface, heating and applying bitumen
by self propelled/ towed bitumen pressuresprayer for uniform spraying at specified
temperature at 9.8 kg/10 sqm spreading
chips at 0.09 cum/ 10. sqm and rolling etc.
complete (using bulk asphalt ) as directd by
Engineer in charge.(By using bulk bitumen
60/70 grade )
Spec. No.: RD 66 Page No. 233.
679RD64
680RD 65
681RD 66
SQ.M.
SQ.M.
SQ.M.
75.00
160.00
58.00
9.0
14.
5.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
14/18
183
Providing & Laying bituminous premix
seal coat to the black topped surfacein-cluding supplying all materials, preparing
exising road surface, heating and applying
bitumen at the rate of 6.8 kg/10 sqm
sprading chips at 0.06 cum/ 10.sqm .and
rolling etc complete as directed by Engineer
in charge. (By using bulk bitumen 60/70
grade )
Spec. No.: MORTH 2001 Cl. No. 503 Page
No. 201
Labour for filling pot holes with premixmaterial(bitumen and chips), cleaning the
road surface with wire brushes and gunny
bags, applying tack coat, spreading premix
material, hand ramming or light compaction
with power roller, conveying material to the
site of work including cost of fuel for heat-
ing asphalt (excluding cost of asphalt andmetal)etc. complete as directed by Engineerin charge.
Spec. No.: As directed by Engineer in charge.
Providing dry rubble stone pitching 23 cm.
(about 9") thick including packing withquarry spalls and hard murum etc. complete
as directed by Engineer in charge.
Spec. No.: Rd. 73 Page No. 246.
Providing dry rubble stone pitchinginclud-
ing all materials hand packing etc. complete
above 23 cm. thick including packing with
quarry spalls and hard murum etc. completeas directed by Engineer in charge.
Spec. No.: Rd.73 Page No. 246.
Providing dry/ trap/ granite/ gneissrubble stone masonryetc. complete as di-
rected by Engineer in charge.
Spec. No. Rd. 74 Page No. 247.
682
683RD 77
684RD 73
685RD 73
686RD 74
SQ.M.
SQ.M.
SQ.M.
CU.M.
CU.M.
66.00
23.00
63.00
227.00
273.00
5.0
20.0
25.0
95.0
88.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
15/18
184
Picking up loose metalincluding stacking
at the road side neatly etc. complete.Spec. No.: As directed by Engineer in charge.
Brooming the water bound macadam sur-face by wire Brushes, coir brushes, dust-ing, cleaning etc for receiving the bitumi-
nous treatment, complete as directed by
Engineer in charge.
Spec. No.: As directed by Engineer in charge.
Providing and laying Hot mix Hot laidBitumenous macadam 50/75 mm thcik(average) with 3.30% bitumen by weight of
total mix for levelling course to remove ir-
regularities including diversion of traffic,
supply of all materials, heating bitumen and
chips mixing bitumen and chips in hot mix
plant laying bituminous macadam by paver
finisher including compacting with power
roller (excluding tack coat) etc complete as
directed by Engineer in charge (By using
bulk asphalt 60/70 grade)Spec. No.: MORTH 2001 Cl No.504 page
No.160
Providing and laying Hot mix Hot laidbitumious macadam 50/75 mm thick(av-erage) with 3.30% bitumen by weight of to-
tal mix for levelling course to remove irregu-
larities including diversion of traffic, supply
of all materials, heating bitumen and chips
mixing bitumen and chips in hot mix plant
laying bituminous macadam by paver fin-
isher including compacting with vibratory
roller (excluding tack coat) etc. complete as
directed by Engineer in charge. (By using
bulk asphalt 60/70 grade)
Spec No.: MORTH 2001 Cl. No.504 page
No.160
687
RD 82
688RD 84
689MORTH21
690MORTH
21
SQ.M.
SQ.M.
CU.M.
CU.M.
0.87
2.30
4204.00
4376.00
0.8
1.8
320.0
325.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
16/18
185
Providing and laying 75 mm thick builtup spary groutincluding supplying all ma-
terials including all lifts, preparing andcleaning the base, laying the required thick-
ness of mm in two layers heating and spread-
ing, btiumen spreading chips compacting
both layer with power roller (excluding tack
coat) etc complete as directed by Engineer
in charge By using bulk asphalt 60/70
grade) Spec No.: MORTH 2001 Cl No.508
page No.179
Providing and laying hot mix hot laidsemi-dense carpet / bituminous concrete25 mm thickbtiumen 5.25% by weight oftotal mix including bitumen and chips in
hot mix plant laying semi dense carpet /
bituminous concrete with paver finisher com-
pacting with power roller etc. complete (ex-
cluding tack coat) etc complete as directed
by Engineer in charge (By using bulk as-
phalt 60/70 grade)
Spec No.: MORTH 2001 Cl No.508 page
No.179
Providing and laying hot mix hot laidsemi-dense bituminous concrete 25 mm.thick bitumen 5.25% by weight of total mixincluding supplying all materials , heating
bitumen and chips , in batch type or
continous or drum type hot mix plant, lay-
ing semi dense concrete with self propelled
paver finisher including compacting vibra-
tory roller etc . complete (Excluding tack
coat) etc complete as directed by Engineer
in charge (By using bulk asphalt 60/70
grade)
Spec No.: MORTH 2001 Cl No 511 page
No.192
Providing and applying tack coatby selfpropelled or towed bitumen pressure sprayer
691 AMORTH
692MORTH
693MORTH
694MORTH
40 B
SQ.M.
SQ.M.
SQ.M.
SQ.M.
186.00
175.00
183.00
18.00
18.0
12.
12.
1.5
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
17/18
186
for uniform spraying at specified temprature
at the specified rate of 3kg/10 sqm on
exising black top surface etc complete Asdirected by Engineer incharge. (By using
bulk asphalt 60/70 grade)
Spec No.: MORTH Cl 503 page No.157
Providing and applyihg tack coat by Self pro-
pelled or towed bitumen pressure sprayer
for uniform spraying at specified temprature
at the specified rate of 4kg/10 sqm on ex-
isting water bound macadam surface etc
complete. As directed by Engineer inchargesSpec No.: MORTH Cl.No. 503 Page No 157
(By using bulk asphalt 60/70 grade)
Providing and laying Hot mix Hot laid bi-tuminous macadam 50/75 mm, thick(av-erage) with 3.30% bitumen by weight of to-
tal mix for levelling course to remove irregu-
larities including diversion of traffic, supply
of all materials, heating bitumen and chips
mixing bitumen and chips, in drum mix typehot mix plant laying bitumionous macadam
by self propelled paver finisher with
hydrostic controls and automatic sensor de-
vice including compacting with vibratory
roller (excluding tack toat) etc complete (By
using bulk asphalt 60/70 grade)
Spec. No.: MORTH 2001 Cl No 504 page
No.160
Providing and laying hot mix Hot laid DenseBituminous macadam 50/75 mm thick(average) with 4.5% bitumen by weight of
total mix for levelling course to remove ir-
regularities including diversion of traffic,
supply of all materails, heating bitumen and
chips mixing bitumen and chips, in drum
type hotmix plant laying bituminous mac-
adam byself propelled paver finisher with
695B
MORTH
40 B
696MORTH
17 A
697MORTH
18 A
SQ.M.
CU.M.
CU.M.
22.00
4288.00
5390.00
1.0
175.0
175.0
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
-
5/26/2018 Rd-road dsr 2010.11
18/18
187
hydrostic controls and automatic sensor de-
vice inclduing compacting with vibratory
roler (excluding tack coat) etc complete asdirected by Engineer in charge. (By using
bulk asphalt 60/70) grade.
Spec No MORTH 2001 Cl No. 504 page
No.160
SR. NO. RATE FOR 2010-1& ITEM DESCRIPTION UNIT (RS.)CODE FULL LABOU
Cement Concrete Pavement M-20 Grade697(A) Construction of unreinforced/reinforced cement
concrete apvement in M-20 grade concrete with43/53 Grade cement, fine aggregate and coarseaggregate of metal of trap/ granite/ quartzite/
gneiss/ over prepared sub base mixed in conceretmixer of appropriate capacity with weigh batcheras per approved mix design, laid with a fixed formor slip form paver, spread compacted and finishedin continuous operation including provision ofcontraction, expansion, construction and logitudinaljoints, joints filler, seperation membrane, sealantprimer, joint sealant, debonding strip, dowel bar,tie rod, admixtures as approved, curing,etc. finishing to lines and grades includingtransportation of mix if done through batchingplant etc. complete as Directed by Engineer-in-charge.
CU.M. 4157.00 673.00
697(B)
Type I
Type II
Type III
109.00 11.50
120.00 11.50
139.00 11.50
Providing and laying a woven poly propylenegeotextile (of suitable type)manfactured from
black UV stabilizedPoly propylene tape/fibri-llated tape garns on the prepared subgradeas a separator-cum reinforcement withnecessary over laps as per drawings oras directed by the Engineer.
SQ.M.
SQ.M.
SQ.M.
(Using tre-mix method) (Excluding surface reinforcement)Spec. No. MORTH Section 600 Page No. 262.