Page 1: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Raúl Rodríguez

TECNALIA

Page 2: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

COTEVOS COncepts Capacities and Methods for Testing EV systems and their interOperability within the Smart grid • Main objectives

• Budget, duration and partners

• Project workflow

• Achieved results

• Additional coming results

• Event at ISPRA

Page 3: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Main objective • Establish the optimal structure and capacities to test conformance and

interoperability of all systems involved in the infrastructure for EV charge: Development of harmonized tests and testing procedures

Unified test facilities

Page 4: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

General information • Budget: 5,6 M€

• Duration: September 2013 – February 2016 (30 months)

• Partners: 11 partners from 9 countries

Page 5: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Project workflow

Page 6: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results • Analysis of needs

Page 7: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results

Page 8: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results • Alignment with standardization activities:

Analysis and alignment of new tests and conformance test procedures with existing standards, regulations, standardization activities and standardization needs at European level

Definition of priorities for new tests and conformance testing methods with broad consensus at European level (both inside and outside COTEVOS) and comparison with the international standardization scenario

SGAM (Smart Grid Architecture Model, M/490)

Page 9: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results • Reference architecture and use case mapping

Page 10: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results • Reference architecture (laboratory)

Page 11: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results • From use cases to test cases

Coherent with the requirements of the standardization activities

Common approach and in agreement with the external contacts of COTEVOS network

28 test cases into 6 groups (dynamic)

Test procedures are developed according to own strategies (evolving)

Round robin tests used for inter-laboratory comparison

Page 12: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results • New testing capacities for Conformance and Interoperability

V2G communication scheme

DSO’s SCADA

Charging Station (EVSE operator)

Charging Station

Numerous EVs Single EV

DSOlevel

Secondary substationlevel

EVSElevel

EV level

ISO

15

11

8

ISO

15

11

8

Charging Station

Single EV

ISO

15

11

8O

CC

Pv3

.0

Protocol translator

PE

N

Transformer 20/0,4 kV

20 kV

0,4kV

3ph

AMI

3ph 3ph

AMI

AMI

DSO CONTROLLER

IEC

61

85

0

IEC

61

85

0

IEC

61

85

0

IEC 61850

IEC 61850

OCCPv3.0

ISO 15118

IEC 61850

Agregated information about V2G transmitted by IEC 61850. Communication DSO controller-EVSE

Detail information about V2G transmitted by IEC 61850. Communication DSO controller-EVSE

Detail information about V2G transmitted by OCCPv3.0. Communication DSO controller-EVSE. Currently available version of the standard is OCCPv2.0 that do not support two direction communication. It is assumed that eventual further version of the protocol will allow both direction information exchange.

Detail information about V2G transmitted by ISO 15118. Communication EVSE-EV

LEGEND

Page 13: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Achieved results • Looking for the Unified Testing Laboratory for EV Interoperability

Page 14: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

Additional coming results • White Book on Business Opportunities and Interoperability Assessment

for EV Integration

• Definition of the individual and common strategies for an offer of

Conformity and Interoperability assessment of products for the EV

integration in the smart grid

Page 15: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

PlugtestTM at ISPRA (30 Nov. – 4 Dec.) • Hosted by the Joint Research Centre (JRC) and organised by ETSI’s centre

for Testing and Interoperability (CTI) with the support of COTEVOS project

• Testing features based on the interoperability test plan and procedures developed by COTEVOS partners

Page 16: Raúl Rodríguez TECNALIA - COTEVOScotevos.eu/wp-content/uploads/2016/03/COTEVOS_presentation-EEVC2015.pdfGeneral information •Budget: 5,6 M€ •Duration: September 2013 – February

www.cotevos.eu • General information

• Publications: deliverables, presentations from workshops, presentations of the project