©railinc 2010 all rights reserved car accounting self service project mark aldenderfer, business...
TRANSCRIPT
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Car Accounting Self Service Project
Mark Aldenderfer, Business Analyst II
1
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
What We Will Cover Today
• Project Background
• Event Query for CASS
• Liability Acceptance Message(LAM) for CASS
• Project Update
2
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Project Background
• Many LCS related customer questions require significant research and time to answer– The CASS system will help in returning events associated
with a LCS decision– More on Event Query later
• Railroads want a easy way to submit LAMs– The CASS system will allow a Railroad to easily submit a
LAM through a web based system. – More on LAM creation later
3
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Goals and Objectives
• Give visibility into confusing car hire decisions created by LCS logic
• Reduce expenses in terms of time and effort researching LCS car hire decisions
• Reduce expense required to create and send Liability Acceptance Messages
4
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Event Query Theme
• The system will allow for the search of equipment movement events by– Searching for a single equipment– Searching using a date range up to 90 days
• The CASS system will have access to at least a years worth of events
5
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Home Page
6
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Event Results Page
7
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Event Detail Screen
8
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
LAM Theme
• This special message type is used to accept car hire liability
• Can be sent as a TRAIN10, but is most commonly known as a TRAIN31 type 5 message
• Can be time consuming to create and send
• Not every Railroad has the ability to send
9
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
LAM Theme Cont.
• TRAINII manual explanation for LAM– If event reporting has caused car hire responsibility to be
assigned to a carrier other than the carrier to whom it belongs, a TRAIN10 or TRAIN31 message with an Action Code of 5 can be used to correct the assignment of car hire responsibility. This Car Hire Liability Acceptance report will result in an LCS gap record from the current responsible road to the road submitting the acceptance interchange event.
10
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
LAM Theme Cont.
• CASS system will validate LAMs using todays logic– The system will check in insure that no LCS evaluated event
has been posted after the time of the Type 5. – If LAM is accepted the system will look to determine when
liability can be changed
o If before the 6th of the current month liability can be placed back to the beginning of previous month
o If after the 6th of the current month liability can be placed back to the beginning of current month
11
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Project Status Update
• The project is currently on schedule– The system will allow for searching new events up to events
90 days old– The system will allow for searching of old events past 90
days old by the end of iteration 2
• Iteration two will be completed this week and iteration three will begin Monday of next week
• Work on the project is scheduled for completion on– October 25, 2011
12
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
CHDX Platform Upgrade
13
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
CHDX Platform Upgrade
• Migration from Mainframe onto Mid-Range Platform• Reduction of Support Costs• Minimization of Manual Intervention• Improved Processing Time• Future Enhancements to the System are made
Possible– Improved Data Quality– Risk Reduction
14
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Current Progress
• Preliminary Validations of Inbound File Format– Ensures that uploaded content is readable by the CHDX
system
• Upload of a File via Web UI– Will Replace MyRailPartner
• Parsing of the EDI414 File– Needed for conversion into 1400 flat file
15
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved
Project Status
• Environment Set-up has been Completed (IT0)– The Proof of Theory of the Common DX has already been
validated during the SSDX Project
• Iteration 1 began on April 26th
• Project Completion Date: December 7th
• First Month Utilized in Production: February 2012
16
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved 17
Questions?
7001 Weston Parkway, Suite 200, Cary, NC 27513 –877.724.5462 -- www.railinc.com
©Railinc 2010 All Rights Reserved ©Railinc 2010 All Rights Reserved 18
Contact us:
7001 Weston Parkway, Suite 200, Cary, NC 27513 –877.724.5462 -- www.railinc.com