Rail Electrification in India

‘IR to achieve 100% electrification – Implementation Challenges &

Suggestions’

Mr. Manish Agarwal, Siemens Limited.

Rail Urja Pavilion, Hall No. 16, Elecrama

21st January, 2020

siemens.com/mobilityUnrestricted © Siemens AG 2019

Frei verwendbar © Siemens AG 2019

Page 2 Mobility Division

Overview for Rail Electrification - IR

1

4

3

2

Present

Situation

Need of Indian

Railways

Options

Solutions

• 100% electrified rail network in next two-three years

• 10,500 Crore annual savings after railway goes full electric

• > 30,000 kms to be electrified – project cost to be 30-35K Crores.

• Emphasis on Diesel

• Annual Savings to the tune of INR 10,500 crores envisaged

• Indian Railways could borrow from ADB or equivalent.

• Funds to be made available through LIC , IRFC and internal funding

• Turnkey contract from large EPC players - ongoing

• Larger contract size of 1500-2000 km

• Global players to bring in new methods, Design, mechanized

installation to increase the pace of electrification rapidly.

?

?

Actual Achievements (in RKM) Targets for Rail Electrification in RKM

2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2020-21

1375 1605 2050 4082 5300 Approx. 7500 10319 10500

Frei verwendbar © Siemens AG 2019

Page 3 Mobility Division

Four type of projects, which requires different approaches.

To innovate and improve needs to focus on right settings.

Green Field

Project with

customer who

had no

electrified track

before

Brown Field

Project with

customer who

had electrified

other tracks

before (incl.

Refurbishment)

Upgrade

technology /

speed / capacity

upgrade of

electrified track

Maintenance

(can also incl.

Refurbishment

done my

maintainer)

Components

Needed for green

field, brown field,

upgrade and

maintenance

Green

Field

Brown

Field

Upgrade

Mainte-

nance

Po

ss

ible

so

luti

on

s!

Pro

babili

ty &

Possib

ilities to influence

custo

mers

desig

n

Preferred focus areas for

Indian Market!

Frei verwendbar © Siemens AG 2019

Page 4 Mobility Division

Sicat plattform

Contact line systems for every task – tailored based on requirements

≤ 80 km/h Sicat 3S ‒

≤ 120 km/h Sicat LD ‒

≤ 160 km/h Sicat SD Sicat SR

≤ 200 km/h Sicat SR Sicat LA

≤ 250 km/h Sicat HD Sicat SA / Sicat SX

> 230 km/h ‒ Sicat HA

DC ACRunning speedApart from economy, longevity and

consistently high quality are the key features

of the Sicat contact line systems.

They permit a high running quality, long

service live, low LCC and comply with both

national and international standards.

Siemens – with more than 138 years

experience electrical railways - is releasing

an adjusted OCL system for projects based

on Sicat plattform solution. Therefore all

requirements could be met (e.g. PAN,

environment, operational & RAMS

requirements, …).

c

o

n

si

st

ofSicat 8WL (EN 50119/IEC 60913 tested!)

Sicat CMS, Sicat DMS, Sicat PMS, …

Frei verwendbar © Siemens AG 2019

Page 5 Mobility Division

SICAT Components

Frei verwendbar © Siemens AG 2019

Page 6 Mobility Division

We electrify rail.

Smart rail electrification

We power rail.

Solutions for

traction power supplies

We make rail smart.

Solutions for rail

electrification of the future

We manage rail.

Solutions for

power system management

Overview

We wire rail.

Solutions for

contact lines

siemens.com/rail-electrification

What may be considered for fast track Rail

Electrification e.g. Modular Aluminum Cantilevers?

Frei verwendbar © Siemens AG 2019

Page 7 Mobility Division

Reasons to adopt….Modular Cantilever

❑ Less number of components, clear interfaces, faster installation & adjustments, lower maintenance

& high availability

Frei verwendbar © Siemens AG 2019

Page 8 Mobility Division

Example: Preassembling of low weight cantilevers with composite

insulators

Delivery (1) or preassembly by installation company (2) – customer’s choice

Preparing for transport, stacked, marked and sorted for easy

installationTransportation on site

1

2

Frei verwendbar © Siemens AG 2019

Page 9 Mobility Division

Example: Installation of low weight preassembled cantilevers with

composite insulators

Prepare

installation

Installation without crane (approx. 35 kg/cantilever),

only 2 workers on platform neededInstallation

Frei verwendbar © Siemens AG 2019

Page 10 Mobility Division

We electrify rail.

Smart rail electrification

We power rail.

Solutions for

traction power supplies

We make rail smart.

Solutions for rail

electrification of the future

We manage rail.

Solutions for

power system management

Overview

We wire rail.

Solutions for

contact lines

siemens.com/rail-electrification

What should be considered to optimize costs

and increase speed of existing lines?

Frei verwendbar © Siemens AG 2019

Page 11 Mobility Division

LCC Cost optimizations in Design, Implementation and

construction of OCL

Lever for Optimization (should be

possible within tender specification!)

⮚ Increase of Span Length

⮚ Increase of Tensioning Length

⮚ System optimization based on TPS network

studies

⮚ Innovative products and components

⮚ Adapt products which require minimum /

zero modification during further upgrade to

high speed

⮚ Digitalization

⮚ Installation plan & technology

Engineering Manufacturing PurchaseAdministration,

Sales

100 %

80 %

60 %

40 %

20 %

70 %

6 %

20 %

36 %

7 %

40 %

3 %

18 %

Cost definition

Cost development

% p

rim

e c

osts

Development process

Source FH Deggendorf &

VDI Richtlinie 2235

»Well done engineering with overall

coordination and logistics concepts will keep

project timeline and budget relaxed ☺

Frei verwendbar © Siemens AG 2019

Page 12 Mobility Division

IR preparedness for Mainline RE // Key concerns

- Funds are available and sanctioned.

- Availability of skilled manpower ?

- Availability of electric locomotives?

- Lack of capacity for production from approved RDSO/ CORE suppliers.

- EPC tenders don’t allow for design flexibility.

- No lever for Design optimization is provided.

- Timelines for execution is limited considering the powerbock activities , especially in hilly terrain.

Frei verwendbar © Siemens AG 2019

Page 13 Mobility Division

Innovations in the field of contact lines –

possible with less restricted specifications

Digitalization in planning, development and

constructionNew models

Assembly

technologyDigitalization in operation

and maintenance

Recording, evaluation and

validation of RAMS/LCC

New overhead line

components

Frei verwendbar © Siemens AG 2019

Page 14 Mobility Division

Smart data opens opportunities –data collection and analysis

Frei verwendbar © Siemens AG 2019

Page 15 Mobility Division

We electrify rail.

Smart rail electrification

We power rail.

Solutions for

traction power supplies

We make rail smart.

Solutions for rail

electrification of the future

We manage rail.

Solutions for

power system management

Overview

We wire rail.

Solutions for

contact lines

siemens.com/rail-electrification

Reliable & approved Sicat components and

systems, domain know-how in overall and

specific engineering disciplines mixed with

a portion of innovation, automation &

digitalization will result in the best in class

life cycle cost optimized contact line

solutions delivered by RE@Siemens!

Frei verwendbar © Siemens AG 2019

Page 16 Mobility Division

Example – RE Programme Denmark

Frei verwendbar © Siemens AG 2019

Page 17 Mobility Division

Rail Electrification across all continents