quick change installation and operation manual document ... series base t… · quick change....

56
Quick Change Installation and Operation Manual Document #9620-20-B-110 Series Base Tool Changer-25 Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-1 Table of Contents B. Base Tool Changer .................................................................................................................B-3 QC-110 Series—Robotic Tool Changer ......................................................................................B-3 1. Product Overview ..................................................................................................................B-3 1.1 Master Plate Assembly ............................................................................................................. B-4 1.2 Tool Plate Assembly.................................................................................................................. B-5 1.3 Optional Modules ...................................................................................................................... B-5 2. Installation .............................................................................................................................B-6 2.1 Master Interface ......................................................................................................................... B-7 2.2 Master Plate Installation ........................................................................................................... B-7 2.3 Master Plate Removal ............................................................................................................... B-8 2.4 Tool Interface ............................................................................................................................. B-9 2.5 Tool Plate Installation ............................................................................................................... B-9 2.6 Tool Plate Removal ................................................................................................................. B-10 2.7 Pneumatic Connections ..........................................................................................................B-11 2.7.1 Valve Requirements and Connections for the Locking Mechanism .............................. B-11 2.8 Electrical Connections............................................................................................................ B-12 2.8.1 PNP Type Lock and Unlock Sensors (-SD,-SG,-SGH,-SEH,-SMH,-STH,-SM,-SFB sensor designation) ...................................................................................................................B-12 2.8.2 NPN Type Lock and Unlock Sensors (-SE,-SF,-SP,-SU sensor designation)................B-12 2.8.3 2-Wire DC Type Lock and Unlock Sensors (-SK sensor designation) ..........................B-13 3. Operation .............................................................................................................................B-14 3.1 Conditions for Coupling ......................................................................................................... B-15 3.2 Fail-Safe Operation ................................................................................................................. B-16 3.3 Conditions for Uncoupling ..................................................................................................... B-16 3.4 Tool Identification.................................................................................................................... B-16 3.5 Tool Storage Considerations ................................................................................................. B-17 4. Maintenance.........................................................................................................................B-18 4.1 Preventive Maintenance ......................................................................................................... B-18 4.2 Cleaning and Lubrication of the Locking Mechanism and Alignment Pins....................... B-19 4.3 Pin Block Inspection and Cleaning ....................................................................................... B-21 5. Troubleshooting and Service Procedures ........................................................................B-22 5.1 Troubleshooting Procedures ................................................................................................. B-22 5.2 Service Procedures ................................................................................................................. B-24 5.2.1 V-ring Seal Replacement...............................................................................................B-24 5.2.2 Alignment Pin Replacement ..........................................................................................B-25

Upload: lethu

Post on 05-Feb-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-1

Table of ContentsB. Base Tool Changer .................................................................................................................B-3QC-110 Series—Robotic Tool Changer ......................................................................................B-31. Product Overview ..................................................................................................................B-3

1.1 Master Plate Assembly ............................................................................................................. B-4

1.2 Tool Plate Assembly .................................................................................................................. B-5

1.3 Optional Modules ...................................................................................................................... B-5

2. Installation .............................................................................................................................B-62.1 Master Interface ......................................................................................................................... B-7

2.2 Master Plate Installation ........................................................................................................... B-7

2.3 Master Plate Removal ............................................................................................................... B-8

2.4 Tool Interface ............................................................................................................................. B-9

2.5 Tool Plate Installation ............................................................................................................... B-9

2.6 Tool Plate Removal ................................................................................................................. B-10

2.7 Pneumatic Connections ..........................................................................................................B-112.7.1 Valve Requirements and Connections for the Locking Mechanism ..............................B-11

2.8 Electrical Connections ............................................................................................................ B-122.8.1 PNP Type Lock and Unlock Sensors (-SD,-SG,-SGH,-SEH,-SMH,-STH,-SM,-SFB sensor

designation) ...................................................................................................................B-12

2.8.2 NPN Type Lock and Unlock Sensors (-SE,-SF,-SP,-SU sensor designation) ................B-12

2.8.3 2-Wire DC Type Lock and Unlock Sensors (-SK sensor designation) ..........................B-13

3. Operation .............................................................................................................................B-143.1 Conditions for Coupling ......................................................................................................... B-15

3.2 Fail-Safe Operation ................................................................................................................. B-16

3.3 Conditions for Uncoupling ..................................................................................................... B-16

3.4 ToolIdentification .................................................................................................................... B-16

3.5 Tool Storage Considerations ................................................................................................. B-17

4. Maintenance .........................................................................................................................B-184.1 Preventive Maintenance ......................................................................................................... B-18

4.2 Cleaning and Lubrication of the Locking Mechanism and Alignment Pins ....................... B-19

4.3 Pin Block Inspection and Cleaning ....................................................................................... B-21

5. Troubleshooting and Service Procedures ........................................................................B-225.1 Troubleshooting Procedures ................................................................................................. B-22

5.2 Service Procedures ................................................................................................................. B-245.2.1 V-ring Seal Replacement ...............................................................................................B-24

5.2.2 Alignment Pin Replacement ..........................................................................................B-25

Page 2: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-2

5.2.3 Rubber Bushing Replacement ......................................................................................B-26

5.2.4 Lock and Unlock Sensor Replacement Procedures ......................................................B-27

5.2.5 RTL Sensor Replacement Procedures ..........................................................................B-31

6. Serviceable Parts ................................................................................................................B-356.1 Common Parts (Alignment Pins, Rubber Bushings and Master plates) ............................ B-35

6.2 Models 9120-110xM-000-000-SD, 9120-110xM-000-000-SD-RD, 9120-110xM-000-000-SE and 9120-110xM-000-000-SF .......................................................................................................... B-36

6.3 Models 9120-110xM-000-000-SK ............................................................................................ B-37

6.4 Models 9120-110xM-000-000-SGH and 9120-110xM-000-000-SEH ...................................... B-38

6.5 Models 9120-110xM-000-000-S0 ............................................................................................. B-39

6.6 Models 9120-110xM-000-000-SMH and 9120-110xM-000-000-STH ...................................... B-40

6.7 Models 9120-110xM-000-000-SM, 9120-110xM-000-000-SP, 9120-110xM-000-000-ST and 9120-110xM-000-000-SU ......................................................................................................... B-41

6.8 Models 9120-110xM-000-000-SFB .......................................................................................... B-42

6.9 Models 9120-110xT-000-000 .................................................................................................... B-43

7. Specifications ......................................................................................................................B-448. Drawings ..............................................................................................................................B-45

8.1 QC-110 Tool Changer, NPT ..................................................................................................... B-45

8.2 QC-110 Tool Changer, 1/4 BSPT Ports .................................................................................. B-49

8.3 QC-110 Tool Changer, 1/4 BSPP Ports .................................................................................. B-53

Page 3: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-3

B. Base Tool Changer

QC-110 Series—Robotic Tool Changer1. Product Overview

The Quick Change Tool Changer provides flexibility to robot applications by allowing the robot to change customer tooling (e.g., grippers, vacuum cup tooling, pneumatic and electric motors, weld guns, etc.) automatically. The Tool Changer consists of a Master plate and a Tool plate. The Master plate is attached to a robot while end-effectors such as grippers, material handlers, etc. are attached to one or more Tool plates.

The Master plate, installed on the robot arm, locks to the Tool plate with a pneumatically driven locking mechanism. This locking mechanism uses a patented, multi-tapered cam with ball locking technology and a patented fail-safe mechanism.

In operation, the robot can be programmed to select the desired customer tooling by coupling the Master plate to the Tool plate. Electrical signals, pneumatic power, vacuum, and fluids can be transferred to the customer tooling through the Master plate and Tool plate by optional modules and ports. See the respective manuals for these options for more details on their operation.

A Tool Changer enhances the flexibility and reliability of a robotic cell. Robotic Tool Changers are used in automated Tool change applications, as well as manual Tool change operations. Robotic Tool Changers also provide a method for quick Tool change for maintenance purposes.

For the most current product information and specifications on the QC-110 Series of Tool Changers, please click the following link: QC-110 Series

Page 4: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-4

1.1 Master Plate AssemblyThe Master plate assembly includes an anodized aluminum body, a hardened stainless-steel locking mechanism, and hardened steel alignment pins (see Figure 1.1).The Master plate has (2) flat sides for mounting of optional modules.The locking mechanism consists of a cam, a male coupling, and chrome-steel ball bearings. Tapered pins located on the Master plate mate with bushings in the Tool plate to ensure repeatable alignment during the coupling process. An extreme pressure grease is applied to the cam, male coupling, ball bearings, and pins to enhance performance and maximize the life of the Master plate assembly.1/8 NPT (or BSPP) port connections are available to supply air pressure for coupling and uncoupling the Tool Changer.There are (8) 3/8 NPT (or BSPP) port connections available for pass through air for supplying air to tools.Proximity sensors are designed into the body of the Master plate to detect Lock and Unlock positions of the locking mechanism. The sensors provide “lock” and “unlock” signals through the control/signal Master module. For DeviceNet applications, a proximity sensor is installed into the body of the Master plate to verify Tool plate presence when coupled. The sensor provides a ready-to-lock (RTL) signal through the control/signal Master module. For non-DeviceNet control/signal module applications, the RTL sensor can be ordered separately. A mounting pattern is machined into the Master plate for mounting to a robot arm or a robot interface plate.

Figure 1.1—Master Plate AssemblyAlignment Pins (2)

Ball Bearing (6)

Proximity SensorAssembly Location(Lock/Unlock Signal)

Male CouplingCam

Proximity SensorAssembly Location(RTL Signal)

1/8" NPT or BSPPLock and Unlock Ports

3/8" NPT or BSPPAir Ports (8)

Flat A

Flat B

Page 5: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-5

1.2 Tool Plate AssemblyThe Tool plate assembly includes an anodized aluminum body and a hardened stainless-steel bearing race. The Tool plate has (2) flat sides for mounting of optional modules. The Tool plate body also includes a 125mm BC machined mounting pattern for mounting to a customer tooling or a tooling interface plate.There are (8) 3/8 NPT (or BSPP) port connections available for pass through air for supplying air to tools.

Figure 1.2—Tool Plate Assembly

3/8” NPT or BSPPAir Ports (8)

Alignment Pin Bushing (2)Proximity Sensor Target (RTL)

Bearing Race

Flat A

Flat B

1.3 Optional ModulesThere are (2) flats available for mounting of the optional modules for support of various utility pass through, such as signal, fluid/air, vacuum, and electric.For assistance in choosing the right modules for your particular application, visit our website (QC-110 Series) and click on the Compatible Modules tab to see what is available or contact an ATI Sales Representative directly

Page 6: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-6

2. InstallationAll fasteners used to mount the Tool Changer to the robot and to customer’s tooling should be tightened to a torque value as indicated in Table 2.1. Furthermore, removable (blue) Loctite 242® must be used on these fasteners. Table 2.1 contains recommended values based on engineering standards.

WARNING: Do not perform maintenance or repair on Tool Changer or modules unless the Tool is safely supported or docked in the tool stand, all energized circuits (e.g. electrical, air, water, etc.) are turned off, pressurized connections purged and power discharged from circuits in accordance with the customer’s safety practices and policies. Injury or equipment damage can occur with Tool not docked and energized circuits on. Dock the Tool safely in the tool stand, turn off and discharge all energized circuits, purge all pressurized connections, verify all energized circuits are de-energized before performing maintenance or repair on Tool Changer or modules.

WARNING: Do not use lock washer under the head of the mounting fasteners or allow the mounting fasteners to protrude above the mating surfaces of the Master and Tool plates. Allowing fasteners to protrude above the mating surface will create a gap between the Master and Tool plates and not allow the locking mechanism to fully engage, this can cause damage to equipment or personal injury. Make sure the mounting fasteners are flush or below the mating surfaces of the Master and Tool plates.

Head of Mounting Fastener Must Be Flush orBelow Mating Surface. (Do Not Use Lock

Washer under Head of Mounting Fastener).Mating Surface

CAUTION: Do not use fasteners that exceed the thread depth in the Tool Changer. Refer to Section 8—Drawings for details on mounting hole thread depth. Secure the Tool Changer with the proper length fasteners. This is true for both robot and tool interfaces.

Table 2.1—FastenerSize,Class,andTorqueSpecifications

Mounting conditions Fastener Size & Property Class

Recommended Torque

Master plate to Robot Interface Plate (6061-T6 aluminum) Minimum thread engagement of 15mm (0.59”) [1.5X fastener Ø].

Confirm available engagement with Robot Manufacturer

M10-1.5Class 12.9

52 N-m(38 ft-lbs.)

MasterplatetoRobot(steel;USS≥90KSI)Minimum thread engagement of 10mm (0.39”) [1.0X fastener Ø].

Confirm available engagement with Robot Manufacturer

M10-1.5Class 12.9

75 N-m(55 ft-lbs.)

Tool Interface Plate (aluminum) to Tool plateMinimum thread engagement of 15mm (0.59”) [1.5X fastener Ø].

Do not exceed maximum available thread depth of 20mmas shown in Section 8—Drawings

M10-1.5Class 12.9

52 N-m(38 ft-lbs.)

Page 7: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-7

2.1 Master InterfaceThe Master plate is attached to the robot arm. The Master plate is designed with mounting features such as a boss and/or bolt and dowel holes. These features are used to accurately position and secure the Master plate to the robot arm or it may be necessary for a robot interface plate (RIP) to be utilized to adapt the Master plate to a specific robot arm. Custom RIPs are available from ATI upon request. (Refer to Section 8—Drawings of this manual for technical information on mounting features.) If the customer chooses to design and build a robot interface plate, the following should be considered:• The interface plate should be designed to include bolt holes for mounting, dowel pins, and a boss for

accurate positioning on the robot and Master plate. (Refer to robot manual.) (The dowel and boss features are important to prevent rotation.)

• The thickness of the interface plate must be great enough to provide the necessary thread engagement for the mounting bolts.

• Mounting bolts should not be too long, such that a gap is formed at the interface.

• The interface plate must be properly designed to provide rigid mounting to the Master plate.

• The interface plate design should take into account clearances required for Tool Changer module attachments and accessories.

2.2 Master Plate Installation1. Make sure the mounting surface of the Master plate and robot arm or RIP are clean and free of debris.2. If required, install the RIP to the robot arm, align using the boss or dowel pins and secure with customer

supplied fasteners.3. Align the dowel pins to the corresponding holes in the Master plate and secure the Master plate to the

robot arm or RIP with customer supplied (10) M10-1.5 socket head cap screws. Apply Loctite 242 to threads (see Table 2.1 for proper fasteners and torque).

NOTICE: If an ATI RIP is used, fasteners to mount the Master plate to the RIP is supplied with the RIP. The fasteners to mount the RIP or the Master plate directly to the robot is customer supplied.

4. Connect utilities to the appropriate modules and Master plate connections.

Page 8: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-8

Figure 2.1— Typical Master Plate Installation

Robot Arm

Robot Interface Plate (Customer Supplied)(If required)

M10-1.5 Socket Head Cap Screws (10)(Customer Supplied)

Master Plate

Dowel Pin (2)

Socket Head Cap Screws(Customer Supplied)

(Customer Supplied)

2.3 Master Plate RemovalNOTICE: Depending on maintenance or repair being performed, utilities to modules and Master plate may need to be disconnected.

1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear access to the Master and Tool plates.

2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 3. Disconnect the utilities from the Master plate and attached modules.4. Remove the M10-1.5 socket head cap screws connecting the Master plate to the robot arm or RIP.

Page 9: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-9

2.4 Tool InterfaceThe Tool plate is attached to customer’s tooling. The Tool plate is designed with mounting features such as a recess and/or bolt and dowel holes. These features are used to accurately position and secure the customer’s tooling. A tool interface plate may be utilized to adapt the Tool plate to customer’s tooling that is not compatible with the Tool plate mounting features. Custom tool interface plates can be supplied by ATI to meet customer’s requirements (see Figure 2.2) (Refer to the application drawing).If the customer chooses to design and build a tool interface plate, the following should be considered:• The tool interface plate should be designed to include bolt holes for mounting, dowel pins, and a boss

that mates with Tool plate recess for accurate positioning. (The dowel and boss features are important to prevent rotation)

• The locating boss height should not exceed 0.16” (4 mm).

• The thickness of the interface plate must be great enough to provide the necessary thread engagement for the mounting bolts. Fasteners should be chosen to meet minimum recommended engagement lengths while not exceeding the maximum available thread depth. Use of bolts that are too long can cause damage to the tool side changer.

• The plate design should take into account clearances required for Tool Changer module attachments and accessories.

• The tool interface plate should be designed with a hole in its center to allow for manually returning the locking mechanism to the unlocked position under adverse conditions (i.e. unintended loss of power and/or air pressure). The center access hole should be kept small [minimum recommended hole diameter: 1” (25.4 mm)] to prevent debris from contaminating the locking mechanism while operating in dirty environments.

2.5 Tool Plate Installation1. Make sure mounting surface of the Tool plate and tool interface plate or customer tooling is clean and

free of debris.2. If required, install the tooling interface plate to the customer tooling, align using the boss or dowel pins

and secure with customer supplied fasteners. 3. Align the dowel pins to the corresponding holes in the Tool plate and secure the Tool plate to the tool

interface plate or customer tooling with customer supplied fasteners. Apply Loctite 242 to threads (see Table 2.1).

NOTICE: If an ATI tool interface plate is used, fasteners to mount the Tool plate to the tool interface plate may be supplied with the tool interface plate. The fasteners to mount the tool interface plate or the Tool plate directly to the customer tooling is customer supplied.

4. Connect utilities to the appropriate module and Tool plate connections.

Page 10: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-10

Figure 2.2—Standard Tool Plate Installation (110CZT Shown)

Tool Plate

Dowel Pins (Customer Supplied)

Tool Interface Plate(Customer Supplied)(If required)

M10-1.5 Socket Head Cap Screws(Refer to Table 2.1)

(Customer Supplied)

2.6 Tool Plate RemovalNOTICE: Depending on maintenance or repair being performed, utilities to modules and Tool plate may need to be disconnected.

1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear access to the Master and Tool plates.

2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 3. Disconnect the utilities from the Tool plate and attached modules. 4. Remove the fasteners connecting the Tool plate to the tooling or tool interface plate.

Page 11: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-11

2.7 Pneumatic ConnectionsThe air supply used for coupling and uncoupling the Tool Changer should be clean, dry, and non-lubricated. A supply pressure in the range of 60 to 100 psi is acceptable for operation of the locking mechanism, with a setting of 80 psi suggested. The air should be filtered 50 micron or better.

CAUTION: Do not use the Tool Changer in a fail-safe condition. Do not transport the Tool Changer in a fail-safe condition. Possible damage to the locking mechanism could occur. Re-establish air pressure to Tool Changer before returning to normal operations.

2.7.1 Valve Requirements and Connections for the Locking MechanismWhen an air adapter module is utilized that does not contain an integrated solenoid valve, it is required that a customer supplied 2-position 4-way or 5-way valve be used to actuate the locking mechanism in the Master plate. It is imperative that when air is supplied to the Lock or Unlock Port on the Master plate, that the opposite port be vented to atmosphere (i.e., when air is supplied to the Lock Port, the Unlock Port must be open to the atmosphere.) Failure to vent trapped air or vacuum on the inactive port may inhibit proper shuttling of the valve and prevent coupling/uncoupling from occurring.

CAUTION: The locking mechanism will not function properly when connected to a single 3-way valve as this type of valve is incapable of venting trapped air pressure from within the Tool Changer. This could result in damage to the product, attached tooling, or personnel. Connect the Lock and Unlock supply air to a 2-position 4-way or 5-way valve.

Figure 2.3—Lock and Unlock Pneumatic Connections

4 or 5 -way Valve

Supply Clean, Dry, Non-lubricated Air 60 – 100 psi (4.1 – 6.9 Bar)Exhaust

Open to AtmosphereLock Port

Unlock Port

Page 12: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-12

2.8 Electrical ConnectionsThe Tool Changer is available with integrated lock/unlock sensors. If sensors are not used, plugs will be provided to seal the locking mechanism. If a control/signal module is to be utilized on Flat A when ordered, the sensors will be connected to the module prior to shipping.

2.8.1 PNP Type Lock and Unlock Sensors (-SD,-SG,-SGH,-SEH,-SMH,-STH,-SM,-SFB sensor designation)These sensors are used on 9120-110AM-000-000-SD, 9120-110AM-000-000-SG, 9120-110AM-000-000-SGH, 9120-110AM-000-000-SEH, 9120-110AM-000-000-SMH, 9120-110AM-000-000-STH, 9120-110AM-000-000-SM, and 9120-110AM-000-000-SFB.

Table 2.2—PNP (Current Sourcing)Description ValueVoltage Supply Range 10-30 VDCOutput Current < 150 mANominal Sensing Distance Sn 2.0 mmOutput Circuit PNP make function (NO)

Figure 2.4—PNP Type Lock and Unlock Sensors

(3) BlueBrown (1)

(4) BlackBrown (1)

Black (4)

Blue (3)

+Vs

Output

0 V

PNPZ

ConnectorPNP (Current Sourcing)

2.8.2 NPN Type Lock and Unlock Sensors (-SE,-SF,-SP,-SU sensor designa-tion)These sensors are used on 9120-110AM-000-000-SE, 9120-110AM-000-000-SF, 9120-110AM-000-000-SP, and 9120-110AM-000-000-SU.

Table 2.3—NPN (Current Sinking)Description ValueVoltage Supply Range 10-30 VDCOutput Current < 200 mANominal Sensing Distance Sn 2.0 mmOutput Circuit NPN make function (NO)

Figure 2.5—NPN Type Lock and Unlock Sensors

(3) BlueBrown (1)

(4) BlackBrown (1)

Black (4)

Blue (3)

+Vs

Output

0 V

NPNZ

ConnectorNPN (Current Sinking)

Page 13: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-13

2.8.3 2-Wire DC Type Lock and Unlock Sensors (-SK sensor designation)These sensors are used on 9120-110AM-000-000-SK.

Table 2.4—DC (Current Sinking)Description ValueVoltage Supply Range 10-30 VDCOutput Current < 100 mANominal Sensing Distance Sn 2.0 mmOutput Circuit DC make function (NO)

Figure 2.6—DC Type Lock and Unlock Sensors

Brown

Blue

+Vs

0 V

DC

DC (Current Sinking)

Page 14: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-14

3. OperationThe Master locking mechanism is pneumatically driven to couple and uncouple with the bearing race on the Tool plate. The Master plate utilizes air ports from an air or air/valve adapter module to provide lock and unlock pressure to the locking mechanism.

CAUTION: Safe, reliable operation of the Tool Changer is dependent on a continuous supply of compressed air at a pressure of 60 to 100 psi. Robot motion should be halted if the air supply pressure drops below 60 psi for any reason.

NOTICE: All Tool Changers are initially lubricated using MobilGrease® XHP222 Special grease. The end user must apply additional lubricant to the locking mechanism components and alignment pins prior to start of service (See Section 4.2—Cleaning and Lubrication of the Locking Mechanism and Alignment Pins). Tubes of lubricant for this purpose are shipped with every Tool Changer. Note: MobilGrease® XHP222 Special is a NLGI #2 lithium complex grease with molybdenum disulfide.

The robot should be programmed to minimize misalignment during coupling and uncoupling. Additionally, the tool stand should be durable and not allow deflection, under uncoupled Tool weight that will take alignment of the Tool Changer plates outside of accepted offsets. See Figure 3.1 and Table 3.1 for recommended maximum allowable offsets prior to coupling. In some cases, greater offsets than shown in Table 3.1 can be accommodated by the Master and Tool plates but will increase wear.

Lock-up should occur with the Master plate in the No-Touch™ locking zone (see Table 3.1) but not touching the Tool plate. As locking occurs, the Master plate should draw the Tool plate into the locked position.

Figure 3.1—OffsetDefinitions

Cocking Offset(About X and Y)

Twisting

Tool Plate

Master Plate

X

X, Y, and Z OffsetY

Z

Table 3.1—Maximum Recommended Offsets Prior to Coupling

ModelNo-Touch Zone Z

Offset (Max)1

X and Y Offset (Max) 2

Cocking Offset (Max)

Twisting Offset (Max)

QC-110 0.12”(3 mm)

±0.04”(1 mm)

±0.7° ±1°

Notes: 1. Maximum values shown. Decreasing actual values will minimize wear during coupling/uncoupling.2. Actual allowable values may be higher in some cases but higher offsets will increase wear during coupling.

Page 15: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-15

3.1 Conditions for CouplingCAUTION: Do not couple Tool Changer when in locked position. The locking mechanism must be in the unlock position when attempting to couple the Tool Changer. Failure to adhere to this condition may result in damage to the unit and/or the robot. Always unlock the Master prior to coupling to a Tool.

1. Verify the Tool Changer locking mechanism is in the Unlocked position by removing air pressure from the Lock Port and supplying air pressure to the Unlock Port (if equipped, the Unlock sensor will indicate the Tool Changer is in the Unlocked position).

2. Position the Master above the Tool, and move the Master into the ready to lock position. The mating surfaces of the Master and Tool should be parallel and not touching. When the Master’s tapered alignment pins enter the alignment holes and bushings on the Tool, the pins should be relatively concentric (without contact) to the alignment bushings.

3. When coupled, it is recommended that the mating faces of the Master and Tool not touch but be within the No-Touch™ distance, listed in Table 3.1, of each other so that stress and wear is minimal on the locking mechanism. The locking mechanism allows the Master to “pull up” the Tool with gaps between the two sides.

CAUTION: Direct contact of the Master and Tool mating surfaces is not suggested or required just prior to coupling. Contact may result in damage to the unit and/or the robot. No-Touch™ locking technology allows the unit to couple with a separation distance between the Master and Tool.

4. If equipped, the RTL (Ready-To-Lock) sensor and target in the Tool Changer must be positioned within approximately 0.05” (1.5 mm) of each other for the sensors to detect Tool presence. This allows detection of Tool proximity to the Master prior to coupling. RTL signals are not required to couple the Tool Changer but serve as further confirmation that the plates are coupled before removing the Tool from the tool stand.

NOTICE: At this point, communication is initiated with the ATI Tool and downstream nodes. If equipped, Tool-ID and communications becomes available shortly after.

5. Couple the Tool Changer by releasing the air pressure from the Unlock Port and suppling air pressure to the Lock Port. When the Tool Changer locking mechanism moves to the locked position, the Tool plate will draw toward the Master plate and couple together. Air must be maintained on the Lock Port during operation to assure rigid coupling (if equipped the Lock sensor will indicate the Tool Changer is in the Locked position).

6. A sufficient delay must be programmed between locking valve actuation and robot motion so that the locking process is complete before moving the robot. If equipped with Lock and Unlock sensors, the Lock signal should read “on” (true), and the Unlock signal should read “off” (false).

Before another attempt to couple the Tool Changer, the locking mechanism must be in the Unlock state. Otherwise, damage could occur to the robot and/or the Tool Changer.

Page 16: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-16

3.2 Fail-Safe OperationA fail-safe condition occurs, when there is an unintended loss of lock air pressure to the Master plate. Without this air pressure, the Tool Changer looses rigidity, and there may be a slight separation between the Master and Tool plates. The lock sensor may indicate that the unit is not locked. ATI’s patented fail-safe feature uses a multi-tapered cam to trap the ball bearings and prevent an unintended release of the Tool plate. Positional accuracy of the tooling will not be maintained during this fail-safe condition. The Tool Changer is not to be operated in the fail-safe condition. Once source air is lost to the unit, movement should be halted until air pressure is restored. When air pressure is re-established to the Master plate, the locking mechanism will energize and securely lock the Master and Tool plates together. If equipped, make sure the lock sensor indicates the Tool Changer is in the locked position before resuming normal operations. It may be necessary to consult the Control/Signal Module Manual for specific error recovery information.

CAUTION: Do not use the Tool Changer in a fail-safe condition. Do not transport the Tool Changer in a fail-safe condition. Possible damage to the locking mechanism could occur. Re-establish air pressure to Tool Changer before returning to normal operations.

3.3 Conditions for Uncoupling1. Move the robot to position the Tool plate in the tool stand. The Position will be in the same location as

when coupling took place.2. Uncouple the Tool Changer by releasing the air pressure from the Lock port and supplying air pressure

to the Unlock port (If equipped, the Unlock sensor will indicate the Tool Changer is in the Unlocked position).

3. A sufficient delay must be programmed between the Unlock output being activated and reading the state of the Lock/Unlock signals, so that the coupling process is completed before checking the Locked state.

4. A sufficient delay must be programmed between unlocking valve actuation and robot motion so that the unlocking process is complete before moving the robot. If equipped with Lock and Unlock sensors, the Unlock signal should read “on” (true) and the Lock signal should read “off” (false). Any other condition indicates a problem and the robot program should be halted. Once the Lock and Unlock signals are verified to be in the proper state, the Master plate may be moved away from the Tool plate in the axial direction.

The robot and Master plate can now proceed to another Tool plate for coupling and subsequent operations.

3.4 ToolIdentificationWhen using multiple Tools, it is good practice to implement a Tool-ID system that identifies each Tool with a unique code. This can be used to verify that the robot has picked up the proper Tool. Modules with Tool-ID are available from ATI. Refer to our Web site http://www.ati-ia.com/products/toolchanger/tool_changer_modules.aspx for products available to your specific application or contact ATI for recommendations and assistance.

Page 17: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-17

3.5 Tool Storage ConsiderationsCAUTION: Tool stand design is critical to proper operation of the Tool Changer. Improperly designed tool stands can cause misalignments that will cause jamming and/or excessive wear of Tool Changer components.

The Tool plates with customer tooling attached may be stored in a tool stand when not being used by the robot. ATI provides compatible tool stands designed for durability, longevity, and maximum adaptability to fit most customers’ applications. The ATI TSM (Tool Stand Medium) system is compatible with ATI Tool Changer sizes QC-20 to QC-110. The TSM systems can be equipped with horizontal modules, clamp modules, and different types of tool sensing. Visit the ATI Web Site http://www.ati-ia.com/products/toolchanger/toolstand/medium/MediumStand.aspx for products available for your specific application or contact ATI for recommendations and assistance.If the customer is supplying the tool stand, it should be designed to provide fixed, repeatable, level, and stable positions for tool pick-up and drop-off. The tool stand must support the weight of the Tool Changer Tool plate, tool interface plate, optional modules, cables, hoses, and customer tooling without allowing deflection in excess of the offsets specified in Section 3—Operation.Ideally, the tool should be hanging vertically in the tool stand so that gravity assists in uncoupling the Tool plate from the Master plate during unlocking. It is possible to design tool stands that hold tools in the horizontal position but care must be taken for the necessary compliance during coupling and uncoupling. In general, “horizontal-position” tool stands cause more wear on the locking mechanism and locating features of the Tool and tool stand. A variety of methods may be used to position the Tool in the tool stand. A common method is to use tapered alignment pins and bushings. Robot programming and positional repeatability are vital in tool pick-up and drop-off, refer to Section 3—Operation.On the tool stand, it is highly recommended that the customer provide a sensor detecting the presence of a properly seated Tool in the tool stand. The sensor may be used prior to coupling to ensure there is a Tool properly seated in the stand. A sensor may also be used as the robot starts to move away after uncoupling. This provides a safety measure in the event that a Tool should become jammed in the stand or if the Tool should fail to release properly from the robot. Proximity sensors should be positioned so that the sensing face is vertical to prevent metal shavings, weld spatter, or other debris from falling on the sensor and creating false readings.Tool stands may also need to incorporate means for covering Tools and modules to protect them in dirty environments, such as grinding or welding. Alternatively, placing tool stands in areas shielded from weld spatter, fluids, adhesives, or other debris eliminates a need for tool covers.

Page 18: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-18

4. MaintenanceWARNING: Do not perform maintenance or repair on Tool Changer or modules unless the Tool is safely supported or docked in the tool stand, all energized circuits (e.g. electrical, air, water, etc.) are turned off, pressurized connections purged and power discharged from circuits in accordance with the customer’s safety practices and policies. Injury or equipment damage can occur with Tool not docked and energized circuits on. Dock the Tool safely in the tool stand, turn off and discharge all energized circuits, purge all pressurized connections, verify all energized circuits are de-energized before performing maintenance or repair on Tool Changer or modules.

NOTICE: The cleanliness of the work environment strongly influences the trouble free operation of the Tool Changer. The dirtier the environment, the greater the need for protection against debris. Protection of the entire EOAT, the Master, the Tool and all of the modules may be necessary. Protective measures include the following:

1) Placement of tool stands away from debris generators.2) Covers incorporated into the tool stands.3) Guards, deflectors, air curtains, and similar devices built into the EOAT and the tool stand.

4.1 Preventive MaintenanceThe Tool Changer and optional modules are designed to provide a long life with regular maintenance. A visual inspection and preventive maintenance schedule is provided in the table below depending upon the application. Detailed assembly drawings are provided in Figure 5.10 of this manual. Refer to module sections for detailed preventive maintenance steps for all utility modules.

Table 4.1—MaintenanceApplication(s) Tool Change Frequency Inspection Schedule

General Usage Material Handling Docking Station> 1 per minute Weekly

< 1 per minute Monthly

Welding/Servo/Deburring, Foundry Operations (Dirty Environments) All Weekly

ChecklistMounting Fasteners

г Inspect fasteners for proper torque, interferences, and wear. Tighten and correct as required. Refer to “Table 2.1—Fastener Size, Class, and Torque Specifications”.

Ball Bearings/Alignment Pins/Bushings/Bearing Race г Inspect for wear and proper lubrication. MobilGrease XHP222 Special a NLGI #2 lithium complex grease with

molybdenum disulfide additive is suggested for locking mechanism and alignment pin lubrication. Over time, lubricants can become contaminated with debris. Therefore, it is recommended to thoroughly clean the existing grease and replace with new as needed. See Section 4.2—Cleaning and Lubrication of the Locking Mechanism and Alignment Pins.

г Inspect for excessive alignment pin/bushing wear, may be an indication of poor robot position during pickup/drop-off. Adjust robot position as needed. Check tool stand for wear and alignment problems. To replace worn alignment pins, refer to Section 5.2.2—Alignment Pin Replacement.

г Inspect for wear on the ball bearings/bearing race, may be an indication of excessive loading.Sensors and Cables

г Inspect sensor cable connectors for tightness, if loose tighten connections.

г Inspect sensor cables for any damage, cuts, and abrasion. Replace as necessary. Refer to Section 5.2.4—Lock and Unlock Sensor Replacement Procedures.

Hoses г Inspect hose connection for tightness and leaks. If leaking or loose secure hose connection.

г Inspect hoses for interferences, abrasions, cuts, and leaks. Replace as required.Electrical Contacts/Pin Block (Modules)

г Inspect for damage, debris, and stuck/burnt pins. Clean pin blocks as required, Refer to Section 4.3—Pin Block Inspection and Cleaning.

Seals (Modules) г Inspect for wear, abrasion, and cuts. Refer to Section 5.2.1—V-ring Seal Replacement

Page 19: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-19

4.2 Cleaning and Lubrication of the Locking Mechanism and Alignment Pins1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear access to

the Master and Tool plates.2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 3. The locking mechanism must be in the unlock state before cleaning. 4. Use a clean rag to thoroughly remove the existing lubricant and debris from the outer surface of the ball

bearings, the male coupling, the cam and the alignment pins.

Figure 4.1—Cleaning Ball Bearings and Outer Surfaces of Male Coupling

5. Use a clean rag to thoroughly remove the existing lubricant and debris from the inner surface of the male coupling and the cam.

Figure 4.2—Cleaning Ball Bearings, Cam and Inner Surfaces of Male Coupling

Page 20: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-20

6. Check each ball bearing to make sure it moves freely in the male coupling. Additional cleaning may be necessary to free up any ball bearings that are sticking in place.

Figure 4.3—Check Ball Bearing Movement

7. Apply a liberal coating of lubricant to the ball bearings, the male coupling (inside and out), and the alignment pins.

Figure 4.4—Apply Lubricant to Locking Mechanism

Apply Lubricant on Inner Surface of Male Coupling

Apply Lubricant on Alignment Pins and Outer Surface of Male Coupling

8. Use a clean rag to thoroughly remove the any lubricant and debris from the bearing race and the bushings from the Tool plate.

Figure 4.5—Clean Tool Plate Surfaces of locking MechanismClean Bushing Surfaces Clean Bearing Race

Surfaces

..

9. No application of lubrication is necessary on the Tool plate components.10. If repairs are complete, return circuits to normal operation.

Page 21: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-21

4.3 Pin Block Inspection and Cleaning1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear access to

the Master and Tool plates.2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 3. Inspect the Master and Tool pin blocks for any debris or darkened pins.

Figure 4.6—Inspect Master and Tool Pin Blocks

4. If debris or darkened pins exist, remove debris using a vacuum, and clean using a nylon brush (ATI Part Number 3690-0000064-60).

NOTICE: : Do not use an abrasive media, cleaners, or solvents to clean the contact pins. Using abrasive media, cleaners, or solvents will cause erosion to the contact surface or pins to stick. Clean contact surfaces with a vacuum or non-abrasive media such as a nylon brush (ATI Part Number 3690-0000064-60)

Figure 4.7—Clean Pin Blocks with a Nylon Brush

5. Inspect the Master and Tool pin blocks for stuck pins or severe pin block damage.

Figure 4.8—Stuck Pin and Pin Block Damage

6. If stuck pins or severe pin block damage exists, contact ATI for possible pin replacement procedures or module replacement.

7. If repairs are complete, return circuits to normal operation.

Page 22: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-22

5. Troubleshooting and Service ProceduresThe following section provides troubleshooting and service information to help diagnose conditions and repair the Tool Changer or control/signal module.

WARNING: Do not perform maintenance or repair on Tool Changer or modules unless the Tool is safely supported or docked in the tool stand, all energized circuits (e.g. electrical, air, water, etc.) are turned off, pressurized connections purged and power discharged from circuits in accordance with the customer’s safety practices and policies. Injury or equipment damage can occur with Tool not docked and energized circuits on. Dock the Tool safely in the tool stand, turn off and discharge all energized circuits, purge all pressurized connections, verify all energized circuits are de-energized before performing maintenance or repair on Tool Changer or modules.

5.1 Troubleshooting ProceduresCheck these conditions for all symptoms prior to troubleshooting:• Proper pneumatic and electrical connections have been made to the Quick Change.

• Air is supplied at a minimum of 60 psi (4.1 Bar).

• No air or vacuum can be trapped in a de-energized Lock or Unlock Port (pressure must be vented to atmosphere). Refer to Section 2.7—Pneumatic Connections.

Table 5.1—Troubleshooting ProceduresSymptom Cause Resolution

Unit will not lock or unlock

The ball bearings and/or cam are not moving freely in the male coupling.

Clean and lubricate as needed to restore smooth operation (see Section 4.2—Cleaning and Lubrication of the Locking Mechanism and Alignment Pins

The control/signal module is not operating correctly. Check the troubleshooting section of the manual for the specific module.

The Master plate and Tool plate are not within the specified No-Touch zone when attempting to lock.

Check that the Tool is properly seated in the tool stand. Refer to Section 3.5—Tool Storage Considerations.

Re-teach the robot to bring the Master plate and Tool plate closer together prior to attempting to lock.

Ready-To-Lock (RTL) sensors not activated indicating Tool is not positioned properly.

Check that the Tool is properly seated in the tool stand.

Re-teach the robot to bring the Master plate and Tool plate closer together prior to attempting to lock. Refer to Section 5.2.5—RTL Sensor Replacement Procedures

Check that both RTL sensors are not damaged. Replace damaged RTL sensors as necessary.

Check all cables for damage and that they are connected properly to the signal control/signal module. Replace damaged cables as necessary.

Page 23: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-23

Table 5.1—Troubleshooting ProceduresSymptom Cause Resolution

Unit is locked but Lock signal does not read “on” (true).

Lock sensor/cable is damaged.

Units using individual Sensors: Replace Lock sensor/cable as necessary (see Section 5.2.4.1—Lock and Unlock Sensor Replacement (with Individual Sensors with Lead Wire) or Section 5.2.4.2—Lock and Unlock Sensor Replacement (with Individual Sensors)

Units using Sensor Assemblies: Replace the lock sensor assembly as necessary. Refer to Section 5.2.4.3—Lock and Unlock Sensor Assembly Replacement (with Sensor Assemblies)

Lock sensor is out of position.

Units using individual Sensors: Adjust Lock sensor using procedure in Section 5.2.4.1—Lock and Unlock Sensor Replacement (with Individual Sensors with Lead Wire) or Section 5.2.4.2—Lock and Unlock Sensor Replacement (with Individual Sensors)

Units using Sensor Assemblies: Replace the lock sensor assembly as necessary. Refer to Section 5.2.4.3—Lock and Unlock Sensor Assembly Replacement (with Sensor Assemblies)

Unit is unlocked but Unlock signal does not read “on” (true).

Unlock sensor/cable is damaged.

Units using individual Sensors: Replace Unlock sensor/cable as necessary (see Section 5.2.4.1—Lock and Unlock Sensor Replacement (with Individual Sensors with Lead Wire) or Section 5.2.4.2—Lock and Unlock Sensor Replacement (with Individual Sensors)

Units using Sensor Assemblies: Replace the unlock sensor assembly as necessary. Refer to Section 5.2.4.3—Lock and Unlock Sensor Assembly Replacement (with Sensor Assemblies)

Unlock sensor is out of position.

Units using individual Sensors: Adjust Unlock sensor using procedure in Section 5.2.4.1—Lock and Unlock Sensor Replacement (with Individual Sensors with Lead Wire) or Section 5.2.4.2—Lock and Unlock Sensor Replacement (with Individual Sensors)

Units using Sensor Assemblies: Replace the unlock sensor assembly as necessary. Refer to Section 5.2.4.3—Lock and Unlock Sensor Assembly Replacement (with Sensor Assemblies)

Units Equipped with Electrical Modules

Loss of Communication

Debris in and around contact pins. Contact Pin worn or damaged.

V-ring seal damaged allowing debris into contact pins. Replace V-ring seal, refer to Section 5.2.1—V-ring Seal Replacement.

Page 24: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-24

5.2 Service ProceduresThe following service procedures provide instructions for component replacement and adjustment.

5.2.1 V-ring Seal ReplacementThe seal protects the electrical connection between the Master and Tool module. If the seal becomes worn or damaged it needs to be replaced.

1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear access to the Master and Tool plates.

2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 3. To remove the existing seal, pinch edge of seal with fingers and gently pull the seal away from

the pin block on the Master.4. Pull the seal off the pin block.5. To install a new seal, stretch the new seal over the shoulder of the pin block.6. Push the seal’s hub down against the pin block using finger tip.7. If repairs are complete, return circuits to normal operation.

Figure 5.1—V-ring Seal Replacement

V-ring Seal

Stretch seal over shoulder of pin block and push seal hub down against

the pin block with finger tipV-ring Seal

Pinch edge of seal with fingers and gently pull away from pin block

Page 25: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-25

5.2.2 Alignment Pin Replacement1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear

access to the Master and Tool plates.2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 3. Unscrew the alignment pin assembly from the Master plate using a 4mm Allen Wrench (see

Figure 5.2). If alignment pin cannot be removed using the Allen Wrench in the tip, go to step 4. If alignment was remove go to step 5.

NOTICE: If for any reason the pin cannot be removed using the Allen Wrench in the tip, it may be necessary to remove it by other means, such as locking pliers.

Figure 5.2—Alignment Pin

Ratchet Wrench

4mm Allen Wrench Socket

Alignment Pin Assembly

Set Screw

Master Plate

4. Another approach would be to use the access hole in the back side of the Master plate. If not already removed, remove the Master plate refer to Section 2.3—Master Plate Removal. Use a 4mm Allen Wrench to remove the alignment pin from the back side of the Master plate. (Refer to Figure 5.3).

Figure 5.3—Allen Wrench

Ratchet Wrench

Allen Wrench Socket

Master Plate

Alignment Pin Assembly

Set Screw

Page 26: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-26

5. Once the alignment pin has been removed, verify that the assembly (pin and set screw) are intact. If the set screw portion of the assembly did not come out, it will be necessary to remove it separately using the access hole in the back plate of the Master plate.

6. Apply Loctite 242 and install the alignment pin assembly into the bushing on the Tool Changer. Tighten to 60 in-lbs (6.8 Nm).

7. Apply MobilGrease XHP222 Special grease to the alignment pin (see Section 4.2—Cleaning and Lubrication of the Locking Mechanism and Alignment Pins

8. If repairs are complete, return circuits to normal operation.

5.2.3 Rubber Bushing Replacement1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear

access to the Master and Tool plates.2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.). 3. Using needle nose pliers grasp the rubber bushing and pull it out of the Master body. Refer to

Figure 5.4.4. If the collar remains in the Master body, remove it.5. Lightly lubricate the new rubber bushing and push into the Master body (refer to Figure 5.4).6. Insert the new collar into the rubber bushing, make sure the bushing is pressed all the way in. 7. If repairs are complete, return circuits to normal operation.

Figure 5.4—Rubber Bushing Replacement

Bushing

Collar

Master Plate

Page 27: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-27

5.2.4 Lock and Unlock Sensor Replacement ProceduresLook at the Figure below to determine what type of sensors the Tool Changer uses.

CAUTION: The Lock and Unlock sensor assemblies are precision aligned and permanently assembled at the factory. Do not attempt to disassemble and rebuild.

Figure 5.5—Determine what type of sensors the Tool Changer uses:

Lock and Unlock Sensor Assembly Replacement (Units using Individual Sensors with

Lead Wire) Refer to Section 5.2.4.1—Lock

and Unlock Sensor Replacement (with Individual Sensors with Lead

Wire)

Lock and Unlock Sensor Replacement (Units using

Individual Sensors)Refer to Section 5.2.4.2—Lock

and Unlock Sensor Replacement (with Individual Sensors)

Lock and Unlock Sensor Assembly Replacement

(Units using Sensor Assemblies)

Refer to Section 5.2.4.3—Lock and Unlock Sensor Assembly

Replacement (with Sensor Assem-blies)

5.2.4.1 Lock and Unlock Sensor Replacement (with Individual Sensors with Lead Wire)The Proximity sensors are very reliable and normally do not need to be replaced. Exhaust all other possible solutions, check continuity, air supply, lubrication, and pneumatic components prior to testing or replacing the sensor

1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to allow clear access to the Master and Tool plates.

2. If you are testing or replacing the Lock sensor make sure the QC-110 is in the locked position, if you are replacing the Unlock sensor make sure the QC-110 is in the unlocked position before continuing.

3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.).

4. Disconnect any cables, air line, etc. if required.

5. Depending on the robot and interface plate used the Tool Changer Master plate may have to be removed. Refer to Section 2.3—Master Plate Removal.

6. Unscrew the M3 socket head cap screws that secure the cable retaining plate to the Tool Changer and remove the plate.

7. Loosen the M4 set screw for the sensor(s) being replaced.

8. Slide the sensor straight out from the Tool Changer body.

9. To test the suspect sensor, reconnect the sensor cable and place a ferrous target in front of the proximity sensor to confirm that the sensor is functional. The sensor lock or unlock signal should read “on”(true) and the sensor LED should illuminate.

10. If the proximity sensor is not functioning properly, replace. Disconnect the sensor cable and discard.

Page 28: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-28

Figure 5.6—Lock and Unlock Sensor Replacement

Standoffs

Lock Sensor

Unlock Sensor

M4 Set Screws

Cable Retaining Plate

M3 Socket Head Flat Screws

11. Slide the new Lock and/or Unlock sensor into the Tool Changer body until it touches the inner plastic sleeve. Do not press the sensor into the sleeve. Refer to Figure 5.6.

12. Apply Loctite 222® to the M3 socket head cap screws for the cable retaining plate. Tighten to contact.

13. Tighten the M4 set screw for the replaced sensor(s) to contact.

14. Route the sensor cable into the cable channel of the Master plate.

15. Install the cable retaining plate.

16. If the Tool Changer was removed from robot or interface plate, install the Tool Changer (refer to Section 2.2—Master Plate Installation).

17. If repairs are complete, return circuits to normal operation.

18. Confirm the operation of the Unlock sensor by issuing the Unlock command and then checking to see that the LED in the Unlock sensor body is on.

19. Confirm the operation of the Lock sensor by issuing the Lock command to lock a Tool to the Master and then checking to see that the LED in the Lock Sensor body is on.

Page 29: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-29

5.2.4.2 Lock and Unlock Sensor Replacement (with Individual Sensors)1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to

allow clear access to the Master and Tool plates.

2. If you are testing or replacing the Lock sensor make sure the QC-110 is in the locked position, if you are replacing the Unlock sensor make sure the QC-110 is in the unlocked position before continuing.

3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.).

4. Disconnect any cables, air line, etc. if required.

5. Depending on the robot and interface plate used the Tool Changer Master plate may have to be removed. Refer to Section 2.3—Master Plate Removal.

6. Unscrew the M3 socket head cap screws that secure the cable retaining plate to the Tool Changer and remove the plate.

7. Loosen the M4 set screw for the sensor(s) being replaced.

8. Slide the sensor straight out from the Tool Changer body.

9. To test the suspect sensor, reconnect the sensor cable and place a ferrous target in front of the proximity sensor to confirm that the sensor is functional. The sensor lock or unlock signal should read “on”(true) and the sensor LED should illuminate.

10. If the proximity sensor is not functioning properly, replace. Disconnect the sensor cable and discard.

Figure 5.7—Lock and Unlock Sensor Replacement

Lock Sensor

Unlock Sensor

M4 Set Screws

Discard Jam Nuts

11. Remove and discard the jam nut from the sensor body.

12. Slide the new Lock and/or Unlock sensor into the Tool Changer body until it touches the inner plastic sleeve. Do not press the sensor into the sleeve. Refer to Figure 5.7.

13. Orient the sensor so the 90° cable connector will be positioned properly.

14. Apply Loctite 222 to the M3 socket head cap screws for the cable retaining plate. Tighten to contact.

15. Tighten the M4 set screw for the replaced sensor(s) to contact.

16. Connect the Lock and/or Unlock sensor cable connector to the proper sensor.

Page 30: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-30

17. If the Tool Changer was removed from robot or interface plate, install the Tool Changer (refer to Section 2.2—Master Plate Installation).

18. If repairs are complete, return circuits to normal operation.

19. Confirm the operation of the Unlock sensor by issuing the Unlock command and then checking to see that the LED in the Unlock sensor body is on.

20. Confirm the operation of the Lock sensor by issuing the Lock command to lock a Tool to the Master and then checking to see that the LED in the Lock Sensor body is on.

5.2.4.3 Lock and Unlock Sensor Assembly Replacement (with Sensor Assemblies)1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to

allow clear access to the Master and Tool plates.

2. If you are testing or replacing the Lock sensor make sure the QC-110 is in the locked position, if you are replacing the Unlock sensor make sure the QC-110 is in the unlocked position before continuing.

3. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.).

4. Depending on the robot and interface plate used the Tool Changer Master plate may have to be removed. Refer to Section 2.3—Master Plate Removal.

5. Disconnect the Lock and/or Unlock sensor cable connectors from the Lock and/or Unlock sensor assembly.

6. Remove the (2) M3 socket head cap screws that secure the Lock and/or Unlock sensor assembly to the Tool Changer body (refer to Figure 5.8). Pull the sensor assembly straight out from the Tool Changer body.

7. To test the suspect sensor, reconnect the sensor cable and place a ferrous target in front of the proximity sensor to confirm that the sensor is functional. The sensor lock or unlock signal should read “on”(true) and the sensor LED should illuminate.

8. If the proximity sensor is not functioning properly, replace. Disconnect the sensor cable and discard.

Figure 5.8—Lock and Unlock Sensor Assembly Replacement

Lock Sensor Assembly

Unlock Sensor Assembly

M3 Socket Head Cap Screws

9. Insert the new Lock and/or Unlock sensor assembly into the Tool Changer body as shown in Figure 5.8.

Page 31: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-31

10. Secure the sensor assembly using the (2) M3 socket flat head screws. Tighten to 12 in-lbs (1.4 Nm).

11. Connect the Lock and/or Unlock sensor cable connector to the proper sensor.

12. If repairs are complete, return circuits to normal operation.

13. Confirm the operation of the Unlock sensor by issuing the Unlock command and then checking to see that the LED in the Unlock sensor body is on.

14. Confirm the operation of the Lock sensor by issuing the Lock command to lock a Tool to the Master and then checking to see that the LED in the Lock Sensor body is on.

5.2.5 RTL Sensor Replacement Procedures

Figure 5.9—Determine what type of sensors the Tool Changer uses:

Refer to Section 5.2.5.1—RTL Flat Pack Style Sensor Replacement (Y-Style and Lead Cable)

Refer to Section 5.2.5.2—RTL Flat Pack Style Sensor Replacement (with Potted Assembly)

5.2.5.1 RTL Flat Pack Style Sensor Replacement (Y-Style and Lead Cable)1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to

allow clear access to the Master and Tool plates.

2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.).

3. Depending on the robot and interface plate used the Tool Changer Master plate may have to be removed. Refer to Section 2.3—Master Plate Removal.

4. Disconnect the utilities from the control/signal module and Valve Module.

5. Unscrew the RTL sensor cable connectors from the control/signal module.(refer to Figure 5.10)

6. Remove the control/signal module from the Valve Module.

7. Remove the Valve Module from the Master plate.

8. Unscrew the M3 socket head cap screws that secure the cable retaining plate to the Tool Changer and remove the plate

9. Unscrew the M3 socket head flat screw that secures the RTL Sensor to the Tool Changer body.

10. Discard the removed RTL sensor.

Page 32: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-32

Figure 5.10—RTL Sensor with Y-Style Cable Replacement

To U Connection

To L Connection

To R1 Connection

To R2 Connection

To Unlock Sensor

To Lock Sensor

Standoffs

M3 Socket Head Flat Screws

RTL Sensor

Valve Module

M6 Socket Head Cap Screws

M4 Socket Head Cap Screws

Control Module

Cable Retaining PlateCables

M3 Socket Head Flat Screws

11. Install the new sensor cable into the cable channel of the Tool Changer body.

12. Install the RTL sensor to the Tool Changer body.

13. Apply Loctite 222 to the M3 socket flat head screws. Secure the sensor to the Tool Changer body and tighten to 60 in-ozs (0.4 Nm).

14. Route the sensor cable into the cable channel of the Master plate.

15. Install the cable retaining plate.

16. Apply Loctite 222 to the M3 socket head cap screws for the cable retaining plate. Tighten to contact.

17. Reinstall the Valve Module to the Master plate, be sure that the cables are routed through the cable channel of the Valve Module.

18. Reinstall the control/signal module to the Valve Module.

19. Apply Loctite 222 to the M3 socket head cap screws for the cable retaining plate. Tighten to contact.

20. If the Tool Changer was removed from robot or interface plate, install the Tool Changer (refer to Section 2.2—Master Plate Installation).

21. If repairs are complete, return circuits to normal operation.

22. Confirm the operation of the RTL sensor by bringing a metallic object into close proximity to the face of the sensor and watching for the LED in the body of the sensor to light up.

Page 33: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-33

5.2.5.2 RTL Flat Pack Style Sensor Replacement (with Potted Assembly)1. Dock the Tool side of the Tool Changer safely and uncouple the Tool Changer to

allow clear access to the Master and Tool plates.

2. Turn off and de-energize all energized circuits (e.g. electrical, air, water, etc.).

3. Depending on the robot and interface plate used the Tool Changer Master plate may have to be removed. Refer to Section 2.3—Master Plate Removal.

4. Disconnect the utilities from the control/signal module and Valve Module.

5. Remove the control/signal module from the air/valve adapter Module (refer to Figure 5.11).

6. Unscrew the Lock/Unlock/RTL sensor cable connector from the control/signal module.

7. Remove the Valve Module from the Master plate.

8. Disconnect the Lock and Unlock sensor cable connectors from the Lock and Unlock sensors.

9. Unscrew the M3 socket head cap screws that secure the cable assembly to the Tool Changer.

10. Unscrew the M3 socket head flat screw that secures the RTL Sensor to the Tool Changer body.

11. Discard the removed RTL sensor and cable assembly.

Figure 5.11— RTL Sensor with Cable Assembly Replacement

Valve Module

Control Module

Cable Assembly

RTL Sensor

M3 Socket Flat Head Screw

M3 Socket Head Cap Screws

M4 Socket Head Cap Screws

M4 Socket Head Cap Screws

To Unlock Sensor

To Lock Sensor

To Control Module

12. Install the new cable assembly into the cable channel of the Tool Changer body.

13. Apply Loctite 222 to the M3 socket head cap screws for the cable assembly. Tighten to contact.

Page 34: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-34

14. Attach the Lock and Unlock sensor cable connectors to the Lock and Unlock sensors.

15. Install the RTL sensor to the Tool Changer body.

16. Reinstall the Valve Module to the Master plate, be sure that the cables are routed through the cable channel of the Valve Module.

17. Reinstall the control/signal module to the Valve Module.

18. Apply Loctite 222 to the M3 socket flat head screws. Secure the sensor to the Tool Changer body and tighten to 60 in-ozs (0.4 Nm).

19. If the Tool Changer was removed from robot or interface plate, install the Tool Changer (refer to Section 2.2—Master Plate Installation).

20. If repairs are complete, return circuits to normal operation.

21. Confirm the operation of the RTL sensor by bringing a metallic object into close proximity to the face of the sensor and watching for the LED in the body of the sensor to light up.

Page 35: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-35

6. Serviceable Parts6.1 Common Parts (Alignment Pins, Rubber Bushings and Master plates)

4

1

2

3

Table 5.2—Common PartsItem No. Qty Part Number Description

1 2 9005-20-2241 1/2” Two Piece Alignment Pin2 8 4010-0000010-01 3/8” Rubber Bushing3 8 3700-20-2000 Collar for 3/8” Bushing4 1 9120-110xM-000-000 QC-110 Sleeveless Master Assembly, NPT4 1 9120-110xM-000-000-E QC-110 Sleeveless Master Assembly, Euro4 1 9120-110xM-000-000-G14 QC-110 Sleeveless Master Assembly, BSPP 1/4” Ports (Black)4 1 9120-110xM-000-000-R QC-110 Sleeveless Master Assembly, R Ports

Notes:

x = A, B, C, D, E, or F for boss size designation.

Page 36: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-36

6.2 Models 9120-110xM-000-000-SD, 9120-110xM-000-000-SD-RD, 9120-110xM-000-000-SE and 9120-110xM-000-000-SF

1

2

Table 5.3—9120-110xM-000-000-SD, 9120-110xM-000-000-SGItem No. Qty Part Number Description

1 0 N/A N/A2 2 8590-9909999-34 Turck Prox (PNP True 2mm Range, Quick Disc.)

Table 5.4—9120-110xM-000-000-SD-RD, 9120-110xM-000-000-SG-RDItem No. Qty Part Number Description

1 1 8590-9909999-123 PNP Flat Pack Proximity Sensor (RTL)2 2 8590-9909999-34 Turck Prox (PNP True 2mm Range, Quick Disc.)

Table 5.5—9120-110xM-000-000-SE, 9120-110xM-000-000-SFItem No. Qty Part Number Description

1 0 N/A N/A2 2 8590-9909999-52 Baumer Prox IFRM 08N17A3/S35L (NPN, 2mm range, QD)

Notes:

x = A, B, C, D, E, or F for boss size designation.

Page 37: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-37

6.3 Models 9120-110xM-000-000-SK

1

Table 5.6—9120-110xM-000-000-SKItem No. Qty Part Number Description

1 2 8590-9909999-05 Prox Switch EE-X2D1-N-NNotes:

x = A, B, C, D, E, or F for boss size designation.

Page 38: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-38

6.4 Models 9120-110xM-000-000-SGH and 9120-110xM-000-000-SEH

1

2

Table 5.7—9120-110xM-000-000-SGHItem No. Qty Part Number Description

1 1 9000-20-1066 PNP Flat Pack Proximity Sensor (RTL)2 2 8590-9909999-34 Turck Prox (PNP True 2mm Range, Quick Disc.)

Table 5.8—9120-110xM-000-000-SEHItem No. Qty Part Number Description

1 0 9000-20-1066 PNP Flat Pack Proximity Sensor (RTL)2 2 8590-9909999-52 Baumer Prox IFRM 08N17A3/S35L (NPN, 2mm range, QD)

Notes:

x = A, B, C, D, E, or F for boss size designation.

Page 39: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-39

6.5 Models 9120-110xM-000-000-S0

12

Table 5.9—9120-110xM-000-000-S0Item No. Qty Part Number Description

1 2 9005-20-1983 Sensor Bore Cover Plate Assembly, SS Screws

2 4 3500-1058008-21A M3 x 8 SHCS, SS, ND Ind. Microspheres Epoxy, Yellow. 0-3 uncoated lead thds. 5-7 coated thds

Notes:

x = A, B, C, D, E, or F for boss size designation.

Page 40: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-40

6.6 Models 9120-110xM-000-000-SMH and 9120-110xM-000-000-STH

1

2

Table 5.10—9120-110xM-000-000-SMH, 9120-110xM-000-000-STHItem No. Qty Part Number Description

1 1 9000-20-1283 Prox Cable Assembly Sleeveless QC110, Potted2 2 9005-20-1917 PNP Lock/Unlock Sensor Subassembly with LED

Notes:

x = A, B, C, D, E, or F for boss size designation.

Page 41: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-41

6.7 Models 9120-110xM-000-000-SM, 9120-110xM-000-000-SP, 9120-110xM-000-000-ST and 9120-110xM-000-000-SU

1

Table 5.11—9120-110xM-000-000-SM, 9120-110xM-000-000-STItem No. Qty Part Number Description

1 2 9005-20-1917 PNP Lock/Unlock Sensor Subassembly with LED

Table 5.12—9120-110xM-000-000-SP, 9120-110xM-000-000-SUItem No. Qty Part Number Description

1 2 9005-20-1918 NPN Lock/Unlock Sensor SubassemblyNotes:

x = A, B, C, D, E, or F for boss size designation.

Page 42: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-42

6.8 Models 9120-110xM-000-000-SFB

2

3

1

Table 5.13—9120-110xM-000-000-SFBItem No. Qty Part Number Description

1 1 9120-C-FPPNP-3PM90-3PM90 Sensor Cable, Flat Pack PNP Sensor to (2) 3-pin Right Angle2 2 9005-20-1917 PNP Lock/Unlock Sensor Subassembly with LED

Notes:

x = A, B, C, D, E, or F for boss size designation.

Page 43: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-43

6.9 Models 9120-110xT-000-000

1

Table 5.14—9120-110xT-000-000Item No. Qty Part Number Description

1 1 9120-110FT-000-000 QC-110 Tool Assembly, 80mm Recess NPT1 1 9120-110FT-000-000-R QC-110 Tool Assembly, 80mm Recess R Port (BSPT)1 1 9120-110FT-000-000-G14 QC-110 Tool Assembly, 80mm Recess G1/41 1 9120-110FT-000-000-E QC-110 Tool Assembly, 80mm Recess BSPP (Black)

Notes:

x = A, B, C, D, E, or F for boss size designation.

Page 44: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-44

7. SpecificationsTable 5.15— MasterandStandardToolplatesSpecifications

Recommended Max Payload 330 lbs. (155kg) The mass attached to the Tool Changer.

Operating Temperature Range -20–150°F(-30–66°C) Temperature for optimal operation.

Operating Pressure Range 60–100 psi(4.1–6.9 bar)

Locking mechanism supply pressure operating range. Supply to be clean, dry, and filtered to 50 micron or better.

Coupling Force @ 80 psi 2,730 lbs(1,235 kg) Axial holding force

Recommended Max Moment X-Y (Mxy)

6,940 in-lbs784 (Nm)

Maximum recommended working load for optimum performance of the Tool Changer

Positional Repeatability 0.0006”(0.015 mm)

Repeatability tested at rated load at one million cycles.

Weight (coupled, no access.) 13 lbs. (6.0 kg) Master 8 lbs (3.6 kg) / Tool 5 lbs (2.3 kg)

Max. Recommended distance between Master and Tool plate

0.12”(3.0 mm)

No-Touch™ locking technology allows the Master and Tool plates to lock with separation when coupling.

Pass through Port, (Qty) Size(Cv, Min)

(8) 1/4 or 3/8 NPT, BSPT, or BSPP

Maximum pressure of 100psi (6.9bar), Nitrile seals

Mounting/Customer Interface

Master plate

Tool plate

125mm BC, (6) M10 Thru Holes, (2) M10 Dowels(SF)

Meets ISO 9409-1-A125

Page 45: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-45

8. Drawings8.1 QC-110 Tool Changer, NPT

3rd

AN

GLE

PRO

JEC

TION

37.7

Tool

Pla

te

55.5

Mas

ter

Pla

te

Cou

pled

93.1

30.1

Pin

18.9

17.9

27.8

46.7

(8) 3

/8 N

PTPn

eum

atic

Thru

Por

ts

(8) 3

/8 N

PTPn

eum

atic

Thru

Por

ts

(B)

(A) 1/

8 N

PTLo

ck P

ort

1/8

NPT

Unl

ock

Port

Opt

iona

l Loc

k/U

nloc

kS

enso

r Loc

atio

n

30°

(2)

10 (S

lip F

it), 1

2 D

p.E

qual

ly S

pace

dC

usto

mer

Inte

rface

B.C

. 12

5

188

Mas

ter

& T

ool

(6) T

hru

Hol

es F

or M

10 S

HC

SC

'Bor

ed 1

5.5

Dp.

Fro

m F

ar S

ide

Equa

lly S

pace

dC

usto

mer

Inte

rface

Mas

ter S

ide

(pro

ject

ion

only

)

Flat

A

Flat

B

See

Not

e 1

B.C

.12

5

30°

(2)

10 H

7, 6

Dp.

Equ

ally

Spa

ced

Cus

tom

er In

terfa

ce80

H7,

4 D

p.C

usto

mer

Inte

rface

See

Not

e 2

76.2

Typ.

15° 30

°

30°

20° T

yp.

(6) T

appe

d M

10x1

.5, 2

0 D

p.Eq

ually

Spa

ced

Cus

tom

er In

terfa

ceTo

ol S

ide

(pro

ject

ion

only

)

Flat

A

Flat

B

8

7

65

4 3

2

1

Part

Num

bers

Sho

wn:

(A) M

aste

r: 91

20-1

10AM

-000

-000

(B) T

ool:

9120

-110

FT-0

00-0

00

Not

es:

1) C

ente

r Bos

s in

serts

ava

ilabl

e.2)

Cen

ter R

eces

s in

serts

ava

ilabl

e.

Pne

umat

icP

ort I

.D.

Rev.

Des

crip

tion

Initi

ator

Dat

e

01In

itial

Issu

eD

SS5/

13/2

009

02A

dd

ed sl

eeve

less

mas

ter a

ssem

bly

ATM

10/2

8/20

11

B1:

2.5

14

REVI

SIO

N

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

5/13

/09

D. W

agne

r 5/2

1/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er

Page 46: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-46

3rd

AN

GLE

PRO

JEC

TION

6

2

5

11

17

16

12

1

14

9

19

15

13

710

3

4

18

QC

-110

Mas

ter A

ssem

bly

8

Rev.

Des

crip

tion

Initi

ator

Dat

e

-Se

e Sh

eet1

--

B1:

22

4RE

VISI

ON

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

5/13

/09

D. W

agne

r 5/2

1/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er

Page 47: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-47

3rd

AN

GLE

PRO

JEC

TION

12

10

15

8

14

1

16

9

5

2

3

4

6

7 11

QC

-110

Sle

evel

ess

Mas

ter A

ssem

bly

Rev

.D

escr

iptio

nIn

itiat

orD

ate

-Se

e Sh

eet1

--

B1:

23

4RE

VISI

ON

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

5/13

/09

D. W

agne

r 5/2

1/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er

Page 48: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-48

3rd

AN

GLE

PRO

JEC

TION

36

5

4

21

QC

-110

Too

l Ass

embl

y

Rev.

Des

crip

tion

Initi

ator

Dat

e

-Se

e Sh

eet1

--

B1:

24

4RE

VISI

ON

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

5/13

/09

D. W

agne

r 5/2

1/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er

Page 49: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-49

8.2 QC-110 Tool Changer, 1/4 BSPT Ports

3rd

AN

GLE

PRO

JEC

TION

37.7

Tool

Pla

te

Cou

pled

93.1

55.5

Mas

ter

Pla

te

30.1

Pin

18.9

17.9

27.8

46.7

(8) R

1/4

Pneu

mat

icTh

ru P

orts

(8) R

1/4

Pneu

mat

icTh

ru P

orts

(B)

(A)

R1/

8Lo

ck P

ort

R1/

8U

nloc

k Po

rt

Opt

iona

l Loc

k/U

nloc

kS

enso

r Loc

atio

n

188

Mas

ter

& T

ool

30°

(2)

10 (S

lip F

it), 1

2 D

p.E

qual

ly S

pace

dC

usto

mer

Inte

rface

B.C

. 1

25

(6) T

hru

Hol

es F

or M

10 S

HC

SC

'Bor

ed 1

5.5

Dp.

Fro

m F

ar S

ide

Equa

lly S

pace

dC

usto

mer

Inte

rface

Mas

ter S

ide

(pro

ject

ion

only

)

Flat

A

Flat

B

See

Not

e 1

B.C

.12

5

30°

(2)

10 H

7, 6

Dp.

Equ

ally

Spa

ced

Cus

tom

er In

terfa

ce80

H7,

4 D

p.C

usto

mer

Inte

rface

See

Not

e 2

76.2

Typ.

15° 30

°

30°

20° T

yp.

(6) T

appe

d M

10x1

.5, 2

0 D

p.Eq

ually

Spa

ced

Cus

tom

er In

terfa

ceTo

ol S

ide

(pro

ject

ion

only

)

Flat

A

Flat

B

8

7

65

4 3

2

1

Part

Num

bers

Sho

wn:

(A) M

aste

r: 91

20-1

10AM

-000

-000

-R(B

) Too

l: 91

20-1

10FT

-000

-000

-R

Not

es:

1) C

ente

r Bos

s in

serts

ava

ilabl

e.2)

Cen

ter R

eces

s in

serts

ava

ilabl

e.

Pne

umat

icP

ort I

.D.

Rev.

Des

crip

tion

Initi

ator

Dat

e

01In

itial

Issu

eD

SS6/

09/2

009

02A

dd

ed sl

eeve

less

mas

ter a

ssem

bly

ATM

10/2

8/20

11

B1:

2.5

14

REVI

SIO

N

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

6/9/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-R

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SPT

Ports

Page 50: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-50

3rd

AN

GLE

PRO

JEC

TION

QC

-110

Mas

ter A

ssem

bly

614

2

5

11

919

1512

113

7

16

18

310

17

4

8

Rev.

Des

crip

tion

Initi

ato

rD

ate

-Se

e Sh

eet1

--

B1:

22

4RE

VIS

ION

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

6/9/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-R

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SPT

Ports

Page 51: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-51

3rd

AN

GLE

PRO

JEC

TION

7

12

15

14

8

1

16

9

10

5

112

3

4

6

QC

-110

Sle

evel

ess

Mas

ter A

ssem

bly

Rev

.D

escr

iptio

nIn

itiat

orD

ate

-Se

e Sh

eet1

--

B1:

23

4RE

VISI

ON

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

6/9/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-R

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SPT

Ports

Page 52: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-52

3rd

AN

GLE

PRO

JEC

TION

QC

-110

Too

l Ass

embl

y

1

5

3

6

4

2

Rev.

Des

crip

tion

Initi

ato

rD

ate

-Se

e Sh

eet1

--

B1:

24

4RE

VIS

ION

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

6/9/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-R

02

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SPT

Ports

Page 53: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-53

8.3 QC-110 Tool Changer, 1/4 BSPP Ports

3rd

AN

GLE

PRO

JEC

TION

37.7

Tool

Pla

te

30 Pin

93.1

Cou

pled

55.5

Mas

ter

Pla

te

18.9

17.9

27.8

46.7

8X G

1/4

Pneu

mat

icTh

ru P

orts

8X G

1/4

Pneu

mat

icTh

ru P

orts

(B)

(A)

G1/

8Lo

ck P

ort

G1/

8U

nloc

k Po

rt

Lock

/Unl

ock

Sen

sors

30°

188

Mas

ter

& T

ool

2X

10 (S

lip F

it)

12

Equ

ally

Spa

ced

Cus

tom

er In

terfa

ce

B.C

. 12

5

25

H7

3.8

6X T

hru

Hol

es F

or M

10 S

HC

S 1

5.5

From

Far

Sid

eEq

ually

Spa

ced

Cus

tom

er In

terfa

ce

Mas

ter S

ide

(pro

ject

ion

only

)

Flat

A

Flat

B

80 H

7 4

Cus

tom

er In

terfa

ceS

ee N

ote

1

15°

20°

Typ.

30°

30°

76

.2Ty

p.

B.C

12

5

Tool

Sid

e(p

roje

ctio

n on

ly)

Flat

A

Flat

B

8

7

65

4 3

2

1

Part

Num

bers

Sho

wn:

(A) M

aste

r: 91

20-1

10AM

-000

-000

-SM

-G14

(B) T

ool:

9120

-110

FT-0

00-0

00-G

14

Not

es: Cen

ter R

eces

s in

serts

ava

ilabl

e.1.

SM in

mas

ter p

art n

umbe

r ind

icat

es P

NP

lock

/unl

ock

sens

ors.

2.

Pne

umat

icP

ort I

.D.

6X T

appe

d M

10x1

.5

20

Equ

ally

Spa

ced

Cus

tom

er In

terfa

ce

2X

10 H

7 6

Equ

ally

Spa

ced

Cus

tom

er In

terfa

ce

Rev.

Des

crip

tion

Initi

ator

Dat

e

04EC

O 1

3022

; 912

0-11

0NM

X-00

0-00

0-G

14 S

leev

eles

s m

aste

r Ass

embl

y: T

ook

out:

3490

-000

1027

-01

Repl

aced

w

ith: 3

490-

0001

048-

01.

TBC

3/17

/201

5

B1:

2.5

14

REVI

SIO

N

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

6/5/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-G

14

04

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SPP

Ports

Page 54: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-54

3rd

AN

GLE

PRO

JEC

TIO

N

12

10

15

14

9

1

8

165

211

3

46

7

QC

-110

Sle

evel

ess

Mas

ter

Ass

embl

y

Rev

.D

escr

iptio

nIn

itiat

orD

ate

-Se

e S

hee

t1-

-

B1:

22

4RE

VIS

ION

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLI

MET

ERS.

DRA

WN

BY:

CH

ECKE

D B

Y:

D. S

wan

son

6/5/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UM

BER

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-G

14

04

PRO

PERT

Y O

F A

TI IN

DU

STRI

AL

AU

TOM

ATI

ON

, IN

C. N

OT

TO B

E RE

PRO

DU

CED

IN A

NY

MA

NN

ER E

XCEP

T O

N O

RDER

OR

WIT

H P

RIO

R W

RITT

EN A

UTH

ORI

ZATI

ON

OF

ATI

.

1031

Goo

dwor

th D

rive,

Ape

x, NC

275

39, U

SATe

l: +1.

919.

772.

0115

Email

: info

@at

i-ia.co

mFa

x: +1

.919

.772

.825

9

www

.ati-

ia.co

mIS

O 90

01 R

egist

ered

Com

pany

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SP

P P

orts

Page 55: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-55

3rd

AN

GLE

PRO

JEC

TION

6

QC

-110

Mas

ter A

ssem

bly

2

14

5

9

11

15

19

12

16

1

310

4

17

13

7

18

8

Rev.

Des

crip

tion

Initi

ator

Dat

e

-Se

e Sh

eet1

--

B1:

23

4RE

VISI

ON

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLIM

ETER

S.

DRA

WN

BY:

CHE

CKE

D B

Y:

D. S

wan

son

6/5/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UMBE

R

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-G

14

04

PRO

PERT

Y O

F A

TI IN

DUS

TRIA

L A

UTO

MA

TION

, IN

C. N

OT

TO B

E RE

PRO

DUC

ED IN

AN

Y M

AN

NER

EXC

EPT

ON

ORD

ER O

R W

ITH P

RIO

R W

RITT

EN A

UTHO

RIZA

TION

OF

ATI.

1031

Goo

dwor

th Dr

ive, A

pex,

NC 27

539,

USA

Tel: +

1.919

.772.0

115

Em

ail: in

fo@ati

-ia.co

mFa

x: +1

.919.7

72.82

59

www

.ati-ia

.com

ISO

9001

Reg

ister

ed C

ompa

ny

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SPP

Ports

Page 56: Quick Change Installation and Operation Manual Document ... Series Base T… · Quick Change. Installation and Operation Manual. Document #9620-20-B-110 Series Base Tool Changer-25

Quick Change Installation and Operation ManualDocument #9620-20-B-110 Series Base Tool Changer-25

Pinnacle Park • 1031 Goodworth Drive • Apex, NC 27539 • Tel: 919.772.0115 • Fax: 919.772.8259 • www.ati-ia.com • Email: [email protected] B-56

3rd

AN

GLE

PRO

JEC

TIO

N

QC

-110

Too

l Ass

embl

y

12

6

35

6

Rev.

De

scrip

tion

Initi

ato

rD

ate

-Se

e S

hee

t1-

-

B1:

24

4RE

VIS

ION

NO

TES:

UN

LESS

OTH

ERW

ISE

SPEC

IFIE

D.

DO

NO

T SC

ALE

DRA

WIN

G.

ALL

DIM

ENSI

ON

S A

RE IN

M

ILLI

MET

ERS.

DRA

WN

BY:

CH

ECKE

D B

Y:

D. S

wan

son

6/5/

09

D. W

agne

r 6/1

0/09

TITLE SC

ALE

SIZE

DRA

WIN

G N

UM

BER

PRO

JEC

T #

SHEE

T

O

F 96

30-2

0-11

0-G

14

04

PRO

PERT

Y O

F A

TI IN

DU

STRI

AL

AU

TOM

ATI

ON

, IN

C. N

OT

TO B

E RE

PRO

DU

CED

IN A

NY

MA

NN

ER E

XCEP

T O

N O

RDER

OR

WIT

H P

RIO

R W

RITT

EN A

UTH

ORI

ZATI

ON

OF

ATI

.

1031

Goo

dwor

th D

rive,

Ape

x, NC

275

39, U

SATe

l: +1.

919.

772.

0115

Email

: info

@at

i-ia.co

mFa

x: +1

.919

.772

.825

9

www

.ati-

ia.co

mIS

O 90

01 R

egist

ered

Com

pany

QC

-110

Bas

e To

ol C

hang

er w

ith 1

/4 B

SP

P P

orts