QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES. Andrea Musso / 1 Section meeting May 12 th , 2005. Aim of the visits. To verify incoming inspection and installation procedures of the manufacturers To check differences between manufacturers - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/1.jpg)
1
QUENCH HEATER PROCEDURE
CHECK AT COLD MASS
ASSEMBLER PREMISES
Andrea Musso /1 Section meeting May 12th, 2005
![Page 2: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/2.jpg)
2
Aim of the visits
• To verify incoming inspection and installation procedures of the manufacturers
• To check differences between manufacturers
• To point out critical points (eventually)
![Page 3: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/3.jpg)
3
Quench heaters producer’s
• Cicorel (Switzerland)
• C.I.V. (France)
Actually all the stainless steel strips are produced and coated only by C.I.V.
![Page 4: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/4.jpg)
4
Operations before installationBNN
• Visual inspection• Remove oxidation from omega
windows• Cleaning with Acetone• Cleaning the omega’s with
Scotch Britte• Preparing wires• Flux+soldering• Fixing wires with epoxy• Wait+cleaning with foam• Insulating with adhesive
polyimide• Approach to pole and cleaning
with acetone• Positioning on poles
Alstom• Visual inspection• Preparing wires• Cleaning with alcool• Flux+soldering• Cleaning with alcool• Positioning on poles
![Page 5: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/5.jpg)
5
Operations before installation
Ansaldo Superconduttori:
They buy quench heaters already equipped with omega’s and wires; the only
operations they do before installation:
• Visual inspection
• Cleaning with alcool
![Page 6: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/6.jpg)
6
Some pictures….Alstom (1)
An inclusion was found and the quench heater put in stand by
Visual inspection
![Page 7: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/7.jpg)
7
Some pictures….BNN (1)
Soldering omega’s
Cleaning
![Page 8: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/8.jpg)
8
Some pictures….Alstom (2)
Connecting the wires between quench heater
![Page 9: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/9.jpg)
9
Some pictures….Alstom (3)
Soldering omega’s
![Page 10: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/10.jpg)
10
Some pictures….BNN (2)
Connecting the wires between quench heater
![Page 11: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/11.jpg)
11
Some pictures….BNN (3)
Quench heaters are fixed on heads with polyimide tape
![Page 12: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/12.jpg)
12
Some pictures….Ansaldo (1)
Quench heaters are fixed on heads with polyimide tape….
![Page 13: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/13.jpg)
13
Some pictures….Ansaldo (2)
…and resin before collaring….
![Page 14: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/14.jpg)
14
Some pictures….Alstom (4)
…Quench heaters are fixed on heads with polyimide tape
![Page 15: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/15.jpg)
15
Some pictures….Ansaldo (3)
Splice between strips
![Page 16: QUENCH HEATER PROCEDURE CHECK AT COLD MASS ASSEMBLER PREMISES](https://reader035.vdocuments.us/reader035/viewer/2022062518/56814217550346895dae2904/html5/thumbnails/16.jpg)
16
Conclusions
• The only critical point at the moment is to fix the extremities on coil’s ends; this causes cut on the vertical plane:
– Alstom fixes the extremities since ten magnets because they had a problem of an omega that was displaced and therefore had problems during collaring
– Ansaldo Superconduttori fixes the extremities also with resin; they did a test on two magnets avoiding to fix them and they aim to avoid fixing in the next future
– BNN fixes slightly the extremities, but since our visit the project engineer suggested them to avoid doing it; they accepted the suggestion