Page 1: QUANTITY SURVEYING & ESTIMATION- Nicmar

QUANTITY SURVEYING & ESTIMATION

NATIONAL INSTITUTE OF CONSTRUCTION MANAGEMENT & RESEARCH

Presented By:-Muneesh Methwani (AP16022) Sumeet Sagar (AP16102)Animesh Sinha (AP16071) Rounak Bhushan (AP16051)

Page 2: QUANTITY SURVEYING & ESTIMATION- Nicmar

CONTENTS

SAFETY GRILLS FOR WINDOWBrief SpecificationsDetailed SpecificationsRate Analysis

FLYOVERApproximate Estimation

Page 3: QUANTITY SURVEYING & ESTIMATION- Nicmar

BRIEF SPECIFICATIONS OF SAFETY GRILLS FOR WINDOWS

Providing oil painted 10mm thick M.S safety grill for a window frame of size 1828*1828 mm by drilling holes into walls.

Page 4: QUANTITY SURVEYING & ESTIMATION- Nicmar

DETAILED SPECIFICATION FOR SAFETY GRILLS FOR

WINDOWS1. Measuring window frame2. Fabricating the frame

2.1 Welding2.2 Oil Painting

3. Drilling4. Installing Safety Grills

Page 5: QUANTITY SURVEYING & ESTIMATION- Nicmar

1. Measuring Window Frame- Measurement of window frame is done using metal tape (30 m), usually rough surface are avoided to reduce variations in measurements

2. Fabricating The Frame:- Fabricating the frame comprise of two steps

2.1. Welding Procedure – A Specified course of action, to be followed in

welding, including a list of materials and tools to be used.

Page 6: QUANTITY SURVEYING & ESTIMATION- Nicmar

2.1.1 Arc Weldinga) Classification and size of Electrodes,b) Current and open- circuit Voltage,c) Length of run per electrode, or speed of travel,d) Number and arrangement of runs in multi- run

welds,e) Position of Welding,f) Preparation and set-up of parts,g) Welding sequence, andh) Pre or Post heating.

Page 7: QUANTITY SURVEYING & ESTIMATION- Nicmar

2.1.2 Welding Roads – Filler Metal, in wire or rod form, used in gas welding and brazing processes, and those arc welding processes wherein the electrode does not furnish the filler metal.2.1.3 Welding Sequence- The Order and/or direction in which either welds or runs are made.2.1.4 Welding Technique- The Manner in which an operator manipulates an electrode, a blowpipe or the like.

Page 8: QUANTITY SURVEYING & ESTIMATION- Nicmar

2.2 Oil Painting: - A Specified course of action, to be followed in Oil Painting, including a list of materials and tools to be used.a) Polishing With Rough paper (60 grit) to

remove dust particles,b) Treatment with anti-rust solution (Asian Paints

Epoxy Primer) to protect against corrosion c) Final Coat – Once the anti-rust solutions

completely dries, the grills are painted with oil paint(Asian Paint Oil Paint)

Page 9: QUANTITY SURVEYING & ESTIMATION- Nicmar

3) Drilling : -A Specified course of action, to be followed in Drilling, including a list of materials and tools to be used.a) DO MARKINGS -Masonry Drills are used with hammer

action power drill,b) A slow rotational speed for drilling into harder

materials to avoid overheating the tip,c) Frequently withdraw the bit to remove dust,d) Long Masonry Bits( 300 – 400 mm) and sizes ranging

from 4 – 16 mm are used,e) Use a drill sharpener or grindstone to sharpen the

tungsten carbide tip.

Page 10: QUANTITY SURVEYING & ESTIMATION- Nicmar

4. Installation: -A Specified course of action, to be followed in Installation, including a list of materials and tools to be used.a) Fix The Frameb) Tighten the Screwc) Ready to use

Page 11: QUANTITY SURVEYING & ESTIMATION- Nicmar

Rate Analysis Assumption• Window Size – 6 Ft* 6 Ft (1828 * 1828 mm)• M.S. Strip (2.54* 4 mm)• No of Horizontal Bars =12 (10mm Dia)• No of Vertical bars = 12 (10mm Dia)• Horizontal Spacing = 150mm c/c• Vertical Spacing = 150 mm c/c• Oil painting with Anti Rust Treatment on M.S

bars and Strip

Page 12: QUANTITY SURVEYING & ESTIMATION- Nicmar

Rate Analysis

Page 13: QUANTITY SURVEYING & ESTIMATION- Nicmar
Page 14: QUANTITY SURVEYING & ESTIMATION- Nicmar
Page 15: QUANTITY SURVEYING & ESTIMATION- Nicmar
Page 16: QUANTITY SURVEYING & ESTIMATION- Nicmar

Approximate Estimation of Flyover

Azadpur Prembhai Elevated Corridor

Dhankawadi Flyover

Fatehgunj Flyover Panvel Elevated Road

Page 17: QUANTITY SURVEYING & ESTIMATION- Nicmar

Approximate Estimation of Flyover

Page 18: QUANTITY SURVEYING & ESTIMATION- Nicmar

References• Wikipedia• IS Codes 4464:1985 (Drilling)• IS Codes 822:1970 (Welding)• Pune DSR 2016-17

Sincere Thanks To,

Page 19: QUANTITY SURVEYING & ESTIMATION- Nicmar

Our Work

• Rate Analysis1.xlsx• ..\Cost Comparison.xlsx

Page 20: QUANTITY SURVEYING & ESTIMATION- Nicmar

Thank You !!!!!!

Presented By:-Muneesh Methwani (AP16022)Animesh Sinha (AP16071)Sumeet Sagar (AP16051)Rounak Bhushan (AP16102)