quality as a priority
DESCRIPTION
Quality as a priority. ARC MONTE. www.arcmonte.rs. CONTENTS. www.arcmonte.rs. COMPANY INFO. www.arcmonte.rs. ABOUT US - PowerPoint PPT PresentationTRANSCRIPT
Quality as a priority
www.arcmonte.rs
ARC MONTE
2www.arcmonte.rs
CONTENTS
COMPANY INFO
ABOUT US
REFERENCE LIST - SERBIA
REFERENCE LIST – FOREIGN COUNTRIES
CERTIFICATE
PICTURES OF OUR WORK
3www.arcmonte.rs
COMPANY INFO
Company/full name/Company for assembling and repair ’’ARC MONTE’’ d.o.o., Belgrade, Rušanj, Moravska 15/A
Company/short name/’’ARC MONTE’’ d.o.o. Belgrade, Rušanj, Moravska 15/A
Authorized person Ivan Jokić
Municipality Čukarica
Place Belgrade – Rušanj
Street name Moravska
House number 15/A
Phone number +381 (0) 11 2580 996
Fax number +381 (0) 11 2580 996
e – mail [email protected]
Web address www.arcmonte.rs
GERMANYPlace 85598 Baldham
Phone number +498 106 999 5414
Fax number +498 106 999 5410
E-mail [email protected]
Web address www.arcmonte.rs
4www.arcmonte.rs
ABOUT US
“ARC MONTE” DOO was founded on 15th January 2007 as a company for providing services in the domain of mechanical engineering at construction, overhauling, maintenance and reconstruction of generating and industrial plants.
During its existence „ARC MONTE“ has positioned itself and became recognizable on more competitive markets, thanks to, at first, the quality of performed works.
From the very beginnings “ARC MONTE” performed works in domestic market as well as in foreign markets, as a partner of reputable companies in field of mechanical engineering on all king of energetic and industrial plants and also on prefabrication of equipment for the plants.
As the strongest advantage for existence on domestic and also on foreign market “ARC MONTE” distinguish quality, accuracy and reliability in performing works being engaged on.
“ARC MONTE” has its own school for the education of welders in all conservative welding performances (according to standard EN 287-1). The education is conducted according to the program for international welding engineers (IWE), and under strict supervision of welding instructors being also experienced and approved welders.
In addition to the basic courses for the education of welders , the school is helping us with the advanced training of already proved welders as well as with trainings for our welders in period of minor orders for work (winter period), since it is necessary to conserve the quality and to be prepared for future orders.
5www.arcmonte.rs
Besides the standard welding training, it is also possible create a training adjusted to investors’ special needs.
“ARC MONTE” has a good cooperation with the domestic and foreign certification authorities, providing us help and direction in working in scope of European norms being very demanding concerning quality and safety at work.
On this note and in order to quality performance of work as well as increasing competence of market „ ARC MONTE“ is certificated by ISO 9001-2008; EN 3834-2.
All above mentioned indicate that ARC MONTE becomes modern company growing fast with market’s demands. The company also invests in human resources, equipment and tools, in order to remain reliable partner on strategic orders in the country and abroad in years to come.
6www.arcmonte.rs
REFERENCE LIST Serbia
PE “ TRANSNAFTA”, Zmaj Jovina 1, 13000 Pancevo Mechanical and assembly works on damage and insulation reparation on oil pipeline based on intelligent pigs scanning results, section DN-1 Urgent intervention on pipeline reparation on section DN-2
“VIA OCEL”, Tadeuša Košćuška 56, Belgrade
PE MB "Kolubara" - branch "Prerada" - VreociAssembly works and dismantling pipeline for chemical treatment of boiler K1 and K2,50MW
PE EPS, PP “Nikola Tesla”, PP “Morava”Works on inlet and outlet superheater collectors
PE EPS, PP “Nikola Tesla” A, ObrenovacReparation of the mill circuit
PE EPS, PP “Nikola Tesla” B, ObrenovacWorks on convective heating surface: superheater 1
PE EPS, PP “Nikola Tesla” B, ObrenovacAdaptation of slag transport system under silo
7www.arcmonte.rs
PE EPS, PP “Nikola Tesla” B, ObrenovacWorks on hanging pipes for Reheater 2 PCE “Beogradskeelektrane”, HPKonjarnikReconstruction of main heating system for hot water Babcock Borsig Steinmüller, PP „Bitola“ Block 3Works on high pressure equipment: superheater from material 13CrMo4-5, 10CrMo9-10, X10CrMoVNb9-1, and collector evaporator - 16Mo3, capacity of steam boiler 210MWe PE EPCG PP „Pljevlja“Works on convective heating surface: Superheater 4 from material 12H1MF on steam boiler capacity 210Mwe PCE “Beogradske elektrane”, HP Novi BeogradDismantling and assembly works on upper eco package VK2 “SLOBODA METAL”, ObrenovacWorks on ear heater on boiler A4 - PE EPS, PP „Nikola Tesla“ A, Obrenovac “MINEL KOTLOGRADNJA”, Uralska street no.3, BelgradePrefabrication of pipeline on steam boiler facilities for PCE „Beogradske elektrane“ “INVEST MONTAŽA” d.o.o., Nikole Spasića 3, Belgrade• Assembly of oil fuel floor heater on HP Cerak• Assembly of oil fuel floor heater on HP Batajnica
8www.arcmonte.rs
“INVEST-IMPORT” A.D. ,Terazije 5, BelgradeLocksmith and welding works on boiler construction PCE Beogradske elektrane, HP Novi Beograd “KIRKA SURI” d.o.o. Miodraga Petrovića 15, BelgradeWelding works on pipe system for hot water boiler (ECO package and collectors)
“MESSER TEHNOGAS” A.D., Banjički put 62, BelgradeLinking of pipe from pipeline to filters in section CO2, factory Pancevo “NIS” – Oil Rafinery PancevoPerfabrication and assembly of bundle tubes with collector for superheater on blast furnance in faciliy FSS AD “BEOGRAD” IMK , Žorža Klemensoa 20, BelgradeAssistance in sertification of DIN 18800-7 unit and training of welders – procedure 135 P BW 1.1 “NS-TERMOMONTAŽA” d.o.o. , Stevana Mokranjca 18/31, Novi SadLocksmith and welding works in suggar plant “Donji Srem” Pecinci “FEROMONT INŽENJERING” AD, Bačvanska 21/II, BelgradeLocksmith and welding works on boiler reparation , PE EPS, PP “Nikola Tesla” A, Obrenovac “UTVA PROING”, Utve Zlatokrile 9, PančevoProduction of road tankers for technical water, V=13500l
9www.arcmonte.rs
REFERENCE LISTForeign countries
GERMANY ZK-TERMOCHEM s.r.o., Lihovarska 1847/14, 19000 Praha 9• Assembly of connecting pipeline – package 3, block F+G- new construction 2x1100MW-RWE Neurath Germany• Assembly of connecting pipeline – package 3, block 9, GKM Manheim Germany• Assembly of pressure parts- package 4, block 9, GKM Manheim Germany “RUDAR ANLAGEMONTAGE”GmbH, Schwedt/Oder, Germany• Production and assembly of tanks and equipment in rafinery PCK Schwedt Germany• Production and assembly of gas pipeline and equipment in rafinery PCK Schwedt Germany• Production and assembly of oil pipeline and equipment in rafinery PCK Schwedt Germany
MONTENEGRO PE “ELEKTROPRIVREDA CRNE GORE AD NIKŠIĆ”, Montenegro• Reconstruction of boiler hangers – PP Pljevlja• Locksmith and welding works on sealing of boiler- PP Pljevlja
MACEDONIA “EL TE INŽENERING” d.o.o., Macedonia, SkopljeLocksmith and welding works on gas pipeline from TIR31 to airport TAV and quarters
10www.arcmonte.rs
CERTIFICATES
11www.arcmonte.rs
PICTURES OF OUR WORK
12www.arcmonte.rs
13www.arcmonte.rs
14www.arcmonte.rs
15www.arcmonte.rs
16www.arcmonte.rs
17www.arcmonte.rs
18www.arcmonte.rs
ARC MONTE Quality as a priority