PV Power Plant Performance Assessment and Risk Assessment
(China)
Daniel HongCEO & President
ofClenergy (Xiamen) Technology Co., Ltd.
November 25, 2014
FiT for Distributed Solar Projects:•Price of electricity generated and used by owners themselves = local electricity price + 0.42 Yuan (7 U.S. cents)/KWh•Price of surplus electricity feed back to the grid = coal-fire power price + 0.42 Yuan /KWh
PV Power Stations performance AssessmentFeed-in Tariffs
Benchmark FiT for PV Power Stations in Different Regions
Unit: Yuan/KWh (Tax Included)
Solar Radiation LevelBenchmark FiT for PV Power Stations
Regions
Solar Radiation Level I 0.9
Ningxia; Haixi in Qinghai; Jiayuguan, Wuwei, Zhangye, Jiuquan,
Dunhuang, Jinchang in Gansu; Hami, Tacheng, Altai, Karamy in
Xinjiang; Inner Mogolia (excluding Chifeng, Tongliao, Hinggan,
Hulunbuir)
Solar Radiation Level II 0.95
Beijing; Tianjin; Heilongjiang; Jilin; Liaoning; Sichuan; Yunnan;
Chifeng, Tongliao, Hinggan, Hulunbuir in Inner Mogolia; Chengde,
Zhangjiakou, Tangshan, Qinhuangdao in Hebei; Datong, Shuozhou,
Xinzhou in Shanxi; Yulin, Yan'an in Shaan'xi; regions in Qinghai,
Gansu, Xinjiang that are not in Solar Radiation Level I
Solar Radiation Level III 1 All other regions
Note: Benchmark FiT in Tibet will be made separately.
The new FiT, scheduled to last 20 years, will apply to all PV projects registered after September 1, 2013. Those registered before
September 2013 and connected to the grid by the end of 2013 will enjoy the previously universal FiT of 1 Yuan (16 U.S. cents) per
KWh. The distributed PV projects get a subsidy of 0.42 Yuan (7 U.S. cents) per KWh generated.
Financial Leverage
•Bank
•Fund
Investment refers to a commercial
activity or process that uses valuable
resources or assets in a project or
activity to obtain economic returns.
Financing refers to the variety of
methods that an enterprise uses to
raise funds from financial institutions or
financial intermediaries.
PV Power Stations performance AssessmentInvestment & Financing
Under current policy in China, ground-mounted or distributed solar projects can
achieve a 10% or higher ROI for 20-25 years by adopting financial leverage. In Fujian
province, for example, the IRR of a distributed solar project can be 18% or more by
leveraging.
PV Power Stations performance AssessmentROI Assessment
Construction Risks
Construction quality is an essential factor for the smooth operation of a PV power plant. Most ground
mounted PV power stations in China are located in the northwest desert area, which includes dry land and high soil
resistivity. It is difficult to maintain ground resistance under 4 ohms in this area. When ground resistance in a PV
field is high, it will directly affect the operation of inverters and communication networks, sometimes even leading to
an explosion of the inverters. The fabrication of HV cable terminals is also crucial because northwestern China has
significant wind and dust. If dust enters the cable terminals during fabrication, it may cause hidden troubles for the
safe operation of cable terminals.
Clenergy, established in August, 2007, is a Sino-Australian joint-venture company. Clenergy is committed to
developing clean energy investment and solar project services. We are a solar solutions and products provider
with an international R&D, managing, marketing and service team. Clenergy has established a global
marketing and R&D network with headquarter in Xiamen as well as operations in Australia, Hong Kong, Japan,
Malaysia, Tianjin, the U.K. and the U.S.
Machine Processing Workshop Power Electronics Workshop
PV-ezRack Workshop WarehouseClenergy Technology Park
Clenergy Profile — About Clenergy
Solar Project Services
Solar Solutions & Products
2 31
Clean Energy Investment
Clenergy Profile — Business Scope
April 2013 - 300MW in Lijiang, Yunnan Province, China
Clenergy and strategic partner CGN Solar Energy Development sign an investment and
development agreement with the city of Lijiang.
May 2013 - 18MW in Binchuan County, Yunnan Province, China
Clenergy and CGN team up for their second solar investment project in Yunnan Province, an 18MW project.
Clenergy signs 100MW solar investment agreement with the city of Huludao.
December 2013 - 100MW in Huludao, Liaoning Province, China
By working closely with leading solar energy enterprises, financial groups and
investment fund companies in China and abroad, Clenergy demonstrates its
involvement in Solar Park Investments. Clenergy is committed to making clean
energy affordable and accessible in more countries and regions.
Business Scope — Clean Energy Investment
Clenergy (Xiamen) Energy Engineering Co., a wholly-owned subsidiary of Clenergy, specializes in
delivering solar project services and builds on Clenergy’s expansion in China. The new company
provides a one-stop turnkey service that includes project consultation and design, construction system
integration, operation and maintenance.
In June 2013, Clenergy, CGN and the Clean Energy Industry Alliance
begin joint efforts to develop clean energy projects in Fujian, China.
In March 2014, Clenergy cooperates with the Xiamen National Hi-
Tech Entrepreneurship Center and co-founds Clenergy (Xiamen)
Energy Investment Co. to develop distributed PV projects in Fujian,
China.
Business Scope — Solar Project Services
21
SPS Grid-connected Inverter (50-500kW)
SPH Grid-connected Inverter (1.5-6kW)
Integrated String Combiner Box
Clenergy Panorama
Business Scope — Solar Solutions & Products
Clenergy is committed to providing products with stable performance and reliable quality and professional and
cost-effective solutions for our partners. Clenergy's design and development team provides comprehensive
solutions that factor in a full evaluation of the natural factors around the construction site (e.g., meteorological
conditions such as typhoons, rainstorms and snowfall as well as geological conditions) to lower equipment
risks for our customers.
PV-ezRack Mounting Systems Resist Natural Disasters
& Reduce Risks for Customers
Clenergy’s PV-ezRack Mounting System withstands super typhoons in Hainan
Clenergy provided a mounting solution for a 20MW solar power plant in mountainous Ledong,
China, that optimized the supporting structure design and that used high-quality carbon steel to
further enhance the system strength. After completion, the project was hit by two typhoons, a pair
of natural disasters that Clenergy’s PV-ezRack mounting system survived essentially intact.
Hainan typhoons impact multiple facilities PV-ezRack mounting system withstands wind damage
Clenergy’s PV-ezRack Mounting System withstands
tornados in Australia
When a series of tornados ripped through the Queensland city of Bundaberg,
Australia on January 26, 2013, a PV-ezRack SolarTerrace III solar power system
from Clenergy survived with only minimum damage.
Tornado wrecks buildings PV-ezRack Mounting System withstands tornados
Making the world a cleaner and safer place for future generations!
Clenergy (Xiamen) Technology Co., Ltd.999-1009 Min’an Rd, Houju Hi-tech Ind. Dev. Zone Xiang’an District,
Xiamen, Fujian, China
E-mail: [email protected]: +86 (592) 311-0088, ext. 5053
Fax: +86 (592) 578-2298