Purpose and Background. The Cecil County Northeast Advanced Wastewater Treatment Plant (NEAWWTP) will need to be expanded to support anticipated growth associated with the APG – BRAC development - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/1.jpg)
![Page 2: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/2.jpg)
Purpose and Background• The Cecil County Northeast Advanced Wastewater Treatment
Plant (NEAWWTP) will need to be expanded to support anticipated growth associated with the APG – BRAC development
• The NEAWWTP permitted capacity is capped at 2.67 MGD at an average Total Nitrogen (TN) concentration of 3.0 mg/l, or approximately 24,500 pound TN annually
• On April 26, 2008 MDE adopted the “Maryland Policy for Nutrient Cap Management and Trading in Maryland’s Chesapeake Bay Watershed” to provide guidance to offset increased discharges and nutrient loads through nutrient credits
• Cecil County wishes to pursue all practical opportunities for nutrient credits for use at the NEAWWTP
![Page 3: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/3.jpg)
Project Scope and Goals• OEA-CSSC Project 9 – Cecil County Wastewater Treatment
Capacity Analysis is intended to develop a plan to obtain nutrient load credits for the expansion of the NEAWWTP from 2.0 MGD to 5.0 MGD
• Identify projects for nutrient credits using the “Maryland Policy for Nutrient Cap Management and Trading in Maryland’s Chesapeake Bay Watershed,” including– Delineate service area boundaries and estimate flow
capacities– Develop preliminary layouts of wastewater collection
systems including alternative studies where feasible– Develop plans and exhibits for selected projects– Develop estimates of probable construction cost– Provide data for MDE approval of nutrient load credits
• Recommend a plan of action
![Page 4: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/4.jpg)
Project IdentificationCredit Opportunity
Existing Significant WWTP’s
![Page 5: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/5.jpg)
Project IdentificationCredit Opportunity
Existing Minor WWTP’s
![Page 6: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/6.jpg)
Project IdentificationCredit Opportunity
On-site Sewage Disposal Systems
![Page 7: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/7.jpg)
Project IdentificationCredit Opportunity
Community Residential OSDS
![Page 8: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/8.jpg)
Project IdentificationCredit Opportunity
Schools and Commercial OSDS
![Page 9: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/9.jpg)
Treatment Regions
![Page 10: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/10.jpg)
Projects By Area
![Page 11: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/11.jpg)
Project DevelopmentZoning and Comprehensive Plan
![Page 12: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/12.jpg)
Project DevelopmentTown of Port Deposit Project
Total Credits = 1.148MGD
Total Cost = $66.7M
Per Credit = $3,000 / credit
![Page 13: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/13.jpg)
Project DevelopmentTown of Port Deposit Project
Total Cost = $14.3M
Total Credits = 0.525MGD
![Page 14: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/14.jpg)
Project Ranking
• Each project was ranked for:– Cost– Credit Opportunity– Ease of Implementation
• A project list was developed prioritized by ranking and showing a cumulative total of proposed credits
![Page 15: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/15.jpg)
Other Credit Opportunities
• Individual OSDS connected to existing sewer• Transfer of development rights• Stormwater management upgrades• Protected lands• Water reuse• Land application of effluent• Trading with municipalities outside of the
County
![Page 16: Purpose and Background](https://reader035.vdocuments.us/reader035/viewer/2022062407/56812fad550346895d95343e/html5/thumbnails/16.jpg)
Recommended Plan of ActionPriority Project Project Credit
(MGD)Cumulative Credit
(MGD)
1 Carpenters Point 0.43 0.43
2 Port Deposit 1.62 2.05
3 Crystal Beach 0.67 2.72
4 Red Point 0.11 2.83
5 Holloway Beach 0.07 2.90
6 Hances Point 0.31 3.21
7 Piney Ridge 0.01 3.22
8 W. Old Philadelphia Rd.
0.05 3.27
9 Bethel Church Rd. 0.01 3.28