Public Notice US ARMY CORPS Reply To: Permission No. OF ENGINEERS U.S. Army Corps of Engineers OD-R 18-010 St. Louis District Gateway to Excellence Attn: CEMVS-00-R Public Notice Date 1222 Spruce Street July 12. 2018 St. Louis, Missouri 63103-2833 Postmaster Please Post Conspicuously Until: Expiration Date August 3, 2018 REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408 Interested parties are hereby notified that an application has been received for a Department of the Army Section 408 permission for certain work near federally constructed flood protection projects of the United States, as described below and shown on the attached maps. COMMENTS AND ADDITIONAL INFORMATION: Comments on the described work should reference the U.S. Army Corps of Engineers Public Notice number shown above and must reach this office no later than the above expiration date of the Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address: U.S. Army Corps of Engineers Readiness Branch 1222 Spruce Street St. Louis, Missouri 63103-2833 ATTN: Jeremy Eck,or [email protected] REQUESTER: Adams Telephone CO-OP, Attention: Mr. Ryan Buehler LOCATION: McGee Creek Drainage and Levee District, Pike County, Illinois PROPOSED ACTION: The applicant is proposing alterations to install a 2-inch Fiber Optic Line and a corresponding 4-inch protective steel conduit over McGee Creek's levee. This fiber optic line will go up and over the levee at approximate levee station 701 +00, or just south of the Hwy 104 bridge over McGee Creek near Chambersburg. More specifically, the proposed project will involve stripping the vegetation and excavation of the unfavorable materials within the construction limits. The protection pipe will be ran up and over the levee then covered with 2 feet of material. The area will then be seeded and left in favorable condition. LOCATION MAPS AND DRAWINGS: See Attachments 1

Upload: others

Post on 27-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Public Notice - St. Louis District...Attn: CEMVS-00-R Public Notice Date 1222 Spruce Street July 12. 2018 St. Louis, Missouri 63103-2833 Postmaster Please Post Conspicuously Until:

Public Notice US ARMY CORPS Reply To: Permission No.

OF ENGINEERS U.S. Army Corps of Engineers OD-R 18-010

St. Louis District Gateway to Excellence

Attn: CEMVS-00-R Public Notice Date

1222 Spruce Street July 12. 2018 St. Louis, Missouri 63103-2833

Postmaster Please Post Conspicuously Until: Expiration Date

August 3, 2018

REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408

Interested parties are hereby notified that an application has been received for a Department of the Army Section 408 permission for certain work near federally constructed flood protection projects of the United States, as described below and shown on the attached maps.

COMMENTS AND ADDITIONAL INFORMATION: Comments on the described work should reference the U.S. Army Corps of Engineers Public Notice number shown above and must reach this office no later than the above expiration date of the Public Notice to become part of the record and be considered in the decision. Comments should be mailed to the following address:

U.S. Army Corps of Engineers Readiness Branch 1222 Spruce Street St. Louis, Missouri 63103-2833 ATTN: Jeremy Eck,or [email protected]

REQUESTER: Adams Telephone CO-OP, Attention: Mr. Ryan Buehler

LOCATION: McGee Creek Drainage and Levee District, Pike County, Illinois

PROPOSED ACTION: The applicant is proposing alterations to install a 2-inch Fiber Optic Line and a corresponding 4-inch protective steel conduit over McGee Creek's levee. This fiber optic line will go up and over the levee at approximate levee station 701 +00, or just south of the Hwy 104 bridge over McGee Creek near Chambersburg. More specifically, the proposed project will involve stripping the vegetation and excavation of the unfavorable materials within the construction limits. The protection pipe will be ran up and over the levee then covered with 2 feet of material. The area will then be seeded and left in favorable condition.

LOCATION MAPS AND DRAWINGS: See Attachments 1

Page 2: Public Notice - St. Louis District...Attn: CEMVS-00-R Public Notice Date 1222 Spruce Street July 12. 2018 St. Louis, Missouri 63103-2833 Postmaster Please Post Conspicuously Until:
Page 3: Public Notice - St. Louis District...Attn: CEMVS-00-R Public Notice Date 1222 Spruce Street July 12. 2018 St. Louis, Missouri 63103-2833 Postmaster Please Post Conspicuously Until:
Page 4: Public Notice - St. Louis District...Attn: CEMVS-00-R Public Notice Date 1222 Spruce Street July 12. 2018 St. Louis, Missouri 63103-2833 Postmaster Please Post Conspicuously Until:

APPROXIMATE

LEVEE CL

EXISTING FIBER

OPTIC LINE

PROPOSED FIBER

OPTIC LINE

ILLINOIS ROUTE 104

APPROXIMATE CL

1

0

'

5:1 SIDE SLOPE

TOP OF LEVEE

40' WIDTH

STA 700+00

(NLDB)

ILLINOIS ROUTE 104

APPROXIMATE ROW

4

5

'

APPROXIMATE

CONSTRUCTION

LIMITS

0+00 0+20 0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00

430

440

450

460

470

430

440

450

460

470

MCGEE CREEK

LANDSIDE OF LEVEE

NAVD 88

2' EXISTING FILL PLACED

DURING PREVIOUS FIBER

OPTIC LINE INSTALLATION

EXISTING LEVEE CROSS SECTION

BASED ON LIDAR AT PROPOSED

FIBER OPTIC CROSSING (50' OFF

CENTERLINE OF ROAD)

4" STEEL CONDUIT

PROTECTION PIPE

2" PROPOSED

FIBER OPTIC

STA 701+54 FIBER OPTIC CROSSING

© 2017 KLINGNER & ASSOCIATES P.C.

This document shall not be used for any purpose or

project for which it is not intended. Klingner & Associates

P.C. and their Divisions shall be indemnified by the client

and held harmless from all claims, damages, liabilities,

losses and expenses, including attorneys fees and costs

arising out of such misuse or reuse of this document. In

addition, unauthorized reproduction of this document, in

part or as a whole, is prohibited.

MARK DESCRIPTION DATE APPR

REVISION HISTORY

17-0905

DRAWING ISSUED DATE:

AD

AM

S T

EL

EP

HO

NE

C

O-O

P

40

5 E

MM

IN

GA

R

OA

D

GO

LD

EN

, IL

6

23

39

MC

GE

E C

RE

EK

AD

AM

S F

IB

ER

C

RO

SS

IN

G

SHEET

PROJECT NO.

SHEET TITLE

CHECK DATECHECKED

FIELD BOOKFIELD

DRAWNDESIGNED

Non-Reduced Sheet Size: 11" x 17"

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

NG

ale

sb

urg

, IL

B

urlin

gto

n, IA

Pe

lla

, IA

H

an

nib

al, M

O C

olu

mb

ia

, M

O

ww

w.klin

gn

er.co

m

61

6 N

orth

2

4th

S

tre

et

21

7.2

23

.3

67

0

Quincy, Illinois

.05/31/2018

USACE REVIEW

.

1

MCGEE CREEK

ADAMS FIBER

CROSSING PLAN +

PROFILE

01/08/2018

JAC.

..

..

120'60'0

SCALE: 1" = 60'

KL

IN

GN

ER

GENERAL NOTESA. THE UNITED STATES ARMY CORPS OF ENGINEERS ENGINEERING MANUAL 1110-2-1913 METHODS FOR UTILITIES CROSSINGS SHALL BE FOLLOWED THROUGHOUT THE DESIGN AND CONSTRUCTION PROCESS. ANY

QUESTIONS AS TO THE APPLICABILITY OR IMPLEMENTATION OF THESE DESIGN STANDARDS SHALL BE COORDINATED WITH USACE MVS (ST. LOUIS DISTRICT) THROUGH THE ENGINEER (KLINGNER).B. PERMANENT WARNING SIGNS SHALL INDICATE THE FIBER OPTIC LINE LOCATION ON BOTH THE LANDSIDE AND RIVERSIDE OF THE LEVEE ON THE EDGE OF THE LEVEE RIGHT-OF-WAY. SIGNS SHALL BE PLACED OUTSIDE

THE LEVEE PRISM OR BEYOND THE RESPECTIVE LEVEE TOE LOCATIONS. LEVEE RIGHT-OF-WAY SHALL BE STAKED DURING CONSTRUCTION AT THE EXPENSE OF THE CONTRACTOR.C. THE PROPOSED FIBER OPTIC LINE SHALL BE COVERED WITH 2 FT OF EXISTING IMPERVIOUS MATERIAL, WITH A MINIMUM 10 FT SEPARATION FROM EXISTING FIBER OPTIC LINE, WHILE MAINTAINING EXISTING LEVEE

TOP WIDTH AND ELEVATION (ELEVATION ON TOP OF LEVEE OVER PROPOSED LINE SHOULD EQUAL THE ELEVATION OF FILL OVER EXISTING FIBER OPTIC LINE). ORIGINAL LEVEE SECTION SHALL NOT BE DISTURBED.D. PROPOSED FIBER OPTIC LINE SHALL BE LAID ON IL 104 RIGHT-OF-WAY, UTILIZING EXISTING FILL FROM PREVIOUS FIBER OPTIC LINE. THE LEVEE TOP SHALL BE MADE CROSSABLE, WITH APPROACHING SLOPES OF 10

HORIZONTAL TO 1 VERTICAL, PERPENDICULAR TO THE FIBER OPTIC CROSSINGS.E. FINAL PROJECT SHALL BE FOUND ACCEPTABLE AND APPROVED BY MCGEE CREEK DRAINAGE & LEVEE DISTRICT.F. ALL WORK SHALL BE UNDER ONE YEAR WARRANTY INCLUDING EROSION.G. CONTRACTOR TO PROVED 48 HOUR NOTICE TO LEVEE DISTRICT AND ENGINEER PRIOR TO PROCEEDING AND SHALL COORDINATE FINAL INSPECTION.H. INDICATED QUANTITIES ARE FOR ESTIMATING REFERENCE ONLY. ANY VARIATION OF IN QUANTITIES TO MEET THE REQUIREMENTS SET FORTH IN THIS PLAN SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

STRIPPING

THE ENTIRE AREA WITHIN THE LIMITS OF EXISTING GROUND TO RECEIVE EMBANKMENT AND STRUCTURES, TOGETHER WITH STRIPS 5 FEET WIDE, BEYOND AND CONTIGUOUS THERETO, EXISTING LEVEES TO RECEIVEBACKILL, PONDING AREAS, AND DITCHES SHOWN ON THE DRAWING SHALL BE STRIPPED TO REMOVE CROPS, WEEDS, GRASS, AND OTHER VEGETATIVE MATERIALS TO THE GROUND SURFACE AND TOPSOIL TO A DEPTH OF12 INCHES. ALL STRIPPED VEGETATION SHALL BE REMOVED FROM THE SITE BY THE CONTRACTOR.

EXCAVATION AND STOCKPILING

EXCAVATION SHALL BE LIMITED TO ACTIVITIES ONLY WITHIN OVERBUILT SECTIONS OF THE LEVEE. EXCAVATION WITHIN THE LEVEE PRISM OR FOOTPRINT WILL NOT BE ALLOWED.IMPERVIOUS FILL REQUIREMENTS

A. SOIL CLASSIFICATION TESTSSOIL CLASSIFICATION TESTS SHALL BE PERFORMED IN ACCORDANCE WITH ASTM D2487. ONE INITIAL CLASSIFICATION TEST SHALL BE REQUIRED FOR EACH CLASSIFICATION OF MATERIAL TO BE UTILIZED AS EMBANKMENTFILL OR BACKFILL. AS PRESCRIBED IN ASTM D2487, GRAIN SIZE ANALYSIS IN ACCORDANCE WITH ASTM D422 AND ATTERBERG LIMITS IN ACCORDANCE WITH ASTM D4318 SHALL BE PERFORMED ON EACH DIFFERENTCLASSIFICATION. SUBMIT ADDITIONAL TESTS FOR EVERY 500 CUBIC YARDS OF EMBANKMENT OF BACKFILL MATERIAL OR AS DEEMED NECESSARY BY THE OWNER'S REPRESENTATIVE. SOIL CLASSIFICATION TESTS SHALL BEPERFORMED ON FOUNDATION MATERIAL AS REQUIRED TO DETERMINE THE ACCEPTABILITY OF IN-SITU SOILS. ADDITIONAL TESTS WILL BE REQUIRED IF NOTICEABLE CHANGES IN THE MATERIAL OCCUR.

B. IMPERVIOUS FILL MATERIALTHIS MATERIAL SHALL CONSIST OF SATISFACTORY IMPERVIOUS MATERIAL CLASSIFIED AS LEAN CLAY (CL), LOW PLASTICITY SILT (ML), HIGH PLASTICITY SILT (MH), SAND CONTAINING MORE THAN 30 PERCENT OF CLAY (CL),AND BORDERLINE CLAY AND SILT (CL-ML) IN ACCORDANCE WITH ASTM D2487.

C. IMPERVIOUS FILL PLACEMENTTHE IMPERVIOUS FILL MATERIAL SHALL BE PLACED AND SPREAD IN LAYERS NOT MORE THAN 6 INCHES IN UNCOMPACTED THICKNESS, EXCEPT THAT WITHIN 4 FEET OF STRUCTURES, THE UNCOMPACTED LAYER THICKNESSSHALL BE REDUCED TO 4 INCHES. LAYERS SHOULD BE STARTED FULL OUT TO THE SLOPE STAKES AND SHALL BE CARRIED SUBSTANTIALLY HORIZONTAL AND PARALLEL TO THE LEVEE CENTERLINE WITH SUFFICIENT CROWNOR SLOPE TO PROVIDE SATISFACTORY DRAINAGE DURING CONSTRUCTION.

D. IMPERVIOUS FILL MOISTURETHE MOISTURE CONTENT AFTER COMPACTION SHALL BE WITHIN THE LIMITS OF 2 PERCENTAGE POINTS ABOVE AND BELOW OPTIMUM OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D698.

E. COMPACTION OF IMPERVIOUS FILLAFTER A LAYER OF MATERIAL HAS BEEN DUMPED AND SPREAD, IT SHALL BE HARROWED TO BREAK UP AND BLEND THE FILL MATERIALS AND TO OBTAIN UNIFORM MOISTURE DISTRIBUTION. HARROWING SHALL BEPERFORMED WITH A HEAVY DISK PLOW, OR OTHER APPROVED HARROW, TO THE FULL DEPTH OF THE LAYER. IF ONE PASS OF THE HARROW DOES NOT ACCOMPLISH THE BREAKING UP AND BLENDING OF THE MATERIALS,ADDITIONAL PASSES OF THE HARROW SHALL BE REQUIRED. WHEN THE MOISTURE CONTENT AND THE CONDITION OF THE LAYER ARE SATISFACTORY, THE LIFT SHALL BE COMPACTED TRAVERSING IN A DIRECTION PARALLELTO THE AXIS OF THE LEVEE TO A MINIMUM OF 95 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE CONTRACTOR OR CONTRACTOR'S REPRESENTATIVE IN ACCORDANCE WITH ASTM D698. IN AREASWHICH ARE NOT ACCESSIBLE BY LARGE EQUIPMENT, THE FILL SHALL BE PLACED IN LAYERS NOT MORE THAN 4 INCHES IN UNCOMPACTED DEPTH AND COMPACTED WITH AN APPROVED HAND OPERATED COMPACTOR TO ADENSITY EQUAL TO THAT OBTAINED IN OTHER AREAS WHICH ARE ACCESSIBLE TO LARGE EQUIPMENT. DUMPING, SPREADING, SPRINKLING, AND COMPACTING MAY BE PERFORMED AT THE SAME TIME AT DIFFERENTPOINTS ALONG A SECTION WHEN THERE IS SUFFICIENT AREA TO PERMIT THESE OPERATIONS TO PROCEED SIMULTANEOUSLY.SEEDING REQUIREMENTS

A. SEED MIXTHE SEED MIX SHALL CONSIST OF THE FOLLOWING:KIND OF SEED POUNDS PER ACRE MINIMUM PURITY % MINIMUM GERMINATION % MAX WEED %COMMON PERENNIAL RYE 50 98 85 0.8GRASS (LOLIUM PERENNE)KENTUCKY 31 TALL FESCUE 50 98 85 0.8(FESTUCA ARUNDINACEA)

B. FERTILIZERAPPLY FERTILIZER AT RATES DETERMINED BY LABORATORY SOIL ANALYSIS OF THE SOILS AT THE JOB SITE. TESTING SHALL BE AT THE EXPENSE OF THE CONTRACTOR WITH AT LEAST ONE SAMPLE PERFORMED FOR EVERY 2ACRES REQUIRING SEEDING. TESTING SHOULD DETERMINE THE APPLICATION RATES OF NITROGEN, PHOSPHOROUS, POTASH, AND LIMESTONE.

C. SEEDING PREPARATION / SEEDINGAFTER AREAS HAVE BEEN BROUGHT TO INDICATED FINISH GRADE, INCORPORATE FERTILIZER AND LIMESTONE INTO SOIL BY DISKING, HARROWING, OR TILLING. REMOVE DEBRIS AND STONES LARGER THAN 34 INCH IN ANYDIMENSION REMAINING ON THE SURFACE AFTER FINISH GRADING. CORRECT IRREGULARITIES IN FINISH SURFACE TO ELIMINATE DEPRESSIONS. SEEDING METHOD SHALL BE BROADCASTED, WHICH SHALL BE PERFORMEDUNIFORMLY AT THE RATES SPECIFIED. THE SEED SHALL BE COVERED UNIFORMLY USING SPIKE-TOOTH HARROW, CULTIPACKER, OR RAKING. ALL DISTURBED AREAS SHALL BE SEEDED AS SPECIFIED HEREIN. ALL DISTURBEDAREAS SHALL BE SEEDED.

D. MULCHA MULCH SHALL BE PROVIDED THAT IS FREE FROM NOXIOUS WEEDS, MOLD, AND OTHER DELETERIOUS MATERIALS. THE HAY OR STRAW MULCH SHALL BE SPREAD AT A RATE OF 2 TONS PER ACRE. MULCH SHALL NOT BECLUMPED OR BUNCHED AND SHALL BE SPREAD ON THE SAME DAY AS THE SEED APPLICATION.

E. WARRANTYSEEDING SHALL BE SUBJECT TO WARRANTY REFERENCED HEREIN OF ONE YEAR.