PT. INDO TEHNIK INDUSTRICompany Profile

Company Information

In order to meet your need, we are stepping forward to you with our abundant engineering technology and construction experience accumulated over 20 years.

Our highly advanced technology and prominent management structure lead all projects promptly and effectively.

We, PT. INDO TEHNIK INDUSTRI, will secure to satisfy all your needs.

PT. INDO TEHNIK INDUSTRI

3

To keep the best specialty of the past and pursue the best quality in the future.

MISSION

VISIONTo be a leading construction company providing Internationally accepted qualification.

To continue enjoying good reputation from clients with their full satisfaction.

In order to meet your need, we are stepping forward to you with our abundant engineering technology and construction experience accumulated over 20 years.

Our highly advanced technology and prominent management structure lead all projects promptly and effectively.

We, PT. INDO TEHNIK INDUSTRI, will secure to satisfy all your needs.

MOTTO

4

Company Information

5

We, PT. INDO TEHNIK INDUSTRI,

was established on January 21, 1997

newly as one of the engineering and construction

company with 100% Foreign Investment (PMA)

Specialized for Mechanical Erection,

Piping Fabrication and Installation,

Steel Structure fabrication and Installation,

Plumbing, H.V.A.C., Fire Fighting, Sanitary Work.

HISTORY

1997

6

Utilizing the unique experience of all our

management and members in

Indonesia and South East Asia for more than

20 years, we,

PT. INDO TEHNIK INDUSTRI, has been growing

rapidly since its establishment and enjoying

good reputation on

our diversified service executed.

It is our firm belief that our service will provide

customers with full satisfaction in terms of

quality and schedule.

20 Years

Now, we are ready to serve you.

Company Information

7

OUR BUSINESS LINES

Major Field of Engineering and Construction

Steel Structure Fabrication / Installation

Piping Fabrication / Installation

Mechanical Erection

Plumbing. H.V.A.C., Fire Fighting, Sanitary Work

8

ORGANIZATION

President Director

Vice President

Board Director

Director

AdministrationProcurement

FinancingAccounting

General Affair

Engineering

Marketing

Steel StructureMechanical

PipingQA/QC

Project Execution

Steel StructureMechanical

PipingQA/QC

CAD Goverment Relations

Cost & Schedule

CAD

Company Information

9

KEY PERSONNEL

President Director Kim Soo Yong

Vice President Kim Chung Sok

Director Kim Ho sok

Site Manager Wi Pil hun, Woo Dae Keun

Project Manager Abdul Rohim

Engineering Manager Gunadi

Cost & Schedule Andi Syamsudin

Administration Manager Johannes Endro Sulistyo

Financing & Accounting Mintari Rimadaniati

Procurement Gatut Sugeng Wiyono

NitaHuman Resource Development

10

Our EmployeeMax.

Mobilization

Description Korean Indonesia

Managing Staff

Administration

Engineering

CAD/DWG

DWG Drafter

Construction

QA/QC, Safety

Sch. / Cost

Supervisor

Foreman & Others

Total 6 114

3 1

6

1 20

5

8

2

UAE

2

1

1

10

10

3

16

35

Description Manpower

Welder (6G/3G)

Pipe Filter

Millwright /Mechanical

Rigger

Scaffolder

Steel Fabricator

Insulator

Painter

Equipment Operator

Semi Skilled Labor

Carpenter

Concrete Worker

Total 1,850

200

300

350

150

100

100

100

100

100

50

150

150

PERFORMANCERECORD

Performance DuringThe Past 20 Years

Project Performanceper Year

Total Contract Amount ExecutedUSD 119,000,000

Biggest Contract Amount for Single ProjectUSD 17,750,000

Highest Manpower Mobilized for Single Project2,000 persons

Highlights for Single Project Executed Steel Structure Fabrication & Erection : 11,800 tons,

Mechanical Equipment Erection of 8,600 tons, Piping Fabrication and Installation of 260,000 DI

93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14

500.0

0

1500.0

2000.0

1000.0

USD 11,000

12

PROJECTHIGHLIGHTS

EMAL Phase 2 CCPP Project

OVERSEAS PROJECT

PRAI CCGT Project

Project Location : Prai, Penang, MalaysiaProject Summary : 1071 MWCustomer : TNB Prai Sdn BhdMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 5,500.000Time Frame : May 2014 ~ September 2015

Project Location : Al Taweelah, Abu DhabiProject Summary : 1,023 MW Customer : Emirates Alumminium Company LimitedMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 12.670.000Time Frame : March 2012 ~ June 2014

14

PROJECT HIGHLIGHTS

UAE Shuwaihat S2 IWPP Project

Project Location : Ruwais, UAE Project Summary : 1510 MW and 100 MIGDCustomer : Ruwais Power Company Main Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 17.750.000Time Frame : September 2009 ~ October 2010

Al- Ezzel Power Plant

Project Location : BahrainProject Summary : 4 Unit HRSG Power PlantCustomer : Al Ezzel Power Co.Main Contractor : Doosan Heavy Industries & Const. Co., Ltd.Work Scope : - Installation of Mechanical Equipment, - Fabrication and Installation of Piping : 98,000 DIContract Amount : USD 2,745,000Time Frame : January 2006 ~ August 2006

15

Khurais Central Gas Facilities Project

Project Location : Khurais, Saudi ArabiaCustomer : Saudi Arabia Oil Company (Saudi Aramco)Main Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 5.000.000Time Frame : August 2007 ~ August 2008

FCFC Aroma II, ISBL Chemical Plant

Project Location : Mai-Liao complex, TaiwanCustomer : Formosa Chemical & Fiber Corp.Main Contractor : Daelim Industrial. Co., Ltd.Work Scope : - Installation of Mechanical Equipment : 8,600 tons, - Fabrication and Installation of Piping : 520,000 DI, - Steel Structure : 11,800 tons, Maintenance and Commissioning Contract Amount : USD 6,000,000 excluding additional work

Time Frame : June 1998 ~ March 2000

16

PROJECT HIGHLIGHTS

Cilacap RFCC Project

Project Location : Anyer, Banten, IndonesiaProject Summary : Chemical PlantCustomer : PT. Asahimas Chemical (ASC)Main Contractor : Lotte Engineering & Construction.Work Scope : - Steel Structure Erection, - Equipment Erection, - Piping Fabrication and Installation - Pipe Support, Painting Insulation Maintenance & Commissioning AssistanceContract Amount : USD 7,700,000Time Frame : December 2014 ~ December 2015

LOCAL PROJECT

17

Project Location : Cilacap, Central Java, IndonesiaCustomer : PT. Pertamina Main Contractor : GS Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Steel Structure Erection, Equipment Erection,Contract Amount : USD 16,200,000Time Frame : March 2013 ~ May 2015

ASC Phase-VI VCM Project

Hankook Tire Indonesia Plant

Project Location : Cikarang, West Java, Indonesia Customer : Hankook Tire Main Contractor : Lotte Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Equipment Erection, Contract Amount : USD 5,000,000Time Frame : December 2011 ~ September 2012

Project Location : Cikarang, West Java, Indonesia Customer : Hankook Tire Main Contractor : Lotte Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Equipment Erection, Contract Amount : USD 5,000,000Time Frame : December 2011 ~ September 2012

Hankook Tire Indonesia Plant Ph2

18

Cibinong Phase III Extension Project

Project Location : Cibinong, West Java, IndonesiaProject Summary : 6,000 MTPD Cement PlantCustomer : PT. Semen CibinongMain Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Steel Structure : 2,637 tons - Erection : 8,071 tons - Piping Fabrication and Installation : 426 tons, Maintenance and Commissioning Contract Amount : USD 6,700,000 excluding additional work

Time Frame : March 1990 ~ July 1992

PROJECT HIGHLIGHTS

LOCAL PROJECT

19

Cirebon CFPP : 660 MW x 1 Unit

Project Location : Cirebon, West Java, IndonesiaProject Summary : 660 MW x 1 UnitCustomer : Cirebon Electric Power Main Contractor : Doosan Heavy Industries & Construction, Co.. Ltd.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 3,300,000Time Frame : September 2009 ~ December 2010

OBL & Revamping for L Project

Project Location : Dumai, Sumatra, IndonesiaProject Summary : Lube Base Oil Plant, VDU unit 25,000 BPSD, CDW unit 9.000 BPSD Customer : PT. Pertamina & SK EnergyMain Contractor : SK Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection : 792 tons, - Piping Fabrication and Installation : 209,000 DI, - CommissioningContract Amount : USD 4,392,000Time Frame : May 2007 ~ April 2008

20

Project Location : Batu Licin, Kalimantan, IndonesiaProject Summary : 1,000 MTPH Cement ConveyorCustomer : PT. Indocement Tunggal Prakarsa, TbkMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Design & Engineering, Civil Work, Steel Structure Fabrication - Erection, Equipment Fabrication & Erection, - Electrical and Instrument, Start Up and CommissioningContract Amount : USD 1,975,000Time Frame : March 2006 ~ October 2006

Bulk Loading Conveyor Project

PROJECT HIGHLIGHTS

Project Location : Muara Tawar, West Java, IndonesiaProject Summary : 6 x 143 MW Gas Turbine Power PlantCustomer : PT. PLNMain Contractor : Samsung Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection, - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 2,475,000Time Frame : October 2003 ~ May 2004

Project Location : Jombang, East Java, IndonesiaCustomer : PT. Cheil Jedang IndonesiaMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Detail Design & Engineering for Piping - Piping Fabrication and Installation 120,000 DI Contract Amount : USD 1,400,000Time Frame : February 2003 ~ January 2004

LOCAL PROJECT

Muara Tawar GTPP Project

Refinery / Fermentation Plant

21

Project Location : Jombang, East Java, IndonesiaCustomer : PT. Cheil Jedang IndonesiaMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Detail Design & Engineering for Piping - Piping Fabrication and Installation 120,000 DI Contract Amount : USD 1,400,000Time Frame : February 2003 ~ January 2004

Project Location : Gresik, East Java, IndonesiaProject Summary : Exhaust gas firing for PA PlantCustomer : PT. PetrowidadaMain Contractor : Envirotect, GermanyWork Scope : - Piping and Duct Fabrication & Refractory - Steel Structure Fabrication & Erection, Work - Equipment Erection, Contract Amount : USD 1,600,000Time Frame : 2001

Project Location : Paiton, East Java, IndonesiaProject Summary : 400 MW Coal Fired Stem Power PlantCustomer : PT. PLNMain Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection : 2.548 tons, - Piping Fabrication and Installation : 1.124 tons - Fabrication and Installation of Fuel Oil Storage Tank, Contract Amount : USD 4,890,000 excl. Additional WorkTime Frame : August 1992 ~ August 1994

Thermal Incineration Unit

Paiton Power Plant Unit No. 1 & 2

22

PROJECTEXPERIENCE

ProjectName

Owner/Client

ContactValue Period Workspace

Hankook Tire Ph 2 IndonesiaCikarang, Indonesia

Hankook Tire Indonesia /

Lotte E & C Co., Ltd.

Equipment ErectionPiping Fab. & Installation

Commissioning Assistance

September 2014 ~

May 2015

USD 3,800,000-

Prai CCGT ProjectPrai, Penang, Malaysia

TNB Northern Bhd. /Samsung C&T

Piping Fabrication & InstallationCommissioning Assistance

May 2014 ~September

2015

USD 5,500,000-

Cilacap RFCC ProjectCilacap, Indonesia

PT. Pertamina /GS E & C Co., Ltd.

Steel Structure Fab. & ErectionEquipment Fab Erection

Piping Fab. & Installation

March 2013 ~May 2014

USD 16,200,000-

Additional Clay StorageKalimantan, Indonesia

PT. Indocement Tbk.

Steel Structure Fab. & ErectionMarch ~ July 2013

USD 375,000-

EMAL Ph 2 CCPP Project -1,023 MWAl Taweelah, UAE

Emirate Aluminum /

Samsung C & T

Piping Fab. & Installation : 150,000 DI - Pipe Support,

Maintenance & Commissioning Assistance

March 2012 ~June 2014

USD12,670,000-

Hankook Tire IndonesiaCikarang, Indonesia

Hankook Tire Indonesia /

Lotte E & C Co.,Ltd.

Equipment ErectionPiping Fab. & Installation

Commissioning Assistance

December 2011 ~

September 2012

USD 5,000,000-

Piping Engineering J ProjectJombang, Indonesia

PT. Cheil Jedang Indonesia

Basic Design & Piping Design,Drawing & As-Built2011

USD 500,000-

UAE S2 IWPP Project1,310MW & 100 MIGD Ruwais, UAE

Ruwais Power Company /

Samsung C & T

Piping Fab. & Installation : 260,000 DI

Pipe Support,Maintenance & Commissioning

Assistance

September 2009 ~

December 2010

USD 17,750,000-

Cirebon Coal Firing Power Plant (660MW 1 Unit) Cirebon West Java, Indonesia

Cirebon Elektric Power /

Doosan Heavy Industry

Piping Fab. & Installation : 100,000 DI - Pipe Support,Commissioning Assistance

September 2009 ~

August 2010

USD 3,300,000-

24

ASC Phase VIVCM, Anyer,Indonesia

Asahimas Chemical/

Lotte E & C Co., Ltd.

December 2014 ~

December 2015USD

7,700,000-

Steel Structure ErectionEquipment Fab Erection

Piping Fab. & InstallationPainting, Insulation

New Jetty - B4 ProjectKalimantan, Indonesia

PT. Indocement Tbk.

Piling & Jetty Installation,Dredging2008

USD 2,000,000-

OBL & Revamping for L-Project - Lube Base Oil Plant

PT. Pertamina & SK Energy

Equipment Erection : 792 Ton Piping Fab. & Installation :

209,000 DI Commissioning

May 2007 ~April 2008

USD 4,392,000-

ProjectName

Owner/Client

ContactValue Period Workspace

Khurais Dentral Gas FacilitiesKhurais, Saudi Arabia

Saudi Arabia Oil Company

(Aramco Energy) /Hyundai E & C

Piping Fab. & Installation : 25,000 DI Pipe Support,

maintenance & Commissioning

August 2007 ~

August 2008

USD 5,000,000-

AL-EZZEL Power Plant4 Unit HRSGBahrain

Al-Ezzel Power Co. /

Doosan Heavy Industri

Equipment ErectionPiping Fab. & Installation :

98,000 DI

January 2006 ~

August 2006

USD 2,745,000-

Bulk Loading Conveyor 1,000

MTPH ConveyorKalimantan, Indonesia

PT. Indocement Tbk.

2006USD 1,975,000-

Steam LineGresik East Java, Indonesia

Piping Fab. & Installation

Methanol RecoveryGresik East Java, Indonesia

PT. Petrowidada

PT. Petrowidada

Steel Structure Fab. & ErectionEquipment Fab Erection

Piping Fab. & Installation

USD176,000-

Dismantling PA No. 2 PlantGresik East java, Indonesia

Dismantling & Recondition

USD 130,000-

Drying & Washing ColumnBio Diesel PlantGresik East Java,

Equipment Erection2005

USD 245,000-

USD 75,000-

Steam & Hydrant for PA PlantGresik East Java, Indonesia

Tank RepairPiping Fab. & Installation

Electrical, Commissioning

USD 295,000-

PROJECT EXPERIENCE

2006

2006

2005

2004

PT. Petrowidada

PT. Petrowidada

PT. Anugerah Intitama

Design & Procurement for Conveyor System, Civil & Found

tionSteel Structure Fab. & ErectionEquipment Fab. & Erection Electric

& Instrument, up &Co missioning

25

ProjectName

Owner/Client

ContactValue Period Workspace

Piping Engineering P ProjectJombang, Indonesia

T. Cheil Jedang Indonesia

Basic Design & Piping Design,Drawing & As-Built2003

USD 150,000-

Muara Tawar GTPP Project6 x 143 MW Gas Tbn Power Plant

PT. PLN /Samsung C & T

Co., Ltd.

Equipment Erection,Piping Fab. & Installation : 45,000 DI Commissioning

USD 2,475,000-

Refinery / Fermentation Plant Jombang, Indonesia

PT. Cheil Jedang Indonesia

Piping Fab. & Installation : 120,000 DI

USD 1,400,000-

Furnace Steel WorkTuban East Java, Indonesia

Stone & Webster, UK

Dismantle & Recondition of Furnace System

USD 780,000-

Suban Gas PlantSuban Sumatra, Indonesia

Gulf Indonesia /Hyundai E & C

Co., Ltd.Field Tank Erection

USD455,000-

Paper Bag Storage & Hydrant SystemKalimantan,

PT. Indocement Tbk

Civil & FoundationSteel Structure Fab. & Erection

Equipment Fab. & ErectionPiping Fab. & Installation

USD 150,000-

ThermalIncineration Unit Exhaust Gas FiringGresik East java, Indonesia

PT. Petrowidada /Envirotech,

Germany

USD USD 1,600,000-

Jetty Bulk Loader ModificationKalimantan, Indonesia

Steel Structure Fab. & ErectionEquipment Fab. & Erection

Piping Fab. & InstallationCommissioning

USD 200,000-

Sumpal Gas Plant Sumpal, Sumatra, Indonesia

Gulf Indonesia /Hyundai E & C

Co., Ltd.Field Tank Erection

USD 75,000-

Dismantle for PA 1 & MA PlantGresik, East Java, Indonesia

Dismantle & Recondition PlantUSD

250,000-

Coal & Laterite Storage BLDG.Kalimantan, Indonesia

PT. Indocement Tbk.

Civil & FoundationSteel Structure Fab. & Erection

USD 570,000-

2004

2003

PT. Petrowidada

2003

2003

2002

2002

2002

2001

2001

2001

Main Reactor Fab. & Erection, Civil & Foundation Steel Structure Fab. &

Erection Equipment Fab. & ErectionPiping Fab. & Installation, Electric &

Instrument Refractory, Insulation, Start up &Commissioning

PT. Indocement Tbk

26

ProjectName

Owner/Client

ContactValue Period Workspace

ASPEX Substation70KVCibinong,Indonesia

PT. Aspex /Hyundai E & C

Co., Ltd.

Electrical2000USD

60,000-

Darajat Geotherm Power Plant 55MW GeothermDarajat West Java,

HVAC

Bosowa Cement PlantUjung Pandang, Indonesia

PT. Bosowa Cement /

Daewoo E & C Co., Ltd.

1999USD 120,000-

Irian Jaya Co-Gen Power Plant 13 MW Wood Chip Firing Irian jaya,

Equipment ErectionPiping Fab. & Installation

Refractory, Electric & Instrument,Insulation, Commissioning

Paiton Steam Power Plant 1,200 MW Coal FiringPaiton East Java,

PT. PLN /Shinwha

Costruction

PT. Korindo /Hyundai E & C

Co., Ltd.

T. Amoseas Indonesia /

Hyundai E & C Co., Ltd.

USD500,000-

TPPI Olefine PlantTuban East Java, Indonesia

Steel Structure ErectionPiping Fab. & Installation

USD 5,500,000-

O-Xylene & Raw

Water Storage Tank

10,000 & 2,000 M3

Gresik East Java,

Indonesia

Tank Fab. & Erection,Piping Fab. & Installation,1997

USD 4,600,000-

USD 950,000-

PROJECT EXPERIENCE

1998

1998

1997PT. TPPI /

Daelim Industri Co., Ltd.

PT. Petrowidada

USD 420,000- 1999

HVAC

Piping Fab. & Installation : 1,124 Ton

Fire Fighting, Electrical,Insulation, Commissioning

27

Scrubber UnitGresik, East Java, Indonesia

Equipment Feb. & Erection,Piping Fab. & Installation

USD 200,000-

FCFC Aroma II Chemical PlantMai-Liau Comlex Taiwan

Formosa Corporation /

Daelim Industrial Co., Ltd.

Steel Structure Erection : 11,800 TonEquipment

Erection : 8,600 Ton

Piping Fab. & Installation :

520,000DI,Maintenance & Commissioning

USD 6,000,000-

2001

2000

PT. Petrowidada

ProjectName

Owner/Client

ContactValue Period Workspace

Miwon Co-Gen

Power Plant 6 MW

Gas Tbn 3 & 4 Unit

Surabaya, Indonesia

PT. Miwon Indonesia 1996

USD 560,000-

Irian Jaya Co-Gen

Power Plant 13 MW

Wood Chip Firing

Irian jaya, Indonesia

PT. Korindo /Hyundai E & C

Co., Ltd.

USD 600,000-

Seram Co-Gen Power Plant13 MW Wood Chip Firing Seram Island, Indonesia

PT. PLN /Hyundai E & C

Co., Ltd.

Equipment Erection : 1,024 TonPiping Fab. & Installation : 210 Ton

Refractory 428 Ton, Electric & Instrument,Insulation, Commissioning

USD 595,000-

Miwon Co-Gen Power Plant 6 MW Gas Tbn 1 & 2 Unit Surabaya, Indonesia

Equipment Erection : 382 TonPiping Fab. & Installation : 120 Ton

Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning

USD 5,000,000-

Paiton Steam Power Plant 400 MW Coal FiringPaiton East java, Indonesia

PT. PLN /Hyundai E & C

Co., Ltd.

USD4,890,000-

Equipment ErectionPiping Fab. & Installation

HVAC Commissioning

USD 540,000-

Semen Cibinong Phase III 6,000 MTPD Cement Plant Cibinong, West Java, Indonesia

PT. Semen Cibinong/

Hyundai E & C Co., Ltd.

USD 6,700,000-

Darajat Geotherm Power Plant55MW GeothermDarajat West Java, Indonesia

PA Storage Tank1,000 M3Gresik East Java, Indonesia

Tank Fab. & Erection,Piping Fab. & Installation,

Steal Tracing w/jacket

USD 400,000-

Butyl Acetate Plant20,000 MTPYMerak, West Java, Indoneisa

Equipment Erection.Piping Fab. & Installation,

Commissioning

USD 540,000-

MA Chemical Plant

3,000 MTPY

Gresik, East Java,

Indonesia

Equipment Erection.Piping Fab. & Installation,

Electric & Instrument,Commissioning

USD 470,000-

1997

1996

1997

PT. Petrowidada /

LG E & C Co., Ltd.

PT. Petrowidada

PT. Petrowidada

1995

1995

1995

1994

1994

1992 ~1993

Steel Structure Erection : 2,637 TonEquipment Erection : 8,071 Ton

Piping Fab. & Installation : 426 TonCommissioning

Equipment Erection : 328 TonPiping Fab. & Installation : 120 Ton

Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning

PT. Miwon Indonesia

Equipment Erection : 2,548 TonPiping Fab. & Installation : 1,124 Ton

Fuel Oil Storage Tank Commissioning

PT. PLN /Hyundai E & C

Co., Ltd.

28

Equipment Erection : 328 TonPiping Fab. & Installation : 120 Ton

Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning

LICENSE & CERTIFICATION

Dinas Perdagangan, Perindustriandan Penanaman Modal

Pemerintah Kota Surabaya

Tanda daftar perusahaan13.0.1.1.45.13185

Sertifikat Tanda RekananPT. Pembangkitan Jawa-Bali

0174/051/TPKP/2008

Certificate of Compliancehas been assesed

and complied against the ISO 9001:2008 Standard

Sertifikat Kesepakatan Jaminan Sosial Tenaga Kerja

NN130091

Assesment Contractor Safety Management

System ResultGrade High

Kementrian Energi dan Sumber Daya Mineral Republik Indonesia

Direktorat Jenderal Minyak dan Gas Bumi

044/SKT-01/DMT/2013

30

Completion Certification

PT. Cheil Jedang IndonesiaCJ P Project

LOTTE Eng. & Const. Co., Ltd. Hankook Tire Indonesia Project

31

GS Engineering & ConstructionPertamina RFCC, Cilacap Project.

Hyundai Eng. & Const. Co., Ltd.KCPF Project Saudi Arabia

SK Eng. & Const. Co., Ltd.SK L Project Dumai

Samsung Eng. & Const. Co., Ltd

UAE S2 IWPP Project

32

Completion Certification

Shinwha Const. Co., Ltd.Paiton Power Plant

PT. Artika Optima Inti

Hyundai Eng. & Const. Co., Ltd.

KCPF Project Saudi Arabia

33

Daelim Industrial Co., Ltd.FCFC Aroma II, Project, Taiwan

Samsung Eng. & Const. Co., Ltd.Muara Tawar DTPP Project

PT. Petrowidada

34

Plaza Segi 8, Blok D, No. 875, Jl. Pattimura, Surabaya, East Java, 60189, Indonesia

Tel.: +62 31 732 7280, 81 Fax.: +62 317327278E-mail : [email protected] : www.itisby.com

CONTACT US

HEAD OFFICE Surabaya

Complex Wijaya Grand Centre (Gedung Citra) 3rd Floor, Room 10, Blok F No. 48. Jakarta Selatan, 12160, Indonesia

Contact Person : Kim, Young Eon/DirectorTel.: +62 21 726 9045, 720 1674 Fax.: +62 21 720 1862E-mail : [email protected]

LIAISON OFFICE Jakarta

11th floor, Cho Hoon Building. 59-7 Mung-Dong 1Ga, Jung-Gu, Seoul, Korea

Contact Person : Dong Youl, Kim/ ChairmanTel.: +82 2 7562235/6, Fax.: +82 2 7562234E-mail : [email protected]

LIAISON OFFICE Korea

35

PO.BOX 107729, L L J Business Centre No. 123, Abu Dhabi – U.A.E

Contact Person : Nawaf S. Mohammed Al Amoudi/ RepresentativeTel.: +971 -2-4950700Mob: +97155 - 8897777E-mail : [email protected]

BRANCH OFFICE UAE, Abu Dhabi

B4-3 Jalan Ampang Utama 2/2, Taman Ampang Utama , 6800 Selangor , Malaysia

Contact Person : Ho Sok, Kim/ RepresentativeTel.: +60 1124250747E-mail : [email protected]

Indo Tehnik Industri Sdn. Bhd.

36

Indo Tehnik Industri

Plaza Segi 8, Blok D, No. 875, Jl. Pattimura, Surabaya, East Java, 60189, Indonesia

Tel.: +62 31 732 7280, 81 Fax.: +62 317327278E-mail : [email protected] : www.itisby.com