provisional and complete specification (2)

Upload: reena-mpsingh

Post on 14-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Provisional and Complete Specification (2)

    1/11

    Reena MP Singh

  • 7/30/2019 Provisional and Complete Specification (2)

    2/11

    SpecificationTechno-legal document

    Contains scientific details of the invention and claims

    Crucial part of patent application

    Disclose fully and particularly various features of the invention

    Specification can be:

    1. Provisional

    2. Complete

    Section 9 and Rule 13 of Indian Patent Act, 1970

  • 7/30/2019 Provisional and Complete Specification (2)

    3/11

    The Specification (Provisional and Complete)-Submitted in Form-2 along with Form-1in duplicate-

    Fee-1000/4000 Rs

    No fee for complete specification after provisional upto30 pages and 10 claims

    For each sheet in addition to 30 :- 100/400 Rs

    For each claim in addition to 10 :- 200/800 Rs

  • 7/30/2019 Provisional and Complete Specification (2)

    4/11

    Provisional SpecificationWhen the invention has not reached the finalstage

    To secure priority date

    It is a permanent and independent scientific cumlegal document and no amendment is allowed in

    this

    No patent is granted on the basis of thisspecification

  • 7/30/2019 Provisional and Complete Specification (2)

    5/11

    It is abandoned if no complete specification is filed withintwelve months from the date of its filing

    If two provisional specifications of the same applicant arecognate then one complete specification can be filed

    Complete specification can be converted into provisional withintwelve months from the date of filing of the application

    If applicant is unable to submit the complete specificationwithin twelve month from the date of filing of application- can

    postdate the provisional specification by 6 month (sec 17)

    Provisional specification can be cancelled and post date theapplication to the date of filing of the complete specification

    (before grant of patent)

    Not necessary to first file an application with provisionalspecification

  • 7/30/2019 Provisional and Complete Specification (2)

    6/11

    Contents of Provisional Specification (Sec 10)

    Title of the invention

    Preamble to the description

    Description

    Field of the invention

    Object of the inventionBrief description of the invention

    Drawings

  • 7/30/2019 Provisional and Complete Specification (2)

    7/11

    Complete specification

    Techno-legal document

    Fully and particularly describes the invention

    Discloses the best method of performing the

    invention

    Important document in the patent proceeding

  • 7/30/2019 Provisional and Complete Specification (2)

    8/11

    When application is accompanied by the

    complete specification, a declaration as to theinventorship of the invention shall be filed(form 5) along with it or within one month fromthe date of filing of the complete specification

    An application when filed with complete

    specification can be postdated by 6 month(before the grant of the patent)-Sec 17

  • 7/30/2019 Provisional and Complete Specification (2)

    9/11

    Contents of Complete Specification (Sec 10)

    Title of the invention

    Preamble

    Description

    Field of the invention

    Object of the invention

    Background of the invention

    Summary of the invention

    Detailed description of the invention

    Drawings

    *Claims

    *Abstract

  • 7/30/2019 Provisional and Complete Specification (2)

    10/11

    Complete Specification in respect of divisionalapplication (sec 16) contain specific reference tothe number of the original application from which

    the divisional application is made

    Complete specification in respect of a patent ofaddition (sec 54) contain specific reference to thenumber of main patent and a definite statement that

    the invention comprises an improvement in, ormodification of, the invention claimed in the

    specification of main patent granted or applied for

    Some important points regarding Complete

    specification

  • 7/30/2019 Provisional and Complete Specification (2)

    11/11

    Thanks