PROVIDENCE RIVER PEDESTRIAN BRIDGE. FINAL CAPSTONE PRESENTATION. CIVIL ENGINEERING CLASS OF 2014 | APRIL 29, 2014. BEVERLY XU (PROJECT MANAGER) – SUSTAINABILITY AND COST ESTIMATION MAX VINHATEIRO – PIER ANALYSIS AND ABUTMENT DESIGN THOMAS SCHIEFER – BRIDGE DECK DESIGN PARTNER - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/1.jpg)
PROVIDENCE RIVER PEDESTRIAN BRIDGEFINAL CAPSTONE PRESENTATION
CIVIL ENGINEERING CLASS OF 2014 | APRIL 29, 2014
![Page 2: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/2.jpg)
BEVERLY XU (PROJECT MANAGER) – SUSTAINABILITY AND COST ESTIMATIONMAX VINHATEIRO – PIER ANALYSIS AND ABUTMENT DESIGNTHOMAS SCHIEFER – BRIDGE DECK DESIGN PARTNERJENN THOMAS – BRIDGE DECK DESIGN PARTNERRACHEL CONNOR (PROJECT DRAFTER) – PIER DECK DESIGNKA LING WU – CANOPY DESIGN
![Page 3: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/3.jpg)
I-195 Redevelopment Parcels June 2007 - RIDOT Feasibility Study Pedestrian Bridge Design Competition
History Geotechnical Bridge Deck Pier Decks Canopy Sustainability Cost
HISTORICAL CONTEXT
INTRODUCTION
![Page 4: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/4.jpg)
HISTORICAL CONTEXT
I-195 REDEVELOPMENT PARCEL
![Page 5: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/5.jpg)
Pier Removal
Steel truss
Steel girder
Concrete
Glu-lam
$0.0 $1,000,000.0 $2,000,000.0 $3,000,000.0 $4,000,000.0 $5,000,000.0
$4,043,055.00
$1,540,539.00
$1,597,103.00
$1,634,426.00
$2,034,810.00
$1,395,741.00
$1,403,317.00
$1,433,734.00
$1,997,914.00
$1,281,675.00
$1,310,224.00
$1,341,268.00
$1,770,520.0072 degrees
60 degrees
Offset
HISTORICAL CONTEXT
FEASIBILITY STUDY
![Page 6: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/6.jpg)
HISTORICAL CONTEXT
FEASIBILITY STUDY
![Page 7: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/7.jpg)
![Page 8: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/8.jpg)
PIER DECK
BRIDGE DECK
CANOPY
![Page 9: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/9.jpg)
GEOTECHNICAL
EXISTING PIERS
• Five piers span the river• 76 feet span between
• 141’x6’• Concrete encased in 1.5’ granite blocks• Deep concrete T-beam
History Geotechnical Bridge Deck Pier Decks Canopy Sustainability Cost
![Page 10: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/10.jpg)
GEOTECHNICALGEOTECHNICAL
EXISTING PIERS
• Shear reinforcement• Flexural reinforcement
![Page 11: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/11.jpg)
GEOTECHNICAL
EXISTING PIERS - ANALYSIS
Flipped problem upside-down
Solve for continuous load
![Page 12: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/12.jpg)
GEOTECHNICAL
EXISTING PIERS - RESULTS
• Allowable distributed load of 305.9 k/ft
• Multiply by entire length of pier: 141 ft.• Divide into total area feeding into single pier: ~ 4,780 ft2
• Area load on bridge deck: 9.07 k/ft2
![Page 13: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/13.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – SOIL CONDITIONS
• Mixture of compacted sand, gravel, fill, some silt
• Thick layers of silt
• Previous bridge loads transferred to bedrock• Largely undisturbed soil
![Page 14: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/14.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – SOIL CONDITIONS
West bank
![Page 15: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/15.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – SOIL CONDITIONS
East bank
![Page 16: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/16.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – BEARING CAPACITY
2 methods considered:
• Terzaghi:
qult=cNc+qNq+0.5γBNγ
Model based on theory of plasticity applied to soil
Requires values of shear angle, density, cohesion
![Page 17: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/17.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – BEARING CAPACITY
• Meyerhof:
qallow=N/4Kd
Empirical formula, uses only boring log data,simple design assumptions
![Page 18: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/18.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – BEARING CAPACITY
West bank bearing capacity: 5.87 k/ft2
East bank bearing capacity: 3.91 k/ft2
Use to calculate area required to deliver loads to soilAssign length of combined footings: 26’ 6”
E1: 3’ 7”. W1: 4’ 1” W2: 3’ 4”
![Page 19: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/19.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – SHEAR
1-Way shear:
ϕVc=ϕ2f'cbwd≥Vu
2-Way shear:
![Page 20: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/20.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – FLEXURAL REINFORCEMENT
Concrete is weak in tensionSteel rebar added to take tensile loads from moments
Area of steel calculated from ultimate moment:
As=Mu/(ϕfyjd )
FOOTING Long Span Short Span
E1 8 No. 6 bars @ 5” 19 No. 8 bars
W1 5 No. 9 bars @ 9” 23 No 8 bars
W1 5 No. 7 bars @ 8” 21 No. 7 bars
![Page 21: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/21.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – FLEXURAL REINFORCEMENT
E1
W1
W2
![Page 22: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/22.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – SETTLEMENT
Settlement occurs in silt layersIncreasing depth -> increased area of applied load
![Page 23: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/23.jpg)
GEOTECHNICAL
FOUNDATION DESIGN – SETTLEMENT
s = Cc/(1+e0)*Hlog((σ’v0 +∆σ )/σ’v0)
FOOTING Settlement
E1 .63 in.
W1 .96 in.
W2 .52 in.
![Page 24: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/24.jpg)
History Geotechnical Bridge Deck Pier Decks Canopy Sustainability Cost
![Page 25: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/25.jpg)
BRIDGE DECK
DESIGN
30° northwest Upward slopes of 1:20 and 1:15 4 girders No joist system Two columns per pier +/- 75 foot spans
![Page 26: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/26.jpg)
BRIDGE DECK
SAP MODEL: DESIGN
With original orientation
Added joist system
Changed average span length
![Page 27: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/27.jpg)
BRIDGE DECK
SAP MODEL: DESIGN - SPANS
1 2 3 4 5 6 7
![Page 28: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/28.jpg)
BRIDGE DECK
SAP MODEL: JOINTS
Bottom of columns completely restrained All other joints have no restraints or constraints All joints welded
![Page 29: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/29.jpg)
BRIDGE DECK
SAP MODEL: AREA LOADS
LOADS: Dead Snow Deck Live Wind Earthquake
![Page 30: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/30.jpg)
BRIDGE DECK
SAP MODEL: MEMBER ASSIGNMENTS
I BEAM/W FLANGE HSS/BOX BEAM WT SECTION
![Page 31: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/31.jpg)
BRIDGE DECK
SAP MODEL: MEMBER ASSIGNMENTS
GIRDERJOIST
COLUMN
GIRDER: HSS28x6x1/2 JOIST: W8x40COLUMN: W12x96
![Page 32: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/32.jpg)
BRIDGE DECK
SAP MODEL: ANALYSIS
DEFLECTIONS
MOMENT DIAGRAM
SHEAR DIAGRAM
![Page 33: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/33.jpg)
BRIDGE DECK
SAP MODEL: ANALYSIS
![Page 34: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/34.jpg)
BRIDGE DECK
MOVING FORWARD
Thermal Loads Seismic Conditions Wind Uplift
![Page 35: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/35.jpg)
BRIDGE DECK
GRAVITY LOAD DETERMINATIONS
Dead Load-Member Loads
-HSS28x6x1/2 Girder Weight: 112.4 plf-W8x40 Joist Weight: 40 plf-W12x96 Column Weight: 96 plf-Total Weight: 296.351 kips
-Decking Loads: 30 psf
Live Load-International Building Code (IBC) and Additional Factor of Safety-100 psf
Snow Load-American Society of Civil Engineering (ASCE) Code 7-10-30psf
![Page 36: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/36.jpg)
BRIDGE DECK
LATERAL LOAD DETERMINATIONS
Wind Load-ASCE 7-10 Standard Chapter 26-Net Wind Pressure: 19.42 psf
Seismic Load-ASCE 7-10 Standard Chapter 12-Seismic Data Taken from United States Geological Survey (USGS)
Maps-Lateral Seismic Load: 44.84 Kips
Load and Resistance Factor Design (LRFD) Combinations-7 Equation Combinations-Use Maximum (Most Conservative) Combination-Treat Lateral Load and Gravity Loads Separately
![Page 37: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/37.jpg)
BRIDGE DECK
TRIBUTARY AREA
Tributary Area of Girder
Tributary Area of Column
Tributary Width of Girder
![Page 38: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/38.jpg)
BRIDGE DECK
HSS28x6x1/2 GIRDER ANALYSIS
Moment Analysis-Both Exterior and Interior Girders were Analyzed
-Tested for Moment Strength
-Calculated Maximum Allowable Moment for Custom Beams Using Method in American Institute of Steel Construction (AISC) Manual
-Analyzed as Simply Supported Beam
Interior Exterior
Maximum Moment in Beam (K-ft) 483.12 708.39
Max Allowed Moment (K-ft) 3644.25 3644.25
Meets Design Constraint?
![Page 39: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/39.jpg)
BRIDGE DECK
W8x40 JOIST ANALYSIS
Moment Analysis-Tested for Joist Above Columns (Takes Larger Load)
-Tested for Moment Strength
-Values for Maximum Allowable Moment Available in AISC Steel Manual
-Analyzed as Simply Supported Beam with Girder Weights as Point Loads
Maximum Moment from Distributed Load (Kips-ft) 86.8
Maximum Moment from Point Loads (Kips-ft) 8
Total Maximum Moment (Kips-ft) 94.8
Max Allowed Moment (Kips-ft) 149
Meets Design Constraint?
![Page 40: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/40.jpg)
BRIDGE DECK
W12x96 COLUMN ANALYSIS
Axial Loading-Gravity Loads are Applied Axially to Columns-Columns are not “Slender” Enough to be Analyzed for Elastic or Inelastic
Buckling-Analyzed for Shear Yielding Instead-Results for 10.5 ft Column
Lateral Loading-Seismic Load Treated as Point Load Acting at Top of Column-Column Tested for Maximum Allowable Moment-Not Necessary to Test for Interaction of Loads
Factored Load (Kips) 333.4
Maximum Allowable Load (Kips) 1127
Meets Design Constraint?
Maximum Moment (Kips-ft) 470.82
Maximum Allowable Moment (Kips-ft) 551
Meets Design Constraint?
![Page 41: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/41.jpg)
BRIDGE DECK
RESULTS COMPARISON
Difference in Applied Moments
-Moments from Hand Calculations are Larger
-Example: 162.82 Kip-ft (SAP) versus 483.12 Kip-ft
-Loading Cases are the Same
Reasons for the Discrepancy
-Difference in Member Length
-Difference in Joint Connections
-Greater Capacity in SAP
![Page 42: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/42.jpg)
BRIDGE DECK
VIBRATIONS
Why Test Vibrations?
-All Structures Vibrate
-Pedestrian Walking Can Cause Resonance
-Millennium Bridge in London
How to Test Vibrations?
-Find vibrational frequencies of all members and of whole system
-Solve for Acceleration Limit,
-Bridge Considered Safe if is less than 5.00%
![Page 43: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/43.jpg)
BRIDGE DECK
SOFTWARE MODELING
Modeled in RAM Structural Software-Only One Panel of the Bridge will be Analyzed-RAM Structural Software only tests for one type of vibration
Modeling Challenges-RAM does not allow custom beams-Only performs vibrational analysis for steel-composite decking
![Page 44: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/44.jpg)
BRIDGE DECK
HAND CALCULATIONS FOR VIBRATIONS
Steel Design Guide #11 “Floor Vibrations Due to Human Activity”-Use Same Values as in RAM Model
-Treatment of Joists and Girders
-Conditions for interior breamPoint Force, is 92lbsDamping Ratio, , is 0.01
-Need to find Panel Weight, W and Frequency, for both members and system
-Acceration Limit is solved by:
![Page 45: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/45.jpg)
BRIDGE DECK
RESULTS COMPARISON
Result Summary
Output from: RAM Software Hand Calculations
Frequency (Hz)
HSS20x12x5/8 2.65 2.25
W8x48 4.95 4.42
System 2.33 2.15
Acceleration limit, ao/g (%) 2.16 1.8
Comparisons-Produced Similar Values
-Both Show the Bridge Satisfies Design Criterion
![Page 46: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/46.jpg)
PIER DECK
DESIGN CONSIDERATIONS
• Collaboration with bridge deck
•Tapered Beams
• Cantilevered spans
![Page 47: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/47.jpg)
PIER DECK
BASIC LAYOUT
40’ 20’ 40’ 40’ 40’
History Geotechnical Bridge Deck Pier Decks Canopy Sustainability Cost
![Page 48: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/48.jpg)
PIER DECK
BASIC LAYOUT
![Page 49: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/49.jpg)
PIER DECK
TAPERED BEAMS
![Page 50: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/50.jpg)
PIER DECK
DEFLECTIONS
Maximum deflection of cantilever: (L/360)*2 = 2.667 in.
Largest deflection: 1.9593 in.
![Page 51: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/51.jpg)
PIER DECK
DEMAND/CAPACITY RATIOS
![Page 52: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/52.jpg)
PIER DECK
DEMAND/CAPACITY RATIOS
SPAN TYPE DEMAND/CAPACITY RATIO
Interior Box Beam – 10 ft. 0.033 – 0.383
Interior Box Beam – 40 ft. 0.144 – 0.174
Exterior Girder (W14x68) – 10 ft. 0.044 – 0.215
Exterior Girder (W14x68) – 40 ft. 0.127 – 0.139
Typical Joist 0.077 – 0.600
Column 0.123 – 0.236
![Page 53: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/53.jpg)
PIER DECK
MOMENT DIAGRAMS
Mu = -260.08 kip-ft
Mu = -523.95 kip-ft Mu = -375.57 kip-ft
![Page 54: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/54.jpg)
PIER DECK
MOMENT DIAGRAMS
Mu = -14.04 kip-ft Mu = -84.24 kip-ft
![Page 55: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/55.jpg)
PIER DECK
REVIT MODEL
![Page 56: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/56.jpg)
PIER DECK
REVIT MODEL
aa
aa
![Page 57: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/57.jpg)
PIER DECK
REVIT MODEL
![Page 58: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/58.jpg)
PIER DECK
REVIT MODEL
![Page 59: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/59.jpg)
CANOPY
INTRODUCTION
3 tempered metal clad canopies Deep “V” structures Solar collectors
History Geotechnical Bridge Deck Pier Decks Canopy Sustainability Cost
![Page 60: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/60.jpg)
CANOPY
SPECIFICATIONS
180’ long, 22’ wide
![Page 61: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/61.jpg)
CANOPY
DESIGN CONSIDERATIONS
Gravity LoadDead Load, Live Load, Snow Load
Lateral LoadWind Load, Seismic Load
Deflection Limits
![Page 62: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/62.jpg)
CANOPY
GRAVITY LOAD
• Dead loadSelf-weight: ~100 KipMetal Cladding and Solar panels: ~5 psf
• Snow load: 30 psf
• Live load: 20 psf
![Page 63: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/63.jpg)
CANOPY
LATERAL LOAD• Wind Load
• Seismic Load: 15 kips
![Page 64: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/64.jpg)
CANOPY
DESIGN
![Page 65: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/65.jpg)
CANOPY
DESIGN
• 10 Fan Trusses
• Frame with releases
• Biggest column size: W36x170
• Number of pieces per canopy: 305
• Weight per canopy: 98.1 Kip
• Cost per canopy: $217,660
![Page 66: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/66.jpg)
CANOPY
CONCLUSION AND DISCUSSION
• Structure of canopies designed• Challenges:
Frame releasesDeflection limitsArea section properties
• Room for improvementOther truss designsOther member section types
![Page 67: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/67.jpg)
SUSTAINABILITY
WOOD DECKING
History Geotechnical Bridge Deck Pier Decks Canopy Sustainability Cost
IPE Structural grade Durable, weather resistant 4” X 6” decking Forest Stewardship Council certified
![Page 68: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/68.jpg)
SUSTAINABILITY
SNOWMELT SYSTEM
Solar-heated glycol circuit
Utility corridor
Glycol-heated pedestrian path
![Page 69: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/69.jpg)
SUSTAINABILITY
SNOWMELT SYSTEM
qconduction
qconvection qradiation
Tatm
Tsurface
Tfluid
¼ ”
6”1”ø
qconduction = qconvection + qradiation
![Page 70: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/70.jpg)
COST ESTIMATION
COST ESTIMATION
History Geotechnical Bridge Deck Pier Decks Canopy Sustainability Cost
GEOTECHNICAL INVESTIGATIONSTEEL - MATERIAL AND INSTALLATIONCONCRETE - MATERIAL AND INSTALLATIONSUSTAINABILITY FEATURESNON-STRUCTURAL FEATURESPROFESSIONAL CONSULTANTSPERMITTINGCONTINGENCIESSITE ADJUSTMENT FACTOR
![Page 71: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/71.jpg)
COST ESTIMATION
GEOTECHNICAL INVESTIGATION
ITEM COST
Borings, field stake out, elevations $3,525.00
Drawings of boring details $1,245.00
Report and recommendations from P.E. $2,850.00
TOTAL $7,620.00
![Page 72: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/72.jpg)
COST ESTIMATION
STEEL COST SUMMARY
ITEM COST
Material $876,226.12
Fabrication $428,068.63
Shipment $19,458.00
Steel Erection – Crane $7,426.67
Steel Erection – Crew $125,472.00
Moment Connections $56,000.00
Profit $76,132.57
TOTAL $1,598,783.99
![Page 73: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/73.jpg)
COST ESTIMATION
CONCRETE COST SUMMARY
ITEM COST
Spread and continuous footings $6,902.50
Rebar Reinforcement $781.95
Profit $384.22
TOTAL $8,068.67
![Page 74: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/74.jpg)
COST ESTIMATION
SUSTAINABLE FEATURES
ITEM COST
FSC Certified Wood $955,597.50
Snowmelt System $25,030.63
TOTAL $980,628.13
![Page 75: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/75.jpg)
COST ESTIMATION
ADDITIONAL COSTS
ITEM COST
Architectural Fees $454,080.13
Construction Management Fees $127,710.03
Engineering Structural Fees $70,950.02
Permits $56,760.02
Contingencies $283,800.08
TOTAL $993,300.28
ITEM COST
Railings $207,900.00
Ornamental Lighting $35,000.00
TOTAL $242,900.00
![Page 76: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/76.jpg)
COST ESTIMATION
GEOTECHNICAL INVESTIGATION
ADJUSTED PROJECT COST: $4,114,817
COST PER SQUARE FOOT: $221.52
UNADJUSTED PROJECT COST: $3,831,301
![Page 77: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/77.jpg)
COST ESTIMATION
VALUE ENGINEERING
Reduce depth of wood decking Narrower bridge deck and canopy Construction staging
![Page 78: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/78.jpg)
ACKNOWLEDGEMENTS
SPECIAL THANKS TO…
PERRY ASHENFELTER, ASSISTANT PM, SHAWMUT DESIGN AND CONSTRUCTION
PROFESSOR JANET BLUME, BROWN UNIVERSITY ENGINEERING
CHRISTOPHER BULL, SENIOR LECTURER IN ENGINEERING, BROWN UNIVERSITY
DAVID CARCHEDI, PhD, P.E., GZA GEOENVIRONMENTAL INC.
WIL HERNANDEZ, RHODE ISLAND DEPARTMENT OF TRANSPORTATION
DR. INDREK KULAOTS, LECTURER IN ENGINEERING, BROWN UNIVERSITY
JULIE MARTON, P.E., ODEH ENGINEERS INC.
MICHAEL MCCORMICK, ASSISTANT VP, DEPT OF FACILITIES MANAGEMENT
DAVID ODEH, P.E., ODEH ENGINEERING, ADJUNCT LECTURER, BROWN UNIVERSITY
MICHAEL SIGMON, F.D. STERRITT LUMBER CO.
PATRICIA STEERE, P.E., STEERE ENGINEERING INC.
![Page 79: PROVIDENCE RIVER PEDESTRIAN BRIDGE](https://reader035.vdocuments.us/reader035/viewer/2022081420/568151c4550346895dbff833/html5/thumbnails/79.jpg)
THANK YOU
QUESTIONS?