proposed residential complex conceptual plan for...

30
Conceptual Plan for Environmental Clearance of the Proposed Residential Complex at Plot No. 04/BS – 02(GH-03) Siddhartha Vihar, District -Ghaziabad, Uttar Pradesh. Submitted By CONSULTANT M/s Apex Heights Pvt. Ltd Proposed Residential Complex Ascenso Enviro Pvt. Ltd. A QCI Accredited Environmental Consulting Organization

Upload: nguyentram

Post on 01-Apr-2018

223 views

Category:

Documents


2 download

TRANSCRIPT

Conceptual Plan for Environmental Clearance of the Proposed Residential Complex

at Plot No. 04/BS – 02(GH-03) Siddhartha Vihar, District -Ghaziabad,

Uttar Pradesh.

Submitted By

CONSULTANT

M/s Apex Heights Pvt. Ltd

Proposed Residential Complex

Ascenso Enviro Pvt. Ltd. A QCI Accredited Environmental Consulting Organization

ProposedGhaziaba

Consultan

1. IN

M/s Ape02, Siddh The Prop1,80,845mt, Mediauthority This landand land (Vide LeBoard tois attache Acceptan12136/S.Ltd.(26%Ltd.(22%Infrastruc The devethe abovproject.

The ProjDevelopm14, 2006 2. SITE

The propby villagarea of pare given

Residentiaad, Uttar Pr

nt-Ascenso E

NTRODUC

x Heights Phartha Vihar

posed projec.83 m2. But ical Center 8

y for further d

d is purchasewill be deve

etter No. 97 SAMS Reaed as Annex

nce letter for Pra./GZB.

% Lead Mem% Relevant cture (P) ltd.

elopment to e, the existi

ject is desigment Projectand its ame

SURROUN

posed projecges such as Mproposed pron in Table-1

al Complex radesh.

Enviro Pvt. Lt

CTION

vt. Ltd. has r, District -G

ct is being deproject will 888 Sq mt adevelopmen

ed from U.P eloped as pe79/S. Pra./G

al Estate Pvtxure-I.

r Plot No. 2/BDated:-22/1

mber), SG EsMember),A.(15% Relev

be done is iing land use

gnated undert) of the Envndments.

NDING & C

t site is connMahinddin P

oject site. Sit.

at Plot No

td.

CONCE

proposed toGhaziabad, U

eveloped on be provided

and Medical nt.

Housing aner the GhaziaGZB. Datedt. Ltd. for Pl

BS-02 from 10/14 and costate Ltd.(22

Apex Heightsvant member

n accordance is not expe

r Category “vironmental

CONNECTI

nected to DePur, Islam Nte surroundin

. 04/BS – 0

EPTUAL PL

o develop GrUttar Pradesh

the total plod 2,688 Sq mCentre hand

nd developmabad Master

d:-01/02/2014lot No-04/BS

U.P Housinonsortium ag2% Relevants Pvt. Ltd.(r)is attached

ce with Ghazected to get

“B” and fallImpact Asse

IVITY

elhi, Noida, Nagar, Mirzangs and Con

02(GH-03) S

LAN

roup Housinh.

ot area of 26mt areas as pded over 80

ment Board tor Plan 2021.I4)from U.PS-02, Siddha

ng and Develgreement amt Member),P(15% Relevas Annexur

ziabad Mastealtered due

ls under Itemessment (EIA

and other Napur, Prata Vnnectivity de

Siddhartha

ng Project at

6,000 m2. Thplots which

00 Sq mt. an

o develop thIn this regar

P Housing aarth Vihar Y

lopment Boamong SAMSPerigee Landvant Membere –II.

er Plan of 2 to construc

m 8(b) (TowA) Notificat

NCR regionsVihar etc. aetails of the

Vihar, Dis

Page 1 of 2

t Plot No. 4/

he built up arinclude 1,00

nd handed ov

e Group Hourd allotment and developYojna, Ghaz

ard vide letteS Real Estated & Housinger) and Env

021. Considction of prop

wnship and ion of Septe

. It is surrouare in 5km o

proposed pr

strict -

29

/BS –

rea is 00 Sq ver to

using letter

pment iabad

er no. e Pvt. g Pvt. virons

dering posed

Area ember

unded of the roject

ProposedGhaziaba

Consultan

S.No.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

Residentiaad, Uttar Pr

nt-Ascenso E

Nearest RaiStation

Nearest Air

Nearest Vil

Nearest UrbSettlements

Nearest Highway/R

Nearest StaBoundary

Water Bodi

Nearest SchCollege

Nearest Hos

Places of w

Nearest Res

al Complex radesh.

Enviro Pvt. Lt

Table-1: S

ilway GhAn

rport IndSa

lage MaIslKi

ban s

KrAhPraMiBhGo

Roads

NHNHGaHaGT50

te DeHa

ies HiYa

hool &

SaCoDAIndViDP

spital JeeSh

worship MoNo

serve Go

at Plot No

td.

Site Surroun

Conne

Descrip

haziabad Rainand Vihar Rdira Gandhi fdarjung Airahiuddin Puram Nagar Vnauni Villag

rishna Viharhinsa Khandatap Vihar irzapur him Nagar opal Nagar H-24 H-91 aushala Roadapur Road T Road meter Servi

elhi-UP Bordaryana-UP Bndan River

amuna Riverntosh Medic

ollege AV Pratap Vdirapuram Puhar

PS Indirapurevan Lok Ho

hanti Gopal Hothi Masjidorani Masjid

opi Sarovar C

. 04/BS – 0

ndings and

ectivity & S

ption

ilway StationRailway StatInternationarport r Kanawni

Village ge

-2

d

ice road der

Border

r cal College a

Vihar ublic School

ram ospital Hospital

d

City Forest

02(GH-03) S

Connectivi

Site Surroun

n tion al Airport

and Dental

l, Pratap

Siddhartha

ity Details

ndings

Distanc

2.24 km8.57 km31.38 km20.64 km0.68 km2.33 km1.63 km1.23 km2.05 km0.3 km, 1.17 km1.53 km2.75 km1.01 km2.5 km, 0.3 km, 2.52 km3.9 km, Adjacen8.53 km17.13 km1.17 km13.49 km0.41 km 1.22 km1.44 km 2.12 km1.15 km2.4 km, 1.89 km2.04 km

5.18 km

Vihar, Dis

Page 2 of 2

ce and Direc

m, ENE m, West

m, Southwesm, Southwes

m, Southwestm, North m, West m, Northeastm, Southwest

East m, East m, East m, Northeastm, South

Northeast North

m, North Northwest

nt to site, Wem, West

m, Southwesm, West

m, West m, East

m, East m, East

m, Southwestm, East

Southwestm, North m, North

m, North

strict -

29

ction

st st t

t

est

st

t

ProposedGhaziaba

Consultan

12.

13.

14.

15.

16.

Source:

A Googlshown in The topoFigure-2the Figur

Residentiaad, Uttar Pr

nt-Ascenso E

Forest, ProtForest and CForest Nearest Weand SanctuaNearest ParGardens

Nearest WT

Nearest DefInstallation

Critically PArea

Google Eart

le Map of 5n Figure-1.

ographical m2 and topogrre-3.

al Complex radesh.

Enviro Pvt. Lt

tected City

CeKhGu

etlands aries

SuOk

rks and AmSw

TP GaUP

fense Hi

olluted KaMoLoMe

th

500m buffer

map showinaphical map

at Plot No

td.

entral Ridge hodnakhurd ulistanpur R.urajpur Wetlakhla Bird Sanmbedkar Parwarna Jayantangajal WateP Jal Nigam

ndan Airforc

avinagar Induohannagar In

oni Industrialeerut Road I

map showi

g the surroup showing th

. 04/BS – 0

Reserve ForR.F. .F. and nctuary

rk, Pratap Viti Park er TreatmentWTP

ce Station

ustrial Areandustrial Arel Area Industrial Ar

ing the surro

unding areahe eco-sensit

02(GH-03) S

rest

ihar

t Plant

ea

rea

ounding are

a within 10 tive area with

Siddhartha

21.14 km15 km, S14.66 km14.5 km13.12 km1.04 km3.46 km0.4km, S0.47 km

7.44 km

3.9 km, 2.33 km3.11 km7.27 km

ea of the pro

km radius hin 15 km ra

Vihar, Dis

Page 3 of 2

m, WSW Southeast m, Southeast

m, Southeastm, SSW

m, East m, West

Southeast m, Southwest

m, North

Northeast m, North m, North m, Northeast

oposed proje

is shown inadius is show

strict -

29

t

t

ect is

n the wn in

C

Consultant-Ascen

Proposed ReGhaziabad, U

nso Enviro Pvt. L

Fi

esidential CompUttar Pradesh.

Ltd.

igure-1: Google

plex at Plot N

e Map of 500m

o. 04/BS – 02(

radius showin

(GH-03) Siddh

Page 4 of 2

ng surroundings

hartha Vihar, D

29

s of the area

District -

C

Consultant-Ascen

Proposed ReGhaziabad, U

nso Enviro Pvt. L

Figure-2: T

esidential CompUttar Pradesh.

Ltd.

Topographical m

plex at Plot N

map (Survey o

o. 04/BS – 02(

f India) of 10km

(GH-03) Siddh

Page 5 of 2

m radius showi

hartha Vihar, D

29

ing surroundin

District -

ng area

C

Consultant-Ascen

Proposed ReGhaziabad, U

nso Enviro Pvt. L

Figure-3: T

esidential CompUttar Pradesh.

Ltd.

Topographical

plex at Plot N

map (Survey o

o. 04/BS – 02(

f India) of 15km

(GH-03) Siddh

Page 6 of 2

m radius show

hartha Vihar, D

29

wing Ecosensitiv

District -

ve area

ProposedGhaziab

Consultan

3. P

M/s ApeSiddharth The propby villagproposed The coorin the Ta

The projcommercwill havdevelope

d Residentibad, Uttar P

nt-Ascenso E

PROJECT L

x Heights Pvha Vihar, Di

posed projeces such as M

d project site

rdinates of thable-2.

Centre

CornerCornerCornerCorner

oject envisacial and othee two base

ed as landsca

ial ComplePradesh.

Enviro Pvt. Lt

LOCATION

vt. Ltd. has istrict -Ghaz

t site is connMahinddin Pu

.

he project bo

Table-2:

e of the Plot

r-I r-II r-III r-IV

ges construer facilities lments mean

aped. The are

ex at Plot N

td.

N AND DES

proposed Griabad, Uttar

nected to Deur, Islam Na

oundary alon

: Coordinat

La

t 28°38

28°3928°39

28°3828°38

uction of dlike post offnt for servicea details are

No. 04/BS

SCRIPTION

roup HousinPradesh.

elhi, Noida, agar, Mirzap

ng with the

tes of the Pr

atitude

8'57.80"N

9'1.49"N 9'1.79"N

8'53.33"N 8'52.89"N

dwelling unfice, police sces and pare given in T

– 02(GH-0

N

ng Project at

and other Npur, Prata Vih

Centre of th

roject Boun

Lo

77°2

77°277°277°277°2

nits for thestation, aganrking purpoable-3 and l

03) Siddhar

t Plot no. 4/B

NCR regionshar are in 5

he project sit

dary

ongitude

24'13.85"E

24'15.88"E 24'12.32"E 24'10.95"E 24'14.57"E

e residentialnbadi, ATM oses and 2,6land use in T

rtha Vihar,

Page 7 of

BS - 02 (GH

. It is surroukm of the ar

te is given b

l purpose, and for bui600 m2 is tTable -4.

, District -

f 29

H-03),

unded rea of

below

club, ilding to be

PG

C

Proposed ResiGhaziabad, Utt

Consultant-Ascen

idential Compltar Pradesh.

nso Enviro Pvt. L

S. No.

1 Tot

2 Per

3 Ac

4 To

5 Tot

a Per

b Ad

c Ad

d Tot

6 To

a FA

b FA

c Pol

d Ag

e Ext

7 To

8 To

a Per

lex at Plot No

Ltd.

Table

tal Plot Area

rmissible Groun

hieved Ground

tal Permissible

tal Permissible F

rmissible FAR a

dditional Purcha

dditional FAR fo

tal Permissible F

tal Achieved FA

AR achieved for

AR achieved for

lice Post FAR A

ganbadi FAR are

tra Facility area

tal Proposed In

tal permissible

rmissible 5% Fa

o. 04/BS – 02(

e-3: Area detai

Particu

nd Coverage @4

Coverage @ 20

e FAR

FAR for Housin

as per 2.5

sable FAR @1.2

or Green Buildin

FAR for Comm

AR

Residential

Commercial

Area

ea

a in FAR

ncentive FAR A

e 5% Facility A

acility Area of p

(GH-03) Siddh

ils of the propo

ulars

40% of Plot Are

0.11% of Plot ar

ng

25

ng @5% of Perm

mercial @1% of t

Area

Area

permissible FAR

hartha Vihar,

Page 8 of

sed project site

ea

rea

missible FAR

total FAR

R

District -

f 29

e

Sq.m

26,00

10,40

5,229

1,03,3

1,02,3

65,00

32,50

4,87

975

1,02,34

99,020

975

800

411.7

1,132

11,188

4,87

3,25

mt.

00

00

.14

350

375

00

00

75

5

40.05

0.67

5

0

77

.61

8.2

75

50

PG

C

T

Proposed ResiGhaziabad, Utt

Consultant-Ascen

The Site layout

idential Compltar Pradesh.

nso Enviro Pvt. L

b Per

9 Ac

a

5%

Ser

b

5%

Lif

10 To

a Tot

b Tot

c Tot

d Tot

e EW

11 To

12 Tot

13 Per

14 Req

plan is attached

lex at Plot No

Ltd.

rmissible 5% Fa

hieved Facility

% of Facility a

rvice Shaft)

% Facility area o

ft Lobby, Servic

tal Non FAR A

tal Lower Basem

tal Upper Basem

tal Fire Stair Ca

tal Incentive Fi

WS and LIG No

tal Built Up ar

tal Open Area

rmissible Lands

quired Landscap

d as Annexure-I

o. 04/BS – 02(

acility Area of P

Area

area(Mummty, M

of incentive FA

ce Shaft)

Area

ment Area

ment Area

ase area

ire Stair Case ar

on FAR Area

ea

cape Area @10

pe Area @10 %

III.

(GH-03) Siddh

Purchasable FAR

Machine Room

AR(Mummty, M

rea

0 % of Plot Area

% of Plot Area

hartha Vihar,

Page 9 of

R

m, Lift Lobby,

Machine Room,

a

District -

f 29

1,62

6,007.

5,508

499.1

62,442

20,933

20,933

3,515

354.

16,705

1,80,84

20,770

2,60

2,60

25

.61

.46

15

2.58

3.75

3.75

.62

.2

5.26

45.83

0.86

00

00

ProposedGhaziab

Consultan

S. No.

1

2

3

4

5

6

7

8

9

10

11

Design o The Propfacilities,

S. No.

1.

2.

3.

d Residentibad, Uttar P

nt-Ascenso E

Total Plot

Achieved

Pol

Co

Ag

Gro

blo

Co

Education

Medical C

Medical ce

Green Are

Ramp Are

Road Area

Electrical

Chabutra

Dustbin

of Building B

posed Group, details are

ial ComplePradesh.

Enviro Pvt. Lt

T

Descrip

Area

Ground Cov

lice Post

ommercial B

ganbadi

ound covera

ocks

ommunity an

facility

Center

enter handed

ea

a

a including s

Sub Station

Blocks:-

p Housing Prshown in Ta

TaDe

T

T

T

ex at Plot N

td.

able 4: Lan

ption

verage

lock

age of reside

nd Social Cen

d over

surface parki

roject comprable 5.

able 5: Detascription

Tower A

Tower B

Tower C

No. 04/BS

nd Use of Pr

ntial

nter

ing

rises residen

ails of Buildi

– 02(GH-0

roject Site

Area (m2)

26,000

5,225.75

231.23

408.94

411.77

3,926.75

247.06

1,000

888

800

2,600

270

14,571.15

274.51

123.53

247.06

ntial blocks,

ing Blocks

2 b

2 b

2 b

03) Siddhar

P

20.09

0.88%

1.57

1.58%

15.10

0.950

3.84%

3.41

3.07%

10%

1.03

56.04

1.05

0.47

0.95

incentive un

De

basement+Gr

basement+Gr

basement+Gr

rtha Vihar,

Page 10

Percentage

100%

% of Plot A

% of Plot Ar

% of Plot A

% of Plot Ar

0% of Plot A

0 % of Plot A

% of Plot Ar

% of Plot A

% of Plot Ar

% of Plot Are

% of Plot A

4% of Plot A

% of Plot A

% of Plot A

% of Plot A

nits, and diff

etails

round+33 Fl

round+31 Fl

round+33 Fl

, District -

of 29

Area

rea

Area

rea

Area

Area

rea

Area

rea

ea

Area

Area

Area

Area

Area

ferent

loor

loor

loor

ProposedGhaziab

Consultan

4.

5.

6.

7.

a.

b.

c.

d.

8.

9.

10.

11.

12.

Ground F

4. PTotal poResidentTable-6.

S. N.

1

2

3

d Residentibad, Uttar P

nt-Ascenso E

Pos

Comm

ATM Exte

Comput

Reserva

R

Rese

Floor plans

POPULATIOopulation ofial Apartme

Total Num

Total Num

Total Num

ial ComplePradesh.

Enviro Pvt. Lt

T

T

T

T

st office

mercial Area

ension Coun

terized Train

ation Counte

Police

Community

Aa

eserved Plot

Plot for M

erved Plot fo

is attached

ON DETAIf the propoent, club, co

Ta

mber of Dwe

mber of LIG

mber of Ews

ex at Plot N

td.

Tower D

Tower E

Tower F

Tower G

Co

Base

nter

n

er

e Post

y & Social C

aganbadi

t for Medica

Medical cen

or educationa

as Annexur

L osed project ommercial a

able-6: Calc

Units

elling Units

units

units

No. 04/BS

ommercial B

(2

ement+Groo

Floor)

Centre

al Center

nter

al facilities

re-IV.

will be 7and visitors.

culation of P

– 02(GH-0

2 b

2 b

2 b

2 b

Block

ound+2

Fir

G+

Gro

Blo

Sec

Blo

2 B

2 b

In T

Ha

dev

,841 whichBreakup o

Population

03) Siddhar

basement+Gr

basement+Gr

basement+Gr

basement+Gr

rst floor of C

+2 Floor of C

ound Floor o

ock

cond Floor o

ock

Basement+G

basaement+G

Tower C

anded over to

velopment

h include thf the popula

Pop

rtha Vihar,

Page 11

round+33 Fl

round+33 Fl

round+30 Fl

round+33 Fl

Commercial B

Commercial

of Commerc

of commerci

Ground+3 Flo

Ground+2 Fl

o GDA for fu

he populatioation is giv

pulation

1,051

128

128

, District -

of 29

loor

loor

loor

loor

Block

Block

cial

ial

oor

loor

further

on of en in

ProposedGhaziab

Consultan

4

5

6

7

8

9

10

11

12

13

14

*Source-

5. D

The projarea is dewith mod Design C

E

U

Mb

P

Aco

6. R

Interperip Exter

d Residentibad, Uttar P

nt-Ascenso E

Incentive

Total

Total popu

Total popu

Total popu

Communi

Commerc

Visitors o

Staff @1%

Total popu

Say

- National B

DESIGN CO

ect structureeveloped andern design a

Criteria:

Eco-friendly

Utilizing max

Modular planasement area

rovision of m

All efforts woncept by us

ROAD & PA

rnal Road - hery and ins

rnal Road -

ial ComplePradesh.

Enviro Pvt. Lt

unit

ulation @5 p

ulation @5 p

ulation @5 p

ity Populatio

ial populatio

f 5% of tota

%of total pop

ulation

Building Cod

ONSIDERA

es have beend bears signand facilities

environmen

ximum FAR

nning by adoa.

maximum lig

will be takensing various

ARKING DE

Project has side the prem

- Sectoral roa

ex at Plot N

td.

person per u

person per u

person per u

on @ 1 perso

on @ 1 perso

l population

pulation

de, 2005

TION

n designed anificant archis with large

t by providin

and height a

opting grid s

ght and vent

n to make ttechniques.

ETAILS

9 meters wmises

ad of 50 met

No. 04/BS

unit of main D

unit of EWS/

unit of incent

on per 1.5 Sq

on /10 Sqm o

n

after due stuitectural aspstretches of

ng maximum

as per Build

ystem to ach

tilation to all

he building

wide road hav

ters is adjace

– 02(GH-0

DU

/LIG

tive DU

qm of FAR

of FAR

udy of the lopect. Likewis

open spaces

m green spac

ding Bye -law

hieve flexibi

l spaces.

in accordan

ving 6 meter

ent to the Pro

03) Siddhar

1

3

7,

ocal architecse, the plot hs.

ce, lawns, tre

ws and fire r

ility in desig

nce with th

r wide fire t

oject site in

rtha Vihar,

Page 12

120

1,427

5,255

1,280

600

164.71

97.5

369.85

73.97

,841.03

7,841

cture. The prhas been pla

ees and shru

egulations.

gn and parki

he green bui

tender path a

West directi

, District -

of 29

roject anned

ubs.

ing in

ilding

at the

ion.

P

ProposedGhaziab

Consultan

Entrythe pr SetbameterParkECS.

Descript

Parking Re

d Residentibad, Uttar P

nt-Ascenso E

y/exits provroject.

ack Detail:-r wide in We

king Details The details

tion

quired

ial ComplePradesh.

Enviro Pvt. Lt

vided in the

-Project hasest direction– The totalof parking r

As P

1.) Residen

2.) Require

3.) Require

Proposed C

4.) Require

proposed C

5.) Require

No. of LIG

6.) Total

6.) Require

Total ECS

ex at Plot N

td.

e Building P

9 meter wn. l parking reqrequired and

Table-7

er Ghaziaba

ntial Parking

ed parking fo

ed parking fo

Commercial

ed Parking f

Community

ed Parking F

G Units=128

ed 10% of v

S required

No. 04/BS

Premises –

ide setback

quires is 1,4d proposed ar

7: Parking D

ad Building

g Required

for incentive

for Commerc

FAR/100*2

for Commun

FAR/100*1

For LIG @3

units

isitors Parki

– 02(GH-0

1 exit/entry

in North, S

403 ECS anre given belo

Details

g Byelaws

FAR

cial @

2

nity @

.5

unit per 1 E

ing

03) Siddhar

points has b

South, East

nd proposed ow:

ECS

=741.1

=11.11

=128/3

1275

=1275

=127.5

=1275

rtha Vihar,

Page 13

been propos

direction an

parking is

Parking

(E.C.S.)

1201

120

=975/100*

19.5, Say

18/100*1.5

177, say 11

3=42.66 ECS

5*10/100

5, say 128 E

5+128

, District -

of 29

sed in

nd 15

1,409

g

*2

y 20

S ,say 43

Cs

P

S.No.

ProposedGhaziab

Consultan

Parking Pro

Lower B 7. L

Increasinpollutionpollutionvarious s

1

2

3

4

. Binomia

Name

d Residentibad, Uttar P

nt-Ascenso E

oposed

asement Pla

LANDSCAP

ng vegetationn. Plants sern. Calculatiosuggested sp

Table-

1 Total P

2 Open A

3 Landsc

4

Landsc

1.) Tota

2.) Tota

al Family

ial ComplePradesh.

Enviro Pvt. Lt

In Upper

Parking Ar

In Lower

Parking A

Surface P

Total ECS

an and Upper

PE DEVELO

n in the formrve as a sinn of green aecies to be u

Ta

9: Suggeste

Plot Area

Area (Plot are

ape area req

ape area pro

al Soft Green

al Hard Gree

y Comm

on Name

ex at Plot N

td.

Basement A

rea (20,010.3

Basement A

Area (20,010

arking @1

S provided

r basement p

OPMENT

m of greenbnk for polluarea for propused in green

ble-8: Calcu

ed Species to

ea - Ground

quired 10 % o

ovided 10 %

n @ 40.70%

en area @ 28

Hindi Name

Sentiv

Toan

No. 04/BS

Area @ 1EC

36 m2)

Area @ 1EC

0.36 m2)

ECS/20m2

plan is attach

belt is one outants, reduposed projecnbelt develop

ulation of G

o be used fo

Coverage A

of plot area

of plot area

% of plot area

8.97% of plo

nsive/ lernt

Habit

Hgh

– 02(GH-0

CS/32m2

CS/32m2

hed as Anne

of the preferuce the flowct is given inpment.

Green Area

or Greenbelt

Area)

a

ot area

Heiht

Growth

rate

03) Siddhar

=1409

exure-V and

rred methodw of dust an Table-8. T

t Developm

26,000

20,770.86

2,600 S

2,600 S

1,560 S

1,040 S

Regeneration

EvreDeuo

rtha Vihar,

Page 14

9 ECS

625 ECS

625 ECS

159 ECS

1409 ECS

d VI respecti

ds to mitigatand reduce Table-9 indi

ment

Sq.m.

6 Sq.m.

Sq.m.

Sq.m.

Sq.m.

Sq.m.

vergen/

ecidous

Flowerg seaso

, District -

of 29

S

S

S

S

ively.

te air noise icates

rinon

Crown shape

1

2

3

4

5

6

7

8

9

10

ProposedGhaziab

Consultan

Source: C

Landscap

Cassia fistulinn

Grevillearobusta A

Cunn.

Jacarandmimosaefo

D.Don

Polyalthilongifolia(Sonn.) T

Delonix reg(Boj. ex

Hook.) RaLagerstroe

a specios(L.) Pers

Caesalpinpulcherrim

(L.) Sw.Euphorbi

pulcherrimWilld. exKlotzsch

Bougainvilspp Comm. ex Juss. Azadirachtindica A. juss.

d Residentibad, Uttar P

nt-Ascenso E

CPCB guide

pe plan is att

ula Caesalpiceae

a A. Proteace

da olia

Caesalpiceae

ia a

Th

Anonace

gia x af.

Fabacea

emisa s.

Lythrace

nia ma .

Fabacea

ia ma x h

Euphorbceae

llea Nyctaginceae

ta Meliacea

ial ComplePradesh.

Enviro Pvt. Lt

eline for deve

tached as An

inaGolden Shower

s

eae

Silvery or

Silky oak

inaNil-

gulmohur

eaAshok

ae Flambo

yant

eaGiant Crape-myrtle

ae Peacoc

k Flower

bia Poinsettia

na Bougainvillea

ae Indian Lilac

ex at Plot N

td.

eloping gree

nnexure-VII

Amlatas

T

T

Jacaranda

S

Devdaru

S

Gulmohar

T

Jarul. T

Radhachura

T

Christmas Star

T

Bougainvillea

T

Nim T

No. 04/BS

enbelts 2007

I.

T Tree

1m

T Tree

2m

S Tree

1m

S Tree

1m

T Tree

1m

T shrub

3m

T shrub

3m

T shrub

4m

T shrub

3m

T Tree

20m

– 02(GH-0

7

2m

Quick Growing

20m

Quick Growing

0m

Quick Growing

5m

Quick Growing

2m

Quick Growing

m Quick Growing

m Quick Growing

m Quick Growing

m Quick Growing

Bt

0m

Quick Growth after 1st season

BS

03) Siddhar

By seeds,

Suckers

Deco

By Seeds

Eveee

By Seeds

Deco

Through seeds (fresh) Evergre

en

Eveee

By seeds

Deco

By Seeds

Deco

By seeds

Deco

By seeds

Deco

By tubers

Decous

By Seeds

Eveeen

rtha Vihar,

Page 15

ciduus

Mar -May

ergren

Feb -April

ciduus

MarchApril

ergren

April June

ciduus

April June

ciduus

June

ciduus

June

ciduus

June

cidus

Round the year

ergrn

Jan - March, Aug. - Sept.

, District -

of 29

- Round

l

Oblong

h-l

Round

- Conical oRounded

- Round

Round /Oblong

Round

Round

r Rounded

Spreading

or d

g

ProposedGhaziab

Consultan

8. W

Water Re

8.1 W

Water re/Private W

8.2 W

Water rewater reqflushing,water reqand filtermet throuDetails o

d Residentibad, Uttar P

nt-Ascenso E

WATER RE

equirement f

Water requir

equirement dWater tanker

Water requir

quirement dquirement fo landscapingquirement for back washugh treated w

of break-up o

ial ComplePradesh.

Enviro Pvt. Lt

EQUIREME

for the propo

rement dur

during the Cr suppliers.

rement dur

during the opor the existing, DG Coolor existing p. The waterwater from oof water requ

ex at Plot N

td.

ENT, SUPPL

osed project

ring Constru

Construction

ring operatio

perational phng phase is 6ling, filter bphase is 488r requiremenonsite STP. uirement are

No. 04/BS

LY AND DI

is discussed

uction phase

n phase wil

on phase

hase will be 687 KLD. Thback wash an8 KLD whicnt for flushin

given in Ta

– 02(GH-0

ISTRIBUTI

d below.

e

ll be met by

met throughhis includes

and for firefich includes ng, DG Coo

able-10.

03) Siddhar

ION

y treated w

h Municipal domestic w

fighting tankdomestic w

oling and lan

rtha Vihar,

Page 16

water from C

supply. Thewater requiremk. The total water requirendscaping w

, District -

of 29

CSTP

e total ment, fresh

ement will be

PG

C

S.

No

.

1 M

2

L

U

2 C

3

C

P

4 v

5 S

6 F

7 D

8 H

Proposed ResiGhaziabad, Utt

Consultant-Ascen

Descriptio

Main Dwelling u

LIG/EWS/Incen

Units

Community Pop

Commercial

Population

visitors

Staff

Fiter Backwash

DG Cooling

Horticulture

idential Compltar Pradesh.

nso Enviro Pvt. L

on No

units

in S

units 1,0

ntive

37

pulation 24

97

37

26

lex at Plot No

Ltd.

Ta

o. of

s/Area

Sq mt

Unit

051.0

76.0

47.1

1 per

75.0

1 pe

…..

5%

Po

….

1%

po

..

00.0

00.0

o. 04/BS – 02(

able 10: Details

Population P

5.0

5.0

rson per 1.5

Sqm

rson per 10

Sqm

% of total

opulation

% of total

opulation

….

….

(GH-03) Siddh

s of Water Req

Populatio

n

U

co

n

5,255.0

1,880.0

164.7

97.5

369.9

74.0

….

…. 1li

….

hartha Vihar,

Page 17 of

quirement

Unit water

onsumptio

n (litres)

T

w

req

(

86.0 4

86.0 1

15.0

30.0

15.0

45.0

….

it /KVA*8

3.0

District -

of 29

Total

water

quired

(kld)

wa

requi

t f

dom

use

451.9 34

161.7 12

2.5 1

2.9 2

5.5 3

3.3 2

15.0 …

29.6 …

7.8 …

ater

remen

for

mestic

(kld)

Flush

g/

Recyc

d wat

(kld

41.6 110.4

22.2 39.5

.5 1.0

2.0 0.9

3.3 2.2

2.2 1.1

… …

…. ….

… ….

hin

cle

ter

)

Total

Wastewat

r (kld)

4 383.6

5 137.2

2.2

2.5

4.9

2.9

….

….

….

te

PG

C

9

W

F

T

Proposed ResiGhaziabad, Utt

Consultant-Ascen

Water Requirem

FF Tank

TOTAL

idential Compltar Pradesh.

nso Enviro Pvt. L

ment for

1% o

wa

requir

lex at Plot No

Ltd.

of total

ater

rement

….

o. 04/BS – 02(

….

….

….

(GH-03) Siddh

….

….

hartha Vihar,

Page 18 of

….

…. 6

…. sa

District -

of 29

6.8 …

687.0 47

ay 687 say

…. ….

72.9 155.0

y 473 say 15

….

0 533.3

55 say 533

ProposedGhaziab

Consultan

8.3 W

The total

Calculati

Water re

Wastew

water r

Water re

Wastew

require

Total W

Water baFigure-5

d Residentibad, Uttar P

nt-Ascenso E

astewater G

l estimated q

ion of wastew

equirement f

water to be

requirement

equirement f

water to b

ement)

Wastewater

alance diagr5.

ial ComplePradesh.

Enviro Pvt. Lt

Generation

quantity of w

water genera

Table-11:

for domestic

generated

t)

for Flushing

e generate

generated

ram for Non

ex at Plot N

td.

wastewater to

ation is show

: Calculatio

Details

c purpose

from dom

g Purpose

d from Fl

n-Monsoon

No. 04/BS

o be generate

wn below in

n of Wastew

mestic use (@

lushing (@

is given in

– 02(GH-0

ed from prop

Table-11.

water Gene

@ 80% of

@ 100% of

Figure-4 an

03) Siddhar

posed projec

ration

domestic

f flushing

nd for Mon

rtha Vihar,

Page 19

ct is 533 KLD

Water (K

473

378

155

155

378+15

= 553 KL

nsoon is giv

, District -

of 29

D.

KLD)

55

LD

ven in

PG

C

Proposed ResiGhaziabad, Utt

Consultant-Ascen

idential Compltar Pradesh.

nso Enviro Pvt. L

lex at Plot No

Ltd.

Figure-4

o. 04/BS – 02(

4: Water Balan

(GH-03) Siddh

nce Diagram for

hartha Vihar,

Page 20 of

r Non Monsoon

District -

of 29

n Season

PG

C

Proposed ResiGhaziabad, Utt

Consultant-Ascen

idential Compltar Pradesh.

nso Enviro Pvt. L

lex at Plot No

Ltd.

o. 04/BS – 02(

Figure-5: Wat

(GH-03) Siddh

er Balance Dia

hartha Vihar,

Page 21 of

agram for Mon

District -

of 29

soon Season

NoM

ProposedGhaziab

Consultan

Reuse of

The geneTreatmenwaste waReactor During tlandscaplandscaprecycled

on-Monsoononsoon Sea

Wastewa

The wastSewage proposed

Dual Plu

Water Suwhen theby potabunauthorand potab

9. S

The stormstagnatiohas beenliable to water dis

d Residentibad, Uttar P

nt-Ascenso E

f Treated W

erated waste nt Plan, andater generate(FAB) and the non-moning and during, and thewater uses a

n Season son

ater Treatm

te water genTreatment P

d STP is base

umbing Sch

upply scheme toilets and ble water. Trized plumbible water sy

TORM WA

m water dispon and floodin decided to

catch the msposal:

ial ComplePradesh.

Enviro Pvt. Lt

Water:

water is 533d the capacited i.e. 640 Kit will be rensoon seasoring the mo

e excess treaare provided

T

Treated Water

426 KLD 426 KLD

ment Scheme

nerated will Plant (STP) ed on Fluidiz

eme

me has been durinals are s

This co-exisng modificastems.

ATER DRA

posal systeming of water

o provide sumaximum ru

ex at Plot N

td.

3 KLD. Thety of Sewag

KLD. The proecycled and on, treated onsoon seasoated water wd in Table-12

Table-12: R

Flushi

155KL155 KL

e

be treated will be hig

zed Aerobic

designed as served by restence of thations that ca

AINAGE

m for the premr. Maximum ufficient rainun-off from

No. 04/BS

waste waterge Treatmenoposed STP re-used for water will

on, as therewill be discha2 below.

Recycled Wa

ing Lan

LD 8LD 4

in the Sewagher of wasBio-Reacto

Dual Plumbcycled watehe two systan lead to a c

mises shall bharvesting w

n water harvthe area. F

– 02(GH-0

r generated wnt Plant (ST

will be baseflushing, Dbe used in

e will be learged into th

ater Uses

ndscaping

8 KLD 4 KLD

age Treatmeste water ge

or (FAB).

bing. Dual Per while the rtems requirecross-connec

be self-sufficwill be donevesting at s

Following ar

03) Siddhar

will be treatTP) will be 2ed on Fluidiz

DG Cooling n Flushing, ss requiremhe Sewer lin

DG Sets Cooling 30 KLD 30 KLD

ent Plan, andenerated i.e.

Plumbing refremaining fies extra cauction betwee

cient to avoie within the elected loca

re some mea

rtha Vihar,

Page 22

ted in the Se20% higherzed Aerobicand landscaDG Coolin

ment of watene. The deta

Discharge

233K237 K

d the capaci. 640 KLD.

fers to the syixtures are seution to pren recycled w

id any collecsite. Therefoations, whicasures for S

, District -

of 29

ewage r than c Bio-aping. ng & er for ails of

e to Sewer

KLD KLD

ity of . The

ystem erved

revent water

ction/ ore, it h are

Storm

ProposedGhaziab

Consultan

1) Spt

2) Pr

3) F

wd

4) Tw

5) T

gcs

10. RA

Rainwatestored fothrough wground w Advanta

T

T

T

T

T

T

T

Im

d Residentibad, Uttar P

nt-Ascenso E

Since the expipe drains ithrough rain

Proposed storegular inter

For basemenwater storagdrain. The annual water draina

The entire sgravity connconnected tosite against f

AINWATE

er harvestingor direct use which rain w

water reservo

ages:

To meet the e

To avoid floo

To augment t

To reduce gro

To improve th

To reduce the

To supplemen

mproves the

ial ComplePradesh.

Enviro Pvt. Lt

xisting topogis planned awater pipes

orm water svals for rain

nt parking, thge tank. This

rainfall inteage system.

site is providnections to o water Draiflooding.

ER HARVES

g is the activor for recha

water is captoir by adopti

ever increasi

oding of road

the ground w

ound water p

he quality of

e soil erosion

nt domestic

quality of g

ex at Plot N

td.

graphy is conadjacent to rs.

system consin water harve

he rainwaters water will

nsity of 90

ded with exthe Rechargin line. The

STING

vity of directarging the grtured from thing artificial

ing demand f

ds.

water storage

pollution.

f ground wat

n.

water requir

ground water

No. 04/BS

ngenial to suroads. All bu

ists of pipe esting and gr

r from rampsbe pumped

mm/hr shal

xtensive plange pits. Ovearrangemen

t collection oroundwater.he roof and precharge tec

for water.

e and control

ter.

rement durin

r through dilu

– 02(GH-0

urface disposuilding roof

drain, catchround water

s will be cold out to the

ll be conside

nned undergerflow fromnt provides

of rainwater. Rain Waterpaved surfacchniques.

l the decline

ng summer, d

ution when r

03) Siddhar

sal, a networf water will b

h basins andrecharging.

llected in thenearest exte

ered for des

ground drainm last Recha

appropriate

. Collected Rr Harvestingces and stor

of water tab

drought etc.

recharged to

rtha Vihar,

Page 23

rk of storm wbe brought d

d seepage p

e basement sernal storm w

signing the s

nage system arge pit shaprotection t

Rainwater wg is the technred in sub-su

ble levels.

o ground wat

, District -

of 29

water down

pits at

storm water

storm

with all be to the

will be nique

urface

ter.

S. N

1.

ProposedGhaziab

Consultan

In

w

w

Rainwat

As per tproposin Dual Pluare attach Plan show 11. P

The totalbe suppTransform

No. T

. Total

S. No.

1.

d Residentibad, Uttar P

nt-Ascenso E

n saline area

water, it redu

water inter-fa

ter Harvestin

the calculatig 6 nos. of R

umbing Plan hed as Anne

wing design

POWER RE

l electrical lolied by Pamers (at 85%

Type of Surf

Roof /Terra

Volume o

desilting ta

14 m3

ial ComplePradesh.

Enviro Pvt. Lt

as, rain wat

uces salinity

aces.

ng CalculatioTable

Tabl

on providedRWH pits.

showing locexure-VIII

ing of rain w

EQUIREME

oad demandaschimancha% loading) ar

face

ace Area

of

ank

Vo

rec

ex at Plot N

td.

er provides

and also he

on for the pre-13: Runoff

le-14: Numb

d above, the

cation of rain

water harvest

ENT

d has been esal Vidyut Vre 3 NOS 16

Catchment

Area (m2)

5229.140

Total ru

olume of

charge pit

3.5 m3

No. 04/BS

good qualit

elps in main

oposed projef Calculatio

bers of Pits

e nos. of RW

n water Harv

ting pit is att

stimated to bVitran Niga600 KVA ea

Runof

Coefficie

0.85

unoff water

Total

Volume

17.5 m3

– 02(GH-0

ty water and

ntaining bala

ect is given on of the Ar

Calculation

WH Pits is

vesting pits a

tached as An

be 3820 KVam Limitedach located a

ff

ent

Inten

Rain

(mm

9

Runoff

15 minu

88.05

03) Siddhar

d when rech

ance between

in Table-13rea

n

required 5

and storm w

nnexure-IX

VA. The sourd (PVVNL)at surface.

nsity of

nfall

m/hr)

In

R

90

ff in

utes

No. o

requ

m3 5

rtha Vihar,

Page 24

harged to gr

n the fresh-s

and Table-

pits and w

water manage

X.

rce of power. Recomme

ntensity of

Rainfall

(m/hr)

0.09

of pits

uired

No

pr

.03

, District -

of 29

round

saline

-14.

we are

ement

r will ended

Runoff

(m3 /hr)

400.03

400.03

o. of pits

roposed

6 pits

ProposedGhaziab

Consultan

In case oprovided The DG be provifacilitate consideri Calculat

H = h + 0

Where: H = Totah = HeighKVA = T For DG H = h+0.H = h+0.H = h+4. We sugg For DG H = 14QConsiderSulphur cSulphur c SO2 EmiSo, H For Com

H = 14Q

d Residentibad, Uttar P

nt-Ascenso E

of power faid as power ba

sets will be ded as per natural disp

ing height of

tion of DG S

0.2 √ (capac

al height of sht of the bui

Total generat

set of 600 K2 √600 2 x 24.4 89 or say 5 m

gest 6 meter

set of 1250

^0.3 wherer Fuel Consucontent in fucontent in w

ssion (Q) = H = 14Q^0.3

= 15.20 me Say 15 m

mbined DG s

^0.3 where

ial ComplePradesh.

Enviro Pvt. Lt

ilure, 4 DG ack-up. The

provided wthe stipulat

persion of exf the buildin

Stack Heigh

city of DG in

stack in meteilding in mettor capacity

KVA

meter

above the m

KVA

e, Q = SO2 eumption = 31uel = 0.25%

whole fuel = 7 = =

1.3175 kg/h

eters m

set capacity

e, Q = SO2 e

ex at Plot N

td.

sets of totaDG sets wil

with acoustic ted guidelinxhaust gases g.

ht:

n KVA.)

er. ters where thin the set of

max. Height

emission (g/s10 lit/hr

77.5 % = .775 lit/hr= 0.65875 kr

y of 3700KV

mission (g/s

No. 04/BS

al capacity oll be of water

enclosure. Anes of Centr

as the calcu

he generator f KVA.

t of the buil

sec)

kg/hr

VA (2*1250+

sec)

– 02(GH-0

of 3700 KVr cooled. DG

Adequate staral Pollutionulation for th

set is install

lding

+2*600 KVA

03) Siddhar

VA (2*1250+G sets are loc

ack heights n Control Bhe stack heig

led.

A)

rtha Vihar,

Page 25

+ 2*600) wcated at surf

of D.G. SetsBoard (CPCBght is given b

, District -

of 29

ill be face.

s will B) to below

S.No

1

2

ProposedGhaziab

Consultan

Consider

Sulphur c

Sulphur c

SO2 Emi

So, H

We sugg 12. S

The projegenerated2000. The domCommerThese sosource ofwaste bluthat maxwaste gen

o. Catego

Residen

(Residen

Commer

(Comme

d Residentibad, Uttar P

nt-Ascenso E

r Fuel Consu

content in fu

content in w

ssion (Q) =

H = 14Q^0.3

= 21.60 me

Say 2gest 6 meter

OLID WAS

ect will adopd from the p

mestic solid cial, Visitor

olid wastes wf generation.ue bins and

ximum solid neration rate

ory of Solid

tial

nts+ Visitors

rcial po

ercial +Com

Total

ial ComplePradesh.

Enviro Pvt. Lt

umption = 10

uel = 0.25%

whole fuel = 2

= 2

=

4.25 kg/hr

eters

2 m above the m

STE GENE

pt a systemaproject will

waste will rs, pertains twill be coll. For the biofor the non-waste gener

e has been co

Table-15:

Waste

Refuse

s+Staff)

opulation

mmunity)

ex at Plot N

td.

000 lit/hr

250%

.5 lit/hr

= 2.125 kg/h

max. Height

RATION A

atic approachbe collected

be generateto the two ected separa

odegradable recyclable wration wouldonsidered as

Proposed S

Waste

Generatio

Rate

0.3 to 0.6

kg/cap/da

0.1 to 0.2

kg/cap/da

No. 04/BS

hr

t of the buil

AND MANA

h for solid wd properly an

d by the occategories, Bately by putwaste green

waste dark gd be about 3s given in Ta

Solid Waste

on

F

6

ay Popu

2

ay Popu

– 02(GH-0

lding.

AGEMENT

waste collectind will be m

ccupants of Bio-degradatting three t

n bins will begrey bins wil3,449.85 kg/able-15.

e Generation

Formula

Total

ulation*0.45

Total

ulation*0.15

03) Siddhar

ion and dispmanaged as

the Residenable and Notypes of sepe provided, fll be provide/day. Follow

n Rate

Tota

Populat

5

7,579

5

262

rtha Vihar,

Page 26

posal. Solid wper MSW R

ntial Apartmon-biodegradparate bins afor the recyced. It is estimwing are the

al

tion

W

Ge

9 3

3,449

, District -

of 29

waste Rules,

ments, dable. at the clable mated solid

Waste

enerated

,410.55

39.3

9.85 kg/day

ProposedGhaziab

Consultan

* SourceEnvironme The E-w2011. The detai

13. F

Organic Waste

- Waste fromcafeteria. - Waste from and landscapMunicipal So(ManagemenHandling) Ru

Disposed sites

compoIt will be testored at

d Residentibad, Uttar P

nt-Ascenso E

: Manual onental Engineer

waste genera

iled Solid W

FIRE FIGHT

e:

green belt pe lid Wastes

nt and ules, 2000

I

---s-(H

to MSW for sting.

emporary the site.

ial ComplePradesh.

Enviro Pvt. Lt

n Municipal ring Organiza

ated will be

Waste Genera

Figur

TING SYST

norganic waste:

Plastic waste Metal waste. W aste from stre

sweeping Municipal Solid W

(Management anHandling) Rules,

Will be disposethrough private wcollecting vendotemporary storasite. Temporaryto be enabled th2 m x 2 m x 1m colored bin.

Infrastructure re1) Trolleys – 5 2) Blue Bins –

ex at Plot N

td.

Solid Waste ation (CPHEEO

managed a

ation Manage

re-6: Solid W

TEM

W

eet

Wastes nd

2000

Ha

-U

ThWaHaTraMo

d off waste

ors after ge at

y storage hrough a blue

equired:

2

WreCB, mwP

In1

2

No. 04/BS

ManagementO), Ministry of

s per the E

ement Plan i

Waste Mana

WASTE

azardous waste:

sed Oil from DG

he Hazardous astes (Managemandling and ansboundaryovement) Rules

Will be disposed tecylcer authorize

Central Pollution CBoard. On each d

Form 13 will be maintained and rewill be filled to thePollution Control B

nfrastructure requ) 2 x 200 liter ba

with proper ma) Secondary

containment inbasement

– 02(GH-0

t, published f Urban Devel

E-waste man

is provided i

agement Pla

Sets

ment,

,2008

E-w

-Infotechtelecequi- Coelecelec

through ed by Control disposal

eturns e Board

uired:arrel arking

n

WithroautCeconRemae-wthroper(MaHa20

03) Siddhar

by Central Plopment, Gove

nagement an

in Figure-6

an

waste:

ormation hnology and communication ipments

onsumer ctrical and ctronics

ll be disposed ough recyclers thorized by

entral Pollution ntrol Board.

ecords will be aintained for the waste generated ough Form 2 as r the E -Waste anagement and

andling Rules) 11.

rtha Vihar,

Page 27

Public Healthernment of Ind

nd handling

below:

Electronic w- CFL Lamp- Fluoresce

As per CPCfor EnvironmSound MercManagemeFluroscentL

Will be disthrough reauthorizedCentral Pocontrol BoRecords wmaintainede- waste gethrough Foper the E -(ManagemHandling R2011.

, District -

of 29

h and dia.

rules

waste: snt tubes

CB Guideline mentally cury nt in

Lamp Sector

sposed ecyclers d by ollution oard. will be d for the enerated orm 2 as -Waste ment and Rules)

ProposedGhaziab

Consultan

The firefCode 2002005. Thguideline

Fire hydr Fire fight 14. D

List of bu

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22.

List of M

d Residentibad, Uttar P

nt-Ascenso E

fighting syst05. Followinhe firefightines;

National Bu

As per requ

As per Indiarants are pro

ting plan is a

DETAIL OF

uilding mate

Coarse saFine sandStone aggStone for Cement Fly Ash ReinforcePlywood Pipe scaffBricks Marble P.V.C. coMCBs/DBPVC overPave tilesGI pipe WastewatS.W. sewPVC rain Stainless Insulated Joinery ha

Machinery to

ial ComplePradesh.

Enviro Pvt. Lt

em in the prng provisionng system h

uilding Code

uirement of f

an Standard ovided all aro

attached as A

F CONSTRU

erials being u

and d gregate masonry wo

ement steel & steel shutfolding (cup

onduit Bs rhead water s

ter lines er line up towater downsteel sink inglass on extardware

o be used du

ex at Plot N

td.

roposed projns are requirhas been des

e of India (N

fire officer/lo

Code for Fiound the proj

Annexure-X

UCTION M

used at site:

ork

ttering lock system

tanks

o main sewern take n kitchen ternal facade

uring Const

No. 04/BS

ject site willred to be masigned consi

NBC);

ocal fire app

re Protectionoject site.

X.

MATERIAL

m)

r

e with ACP

truction is a

– 02(GH-0

l be done acade accordindering the f

proving autho

n (IS Codes)

L

as follows:

03) Siddhar

cording to Nng to Nationafollowing co

orities; and

)

rtha Vihar,

Page 28

National Buial Building odes, manua

, District -

of 29

ilding Code

al and

ProposedGhaziab

Consultan

1.

2.

3.

4.

5.

d Residentibad, Uttar P

nt-Ascenso E

Dumper

Concrete

JCB/Pock

Concrete

Road rolle

ial ComplePradesh.

Enviro Pvt. Lt

mixer with h

k line

Batching Pl

er

ex at Plot N

td.

hopper

ant

No. 04/BS

: Shall be us

: for RCC w

: Shall be us

: Will be us

: For compa

– 02(GH-0

sed for mud

work

sed for diggi

sed for concr

acting the ea

03) Siddhar

and materia

ing and earth

rete mixing

arth

rtha Vihar,

Page 29

al handling

h work

, District -

of 29