proposed capital improvement program (cip) fy 2021-25 · capital improvement program ... the...

20
PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 December 19, 2019

Upload: others

Post on 25-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25December 19, 2019

Page 2: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Capital Improvement Program

The CIP annually reviews current student membership and facilities data in order to identify:

• future capital requirements

• new construction

• capacity enhancements

• renovations

• potential site acquisitions

The identified needs are included in the schedule of projects for the five-year timeframe. The capital cash flow tracks the funding allocation for these projects.

12/19/2019 Proposed CIP FY 2021-25 2

Page 3: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Student Membership SY 2019-20

Membership: 188,018 SY 2018-19 to 189,010 SY 2019-20

• FCPS increased by 992 students• ES increased by 198 students (Region 2 grew the most)

• MS increased by 296 students (Region 2 grew the most)

• HS increased by 617 students (Region 4 grew the most)

• Centers/Alt. Programs decreased by -79 students

• Other (Adult, Home Schooled, etc.) decreased by -40 students

Birth to Kindergarten:

• Birth to kindergarten ratio remained at 87 percent • Total number of births and birth rate has been on the decline

12/19/2019 Proposed CIP FY 2021-25 3

Page 4: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Student Membership SY 2019-20 (cont’d)

Transfers:

• The number of transfer students was 19,385 (10%)

• Top Transfer Categories• Advanced Academic

Programs (AAP) (26%)

• Special Education

Programs (21%)

• Student Transfer

Regulation (18%)

12/19/2019 Proposed CIP FY 2021-25 4

Region 117%

Region 222%

Region 317%

Region 416%

Region 514%

Centers/ Alternative Programs

10%

Other4%

Transfer Breakdown by Region

Page 5: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Student Membership SY 2019-20 (cont’d)

Migration:

• Net migration: difference between students who withdrew in SY 2018-19 versus new students who enrolled in SY 2019-20

• Net migration increased from -357 students in SY 2018-19 to 1,725 students in SY 2019-20

12/19/2019 Proposed CIP FY 2021-25 5

Page 6: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Student Membership Projections

• Five-year projection: overall contracted growth• Housing growth of development already approved and under

construction is included

• Housing growth will remain high but be primarily multi-family

which yields smaller amounts of students

• Demographic shifts are a driver, particularly declining birth rates

• Elementary membership is projected to decline

• Future growth is expected at middle and high school levels as

large cohorts move up

• Capacity pressure expected in more middle and high

schools

• Membership growth expected to occur in areas where

schools may not have capacity surplus

12/19/2019 Proposed CIP FY 2021-25 6

Page 7: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Funding Sources

General Obligation Bond Funding

• Capital projects ($180 million/year)

FCPS Operating Funds

• Routine/major maintenance ($10 million)

• Overcrowding ($2.7 million)

Fairfax County Board of Supervisors

• Infrastructure management ($13.1 million)

12/19/2019 Proposed CIP FY 2021-25 7

Page 8: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Routine/Major Maintenance Projects Summary

Top Five FY 2019 Expenditures

1. Playgrounds/

Equipment Repairs $2.8 million

and Installation

2. Asbestos Removal $0.9 million

3. Concrete Repairs $0.7 million

4. Boiler Repairs $0.5 million

5. Floor Tile Installation $0.5 million

12/19/2019 Proposed CIP FY 2021-25 8

Page 9: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Infrastructure Management Projects Summary

Top Five FY 2019 Expenditures

1. Roofing $3.6 million

2. HVAC Replacement $3.3 million

3. IT $2.0 million

4. ADA-Facilities $1.2 million

5. Athletic Replacement $0.6 million

Asphalt Replacement $0.6 million

Safety & Security $0.6 million

12/19/2019 Proposed CIP FY 2021-25 9

Page 10: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Capital Projects Summary

New Construction

Funded:

• North West County ES

(McNair ES site)

• Fairfax/Oakton area ES

(site TBD)

Partially Funded:

• Silver Line Area ES Planning

(site TBD)

12/19/2019 Proposed CIP FY 2021-25 10

Construction of North West County ES

Page 11: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Capital Projects Summary (cont’d)

Capacity Enhancements

Funded:

• Modular Relocations (2)

• Justice HS Addition

• Madison HS Addition

• West Potomac HS Addition

12/19/2019 Proposed CIP FY 2021-25 11

Page 12: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Capital Projects Summary (cont’d)

Projects beyond the five-year horizon:

• Future Western HS

• 5 New and/or Repurposed Sites

(Dunn Loring, Pimmit Hills, Route 1 ES, Tysons ES, Virginia Hills)

12/19/2019 Proposed CIP FY 2021-25 12

Page 13: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

FY 2021-25 Capital Cash Flow

Total Five Year Requirement: $1,072,619,378

• Funded $499,440,755

• Unfunded $573,178,623

Total Ten Year Requirement: $2,100,846,196

• Funded $520,610,103

• Unfunded $1,580,236,093

12/19/2019 Proposed CIP FY 2021-25 13

Page 14: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Capital ProjectsFY 2021-25 Funded Projects

Elementary Middle

Under Construction In Planning Under Construction In Planning

Annandale Terrace ES (Ren) Bonnie Brae ES (Ren) Hughes MS (Ren) Cooper MS (Ren)

Belle View ES (Ren) Braddock ES (Ren) Rocky Run MS (Ren) Frost MS (Ren)

Clearview ES (Ren) Crossfield ES (Ren)

Mount Vernon Woods ES (Ren) Fairfax/Oakton ES (New)*

North West County ES (New) Fox Mill ES (Ren) High

Silverbrook ES (Ren) Hybla Valley ES (Ren) Under Construction In Planning

Louise Archer ES (Ren) Herndon HS (Ren) Falls Church HS (Ren)

Mosby Woods ES (Ren) Oakton HS (Ren) Justice HS (Add)

Oak Hill ES (Ren) Madison HS (Add)

Silver Line ES (New)* West Potomac HS (Add)

Wakefield Forest ES (Ren)

Washington Mill ES (Ren)

*Site to be determined

Add – Addition

New – New Construction

Ren – Renovation

12/19/2019 Proposed CIP FY 2021-25 14

Page 15: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Renovations Recently Completed

• Hollin Meadows ES

• Waynewood ES

• West Springfield HS

• White Oaks ES

12/19/2019 Proposed CIP FY 2021-25 15

Hollin Meadows ES Waynewood ES

White Oaks ESWest Springfield HS

Page 16: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

New Content

• Capacity Utilization Tables and Maps reflecting schools with and without Modulars

12/19/2019 Proposed CIP FY 2021-25 16

Page 17: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

New Content

• AAP Feeder Tables

• Expanded Schools alphabetical listing (to include temporary classrooms, modulars, and feeder schools)

• Administrative and Support Centers alphabetical listing

12/19/2019 Proposed CIP FY 2021-25 17

Page 18: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

New Content

• Historical Projection Accuracy (ten-year)

• Historical Capacity, Membership, and Capacity Utilization (ten-year)

12/19/2019 Proposed CIP FY 2021-25 18

Page 19: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

Upcoming Dates

New Business Thursday, December 19, 2019

Work Session Monday, January 13, 2020

Work Session Tuesday, January 21, 2020

Public Hearing Tuesday, January 27, 2020

Action Thursday, February 6, 2020

12/19/2019 Proposed CIP FY 2021-25 19

Page 20: PROPOSED CAPITAL IMPROVEMENT PROGRAM (CIP) FY 2021-25 · Capital Improvement Program ... The identified needs are included in the schedule of projects for the five-year timeframe

www.fcps.edu