proposed 2016-2017 conservation compliance target and 10 ... · • 2016-2017 potential is 1.66 amw...

13
Proposed 2016-2017 Conservation Compliance Target and 10-Year Compliance Plan Presentation to Chelan PUD Board of Commissioners November 16, 2015

Upload: others

Post on 20-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Proposed 2016-2017 Conservation Compliance Target and

10-Year Compliance Plan

Presentation to Chelan PUD Board of Commissioners November 16, 2015

Page 2: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Overview

• No action requested • Purpose of the Conservation Potential

Assessment (CPA) • Review results of the 2016-2017 CPA • Review proposed 2016-2017 target

and 10-year plan • Review proposed programs for 2016

and associated budget

Page 3: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Conservation Potential Assessment • To identify achievable cost-effective conservation potential

• RCW19.285.040 (1)(a) “…using methodologies consistent with the

Pacific Northwest electric power and conservation planning council in its most recently published power plan, each qualifying utility shall identify its achievable cost-effective conservation potential…”

• RCW19.285.040 (1)(b) “…each qualifying utility shall establish and

make publicly available a biennial acquisition target for cost-effective conservation consistent with its identification of achievable opportunities in (a) of this subsection, and meet that target in the subsequent two-year period….”

Page 4: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Chelan PUD’s CPA Meets the Standard

• WAC 194-37-070 (6)(a) Utility Specific Analysis/Conservation Potential Assessment: “The NWPCC's analytical methodology for establishing the conservation resource potential and conservation targets for the Northwest power system is outlined in procedures (a)(i) through (xv) of this subsection. A utility that chooses this option will document that it established a ten-year potential using an analytical methodology consistent with these NWPCC procedures (a)(i) through (xv) of this subsection:”

• The 2016-2017 CPA documents how these criteria are met.

Page 5: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

CPA Results

• 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers

– Lower avoided costs (energy market) – Code changes (e.g. no more incandescent bulbs) – Recent achievements – Deemed measure savings from the Regional

Technical Forum were revised – Updated customer characteristics data

Page 6: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Achievable 10-Year Savings Plan

0

0.2

0.4

0.6

0.8

1

1.2

2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

1.66 aMW

aMW

Page 7: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Comparison of I-937 Compliance Targets by Biennium

0

0.5

1

1.5

2

2.5

3

3.5

4

2010-11 2012-13 2014-15 2016-17

Compliance Target (aMW)

aMW

Page 8: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

2016 Residential Programs Existing • Weatherization • Low-income weatherization • Appliances • Refrigerator/freezer recycling • Manufactured home duct sealing • Simple Steps/Smart Savings • Ductless heat pumps • Heat pump water heaters • Air Source HP conversion • NEEM manufactured homes Proposed • NW Energy Star new construction • Residential direct installations • Mail-in by-request showerheads, LED lamps • Smart powerstrips

Page 9: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

2016 Commercial Programs

General • Lighting • Energy Smart Grocer • Energy Smart Business • Strategic Energy

Management • Custom measures/HVAC

Local Govt. Initiatives • Chelan County Justice Ctr • Town Toyota Center LEDs • City of Cashmere Offices • Wenatchee School

District • Cascade School District • City of Wenatchee • City of Entiat

Page 10: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

2016 Industrial Programs

• Lighting • Custom measures

Page 11: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

2016 Regional Program

Northwest Energy Efficiency Alliance

Page 12: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Schedule • Nov. 16 (today) – Commission study session to

review CPA, proposed 2-year target and 10-year plan

• Dec. 7 – Publicly advertised Commission business

session to request approval of proposed 2-year target and 10-year plan

• By Dec. 31 - Submit target and plan to Commerce

per WAC 194-37-070(1) and (2)

Page 13: Proposed 2016-2017 Conservation Compliance Target and 10 ... · • 2016-2017 potential is 1.66 aMW • 20% reduction from 2014-2015 (2.08 aMW) • Key drivers – Lower avoided costs

Questions?