proposal for the implementation of scarcity pricing in the belgian ...€¦ · 2 how scarcity...
TRANSCRIPT
Proposal for the Implementation of ScarcityPricing in the Belgian Electricity Market
Anthony PapavasiliouUCLouvain
Joint with Yves Smeers (UCLouvain),Gauthier de Maere d’Aertrycke (ENGIE)
National Technical University of Athens, GreeceJune 20, 2019
1 / 27
Outline
1 Motivation of Scarcity Pricing
2 How Scarcity Pricing Works
3 Scarcity Pricing Developments in the US and Europe
2 / 27
Outline
1 Motivation of Scarcity Pricing
2 How Scarcity Pricing Works
3 Scarcity Pricing Developments in the US and Europe
3 / 27
A Paradox of Highly Renewable SystemsGas and oil units are (i) the most flexible, and (ii) the leastprofitable
Inv. cost Marg. cost Min load Energy market Profit(e/MWh) (e/MWh) cost (e/MWh) profit (e/MWh) (e/MWh)
Biomass 27.9 5.6 0 35.6 7.7Nuclear 31.8 7.0 0 34.2 2.4
Gas 5.1 50.2 20 0.1 -5Oil 1.7 156.0 20 0 -1.7
4 / 27
Motivation for Scarcity Pricing
Scarcity pricing: a real-time demand for reserve capacity,determined by loss of load probability
introduces a non-volatile real-time price for reserve capacityaffects the real-time price of energy
Definition of flexibility for this talk:Secondary reserve: reaction in a few seconds, fullresponse in 7.5 minutesTertiary reserve: available within 15 minutes
such as can be provided bycombined cycle gas turbinesdemand response
5 / 27
Outline
1 Motivation of Scarcity Pricing
2 How Scarcity Pricing Works
3 Scarcity Pricing Developments in the US and Europe
6 / 27
Operating Reserve Demand Curve (ORDC)
Reserve is procured by the system operator fromgenerators in order to ensure reliability, which is a publicgoodDemand for reserve can be driven by its value for dealingwith uncertainty, based on engineering principles:
Above a max threshold (Qmax), extra reserve offers noadditional protection⇒ (P, Q) = (0, Qmax)Below a min threshold (Qmin), operator is willing to curtaildemand involuntarily⇒ (P, Q) = (VOLL, Qmin), whereVOLL is value of lost loadAt Qmin < Qi < Qmax , extra reserve increases probabilityof preventing load curtailment⇒ (P, Q) = (LOLP · VOLL,Qi), where LOLP is loss of load probability
7 / 27
Loss of Load Probability
Uncertainty ∆ in real time due toforecast errorsunscheduled outages of generators
LOLP(x) = P[∆ ≥ x ] is the probability that real-timeuncertainty exceeds reserve capacity x
8 / 27
Scarcity Pricing Adder Formula
In its simplest form, the scarcity pricing adder is computed as
(VOLL− M̂C(∑
g
pg)) · LOLP(R),
where M̂C(∑
g pg) is the incremental cost for meeting anadditional increment in demand, R is the available reserve
More frequent, lower amplitude price spikesPrice spikes can occur even if regulator mitigates bids ofsuppliers in order to mitigate market powerCan co-exist with capacity mechanisms, perceived asno-regret measure for improving the energy-only market
9 / 27
Example
The generator used in our example can provide secondaryreserveThe day-ahead energy price is λDA = 20 $/MWhThe day-ahead secondary reserve price is λR,DA = 65$/MWhThe real-time secondary reserve price is λ̃R,RT = 1229.2$/MWh; note that this is entirely due to the contribution ofthe adderThe real-time energy price is λRT = 1539.2 $/MWh; notethat this is equal to the imbalance price plus λ̃R,RT
The capacity of the generator is P+ = 125 MW
10 / 27
Example: Settlement without Adder
Settlement Formula Price Quantity Cashtype [$/MWh] [MW] flow [$/h]
DA energy λDA · pDA λDA = 20 pDA = 0 0DA reserve λ̃R,DA · rDA λ̃R,DA = 65 rDA = 25 1,625RT energy λRT · (pRT − pDA) λRT = 300 pRT − pDA = 125 37,500
Total 39,125
11 / 27
Example: Settlement with Adder
Settlement Formula Price Quantity Cashtype [$/MWh] [MW] flow [$/h]
DA energy λDA · pDA λDA = 20 pDA = 0 0DA reserve λ̃R,DA · rDA λ̃R,DA = 65 rDA = 25 1,625RT energy λRT · (pRT − pDA) λRT = 1, 529.2 pRT − pDA = 191,150
125RT reserve λ̃R,RT · (rRT − rDA) λ̃R,RT = 1, 229.2 rRT − rDA = -30,730
-25Total 162,045
12 / 27
Illustration from Texas: July 30, 2015
13 / 27
Illustration from Texas: July 30, 2015
14 / 27
Outline
1 Motivation of Scarcity Pricing
2 How Scarcity Pricing Works
3 Scarcity Pricing Developments in the US and Europe
15 / 27
Scarcity Pricing Developments in PJM
Synchronized Reserves are a 10-minute, online, reserveproductAverage requirement is about 1640 MW2018 Market Revenues ∼44 million
Price performance is poor$24 million settled through clearing price$20 million settled through uplift payments
Revenues paid through the market clearing price onlycover about 78% of the total cost to procure reserves
16 / 27
Scarcity Pricing Developments in PJM
17 / 27
Scarcity Pricing Developments in PJM
18 / 27
Scarcity Pricing Developments in ISO-NE
Three (mostly) new types of co-optimized ancillaryservices
1 Replacement-energy reserves2 Load-balance reserves3 Generation contingency reserves
ISO-NE discussing with stakeholders about adoptingsix-day ahead multi-settlement marketDiscussion paper: http://www.iso-ne.com/committees/key-projects/energy-security-improvements/
19 / 27
Balkanization of European Electricity Market
Source: Eurelectric
20 / 27
Scarcity Pricing Developments in Europe
Diverse approaches towards remuneration of (flexible)capacity in EuropeSome of these measures draw scrutiny as possiblyconstituting anti-competitive state aidEuropean Commission not in favor of balkanization ofmember-state market rulesTwo legal documents of the European Commissionindicate favorable view towards ORDC:
Electricity balancing guidelineClean energy package
21 / 27
European Commission Electricity Balancing Guideline,Article 44(3)
Each TSO may develop a proposal for an additional settlementmechanism separate from the imbalance settlement, to settlethe procurement costs of balancing capacity pursuant toChapter 5 of this Title, administrative costs and other costsrelated to balancing. The additional settlement mechanismshall apply to balance responsible parties. This should bepreferably achieved with the introduction of a shortage pricingfunction. If TSOs choose another mechanism, they shouldjustify this in the proposal. Such a proposal shall be subject toapproval by the relevant regulatory authority.
22 / 27
Clean Energy Package, Article 20(3)
Member States with identified resource adequacy concernsshall develop and publish an implementation plan with atimeline for adopting measures to eliminate any identifiedregulatory distortions or market failures as a part of the Stateaid process. When addressing resource adequacy concerns,the Member States shall in particular take into account theprinciples set out in Article 3 and shall consider:
. . .
introducing a shortage pricing function for balancingenergy as referred to in Article 44(3) of Regulation2017/2195;. . .
23 / 27
The CREG Scarcity Pricing Studies
First study (2015): How would electricity prices change ifwe introduce ORDC (Hogan, 2005) in the Belgian market?Second study (2016): How does scarcity pricing dependon
Strategic reserveValue of lost loadRestoration of nuclear capacityDay-ahead (instead of month-ahead) clearing
This talk: Third study (2017): Can we take a US-inspireddesign and plug it into the existing European market?ELIA ex-post simulation (2018): ELIA (Belgian TSO)releases report on the simulation of scarcity prices in theBelgian market for 2017ELIA parallel run (2019): By October 2019, ELIA will beposting adders publicly
24 / 27
Scarcity Pricing Developments in Belgium
25 / 27
Thank You for Your Attention
For more information:[email protected]
http://uclengiechair.be/
https://perso.uclouvain.be/anthony.papavasiliou/public_html/
26 / 27
References
1 A. Papavasiliou, Y. Smeers. “Remuneration of Flexibilityunder Conditions of Scarcity: A Case Study of Belgium”,the Energy Journal, vol. 38, no. 6, pp. 105-135, 2017.
2 A. Papavasiliou, Y. Smeers, G. Bertrand. “An ExtendedAnalysis on the Remuneration of Capacity under ScarcityConditions”, Economics of Energy and EnvironmentalPolicy, vol. 7, no. 2, 2018.
3 A. Papavasiliou, Y. Smeers, G. de Maere d’Aertrycke,“Study on the general design of a mechanism for theremuneration of reserves in scarcity situations”, June 6,2019.
4 ELIA, “Study report on Scarcity Pricing in the context of the2018 discretionary incentives”, December 20, 2018.
27 / 27