3/31/2016 Itp://deccontracting.com/projects/ (http://deccontracting.com/dev/wp- , content/uploads/2014/05/01eb9c6cdc512ec76af7f416efde1560e26b97c586.jpg) Chttp://deccontracting.com/dev/wp- Projqcts - DEC Contracting Page 1 of 5 #g 9 1 0 DEC Contracting Group, Inc PROJECTS Myakka State Park Cabin, Pavilion and Restroom Renovation, Sarasota County, Florida Refurbishment of Cabins 1 thru 5, Pavilion and Latrine. Accessibility Improvements in Cabin 5 at the Myakka State Park, Sarasota County, Florida. Florida Department of Environmental Protection Division of Recreation and Parks Bureau of Recreation and Construction. Elevation of Cabins 18" with structural and building repairs and reconnect all utilities while preserving the integrity of the historic buildings. (http://deccontracting.com )

Upload: others

Post on 30-Apr-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

3/31/2016 Itp://deccontracting.com/projects/

(http://deccontracting.com/dev/wp- ,

content/uploads/2014/05/01eb9c6cdc512ec76af7f416efde1560e26b97c586.jpg)

Chttp://deccontracting.com/dev/wp-

Projqcts - DEC Contracting Page 1 of 5

#g 910 DEC Contracting Group, Inc

PROJECTS

Myakka State Park Cabin, Pavilion and Restroom Renovation, Sarasota County, Florida

Refurbishment of Cabins 1 thru 5, Pavilion and Latrine. Accessibility Improvements in Cabin 5 at the Myakka

State Park, Sarasota County, Florida. Florida Department of Environmental Protection Division of Recreation

and Parks Bureau of Recreation and Construction. Elevation of Cabins 18" with structural and building repairs

and reconnect all utilities while preserving the integrity of the historic buildings.

(http://deccontracting.com )

Page 2: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

Projects - DEC Contracting

content/uploads/2014/05/0134f2c44d68b3376fdfde51d869cb001951845844.jpg)

(http://deccontracting.com/dev/wp-

content/uploads/2014/05/01454f383bb6cdb98d94a796ccObd4e825baa751c7.jpg)

(http://deccontracting.com/dev/wp-

content/uploads/2014/05/01973ce9991326919d37ed329d0548f07f499f5205.jpg1

Panera Bread Stores #1233, #1741, #1029, #1600 & #1233 - Northeast and Southwest Florida

Renovation of Five Panera Bread Stores located in Northeast and Southwest Florida completed between July

and September, 2014. Renovation work consisted of demolition, interior re-paint, signage, millwork, flooring

replacement, bakery equipment upgrades, electrical and plumbing upgrades and restroom ADA compliance.

All construction activity was completed while maintaining a fully operational and functional store.

(http://deccontracting.com/dey/wp-content/uploads/2014/05/Overall .jpg)

Palmetto Elementary - Naples, Florida

New construction of a two story 122,000 square foot $30

million elementary school. Situated on 34.75 acres with

22.75 acres hping develonPri rid the rPmaining arrpagp wac

-ittp://deccontracting.com/projects/

3/31/2016

Page 3: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

Projects - DEC Contracting was the construction of a water and waste water treatment

facility and generator which allowed the school to act as a

hurricane shelter. The school was constructed using tilt-wall

panel construction which allowed construction to be

completed and open for school in under 11 months. Doug Masch was the Project Manager on Palmetto \

Elementary while employed at a previous construction

company, this was not an actual project completed by DEC

Contracting Group, Inc.

M GO- WA 4424 5t4VtikrTA307

Page 3 of 5

Villas Elementary - Fort Myers, Florida

Renovation work consisted of replacement of windows in all

classrooms, new floor finishes, ceilings and lighting, new

classroom millwork. Egress improvements, renovations of

existing group restrooms, expansion of clinic, new entrance

facade, replacement & upgrade of classroom HVAC,

demolition of Amphitheatre and canopy relocation,

replacement of existing P.E. structure with School District

Prototype and roof repair at the Music/Art Building. This

renovation work consisted of 14 different phases all of

which were completed while the facility was occupied.

Doug Masch was the Project Manager on this project while

employed at a previous construction company, this was not

an actual project completed by DEC Contracting Group, Inc.

Wa-ke Hatchee Park - Fort Myers, Florida

Construction of a new Lee County Park totaling 48 acres of

developed ball fields, lakes, walk paths, restroom building,

tennis courts, playground, parking and maintenance

building. The construction was conducted adjacent to tidal

influenced wetlands. This led to many challenges that were

overcome through continuous, effective and concise

communication with multiple governmental authorities

(SFWMD, Lee County Construction & Design, Lee County

Parks Department and Lee County Stormwater).

http ://de c contracting. c om/proj ects/

3/31/2016

Page 4: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

Projects - DEC Contracting , employed at a previous construction company, this was not

an actual project completed by DEC Contracting Group, Inc.

Wal-Mart # 8150, 579, 623, 721, 769, 5391, 8173 - Port St. Lucie, St. Augustine, Ft. Myers, Port Charlotte, Venice, Naples & Miromar, Florida

Remodels of seven (7) different Sam's Club and Wal-Mart

Supercenters totaling over $2.5 million and were completed

between the months of April and October. At any given time

there were three (3) projects that were under construction

simultaneously. These remodels consisted of complete

interior and exterior re-paint, joint sealants, signage,

millwork/laminate replacement, complete store flooring

replacement, refrigeration replacement, vision centers,

hearing centers, electrical upgrades, plumbing upgrades,

tire and lube upgrades, restroom ADA compliance, plastic

laminate wainscot, ceramic tile, oven and dishwasher

upgrades and epoxy flooring. All construction activities were

completed while maintaining a fully operational and

functional store. Safety and the ability not to disrupt sales

and the customer experience was paramount to the success

of these projects.

Doug Masch was the Project Manager on this project while

employed at a previous construction company, this was not

an actual project completed by DEC Contracting Group, Inc.

Gulf Elementary Mechanical Renovations - Cape Coral, Florida

Renovations consisted of complete removal and replacement of all HVAC systems (chillers, air handlers,

piping, duct work and insulation), fire protection systems, upgrade to electrical and plumbing systems,

construction of new walls, painting and installation of new acoustical ceiling This work was conducted in three

(3) phases two of which were completed while the school was occupied. Phase II consisted of two (2) chiller

removal and replacement and five (5) air handlers removal and replacement , construction of new walls,

painting and acoustical ceiling which occupied approximately 66% of the school. The phase II work was

completed in seven (7) weeks.

Doug Masch was the Project Manager on this project while employed at a previous

ittp ://deccontracting.com/proj ects/

3/31/2016

Page 5: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

Projects - DEC Contracting Page 5 of 5

This site / civil project was a refurbishment to an existing

storm retention system. The existing pond liner and

underdrains were removed in their entirety. The bottom

and slopes were re-graded to meet proposed grades.

Concrete pipe and mitered end sections were removed and

replaced to meet new elevations and match the new

slopes/banks. Modifications to the pond outlet structure

were performed. New rip-rap was installed around the

newly installed mitered end sections. Construction activities

for this project were completed in the months of June and

July. This project was completed on time, within budget and

required effective communication with Wal-mart and the

local / state agencies.

Doug Masch was the Project Manager on this project while

employed at a previous construction company, this was not

an actual project completed by DEC Contracting Group, Inc.

DEC CONTRACTING GROUP, INC 1560 Matthew Drive, Suite B

Fort Myers, Florida 33907

OFFICE: 239.332.4322

EMAIL: infoOdeccontracting.com

(mailto:infoPdeccontracting.com)

GENERAL CONTRACTING

CONSTRUCTION MANAGEMENT

DESIGN BUILD

Connect with us

(https://twittercom/deccontracting)

(http://www.facebook.com/deccontracting

Copyright 0 2014 DEC Contracting Group, Inc. All Rights Reserved. Design Services and Hosting by Web Hosting Hub

ittp://deccontracting.com/projects/ 3/31/2016

Page 6: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

C.C.P.S. - ELEMENTARY SCHOOL J

DISTRICT SCHOOL 130.-UtD OF COLLIER COUNTY STANDARD FORM OF CHANGE ORDER

PROJECT: CHANGE ORDER NUMBER 01 (Name, Address)

Elementary School .1 1175 Everglades Blvd. S Napks, Fl 34109

ARCHITECT'S PROJECT NO. 05106

CONTRACT FOR: New Construction

CONTRACT DATE:

To: (Contractor): Lodge Construction. Inc.

You are directed to make the following changes in this Contract: Add five additional 100% outside air moisture removal units for constant volume operation. The units are based on the attached description by Dynathenn Resources. Inc.

The Architect's signature on this constitutes his certification that supporting cost data is accurate and that in his considered professional opinion the prices quoted are both fair and reasonable and in proper ration to the original work contracted for under benefit of competitive bidding.

the Original Contract Sum was $27.534,026.00

Net Change by previous Change Order 5 0.01)

The Contract Suns prior to this Change Order was 527.534.026.09

The Contract Sum will he (increased) (decreasedi(unchunged) by this Change Order 424325.00

The new Contract Sum including this Change Order will he .... 527.958351.00

The new Contract Time will be tincrosed) (decreased) by ( 0 Days

The Date of Comploion as of the date of this Change Order therefore is S July 15. 2007 (Date)

Harvard Jolly

lodge Construction, Inc. District School Board of Collier Co. Architect

Construction Manager

Owner

2161-A McGregor Blvd. 5575 Osceola Trail

Address Address

Foil Myeis. Fl 33901 Naples. Fl 34109

BY kl2 1f P40&4-1- BY

DATE

DATE

1714 ML King.IrSt. N

Address

St. Petersburg. Fl 33704

BY

DATE

STANDARD FORM OF CHANGE ORDER 1)0315-2

Page 7: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

ONSTRUCTION, INC.

Meeting Minutes Project [06-913] - Elementary School

Lodge Construction, Inc. 2161 McGregor Blvd Fort Myers, FL 33901 Phone: (239) 332-4371

View Date 8/27/2007 Date 8/21/2007

Meeting No. 06-913- 002

Fax: (239) 332-0218

Meeting Pre-Construction Date 8/21/2007 Type Time 9:30 AM UTC Subject Owner / Architect / CM Pre- Location CCPS Administration Bldg. 4th fl. Rm.

Construction 168 Prepared By Russ Vought

Meeting Attendance

Company - Attendee Attended Company - Attendee Attended

Banks Engineering - David Sheppard F -Lodge Construction, Inc. - Doug Masch

1;7

District School Board of Collier County - Adrian Roman

I— 'Lodge Construction, Inc. - George Riviere

District School Board of Collier County - Fai Chan

17 Lodge Construction, Inc. - Russ Vought

17

District School Board of Collier County - Maria Gomez

17 Lodge Construction, Inc. - Tammy Kaminski

Fi

Harvard Jolly Inc., PA, AIA - Dick Gay F. McCarthy & Associates - Mark Erkkila n Harvard Jolly Inc., PA, AIA - Jeff Cobble 17 Schmidt Dell Associates, Inc. - Gene

Schmidt E.

Harvard Jolly Inc., PA, AIA - John Rhodes 17 Schmidt Dell Associates, Inc. - Heather Callaway

S7

Lodge Construction, Inc. - Cabot Dunn P7 TKW Consulting Engineers - Dan Johnson

r

Ordered By Item No.

06-913-002-001

Type General Originated 8/15/2007 Category Schedule Due 8/21/2007 Summary SCHEDULES Resolved 8/21/2007 Desired Outcome Establish Dates Complete 1%7

Responsible Parties For Information Only

Discussion Details Project Construction Schedule:

A. Review of Construction Schedule

• July 15th, 2008 is Substantial Completion of Elem. "J"

B. Determine Schedule / Guidline of Consultants Inspections

• CCPS requested that the consultants be present for the weekly meetings during the for front of the project

• Consultant visits for observations on an as needed basis • 48 hr notice is prefered for consultant observation / inspections

Page 8: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

• Non compliance items are to be noted, forwarded to the Architect for distribution to the Owner & C.M.

06 -913-002-002

Type General

Originated 8/15/2007 Category New Business

Due 8/21/2007

Summary TESTING

Resolved 8/21/2007 Desired Outcome Establish Testing Agency Contacts

Complete 17

Responsible Parties For Information Only

Discussion Details Testing

A. Determine what testing agency is to be utilized on this project

• ASC Geosciences, Inc. will be the testing agency / Contact Person is Frank Murati - 239-693- 6334

06-913 -002-003

Type General Originated 8/15/2007 Category Action Due 8/21/2007 Summary INSPECTIONS Resolved 8/21/2007 Desired Outcome Establish Contacts and Timelines Complete F7

Responsible Parties For Information Only

Discussion Details Project Inspections:

A. Building Inspections performed by PEICO for compliance to project documents

• Confirmed

B. Threshold Inspections to be performed by what identity

• TLC Engineering for Architecture - Mike Head- 239-275-4240

C. MEP / Consultant Inspections / Observations to be determined for contacts and timeline

• Consultant visits for observations on an as needed basis • 48 hr notice is prefered for consultant observation / inspections

Page 9: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

Type

General Category

Schedule Summary

PROGRESS MEETINGS Desired Outcome Schedule and Assign Responsibilty Responsible Parties For Information Only

Originated 8/15/2007 Due 8/21/2007 Resolved 8/21/2007 Complete 17/-

Discussion Details Owner / Architect / Consultant Progress Meetings

A. Establish Date & Time

• Weekly: Wednesday's 9:00 a.m. • Location: 4th floor of the CCPS Admin Bldg. untill the construction trailer is in place

B. Establish who will provide agenda and conduct the meetings

• Construction Manager

C. Establish who will be responsible for providing and distribution of meeting minuets

• Construction Manager

06-913-002-004

06-913-002-005

Type General Originated 8/15/2007

Category Schedule Due 8/21/2007

Summary STAGING AREA Resolved

Desired Outcome Staging Area Defined Complete r Responsible Parties For Information Only

Discussion Details Staging Area:

A. Discuss and propose project staging area

• C.M. requested location at the southwest corner of the site along the west side of the Future Access Road.

• C.M. to verify this location with Johns Rhodes on Friday 8-24-07

Page 10: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

Type Category Summary Desired Outcome Responsible Parties

Action Item

Schedule REVISED PROJECT DRAWINGS / DOCUMENTS

Reciept of Current Drawings and Documents

Originated 8/15/2007

Due 8/21/2007

Resolved Complete r

Discussion Details Revised Documents:

A. Discuss status of receiving current construction drawings and changes for review and submission to PEICO for revisions to current permitted documents

• ASI No. 1 to be provided by Harvard Jolly 8-24-07 / 8-27-07 • Harvard Jolly to provide to Lodge 8-21-07 HVAC Drawings • Review of HVAC changes to confirm pricing of equipment changes • Provide to owner a Change Order for HVAC related changes

B. Discuss status of receiving the approved SBR drawings and documents

• Signed & Sealed SBR Drawings to be forwarded for distribution to the Architect from TKW • Dan Johnson will forward to Lodge Construction the SWP3 Plan

06-913-002-006

06-913-002-007

Type Action Item Originated 8/15/2007

Category New Business Due 8/21/2007

Summary RESPONSIBLE PERSONNEL Resolved 8/21/2007

Desired Outcome Establish Contacts and Roles Complete 1.7

Responsible Parties For Information Only

Discussion Details Project Principal Contacts:

A. Owners representative

Page 11: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

• Fai Chan - CCPS Director of Project Management • Maria Gomez - CCPS Project Manager - 239-377-0269

B. Architects representatives

Harvard Jolly

• John Rhodes - 954-486-7910 / fax 954-486-7825 • Dick Gay - 239-275-774 / fax 239-275-0447 • Jeff Cobble - 727-896-4611

Schmidt Dell Associates

• Heather Callaway - 727-822-6286 / fax 727-822-6280 • Gene Schmidt - 850-438-0050 / fax 850-432-8631

McCarthy & Associates

• Mark Erkkila - 727-536-8772

TKW Consulting Engineers

• Dan Johnson - 239-278-1992

C. CM's representatives

• Cabot Dunn - Senior Project Manager - 239-332-4371 / fax 239-332-0218 • Russ Vought - Project Manager - 239-332-4371 / fax 239- 332-0218 • George Riviere - Project Superintendent - 239-633-9497 • Doug Masch - Project Superintendent - 239-462-1028 • Jossie Pineros - Adimistrative Asst. - 239-332-4371

06-913-002-008

Type Category Summary Desired Outcome Responsible Parties

General New Business OPEN RFI'S Closing of Open RFI's All Team Members

Originated Due Resolved Complete

8/15/2007

I-

Discussion Details Review of Open RFI's ( 13 - 20 )

• John to review these in the next few days

Page 12: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

06-913-002-009

Type General Originated 8/15/2007 Category New Business Due 8/21/2007 Summary OPEN DISCUSSION Resolved 8/21/2007 Desired Outcome Complete 17 Responsible Parties

Discussion Details

Meeting Open for Additional Items of Discussion:

A. Boundry Verification for Iron Rod Location

• ABB's 5/8 iron rod and cap are not in place. Request that ABB revisit the site and confirm / re-establish the boundry markers to confirm that the residential fencing is on school property.

B. Moisture Removal Units Change Order Request

• Request current MEP Drawings for Mechanical Contractors review and confirm current pricing. ( Incorporated in ASI No. 1 )

C. Pay Application Review

• Pay Application to be reviewed the last Wednesday of each month • As-Built drawings to be current at time of Pay App. review ( Pencil Copy ) • Schedule: review of past weeks progress, review of 2 week projected work

D. Documentaion

• ASI's provided by Architect • Contingency is for unforseen & Owner requested items • PR's are to be reviewed by Architect for recomendation and frowarded to Owner • CM-PR's are associated with ASI's, Credits & Costs • Visitors sign-in sheet for all Visitors to project site

E. Project Changes / Additions

• ASI No. 1 is forthcomming • Eyebrow changes pending review • Addition of on site Sherrifs Trailer and associated utilities forthcomming • Audio Enhanced System associated with ASI No.1 • Change Order associated with HVAC labor & equipment • Double check valve required at WWTP • Deletion of Pulper associated with the kitchen equipment

F. Required Owner Approval / Review

• Color Selections • Kitchen Equipment • Hardware followed by Keying Schedule Meeting

Page 13: Projqcts - DEC Contracting Page 1 of 5 #g 10 9DEC - Granicus

G. Permits

• PEICO Building Permit expiration / Re-Submit • Fire Permit status

H. Misc.

• Any school personel requested changes send to Maria Gomez • Request to Fai to visit Elem. "M" • Provide to Fai contingency log sample

Distribution

Recipient Company Method Date

Cabot Dunn Lodge Construction, Inc. Email: [email protected] 8/16/2007

Cabot Dunn Lodge Construction, Inc. Message 8/16/2007

Dan Johnson TKW Consulting Engineers Email: [email protected] 8/16/2007

David Sheppard Banks Engineering Email: [email protected] 8/16/2007

Doug Masch Lodge Construction, Inc. Email: [email protected] 8/16/2007

Doug Masch Lodge Construction, Inc. Message 8/16/2007

Fai Chan District School Board of Collier County

Email: [email protected] 8/16/2007

George Riviere Lodge Construction, Inc. Email: [email protected]

8/16/2007

George Riviere Lodge Construction, Inc. Message 8/16/2007

Heather Callaway

Schmidt Dell Associates, Inc. Email: [email protected] 8/16/2007

John Rhodes Harvard Jolly Inc., PA, AIA Email: [email protected] 8/16/2007

Maria Gomez District School Board of Collier County

Email: [email protected] 8/16/2007

Mark Erkkila McCarthy & Associates Email: [email protected] 8/16/2007

Russ Vought Lodge Construction, Inc. Email: [email protected] 8/16/2007

Russ Vought Lodge Construction, Inc. Message 8/16/2007