  • 7/24/2019 Projects in AP State

    1/37

    Information on Projects in Andhra Pradesh

    Contents

    Project 1: Integrated Sports Complex at Tirupati ............................................................... 2

    Project 2: International school at Tirupati ......................................................................... 5

    Project 3: International school at Nellore .......................................................................... 7

    Project 4: International school at Vishakhapatnam ............................................................ 9

    Project 5: Greenfield Airport in Bhogapuram, Vizianagaram ........................................... 12

    Project 6: Greenfield Airport in Dagadarthi, Nellore District ........................................... 13

    Project 7: Greenfield Airport in Orvakal, Kurnool ........................................................... 15

    Project 8: National Waterway No.4 ................................................................................ 17

    Project 9: Convention Centre at Vijayawada ................................................................... 22

    Project 10: Beach Road Project ....................................................................................... 24

    Project 11: Power Distribution for Amaravati .................................................................. 26

    Project 14: Solid waste management system for Amarvati Capital city .............................. 32

    Project 15: Development of Government HoD buildings .................................................. 34

    Project 16: Development of affordable housing for economically weaker sections .............. 36

  • 7/24/2019 Projects in AP State

    2/37

    2

    Project 1: Integrated Sports Complex at Tirupati

    Project NameIntegrated Sports Complex at Tirupati

    Sector Social Sector

    DeveloperProject Location Andhra Pradesh/Chittoor/Tirupati

    Physical Parameters

    Project Capacity

    The sporting facilities in the complexshall encompass the following:

    1 Outdoor facilitiesa) Football (FIFA Standard)

    cum Cricket stadium (ICC

    Standard) with gallery of2600 capacity

    b) Athletic (IAAF Standard)with gallery of 900 capacity

    c) Aquatic Complex with 2200capacity

    d) Tennis Complex with 1000capacity

    e) Rock Climbingf) Volley ball 3 courtsg) Kabaddi fields 8 Nosh) Jogging Track 7M Widthi) Skating Rink

    2 Indoor facilitiesIndoor Stadium 1 2000 gallerycapacity

    a) Badminton Courts - (To beinterchangeably used asBadminton/Volleyballcourts ) 14 Nos

    b) Basketball/Volleyball court 1 No

    Indoor Stadium 2 2100 gallerycapacity

    a) Kabaddi 2 Nos

  • 7/24/2019 Projects in AP State

    3/37

    3

    b) Boxing 2 Nosc) Badminton courts 6 Nosd) Squash court 2 Nose) Gymnasium 1 No

    3 Other facilitiesa) Academy building including

    Dormitories b) Food Courtsc) Amphitheatre 2700

    Temporary Galleryd) Guest House Complex - 22

    unitse) Studio Apartments 50

    unitsf) Shopping Arena and club

    houseg) Parking area

    Scheduled completion dateConstruction period 3 years startingJuly2016

    Present Status

    Project tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay

    State Govt. relatedCentral Govt. relatedFinancial relatedOthers

    Financial Parameters Project Cost INR 310 CroresExpenditure Incurred & Means of Finance

    Funds required for project completionAnnuity (INR 52.4 Crores per year for15 years)

    Amount & Reasons of overrun (if any)Amount of funding available

  • 7/24/2019 Projects in AP State

    4/37

    4

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2

    Email [email protected]

    Additional Information

    1 Financial IRR 0.33%

    2 Concession Period in case of PPPprojects (Years)

    18 years

    3 Cashflow/Revenueenvisaged perannum fromthe project (RsLakh/Annum)

    1. ToDeveloper

    Cash Flows with NPV of INR 39.33 crores for 15years including annuity paid by the govt.

    2. To StateGovernment

    Negative cash flows with NPV of INR (237.4Crores) for 15 years

  • 7/24/2019 Projects in AP State

    5/37

    5

    Project 2: International school at Tirupati

    Project Name International school at TirupatiSector EducationDeveloper

    Project Location Tirupati, Andhra Pradesh

    Physical Parameters

    Project Capacity

    Parameter Details Curriculum Mandatory: IB

    or IGCSEOptional:CBSE/ICSE etc.

    Grades nursery to 12Number of Students

    per classroom

    25

    Number ofclassrooms

    40

    Number of Students 1000

    Faculty student ratio > 1:16Number of dayscholars

    500

    Number of residentialstudents

    500

    Scheduled completion dateDec, 2017 (School Operation) 18 months ofconstruction period.

    Present StatusProject tie-ups includingimplementation methodology, rawmaterial tie-ups, off-take arrangements,approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay

    State Govt. related

    Central Govt. relatedFinancial relatedOthers

    Financial Parameters Project Cost INR 62 CroreExpenditure Incurred & Means of

  • 7/24/2019 Projects in AP State

    6/37

    6

    FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2

    Email [email protected]

    Additional Information

    1 Financial IRR 13.2%

    2 Construction Period (Years) 1.5 years (Phase I 50% capacity)10 years (Phase II 100% capacity)

    3 Project Economic Life (Years) 50 years

    4 Concession Period in case of PPPprojects (Years)

    33 years

  • 7/24/2019 Projects in AP State

    7/37

    7

    Project 3: International school at Nellore

    Project NameInternational school at Nellore in AndhraPradesh on PPP basis

    Sector EducationDeveloperProject Location Nellore, Andhra Pradesh

    Physical Parameters

    Project Capacity

    Parameter Details Curriculum Mandatory: IB

    or IGCSEOptional:CBSE/ICSE etc.

    Grades nursery to 12

    Number of Students per classroom

    25

    Number ofclassrooms

    40

    Number of Students 1000

    Faculty student ratio > 1:16Number of dayscholars

    500

    Number of residential

    students

    500

    Scheduled completion dateDec, 2017 (School Operation) 18 months ofconstruction period.

    Present StatusProject tie-ups includingimplementation methodology, rawmaterial tie-ups, off-take arrangements,approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay

    State Govt. relatedCentral Govt. relatedFinancial relatedOthers

    Financial Parameters

  • 7/24/2019 Projects in AP State

    8/37

    8

    Project Cost INR 62.6 CroreExpenditure Incurred & Means ofFinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2

    Email [email protected]

    Additional Information

    1 Financial IRR 17%

    2 Construction Period (Years) 1.5 years (Phase I 50% capacity)10 years (Phase II 100% capacity)

    3 Project Economic Life (Years) 50 years

    4 Concession Period in case of PPPprojects (Years)

    33 years

  • 7/24/2019 Projects in AP State

    9/37

    9

    Project 4: International school at Vishakhapatnam

    Project NameInternational school at Vishakhapatnam inAndhra Pradesh on PPP basis

    Sector EducationDeveloperProject Location Vishakhapatnam, Andhra Pradesh

    Physical Parameters

    Project Capacity

    Parameter Details Curriculum Mandatory: IB

    or IGCSEOptional:CBSE/ICSE etc.

    Grades nursery to 12

    Number of Students per classroom

    25

    Number ofclassrooms

    80

    Number of Students 2000

    Faculty student ratio > 1:16Number of dayscholars

    1500

    Number of residential

    students

    500

    Scheduled completion dateOct - Nov, 2017 (School Operation) 18months of construction period

    Present StatusProject tie-ups includingimplementation methodology, rawmaterial tie-ups, off-take arrangements,approvals & clearances, etc. PPPDelay vis--vis original scheduleReasons for delay

    State Govt. relatedCentral Govt. relatedFinancial relatedOthers

    Financial Parameters

  • 7/24/2019 Projects in AP State

    10/37

    10

    Project Cost INR 93.4 CroreExpenditure Incurred & Means ofFinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2

    Email [email protected]

    Additional Information

    1 Brief description of the project Promotion of educational infrastructure is oneamongst the many initiatives being taken up bythe government on a priority basis.

    International schools are being promoted toprovide world-class education to the studentsand also as a tool to attract foreign investments

    to Andhra Pradesh. It is well known thatavailability of international schools is animportant consideration for non-Indian staff ofMNCs who come to India.

    The international School id developed throughPPP (DBFOT model) and Revenue share as thecriteria for selection. The concession period is 33years.

    The international school could follow thesyllabus of either IB, IGCSE along with theoption of CBSE/ICSE or any other

    international, national or AP State Board. The awareness of international schoolcurriculum (such as IB, IGCSE etc.) isincreasing amongst the parents and therefore thedemand for international schools in the country.It offers benefits such as differentiated learning /curriculum, global student mix, state of the artinfrastructure, opportunity to pursue higher

  • 7/24/2019 Projects in AP State

    11/37

    11

    education in globally reputed institutions,faculty quality and diversity etc.

    2 Financial IRR 20.1%

    3 Construction Period (Years) 1.5 years (Phase I 50% capacity)10 years (Phase II 100% capacity)

    4 Project Economic Life (Years) 50 years

    5 Concession Period in case ofPPP projects (Years)

    33 years

  • 7/24/2019 Projects in AP State

    12/37

  • 7/24/2019 Projects in AP State

    13/37

    13

    Project 6: Greenfield Airport in Dagadarthi, Nellore District

    Project NameDevelopment of Greenfield Airportin Dagadarthi, Nellore District

    SectorInfrastructure Transportation -Airports

    DeveloperProject Location Dagadarthi, Nellore District

    Physical Parameters Project Capacity

    Scheduled completion dateTentative initiation June 2016.Construction period 2 years

    Present StatusProject tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPP-DBFOTDelay vis--vis original scheduleReasons for delay

    State Govt. relatedCentral Govt. relatedFinancial relatedOthers

    Financial Parameters

    Project Cost

    Phase I: 76.49 Cr, Phase II: 116.63Cr,O&M 30.9 Cr

    Expenditure Incurred & Means of FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]

  • 7/24/2019 Projects in AP State

    14/37

  • 7/24/2019 Projects in AP State

    15/37

    15

    Project 7: Greenfield Airport in Orvakal, Kurnool

    Project NameDevelopment of Greenfield Airportin Orvakal, Kurnool

    SectorInfrastructure Transportation -Airports

    DeveloperProject Location Orvakal, Kurnool District

    Physical Parameters Project Capacity

    Scheduled completion dateTentative initiation June 2016.Construction period 2 years

    Present StatusProject tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPP-DBFOTDelay vis--vis original scheduleReasons for delay

    State Govt. relatedCentral Govt. relatedFinancial relatedOthers

    Financial Parameters

    Project Cost

    Phase I: 88.01 Cr, Phase II: 112.48Cr, O&M 30.90 Cr

    Expenditure Incurred & Means of FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]

  • 7/24/2019 Projects in AP State

    16/37

    16

    Additional Information

    1 Financial IRR 13.06% (Equity IRR)

    2 Project Economic Life (Years) 66 + 33 years

    3 Concession Period in case of PPPprojects (Years)

    66 + 33 years

    4 Multiplier effects on other sectorsof the economy

    In the global economy, every $100 of outputproduced and every 100 jobs generated by airtransport trigger additional demand of some $325and 610 jobs in other industries.

    5 Loss of agricultural land (Acres) 613.79 acres

    6 Associated environmental risk (air

    quality, impact on biodiversity,forest land, water bodies, etc)

    Environment Impact Assessment under way.

  • 7/24/2019 Projects in AP State

    17/37

  • 7/24/2019 Projects in AP State

    18/37

    18

    Kakinadacanal 319.50 CroresNorthBuckinghamcanal 300.00 Crores

    Commamurcanal 894.00 Crores

    Total Amount3044.5

    0 CroresExpenditure Incurred & Means of FinanceFunds required for project completionAmount & Reasons of overrun (if any)Amount of funding available

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]

    Additional Information

    1 Brief descriptionof the project

    The Government of India has declared the Canal System fromKakinada to Puducherry along with Godavari and Krishna riversystem as National Waterway w.e.f 25.11.2008. NationalWaterway No.4 is having total length of waterway Km. 1078from Kakinada to Puducherry. The length of the NW-4 inAndhra Pradesh, Tamil Nadu, and Pondicherry are 888 Km, 188Km, and 2 Km respectively. The cargo identified for NW-4include Coal, Rice, Food grains, Cement, Fertilizers, ForestProducts, Salt and Other Bulk Cargo. The governmentsInfrastructure Mission envisages construction of eight terminals atKakinada, Rajahmundry, Eluru, Kottapatnam, Maipadu,Dugarajapatnam, Vijayawada and Tadepalligudem.

    The stretches identified are:1.Krishna Eluru Canal2.Godavari Eluru Canal3.Kakinada Canal4.Commamur Canal5.Buckingham Canal

  • 7/24/2019 Projects in AP State

    19/37

    19

    Following is a breakup of components and costs of variousstretches:

    Krishna Eluru Canal:

    TYPE OFSTRUCTURE Nos

    Tentative Cost involved formodification for class IIIwater way : in " INR Crores

    "BRIDGES 58 774.00

    UNDERTUNNELS 11 42.00LOCKS 2 40.00

    REGULATORS 1 20.00AQUEDUCTS 2 40.00

    SLUICE GATES/CHANNELS 86 43.00

    Total 959.00

    Godavari Eluru Canal:

    TYPE OFSTRUCTURE Nos

    Tentative Cost involved formodification for class III

    water way : in " INR Crores"

    BRIDGES 34 462.00

    UNDERTUNNELS 9 27.00INLETS 15 15.00

    OUTLETS 15 15.00SLUICES/

    CHANEELS 106 53.00

    Total 572.00

    Kakinada Canal:

    TYPE OFSTRUCTURE Nos

    Tentative Cost involved formodification for class IIIwater way : in " INR Crores

    "LOCKS 7 70.00

    REGULATORS 1 5.00SURLUS WEIRS 2 10.00

    OFF TAKE 37 18.50

  • 7/24/2019 Projects in AP State

    20/37

    20

    SLUICESBRIDGES 21 216.00

    Total 319.50

    Commamur Canal:

    TYPE OFSTRUCTURE Nos

    Tentative Cost involved formodification for class III

    water way : in " INR Crores"

    LOCKS 7 114.00UNDER

    TUNNELS 10 32.00OTHER

    STRUCTURES 14 217.00BRIDGES 38 428.00

    OFF TAKESLUICES 203 103.00

    Total 894.00

    Buckingham Canal:

    TYPE OFSTRUCTURE Nos

    Tentative Cost involved formodification for class III

    water way : in " INR Crores"

    LOCKS 10 150.00BRIDGES 14 150.00

    Total 300.00

    2 Monetary supportrequired fromStateGovernment (Rs.Crore)

    Will be decided by IWAI based on the TEFR

    As of now the State is supposed to bear 10% of the investigationand project preparatory cost

    The remaining costs will be borne by the Central Government.3 Construction

    Period (Years)5 years (Planned to be completed by 2020)

    4 Project EconomicLife (Years)

    100 years

  • 7/24/2019 Projects in AP State

    21/37

    21

    5 ConcessionPeriod in case ofPPP projects(Years)

    Upto 99 years

    6 Multiplier effects

    on other sectorsof the economy

    IWT is an economic, fuel efficient, environmental friendly and

    low cost transport mode.

    The project will be an important component of the state logistics.As NW-4 is along the coastline it will serve the ports of the stateand reduce cargo congestion from roads and rails. The modal shiftof cargo evacuation will also reduce the average cost of evacuationas IWT is a low cost transport mode.

    Construction and operation of the project will also boost theindustries and manufacturing sector.

    This project will also incentivize potential investors to invest inother projects like greenfield ports, beach corridor etc.

  • 7/24/2019 Projects in AP State

    22/37

    22

    Project 9: Convention Centre at Vijayawada

    Project Name Convention Centre at Vijayawada inAndhra Pradesh on PPP basis

    Sector Tourism MICE sector

    Developer

    Project LocationAndhraPradesh/Vijayawada/Ibrahimpatnam

    Physical Parameters Project Capacity

    Scheduled completion date

    Convention and Exhibition Centre 18 months4-Star Hotel 24 monthCommercial complex (50%) 30monthsCommercial complex (100%) 60months

    Present Status

    Construction initiation November2016

    Project tie-ups including implementationmethodology, raw material tie-ups, off-takearrangements, approvals & clearances, etc. PPPDelay vis--vis original schedule

    Reasons for delayState Govt. relatedCentral Govt. relatedFinancial relatedOthers

    Financial Parameters Project Cost Rs. 260 croreExpenditure Incurred & Means of FinanceFunds required for project completion

    Amount & Reasons of overrun (if any)Amount of funding available

    DebtEquity

    Amount of Investment RequiredInvestment Rationale

  • 7/24/2019 Projects in AP State

    23/37

    23

    Name of Contact Person VC and MD INCAPMobile No +91-40-2332 1771/2Email ID [email protected]

    Additional Information

    Brief description of the project The project involves selection of a developer toundertake development, operation and maintenanceof the Convention Centre and allied facilities inVijayawada through Public Private Partnership(PPP) on Design, Build, Finance, Operate andTransfer basis. The key components of the projectinclude:

    Convention Centre 3,000 pax Exhibition Centre 50,000 sq. ft 4-Star Hotel 150 rooms Commercial complex Gross leasable area

    of 75,000 sq. ft

  • 7/24/2019 Projects in AP State

    24/37

  • 7/24/2019 Projects in AP State

    25/37

    25

    Email ID [email protected] Information

    Brief description of the project The Government of Andhra Pradesh has planned todevelop a road with new alignment along the High

    Tide Line from Ichchapuram to Tada to promoteeconomic activities along the long coast line whichthe state is endowed with. In phase I, two prioritysections i.e. Bhogapuram to Visakhapatnam (~19km) and Visakhapatnam to Addaripeta (~ 85 km)have been identified for development.

    The Beach Road is expected to energize the coastalareas by providing connectivity. It is envisaged tosupport and promote many economic activities inthe Influence Zone such as industrial activities,

    tourism, port related activities, marine and fisheries.

  • 7/24/2019 Projects in AP State

    26/37

    26

    Project 11: Power Distribution for Amaravati

    Project Name Power Distribution for AmaravatiSector Urban Infrastructure

    Developer Andhra Pradesh Capital Region Development Authority

    Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 1500 MW Scheduled 2019

    Present StatusIntegrated Smart infrastructure master planner and DPR

    consultant to be onboard by Feb 2016. Draft DPR for Power to be ready by August 2016

    Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-take

    All approvals facilitation to be provided by APCRDA /GoAP.

    A population of 4 lacs led by the Govt. of AP employees, support staff and current local populations expected to be in place

    by year 2019/2020.

    Delay vis--visoriginal

    Project on track

    Reasons for delay NA State Govt. related NA

    Central Govt. related NA Financial related NA Others NA FinancialProject Cost INR 7,500 Cr. ExpenditureIncurred & Means

    DPR under progress Govt. equity/Private equity (PPP)/ Debt

    Funds required forproject

    INR 7,500 Cr.

    Amount & Reasonsof overrun

    None

    Amount of funding Viability Gap Funding may be available Debt D/E - ~70 : 30 Equity Amount ofInvestment Equity - INR 2,250 Cr.

  • 7/24/2019 Projects in AP State

    27/37

    27

    InvestmentName of Contact Dhananjaya Joshi Mobile No +91-7095599133 Email ID josh [email protected]

    mailto:[email protected]:[email protected]
  • 7/24/2019 Projects in AP State

    28/37

  • 7/24/2019 Projects in AP State

    29/37

    29

    Amount ofInvestment Equity - INR 480 Cr.

    InvestmentName of Contact Dhananjaya Joshi

    Mobile No +91-7095599133 Email ID josh [email protected]

    mailto:[email protected]:[email protected]
  • 7/24/2019 Projects in AP State

    30/37

    30

    Project 13: Waste water collection & treatment system for Amarvati

    Project Name Waste water collection & treatment system for Amarvati

    Capital city

    Sector Urban Infrastructure

    Developer Andhra Pradesh Capital Region Development Authority

    Project Location Amaravati, Andhra Pradesh Physical Parameters

    Project Capacity Sewer network - 660 km Sewage treatment - 210 MLD

    Scheduled 2019

    Present StatusIntegrated Smart infrastructure master planner and DPR consultant to be onboard by Feb 2016. Draft DPR for Power to

    be ready by September 2016 Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-take

    All approvals facilitation to be provided by APCRDA /GoAP.

    A population of 4 lacs led by the Govt. of AP employees, supportstaff and current local populations expected to be in place by year2019/2020.

    Delay vis--visoriginal

    Project on track

    Reasons for delay NA State Govt. related NA Central Govt. related NA Financial related NA Others NA FinancialProject Cost INR 1,900 Cr. ExpenditureIncurred & Means

    DPR under progress Govt. equity/Private equity (PPP)/ Debt

    Funds required forproject INR 1,900 Cr.

    Amount & Reasonsof overrun

    None

    Amount of funding Viability Gap Funding may be available Debt

  • 7/24/2019 Projects in AP State

    31/37

    31

    Equity D/E - ~70 : 30

    Amount ofInvestment Equity - INR 570 Cr.

    InvestmentName of Contact Dhananjaya Joshi Mobile No +91-7095599133 Email ID josh [email protected]

    mailto:[email protected]:[email protected]
  • 7/24/2019 Projects in AP State

    32/37

    32

    Project 14: Solid waste management system for Amarvati Capital city

    Project Name Solid waste management system for Amarvati Capital city

    Sector Urban Infrastructure

    Developer Andhra Pradesh Capital Region Development Authority

    Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 250 MT of Solid Waste per day Scheduled 2019

    Present StatusIntegrated Smart infrastructure master planner and DPR

    consultant to be onboard by Feb 2016.

    Draft DPR for Power to be ready by September 2016

    Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-take

    All approvals facilitation to be provided by APCRDA /GoAP.

    A population of 4 lacs led by the Govt. of AP employees, support staff and current local populations expected to be inplace by year 2019/2020.

    Delay vis--visoriginal

    Project on track

    Reasons for delay NA State Govt. related NA Central Govt. related NA Financial related NA Others NA FinancialProject Cost INR 250 Cr. ExpenditureIncurred & Means

    DPR under progress Govt. equity/Private equity (PPP)/ Debt

    Funds required forproject INR 250Cr.

    Amount & Reasonsof overrun

    None

    Amount of funding Viability Gap Funding may be available Debt D/E - ~70 : 30 Equity

  • 7/24/2019 Projects in AP State

    33/37

    33

    Amount ofInvestment Equity - INR 75 Cr.

    InvestmentName of Contact Dhananjaya Joshi

    Mobile No +917095599133 Email ID josh [email protected]

    mailto:[email protected]:[email protected]
  • 7/24/2019 Projects in AP State

    34/37

    34

    Project 15: Development of Government HoD buildings

    Project Name Development of govt. HoD buildingsSector Real Estate

    Developer Andhra Pradesh Capital Region Development Authority

    Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 4. 8 million sq. ft. Scheduled 2019

    Present Status

    International Architectural Design competition is being held for themaster planning of the overall govt. complex and the design of the

    State Assembly, Secretariat and High Court. Other architects andlandscape designers empanelled for design of other buildingsincluding the HoD buildings.

    Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-takearrangements,

    All designs to be completed by January 2017 post which theconstruction to be taken up under Works contract mode forAssembly, Secretariat, High Court and few other buildings .

    All approvals facilitation to be provided by APCRDA / GoAP.Land to be provided at concessional rates.

    Delay vis--visoriginal

    Project on track

    Reasons for delay NA State Govt. related NA Central Govt. related NA Financial related NA Others NA

    FinancialProject Cost ~INR 1,700 Cr. ExpenditureIncurred & Means

    Govt. equity/Private equity (PPP)/ Debt

    Funds required forproject

    ~INR 1,700 Cr.

  • 7/24/2019 Projects in AP State

    35/37

    35

    Amount & Reasonsof overrun

    None

    Amount of funding None Debt D/E - ~70 : 30

    Equity Amount ofInvestment Equity - INR 510 Cr.

    InvestmentName of Contact Dhananjaya Joshi Mobile No +91-7095599133 Email ID josh [email protected]

    mailto:[email protected]:[email protected]
  • 7/24/2019 Projects in AP State

    36/37

    36

    Project 16: Development of affordable housing for economically weaker sections

    Project Name Development of affordable housing for economicallyweaker sections

    Sector Real Estate

    Developer Andhra Pradesh Capital Region Development Authority

    Project Location Amaravati, Andhra Pradesh Physical Parameters Project Capacity 10,000 households Scheduled 2020

    Present Status Policy for the development of Affordable housing under Progress

    Project tie-upsincludingimplementationmethodology, rawmaterial tie-ups,off-takearrangements,

    All approvals facilitation to be provided by APCRDA /GoAP. Land may be provided at concessional rates.

    Construction labour employed in the construction activity andstaff providing various support services for the citypopulation to

    be the focus audience.

    Delay vis--visoriginal

    Project on track

    Reasons for delay NA

    State Govt. related NA Central Govt. related NA Financial related NA Others NA FinancialProject Cost ~INR 600 Cr. ExpenditureIncurred & Means

    Govt. equity/Private equity (PPP)/ Debt

    Funds required for

    project ~INR 600 Cr.

    Amount & Reasonsof overrun

    None

    Amount of funding None Debt D/E - ~70 : 30 Equity

  • 7/24/2019 Projects in AP State

    37/37

    Amount ofInvestment Equity - INR 180 Cr.

    InvestmentName of Contact Dhananjaya Joshi

    Mobile No +91-7095599133 Email ID josh [email protected]

    mailto:[email protected]:[email protected]