projects by location the san francisco builders · pdf fileprojects by location the san...

22
The San Francisco Builders Exchange PROJECTS BY LOCATION Friday, May 18, 2018 To view plans online go to www.bxofsf.com Plan # # Of Add. Location Bid Date Plan Name Bid Time Plans The Work consists of the supply of fully operated and maintained construction equipment and the furnishing of labor and material to implement project and emergency work on an as -needed basis. Online 0 Alameda County ON-CALL CONSTRUCTION & EMERGENCY SUPPORT SERVICES - ZONE 7 WATER AGENCY 5/24/18 2:00 PM Traffic control, water pollution control, AC milling and paving, pruning tree roots, adjusting manholes and valves to grade, construct drain inlets, curb and gutter, curb ramps, driveway, relocate sign and post, pavement stripe and marking.Project Contact: Ferd Del Rosario 510-528-5766Email: [email protected] Online 0 Albany EVELYN AVENUE PAVEMENT REHABILITATION 6/4/18 2:00 PM Div 1-2, 5, 9 & 11. Rehabilitate a boat launch facility composed of: replace, remove and dispose of existing floating docks, raised wood walkway, aluminum transition plate, fishing dock, and four timber piles; and fabricate and install new boarding docks, new fishing pier dock, and two new steel piles, including all incidentals and appurtenant items as shown on the Plans and specified herein.All questions during bidding must be emailed before 5PM on Monday, May 14, 2018. If necessary, responses will be included in an addendum. Send questions to: Marvin Yee at: [email protected] Online 3 Antioch CONTRA LOMA REGIONAL PARK BOAT LAUNCH FACILITY IMPROVEMENTS (PHASE 2) 5/24/18 SFONLINE 2:00 PM Cabrillo is requesting Plumbing Service & Repair Support for our Facilities Maintenance Staff.PREVAILING WAGEProject Contact: Gale StevensEmail: [email protected] Online 0 Aptos PLUMBING SERVICE & REPAIR 5/24/18 2:00 PM Cabrillo is need of HVAC Controls support and has a variety of HVAC Control Systems, which may include: Trane Tracer Summit, Trane Tridium, Johnson, Siemens, York, Honeywell and others.PREVAILING WAGEProject Contact: Gale StevensEmail: [email protected] Online 0 Aptos HVAC CONTROLS 5/24/18 2:00 PM Cabrillo is requesting HVAC Service & Repair Support for our Facilities Maintenance Staff.PREVAILING WAGEProject Contact: Gale StevensEmail: [email protected] Online 0 Aptos HVAC SERVICE & REPAIR 5/24/18 2:00 PM NEW This project consists of removal of old drinking fountains and replacing them with new drinking fountains and bottle fillers.PREVAILING WAGEProject Contact: Gale Stevens 831- 477-5613 Online 0 Aptos CW DRINKING FOUNTAINS PHASE II 5/30/18 2:00 PM Construction of a new asphalt paved playground on the upper lawn area of the site and a new concrete paver Outdoor Learning Center and associated drainage and landscaping. Install a new 8’-0” high chain link fence on the west side of the new playground and OLC. Install a new concrete access ramp to comply with current access codes. Install and connect all underground utilities and all other required elements to provide a fully functioning learning area.PREVAILING WAGEProject Contact: Cindy NaberEmail: [email protected] Online 2 Arroyo Grande OCEAN VIEW ELEMENTARY OUTDOOR LEARNING CENTER/ASPHALT COURT 5/21/18 2:00 PM In general the project consists of asphalt repairs, including: cold planning, Hot Mix Asphalt (HMA) paving, striping, traffic control and related items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directed by the Engineer.PREVAILING WAGEProject Manager: Jill McPeek at (805) 473-5444 Online 1 Arroyo Grande 2018 STREET REPAIRS 5/22/18 2:00 PM In general the project consists of the replacement of lifted and/or broken sidewalk and curb/gutter sections throughout the City of Arroyo Grande, along with sidewalk and curb ramp installation of Farroll Avenue.PREVAILING WAGEContact Person: Jill McPeek, Capital Improvement Project ManagerEmail: [email protected] Online 0 Arroyo Grande 2018 CONCRETE REPAIRS 5/31/18 2:00 PM Project comprises labor, material and services necessary for: Demolition, fire sprinklers, fire alarms, doors, plumbing, HVAC, fixtures, toilets, beds, concrete, electrical raceway, wiring, cable, and related work.Project Contact: Nathan HigginsEmail: [email protected] Online 0 Atascadero STATEWIDE ENHANCED TREATMENT UNITS AT ATASCADERO STATE HOSPITAL 5/23/18 2:00 PM Construction services for locker room remodel. Online 3 Atherton LEASE-LEASEBACK (LLB) CONSTRUCTION SERVICES FOR MENLO-ATHERTON HIGH SCHOOL LOCKER ROOM REMODEL - SEQUOIA UNION HIGH SCHOOL DISTRICT - REBID 5/21/18 2:00 PM Page 1 of 22

Upload: dangdiep

Post on 20-Mar-2018

238 views

Category:

Documents


15 download

TRANSCRIPT

Page 1: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

The San Francisco Builders ExchangePROJECTS BY LOCATION Friday, May 18, 2018

To view plans online go to www.bxofsf.com

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

The Work consists of the supply of fully operated and maintained construction equipment and the furnishing of labor and material to implement project and emergency work on an as-needed basis.

Online0Alameda County ON-CALL CONSTRUCTION & EMERGENCY SUPPORT SERVICES - ZONE 7 WATERAGENCY

5/24/18 2:00 PM

Traffic control, water pollution control, AC milling and paving, pruning tree roots, adjusting manholes and valves to grade, construct drain inlets, curb and gutter, curb ramps,driveway, relocate sign and post, pavement stripe and marking.Project Contact: Ferd Del Rosario 510-528-5766Email: [email protected]

Online0Albany EVELYN AVENUE PAVEMENT REHABILITATION 6/4/18 2:00 PM

Div 1-2, 5, 9 & 11. Rehabilitate a boat launch facility composed of: replace, remove and dispose of existing floating docks, raised wood walkway, aluminum transition plate, fishingdock, and four timber piles; and fabricate and install new boarding docks, new fishing pier dock, and two new steel piles, including all incidentals and appurtenant items as shown onthe Plans and specified herein.All questions during bidding must be emailed before 5PM on Monday, May 14, 2018. If necessary, responses will be included in an addendum. Sendquestions to: Marvin Yee at: [email protected]

Online3Antioch CONTRA LOMA REGIONAL PARK BOAT LAUNCH FACILITY IMPROVEMENTS(PHASE 2)

5/24/18 SFONLINE2:00 PM

Cabrillo is requesting Plumbing Service & Repair Support for our Facilities Maintenance Staff.PREVAILING WAGEProject Contact: Gale StevensEmail: [email protected]

Online0Aptos PLUMBING SERVICE & REPAIR 5/24/18 2:00 PM

Cabrillo is need of HVAC Controls support and has a variety of HVAC Control Systems, which may include: Trane Tracer Summit, Trane Tridium, Johnson, Siemens, York,Honeywell and others.PREVAILING WAGEProject Contact: Gale StevensEmail: [email protected]

Online0Aptos HVAC CONTROLS 5/24/18 2:00 PM

Cabrillo is requesting HVAC Service & Repair Support for our Facilities Maintenance Staff.PREVAILING WAGEProject Contact: Gale StevensEmail: [email protected]

Online0Aptos HVAC SERVICE & REPAIR 5/24/18 2:00 PM

NEW

This project consists of removal of old drinking fountains and replacing them with new drinking fountains and bottle fillers.PREVAILING WAGEProject Contact: Gale Stevens 831-477-5613

Online0Aptos CW DRINKING FOUNTAINS PHASE II 5/30/18 2:00 PM

Construction of a new asphalt paved playground on the upper lawn area of the site and a new concrete paver Outdoor Learning Center and associated drainage and landscaping.Install a new 8’-0” high chain link fence on the west side of the new playground and OLC. Install a new concrete access ramp to comply with current access codes. Install andconnect all underground utilities and all other required elements to provide a fully functioning learning area.PREVAILING WAGEProject Contact: Cindy NaberEmail:[email protected]

Online2Arroyo Grande OCEAN VIEW ELEMENTARY OUTDOOR LEARNING CENTER/ASPHALT COURT 5/21/18 2:00 PM

In general the project consists of asphalt repairs, including: cold planning, Hot Mix Asphalt (HMA) paving, striping, traffic control and related items of work as shown on the plans, asspecified in the Standard Specifications and these special provisions, and as directed by the Engineer.PREVAILING WAGEProject Manager: Jill McPeek at (805) 473-5444

Online1Arroyo Grande 2018 STREET REPAIRS 5/22/18 2:00 PM

In general the project consists of the replacement of lifted and/or broken sidewalk and curb/gutter sections throughout the City of Arroyo Grande, along with sidewalk and curb rampinstallation of Farroll Avenue.PREVAILING WAGEContact Person: Jill McPeek, Capital Improvement Project ManagerEmail: [email protected]

Online0Arroyo Grande 2018 CONCRETE REPAIRS 5/31/18 2:00 PM

Project comprises labor, material and services necessary for: Demolition, fire sprinklers, fire alarms, doors, plumbing, HVAC, fixtures, toilets, beds, concrete, electrical raceway,wiring, cable, and related work.Project Contact: Nathan HigginsEmail: [email protected]

Online0Atascadero STATEWIDE ENHANCED TREATMENT UNITS AT ATASCADERO STATE HOSPITAL 5/23/18 2:00 PM

Construction services for locker room remodel.

Online3Atherton LEASE-LEASEBACK (LLB) CONSTRUCTION SERVICES FOR MENLO-ATHERTONHIGH SCHOOL LOCKER ROOM REMODEL - SEQUOIA UNION HIGH SCHOOLDISTRICT - REBID

5/21/18 2:00 PM

Page 1 of 22

Page 2: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Demolishing the existing Administration/Police Department (PD) buildings (fixed and modular), PD garage, Library, renovation of the historic Town Hall, building, a Town Hall,Library, site improvements and removing, realigning and rebuilding sections of the existing Ashfield Road and Station Lane.

Online4Atherton TOWN CENTER PROJECT 5/22/18 2:00 PM

The Project proposes to seismically retrofit the existing bridge on Avila Beach Drive over San Luis Obispo Creek, in the Community of Avila Beach. Project implementation willincrease the bridge strength to prevent a sudden bridge collapse during an earthquake event at the design level severity. Project activities involve diversion and dewatering withinSan Luis Obispo Creek and all anticipated project impacts are temporary; no permanent impacts will occur.Bid Contact: JR Beard(805) [email protected]

Online0Avila Beach AVILA BEACH DRIVE BRIDGE SEISMIC RETROFIT AT SAN LUIS OBISPO CREEK 5/31/18 3:00 PM

New Construction of eight (8) separate residential buildings, including 193 units of residential, swimming pool and spa, and on-grade parking with carport structures. The Project isanticipated to start August 1, 2018. Prevailing Wage is NOT required. PLEASE NOTE: GC's listed on this Project are asking for bids on different dates. Please confirm bid due datewith each GC prior to submitting your bid.

Online4Bay Point BAY POINT FAMILY APARTMENTS 6/5/18 SFONLINE2:00 PM

Constructing approximately 165 linear feet of new retaining wall, installing new railings on top of an existing retaining wall, cleaning and waterproofing the surface of an existingretaining wall.Project Contact: Gilbert Yau 650-595-7467Email: [email protected]

Online0Belmont RALSTON RETAINING WALL REPAIR PROJECT 5/24/18 2:00 PM

Project generally includes the following items of work: Construction of new sewer mains, manholes and appurtenances, abandonment of existing sewer infrastructure, and otheritems as identified in the Contract Documents (the “Work”)Questions: Brian Dong, Associate Civil Engineer, at (650) 595-7463, or by email at: [email protected]

Online0Belmont SHOREWAY SEWER REPLACEMENT PROJECT 6/8/18 2:00 PM

The Project consists of trench excavation, conduit and vault installation, utility connections, backfill, compaction, replacement of impacted street improvements, and all ancillary work.

Online0Belvedere ACACIA/LAUREL UTILITY UNDERGROUNDING ASSESSMENT DISTRICT 5/31/18 SFONLINE11:00 AM

Rebuild in a new alignment the sanitary sewer line leaving the west side of Dwinelle Hall. Current sanitary line has a deep sag in the pipe and must be replaced. Provide potholing ofexisting utilities, create a new pathway as shown on the documents, and install, pressure test and backfill a new 6” PVC sanitary line.

Online1Berkeley DWINELLE HALL SANITARY SEWER REPLACEMENT - UC BERKELEY 5/23/18 2:00 PM

Basketball court demolition and rebuild.Project Contact: Taylor Lancelot 510-981-6421Email: [email protected]

Online1Berkeley GLENDALE - LA LOMA PARK BASKETBALL COURT RENOVATION 5/24/18 2:00 PM

Renovate paving surface of three existing fenced sport courts; improve pedestrian and ADA access including installation of an ADA accessible ramp; renovate existing chain linkfence including replacement of fence fabric for all three sport courts; install site furnishings including net assembly for tennis and volleyball, ball wall, bike racks, removable bollard,bench and ancillary work.Project Contact: Taylor Lancelot Email: [email protected]

Online0Berkeley STRAWBERRY CREEK PARK SPORT COURT RENOVATIONS PHASE 1 5/24/18 2:00 PM

NEW

Installation of standard campus light pole and accompanying landscape (hardscape and softscape) repair.

Online0Berkeley CAMPUS LIFE SAFETY LIGHTING - UC BERKELEY 5/24/18 2:00 PM

NEW

Traffic control, adjustment of valve boxes and utility boxes, frames, and covers, protection and relocation of underground utility services (e.g. gas, water, sewer, electrical, telecom),concrete curbs and gutters, sidewalk, curb ramps, driveways, valley gutters, cross drains at curb ramps, storm drain pipe replacement, storm drain inlets, edge drain, base failurerepairs, pavement milling, removal and disposal of pavement surfaces and base materials, sub-grade preparation, proof rolling including over-excavation, stabilization ancompaction, aggregate base course, hot-mix asphalt (HMA) paving, shoulder backing, and pavement markings, striping, and markers.Project Contact: Wendy WongEmail: [email protected]

Online0Berkeley FY 2018 MEASURE M STREET REHABILITATION 5/31/18 2:00 PM

NEW

Pavement rehabilitation, construction of sidewalk, curb and gutter, driveways, planting strips, retaining walls, thrie beam barrier, reconstruction of curb ramps, removal of concrete,removal of posts and chain linked fence, reconstruction and construction of cross drains and other drainage features, restoring pavement markings, and traffic control.ProjectContact: Wendy WongEmail: [email protected]

Online0Berkeley PANORAMIC HILL REHABILITATION PROJECT 5/31/18 2:00 PM

Clean and prepare existing columns and sections of walls for repair. Remove by lightweight hand tools, any damaged or lose material, to clean sound concrete. Provide structuralrepair and additional reinforcement for five concrete columns, to prevent future damage. Provide structural repair and additional reinforcement to the concrete wall on both sides ofthe entrance.Project Contact: Jennifer Allen 510-981-6627Email: [email protected]

Online0Berkeley TRANSFER STATION COLUMN REPAIR 6/7/18 2:00 PM

Page 2 of 22

Page 3: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

NBD

Traffic control, removal and disposal of pavement surfaces and base materials, removal and disposal of concrete curb and gutter, excavation and installation of cistern structure withassociated inlet and outlet control structures and piping, installation of manholes and catch basins with associated storm drain pipeline, installation of storm water treatmentbio-swalewith plantings, planting of trees, backfilling and compaction of excavations, hot-mix asphalt (HMA) paving, sll;lITY sealing pavement.Project Contact: Danny Akagi Email:[email protected]

Online1Berkeley FY 2018 MEASURE M LOW IMPACT DEVELOPMENT (LID), WOOLSEY STREETPROJECT

6/7/18 2:00 PM

NEW

The purpose of the work is to provide a replacement well for the existing Pasatiempo Well No. 6, which has experienced structural problems necessitating its replacement. Thedesign capacity of the well is 400 gallons per minute (gpm).PREVAILING WAGE

Online2Boulder Creek PASATIEMPO WELL 8 REPLACEMENT 5/30/18 2:00 PM

City is seeking a qualified design build entity to design, permit and construct the conversion or replacement of a portable generator to a stationary unit and configuration of anautomatic transfer switch.To obtain an electronic copy of the RFQ/P (via email) at no charge, a “Document Request Form”, AVAILABLE ONLINE IN THE SPECS FOLDER & locatedon the City’s website at: https://www.brentwoodca.gov/gov/pw/cip/pw_rfps.asp, should be completed and emailed to: [email protected]. PLEASE NOTE: Entities mustobtain the document directly from the City in order for a submittal to be considered valid.

Online0Brentwood RFP CITY HALL AUTOMATIC TRANSFER STATION DESIGN/BUILD PROJECT 5/25/18 SFONLINE4:00 PM

NEW

New 29,036 sq. ft. ground up Industrial Shell; trades required but not limited to; survey, termite control, erosion control, earthwork, asphalt, striping and signage, site concrete,underground utilities, fencing, landscape, concrete, masonry, structural steel, rough carpentry, insulation, roofing, sheet metal, roof hatch, joint sealers, doors/frames/hardware,overhead doors, aluminum storefront, plaster, drywall, ceramic tile accents, paint, and DESIGN BUILD fire sprinklers, plumbing, HVAC, electrical and fire alarm.Questions: JamesMorefield at: [email protected] with any scope questions and Lee Ann Blaylock at: [email protected] with any plan distribution needs at (916) 408-6950.

Online0Brentwood KENDALL PLAZA - BRENTWOOD 6/5/18 SFONLINE1:00 PM

Saw cutting and demolition, pavement removal, earthwork, pavement installation, curb and gutter, storm drain installation, landscaping, striping, and signage.

Online0Burlingame PARKING LOT RESURFACING PROJECT 5/22/18 2:00 PM

Installing new water mains.Project Contact: Kevin Okada

Online0Burlingame SHORELAND SUBDIVISION WATER IMPROVEMENTS SOUTH ROLLINS ROAD -PHASE 2

5/29/18 2:00 PM

NEW

Installation of a dual cord Commercial Level 2 electric vehicle (EV) charging station, also known as Electric Vehicle Supply Equipment (EVSE), at two city-owned properties:ProjectContact: Marie Galvin 650-558-7681Email: [email protected] copies also available for review at Santa Clara Builders Exchange

Paper & Online0Burlingame ELECTRONIC VEHICLE CHARGING STATIONS PROJECT 5/30/18 2:00 PM

NEW

Pruning primarily Eucalyptus and other large canopy trees, and stump removal/grinding on City property and rights-of-way at various locations.

Paper & Online0Burlingame TREE PRUNING & STUMP REMOVAL 2018-2019 6/5/18 2:00 PM

The proposed new library will be a 11,700 square-foot single story building positioned in the south-east corner of the 47,536 square-foot parcel, located at 2005 Wharf Road, inCapitola, CA.The construction of a new ground-up wood-frame, Type V-B, non-rated, single-story library, including; reading rooms, group study areas, stack shelving areas, meetingrooms, multi-purpose room, and staff offices. Work includes all relevant scopes of work; site work, weather-tight exterior assemblies, roofing, metal-stud framing and interior gypsumboard, related electrical, plumbing, HVAC, and fire protection systems, utilities-infrastructure, and interior and exterior architectural finishes.PREVAILING WAGEJamie Goldstein –City ManagerSteve Jesberg – Public Works DirectorPhone: 831-426-8191

Paper & Online0Capitola CAPITOLA BRANCH LIBRARY 5/30/18 3:00 PM

Modernization of Canyon Middle School see specs for complete scope of work.Electronic documents from Facilities Office of the District, direct to [email protected]

Online4Castro Valley CVUSD CANYON MIDDLE SCHOOL PHASE 1 & 2 MODERNIZATION PROJECT RE-BID 5/22/18 3:00 PM

NBD

Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33 & 40. Work includes rehabilitation of three steel reservoirs whose volumes range from 0.2 million gallons (MG) to 2.9 MG. The reservoirs arelocated in Castro Valley, Orinda, and Walnut Creek, California.Work includes demolition and removal of three existing wooden roofs, construction of a 0.28 MG temporary bolted-steel tank, construction of three aluminum dome roofs, abrasive blasting and recoating of the tank interiors, low-pressure water cleaning, priming and top-coating of the tankexteriors, and constructing civil, structural, pipeline, mechanical and electrical appurtenances at each reservoir.

Online3Castro Valley,Orinda and WalnutCreek

ARCADIAN, LARKEY, AND RHEEM RESERVOIRS REHABILITATION - EBMUD 5/23/18 SFONLINE1:30 PM

Page 3 of 22

Page 4: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

NEW

The Work to be done in general consists of mobilization, traffic control, storm water pollution control, potholing of existing utilities, clearing and grubbing, tree trimming, bypasspumping of sanitary sewer flows, open trench replacement of sanitary sewer mains and laterals, pipe bursting of sanitary sewer laterals, sewer cleanout and rodding inletinstallations, manhole construction, manhole rehabilitation, ADA curb ramp reconstruction, pavement milling, digout repairs, HMA overlay, keycuts, remove and replace PCC valleygutters, traffic striping and markings, and all other work as specified in these Special Provisions and shown in the Drawings.

Online1Concord CONCORD BART AREA SANITARY SEWER UPGRADE 5/23/18 SFONLINE2:00 PM

See RFP for complete scope of work. Please submit all questions to Debbie Wellnitz at: [email protected]

Online0Concord LANDSCAPE MAINTENANCE CONTRACT 6/15/18 SFONLINE10:00 PM

Div 1 & 2. The Work generally consists of CIPP lining, as needed, over a two-year period, of sewer pipe in varied lengths ranging in diameter from 8-inch to 15-inch pipe, reinstatingof laterals, ferreting and CCTV. In addition, the work includes ten (10) required CIPP lining sites to be completed within 90 days from the Notice to Proceed.Questions: DamasioZepeda Aragon at (925) 229-7332, or by email at: [email protected]

Online2Contra CostaCounty

CURED-IN-PLACE PIPE (CIPP) CONTRACT 2018-2020 5/21/18 SFONLINE2:00 PM

The Work covered by this contract will be performed at nine locations in Contra Costa County: one location in an unincorporated area, four locations in the City of San Pablo, andfour locations in the City of Richmond.The Work generally consists of pipe bursting and spot repairing sewer pipe in varied lengths ranging in diameter from 6- to 8-inch pipe,reconnecting sewer laterals, ferreting, TV’ing, potholing for utilities, rehabilitating manholes, installing manholes and paving. The work includes construction for two pipe burstingsites and seven spot repair sites to be completed within 120 days from the Notice to Proceed.Questions: Mr. Armondo Hodge, Engineer III, at (510) 222-6700 x3630, or by email at:[email protected]

Online0Contra CostaCounty

PIPE BURSTING AND SPOT REPAIRING OF SANITARY SEWERS 6/5/18 SFONLINE2:00 PM

NEW

This project involves the replacement of an existing bridge with a new bridge/side-hill viaduct. The bridge is approximately 29 feet and the side-hill viaduct is 93.75 feet. Thesuperstructure is a cast-in-place slab supported on CIDH pile extensions and diaphragm abutments on CIDH piles. Approach roadway work includes construction of approximately242 feet of reconstructed roadway with soldier pile retaining wall and drainage improvements.Project Contact: Jeffrey delosSantosEmail: [email protected]

Online0Corralitos REDWOOD ROAD OVER BROWNS CREEK TRIBUTARY (36C0179) BRIDGEREPLACEMENT

6/7/18 2:00 PM

NBD

The Bid #1800 Science Center Roof Repair project at De Anza College will clean and power wash the entire roof area. Remove all ponding water and any oil or chemical spill. Installtemporary air filters for the duration of the project. Provide notice to the district if any mechanical equipment needs to be shut down. Provide performance logs prior to and afterroofing work. Cut and remove all blisters or cracked membrane. Remove any delaminated material and solvent wipe area. Remove and replace any walk pads necessary to accessdamaged existing roofing material. Patch blisters with Permaflash system. Repair all scuppers. Clean and prepare outside face of scupper to receive Permaflash coating. Providewatertight tie-in to existing stucco without damaging (e) stucco. Stucco damage during the course of the work shall be repaired by the contractor at no cost to the owner. Repairdamaged downspout and conductor heads. Clean and prepare counterflashing. Remove and replace sealant at coping cap along parapet wall. Match color of the existing sealantand coping cap. Remove and reinstall Dura-blocks as necessary to repair roof. Clean and snake all existing drains. Clean and prepare (e) round penetrations for application ofPermaflash system all round and 6” up penetration. Verify locations in the field. Repair (e) base flashing cracks/blisters/holes. Clean and prepare prior to Permaflash systemapplication. Verify locations in the field.

Online2Cupertino SCIENCE CENTER ROOF REPAIR DE ANZA COLLEGE 5/23/18 2:00 PM

Installation of Cured-in-place (CIPP) for sectional point repairs within sanitary sewers.Project Contact: Jackie YeeEmail: [email protected]

Online1Dublin SEWER COLLECTION SYSTEM CURE-IN-PLACE PIPE SPOT REPAIR - DUBLIN SANRAMON SERVICES DISTRICT (DSRSD)

5/24/18 2:00 PM

Replacement of existing cameras and microphones and the installation of new cameras and microphones in Housing Units (HU) 1, 2, 8, 9, 24, and Intake and Release (ITR).ProjectContact: Michael Cadrecha 510-208-9589 Email: [email protected]

Online0Dublin PRE-QUALIFICATION OF GENERAL CONTRACTORS FOR SANTA RITA JAIL HU-ITRCAMERA REPLACEMENT PROJECT

6/4/18 2:00 PM

Page 4 of 22

Page 5: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

The Project is more specifically defined in the Contract Documents, but generally includes: Construction at night between 8:00 PM and 6:00 AM Sunday nights to Friday mornings tofurnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of, but not limited to, the following: tree removal,clearing & grubbing, removal of PCC curb, gutter and sidewalk, removing asphalt concrete pavement and striping, slurry seal parking lot, maintaining traffic and furnishing trafficcontrol throughout construction, replacement of traffic signals and related facilities, installation of sidewalk paving, curbs and curb & gutters, placement of Hot Mix Asphalt Concrete,installation of a pedestrian bridge, adjusting utility facilities, crosswalks, street lights, landscaping, irrigation, drainage improvements, installation of thermoplastic traffic stripes andpavement markings and reflective pavement markers, and installation of traffic signs. There may be other items of work not mentioned above, providing water pollution control,cleaning of the site at the end of the job, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office ofthe Public Works Director, to which reference is hereby made for further particulars.Questions must be submitted by fax to (925) 829-9248, ATTN: Michael Boitnott or by email at:[email protected], at least ten (10) calendar days before the time specified for bid opening.

Online0Dublin DUBLIN BOULEVARD WIDENING PROJECT 6/5/18 2:00 PM

NEW

Multiple phases of construction of interior accessibility upgrades in various detention units and other areas located in the Santa Rita Jail complex.Project Contact: Tom McKimmy510-208-3990Email: [email protected]

Online0Dublin SANTA RITA JAIL INTERIOR ACCESSIBILITY UPGRADES 6/20/18 2:00 PM

Construction of remaining work of phase 2 which consists of street lighting along entry road of Cooley Landing, remaining work of phase 3 of the prefabricated restrooms and trashenclosures, phase 4 consisting of outdoor classroom, picnic area, and extension of main pathways, and finally phase 5 consisting of secondary trails, seating areas, and interpretivesignage.Project Contact: Fanny YuEmail: [email protected]

Online1East Palo Alto COOLEY LANDING PARK PHASE 4 & 5 5/31/18 2:00 PM

NEW

The Project consists of preparing the site, designing, furnishing, delivering, and installing composite play structures.

Online1El Cerrito WILSON TEMP CAMPUS PLAY STRUCTURES 5/21/18 SFONLINE2:00 PM

NEW

THIS PROJECT IS A REBIDDiv 1-3, 5-10, 22-23 & 26. The Project consists of: Remodeling eight restrooms including concrete floor slab removal and replacement as well as newnon-load bearing wood stud wall construction. The scope of work includes new floor, wall, and ceiling finishes, new partitions, new exhaust ventilation, new plumbing piping andfixtures, and new electrical power and lighting systems. The scope of work also includes addition of a man-door connecting the special education classroom with an adjacentclassroom lab as well as 2,000 square feet of classroom flooring replacement.(Previously scheduled bid dates were 7/21/16 & 5/3/17)

Online0El Sobrante CRESPI MIDDLE SCHOOL RESTROOM RENOVATION - PHASE II - REBID 6/1/18 SFONLINE2:00 PM

The Work includes, without limitation, providing all labor. material, and equipment necessary to perform the work specified in the Plans and Specification including, but not limited to,procurement and installation of material for traffic control, construction fencing, removal and installation of synthetic turf including header board where needed, placing grey fines,removal and installation of new fencing, shade structure fabric replacement, installation, and exposing of existing drainage to verify functionality after new drainage fittings have beeninstalled. Details of work are described within the Contract Documents.Questions: Frank Fanara, Parks Mgr, at (650) 286-3553, or by email at: [email protected]

Online1Foster City FOSTER CITY DOG PARK REFURBISHMENT 6/7/18 2:00 PM

NEW

This project serves to reduce the surface storm water runoff entering the existing valve vault and wet well at the Los Arboles Pump Station. The project includes the installation ofthree new drainage inlets, a storm drain junction box, associated storm drain pipes, and a concrete cross gutter. Also included are modifications to the existing asphalt concretepavement, berms, curbs, and gutters in the project area.Project Contact: Ashleigh TrujilloEmail: [email protected]

Online0Freedom LOS ARBOLES PUMP STATION DRAINAGE IMPROVEMENTS 5/31/18 2:00 PM

Replacement of Classroom Wall Type Mechanical Units, Slimline Condensing Units, Wall Mounted Heat Pumps, & Roof Top Mechanical Units, Miscellaneous Roof & Wall Patchingdue to Mechanical Unit Removal.Project Contact: Julio Hernandez Email: [email protected]

Online0Fremont SCHOOL MODERNIZATION GRIMMER ELEMENTARY SCHOOL - FREMONT UNIFIEDSCHOOL DISTRICT (FUSD)

5/29/18 2:00 PM

Applying cape seals and slurry seals, delivering advance public notifications; implementing traffic controls, removing weeds from the roadway, pruning of trees; removing andreplacing traffic striping, markings, and raised pavement markers; installing green bike lanes; installing roadside signs.Project Contact: Edward Nakayama 510-494-4775Email:[email protected]

Online0Fremont 2018 CAPE & SLURRY SEAL PROJECT - REBID 5/29/18 2:00 PM

NEW

1) removing and disposing of existing stabilized decomposed granite, including aggregate base, to 12" depth and installing permeable pavers with class 2 permeable aggregate baseand 2) sawcutting, removing and disposing of concrete paving, curb and gutter and installing trench drain with new curb and gutter. All remaining concrete paving, structures,underground trenches and piping are to remain and shall be preserved and protected.Project Contact: Jennie Suen 510-494-4744Email: [email protected]

Online0Fremont NILES TOWN PLAZA PERMEABLE PAVERS 6/6/18 2:00 PM

Disconnection of all utilities, demolition of the existing Bathroom and Meeting Room structures, including proper removal and disposal of all hazardous materials.Project Contact:Mark Mennucci 510-494-4530Email: [email protected]

Online0Fremont WARM SPRINGS MEETING ROOM & RESTROOM REPLACEMENT 6/7/18 2:00 PM

Page 5 of 22

Page 6: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

NBD

Clearing vegetation around fire hydrants, painting fire hydrants, installing City provided fire hydrant ID tags, installing blue pavement reflectors where needed, and submit a completelist of all fire hydrants with GPS coordinates.

Online1Gilroy FIRE HYDRANT PAINTING/ ID TAGS 5/22/18 2:00 PM

NEW

Construction of concrete curb and gutter repairs, access ramps, weed kill, crack seal, sweeping asphalt point repairs, micro-surfacing, rubberized cape seal, asphalt grind and hotmix asphalt overlay, utility lowering and adjusting and pavement striping and markings and clean up on various streets.

Online0Gilroy FY 18 CITYWIDE PAVEMENT MAINTENANCE 6/5/18 2:00 PM

Painting Projects for Gonzales Unified School District at La Gloria Elementary School, Fairview Middle School and Gonzales High School.Project consists of: Exterior Painting &Interior Painting.Questions: Luis Vargas Email: [email protected]

Paper & Online0Gonzales PAINTING PROJECTS FOR GONZALES UNIFIED SCHOOL DISTRICT 5/24/18 2:00 PM

In general, this Project includes: Pavement Rehabilitation including mobilization; traffic control and construction signage; water pollution control; clearing and grubbing; trafficmarkings and markers removal; stormdrain pipe replacement/repair; ADA improvements, concrete curb and gutter installation; full depth asphalt base repair; hot mix asphaltreconstruction; adjusting of utility features (e.g. water valve boxes, sanitary manhole frame and covers); and placement of thermoplastic traffic stripes, pavement markers, andthermoplastic pavement markings.Questions: Maziar Bozorginia, City Engineer, at (650) 726-8251.

Online1Half Moon Bay 2018 STREET RECONSTRUCTION PROJECT 5/30/18 3:00 PM

NEW

Please refer to specifications for complete scope of work.

Online1Hayward HARDER ELEMENTARY SCHOOL RECONSTRUCTION LEASE-LEASEBACK (LLB)-HAYWARD UNIFIED SCHOOL DISTRICT

5/31/18 3:00 PM

The Work consists of modifications to the Water Pollution Control Facilities, including but not limited to the following:• Coating repair for Final Clarifier No. 1 and No. 2 Equipment•Concrete repairs at Final Clarifier No. 1• Concrete and lining repair at the GBT Sludge Blending Tank• Modifications to the South Primary Clarifier Control Box• New Decant PumpDischarge Piping• Miscellaneous improvements including electrical conduit replacement, piping modifications inside the GBT FacilityQuestions: Feng Chang at (510) 293-5061, orby email at: [email protected]

Online1Hayward FINAL CLARIFIER AND GBT SLUDGE BLENDING TANK REHABILITATION 6/5/18 2:00 PM

NEW

Construct a 2 building ground up self-storage facility. Building A is a single story 4,512 sf building. Building B is a 2 story 36,800 sf building. The current site is asphalt paved and willneed to be demolished, graded and add new site improvements.

Online0Hayward SAF KEEP SELF STORAGE 6/6/18 12:00 PM

The Work will be completed in two project phases. Phase I shall consist of preparing specified equipment shop drawing submittal and approval process to develop favorablyreviewed shop Drawings. Phase 1 work shall be completed in all respects within 77 calendar days from the Notice-To-Proceed. Phase II shall consist of fabrication and delivery ofthe membrane system as specified, assistance in equipment installation, start-up, testing, training and other work as specified. The City will assign Phase II of this contract to aContractor.Questions: Feng Chang at (510) 293-5061, or by email at: [email protected]

Online0Hayward PROCUREMENT OF MEMBRANE TREATMENT SYSTEM FOR THE RECYCLEDWATER TREATMENT FACILITY - PHASE 1

6/12/18 2:00 PM

THIS PROJECT IS A REBIDImprovements to the existing Duck Pond Park including installation of a 2-stall prefabricated restroom building (purchased separately by the City) andassociated utilities, a basketball shooting area consisting of asphalt pavement (approximately 1,750 SF) with basketball court striping and a basketball goal, a players bench andornamental mental fence, and concrete pavement for access to the above amenities.(Previously scheduled bid date was 4/17/18)

Online0Hercules DUCK POND PARK IMPROVEMENT PROJECT - REBID 5/22/18 SFONLINE2:00 PM

This Project includes construction of cleaning and CCTV/Video inspection of sanitary sewer mainline segments within two sanitary sewer drainage sub-basins within the Town ofHillsborough, including manhole inspections of both the upstream and downstream manhole of the selected segment. The video inspection equipment must be able to maneuver infour inch pipes and larger. The pipe segments are to be cleaned by the contractor before inspecting them. There may be inherent conditions requiring multiple attempts to inspectand/or attempts from both ends. Some of the access manholes are in the street, while others are in landscaped or unimproved easements across private property (owners arerequired to allow crews to access public facilities within easements).

Online1Hillsborough FY17-18 VIDEO INSPECTION & SANITARY SEWER CLEANING PROJECT 5/23/18 2:00 PM

Replacing approximately 719 traffic regulatory signs, 462 warning signs and 17 guide signs on existing poles; replacing damaged sign posts on an as-needed basis; installingapproximately 42 new sign posts with traffic warning and regulatory signs in six school locations

Online1Hillsborough SIGN INVENTORY REPLACEMENT PROJECT VARIOUS LOCATIONS 5/23/18 2:00 PM

This project involves the re-coating of two existing welded steel water storage tanks, 2.0 and 3.5 million gallon (MG) capacity, with knuckle style roofs.Project Contact: DannyHillstockEmail: [email protected]

Online1Hollister PARK HILL TANKS RECOATING 5/22/18 2:00 PM

Page 6 of 22

Page 7: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

The project includes, but is not limited to, improve roadways at various locations by Seal Coat (Chip Seal) 0.67 Mile and Slurry Seal 0.37 Mile. (San Felipe Road, Gardena Lane,Nash Road, Ladd Lane, Cienega Road)Project Contact: Adam GoldstoneEmail: [email protected]

Online0Hollister SEAL COAT (CHIP SEAL) AND SLURRY SEAL AT VARIOUS LOCATIONS 6/7/18 2:00 PM

The project includes, but is not limited to improve roadways at two locations by a 2” AC Overlay (Magladry Road and Southside Road)Project Contact: Adam GoldstoneEmail:[email protected]

Online0Hollister HMA OVERLAY PROJECT AT TWO LOCATIONS 6/7/18 2:00 PM

Div 1-5, 7, 9, 12, 16, 26-28 & 31-33. The Project consists of: Removal of existing natural turf field and replace with new synthetic turf, CMU home and visitors dugouts, bullpens,batting cage, backstop with safety netting and aluminum bleacher system. Work also includes new perimeter fencing, storage area, and scoreboard. Existing improvements will bemade to the drainage, irrigation and other utility systems.Questions: Paul Lum at (415) 457-8811 x7504, or by email at: [email protected]

Online1Kentfield ATHLETIC BASEBALL FACILITIES IMPROVEMENTS KENTFIELD CAMPUS 5/31/18 SFONLINE2:00 PM

Provide general and landscape maintenance, including but not limited to scheduled landscape maintenance and irrigation maintenance and repair services, storm drain and ditchcleaning, minor sidewalk and road repairs, pathway maintenance, tree maintenance, weed control, stormwater pollution prevention activities and required reporting, unanticipated oradditional related work as directed by the City, and emergency response and emergency work as needed. Additional information is shown and described in the Request for Proposal(RFP) package.Questions: Donna Feehan, Public Works Manager, at: [email protected] or at (925) 935-1238.

Online0Lafayette RFP GENERAL AND LANDSCAPE MAINTENANCE 5/24/18 SFONLINE2:00 PM

Work includes, but not limited to: mobilization; traffic control and construction signage; clearing and grubbing including tree trimming; traffic striping, marking and marker removal;removal and replacement of concrete curb and gutter; construction of asphalt concrete pavement repairs; crack seal; rubberized chip seal; micro-surfacing; traffic stripes, markers,and markings; and all other work as shown on the plans and as described in the Specifications to provide a complete project.Questions: Matt Luttropp, City Engineer’s Office, at(925) 299-3247.

Online1Lafayette 2018 SURFACE SEAL AND STRIPING PROJECT 5/31/18 SFONLINE1:30 PM

Work includes, but not limited to: mobilization; traffic control and construction signage; potholing utilities; clearing and grubbing including tree protection, trimming and removal;removal and disposal of asphalt concrete pavement and subgrade, concrete and asphalt curb, gutter, flatwork; construction of minor concrete structures, concrete and/or asphaltcurb, gutter, asphalt concrete pavement, storm drain facilities, pipe lining, traffic stripes, markers, and markings; and all other miscellaneous work as shown on the Plans and asdescribed in the Specifications to provide a complete project.Questions: Matt Luttropp, City Engineer’s Office, at (925) 299-3247.

Online1Lafayette 2018 STORM DRAIN REHABILITATION PROJECT 5/31/18 SFONLINE2:00 PM

Preparatory street cleaning, tree trimming, root pruning, asphalt concrete pavement repairs, installation of ADA ramp truncated domes, minor concrete work, crack sealing, removalof existing traffic striping and markers, application of micro-surfacing and slurry seal treatments, adjustment to grade of utility boxes, the installation of new thermoplastic pavementstriping and markings and raised pavement makers and various site improvements.Project Contact: Saurabh Nijhawan

Online1Livermore 2018 SLURRY SEAL 5/22/18 2:30 PM

Removal and replacement of street light poles on "J" Street and "K" Street between First Street and Third Street, the installation of new luminaires mounted on 6' mast armsmounted on joint utility poles and decorative spot lights for art sculptures.Project Contact: Kevin Duffus 925-960-4556 Email: [email protected]

Online2Livermore STREET LIGHT INSTALLATION & LIGHT POLE REPLACEMENT & SCULPTURELIGHTING

5/23/18 2:30 PM

Playground renovations at Big Trees, Jane Adams, May Nissen, Pleasure Island Playgrounds.Project Contact: Bob Tanaka

Online0Livermore LARPD PLAYGROUND RENOVATION PROJECTS- BIG TREES PARK, JANE ADAMS,MAY NISSEN PARK, PLEASURE ISLAND PARK

6/27/18 1:00 PM

Renovate five (5) existing public restrooms & lobby enry area of Los Altos City Hall Facility.

Online1Los Altos RFP ENGINEERING SERVICES FOR CITY HALL RESTROOM & LOBBY RENOVAION 5/23/18 4:00 PM

Provide traffic signal maintenance service for equipment.Hard copies also available for review at Santa Clara Builders Exchange

Paper & Online1Los Altos RFP TRAFFIC SIGNAL MAINTENANCE SERVICES 6/1/18 2:00 PM

Replace the existing wooden bridge material to improve the condition of the bridge.

Online0Los Altos RFP ENGINEERING SERVICES FOR FREMONT AVENUE PEDESTRIAN BRIDGEREHABILITATION

5/24/18 4:00 PM

Page 7 of 22

Page 8: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

NBD

1. Demolition of the existing flooring systems in its entirety (down to concrete).2. Demolition of finishes adjacent to flooring such as base, walk-off mats (including frames),3. Removaland disposal of all items from the job site.4. Preparation of surfaces for new finishes in accordance with standard industry practices for tile work.5. Provide and installation of newflooring systems and finishes.

Online2Los Altos Hills CAMPUS CENTER FLOORING FOOTHILL COLLEGE 5/23/18 2:00 PM

The Project is located along University Avenue and Winchester Boulevard in the Town of Los Gatos, CA. The pipeline traverses from Manhole (MH) 8-049-90 at Blossom Hill Roadnorthward along University Avenue and Lake Vasona terminating at MH 6-084-88 just North of Smith Ranch Court.The scope of work includes, but is not limited to, the following:1.Trenchless rehabilitation of approximately 9,100 lf of 15-inch to 18-inch diameter Vitrified Clay Pipe (VCP) and Asbestos Cement Pipe (ACP) trunk sewer.2. Sanitary sewer lateralreinstatement.3. Rehabilitation of 28 existing sanitary sewer manholes.4. Abandonment of an existing manhole and installation of a new manhole.5. Extension and replacement ofexisting sewer laterals.6. Open cut installation of approximately 29 lf of 18-inch diameter Polyvinyl (PVC) trunk sewer.7. Site and pavement restoration.

Online0Los Gatos UNIVERSITY AVENUE ACP SEWER REHABILITATION - WEST VALLEY SANITATIONDISTRICT

5/24/18 10:00 AM

Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of drilled concrete pier and soldier pile wall with concrete lagging, road grading and erosioncontrol BMP’s. The Work to be done is located on Marin County Open Space within the County of Marin, CA.Questions: Alex Anaya, Project Engineer, at (415) 945-1574.

Online0Marin County SOUTHERN MARIN LINE SLIDE REPAIR AT SM-13 - MMWD 5/31/18 SFONLINE10:00 AM

Div 1-3, 9, 15 & 18. This Contract is for furnishing labor and equipment for the installation of soil nail wall, drainage, road excavation and road grading. The Work to be done islocated in Marin County Open Space within the County of Marin, CA.Questions: Alex Anaya, Project Engineer, at (415) 945-1574.

Online0Marin County SOUTHERN MARIN LINE SLIDE REPAIR AT SM-3 - MMWD 5/31/18 SFONLINE11:00 AM

NBD

Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of drilled concrete pier and soldier pile wall with concrete lagging, road grading and erosioncontrol BMP’s. The Work to be done is located on MMWD Watershed within the County of Marin, CA.Questions: Alex Anaya, Project Engineer, at (415) 945-1574.

Online1Marin County CONCRETE PIPE ROAD SLIDE REPAIR AT CP-9 - MMWD 6/1/18 SFONLINE10:00 AM

NBD

Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of two drilled concrete pier and soldier pile walls with concrete lagging, road grading anderosion control BMP’s. The Work to be done is located on MMWD Watershed within the County of Marin, CA.Questions: Alex Anaya, Project Engineer, at (415) 945-1574.

Online1Marin County CONCRETE PIPE ROAD SLIDE REPAIR AT CP-26 - MMWD 6/1/18 SFONLINE11:00 AM

NBD

Div 1-3, 9 & 18. This Contract is for furnishing labor and equipment for the installation of drilled concrete pier and soldier pile wall with concrete lagging, clearing and grubbing, roadgrading and erosion control BMP’s. The work to be done is located on MMWD Watershed within the County of Marin, CA3Questions: Alex Anaya, Project Engineer, at (415) 945-1574.

Online1Marin County PHOENIX DAM ROAD SLIDE REPAIR AT SPILLWAY - MMWD 6/1/18 SFONLINE12:00 PM

NEW

Project consists of: Site Demo; Selective Structure Demo; Metal Railings; Door Hardware; Painting; Modular Scope Matrix; Electrical; Structured Cabling; IC-PA-Clock; IntrusionAlarm; Fire Alarm System; Emergency Voice Evac System; Earthwork; Exterior Improvements; Utilities.PREVAILING WAGE

Paper & Online2Marina MARINA HIGH SCHOOL NEW GYMNASIUM & LOCKER BUILDING - INCREMENT 1 6/12/18 3:00 PM

NEW NBD

Project consists of: Site Demo; Selective Structure Demo; Rough Carpentry; Painting; Plumbing General; Common Work Results for Plumbing; Mechanical General Requirements;Basic Mechanical Materials and Methods; Electrical; Fire Alarm System.PREVAILING WAGE

Online1Marina LOS ARBOLES MIDDLE SCHOOL HV UPGRADES 6/14/18 2:00 PM

NEW

In general, the Work consists of:• Repair/Replace the chiller plant network controller and re-implement BACNET communications with the chiller controllers and chiller plantfunctions and sequences on 1st floor.• Connect existing exhaust fans to DDC controls for status monitoring on all floors.• Install new CO2 sensor at 5’0” above finished floor on2nd, 5th and 6th floors.• Program VAV terminal for CO2 demand ventilation on 2nd, 5th and 6th floors.• Install new dual duct VAV terminal, supply ductwork, ceiling supplydiffusers and thermostat with control wiring for new separate zone on 3rd floor.• Connect new branch supply ducts to cold and hot main decks and to new terminal on 3rd floor.•Install new 2 x 2 Titus PAS ceiling supply diffuser and connect existing flex supply duct to new diffuser neck on the 4th floor. Provide transition at diffuser neck as needed.•Convert the existing single duct cooling only VAV terminal to a dual VAV terminal by adding a new warm air single duct VAV terminal and joining it together with the existing cold airterminal on the 4th floor.• Replace the existing controller and actuator with new dual duct controller and actuators on the 4th floor.• Provide a new hot deck branch supply ductconnecting existing hot deck main duct to new warm air terminal, provide duct transitions as needed for connection to existing supply discharge plenum or duct on the 4th floor.•Replace existing thermostat with new thermostat with override buttons for afterhours operation on the 6th floor. When triggered, the DDC system shall start the air handling unit andexhaust fan on the 6th floor and operate the VAV terminals on the entire 6th floor under normal occupied mode for 4 hours (adjustable). All other VAV terminals shall close during theoff hours.Questions must be addressed in writing to: Jovan Esprit, Contracts Manager, at: [email protected], or by fax to (925) 370-7512.

Online0Martinez P-4023 VAV BOX ZONING, CONTROLS AND BALANCING AT DISTRICT OFFICEBUILDING

6/7/18 SFONLINE2:00 PM

Installing asphalt concrete speed humps and speed tables, removing existing speed humps and tables, transporting City-furnished concrete planters from the City’s corporation yard,installing new striping and pavement marking and markers, installing new traffic signs and poles, removing and replacing existing striping, pavement marking and markers.

Online0Menlo Park CARLTON AVENUE, MONTE ROSA DRIVE, & NORTH LEMON AVENUE TRAFFICCALMING PROJECT

5/23/18 2:00 PM

Page 8 of 22

Page 9: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Provide services establishing and managing a Citywide Safe Routes to School program.Project Contact: Nicholas Yee 650-330-6754Email: [email protected] copies alsoavailable for review at Santa Clara Builders Excchange

Online0Menlo Park RFP PROFESSIONAL CONSULTING SERVICES MENLO PARK SAFE ROUTES TOSCHOOL PROGRAM

5/23/18 5:00 PM

Renovate approximately 19,200 square feet of administrative space into a Homeless Resource Center that includes interior and exterior renovation.Project Contact: Dennis Becker925-372-2307

Online0Menlo Park VA RENOVATION BUILDING 348 HOMELESS RESOURCE CENTER 5/30/18 2:00 PM

Provide sweeping maintenance services.Hard copies also available for review at Santa Clara Builders Exchange

Paper & Online0Menlo Park RFP MAINTENANCE SERVICES FOR STREET SWEEPING 6/1/18 2:00 PM

NEW

Utility lines, chemical feed system, emergency generator, discharge and pressure vessel piping, submersible deep well pump, hydro pneumatic tank, drain facilities, civil siteimprovements, landscaping and irrigation improvements, electrical and telemetry improvements, systems start-up and testing.Project Contact: Pam LoweEmail:[email protected]

Online0Menlo Park WELL FACILITY (CORPORATION YARD BACKUP WELL) 6/7/18 2:00 PM

NEW

This Project involves the demolition and removal of an existing 31’-6” long wood trail bridge with 36” high railing, concrete rubble below the bridge, eight concrete foundations andwater service lines that run along the length of the bridge. The replacement project will include a new 31’-6” long fiberglass trail bridge with a 42” high western red cedar railing anddecking, two concrete footings, water service lines that run along the length of the bridge, salvaging and replacing brick as needed on adjacent landings, and a stone landing onconcrete.

Online0Mill Valley CSA-14 UPPER THREE GROVES BRIDGE REPLACEMENT PROJECT 5/22/18 SFONLINE2:00 PM

The proposed scope of work includes the slurry seal of several streets in the City of Mill Valley. As outlined in the schedule of bid items, this work includes, but is not limited to,implementation of storm water pollution and prevention; traffic control; localized pavement and subgrade repairs; crack sealing; applying slurry seal; applying striping, markers, andlegends; and all other work as shown on the Plans, as called for in the Special Provisions, and as directed by the Engineer. Questions: Sharon Chan at (415) 384-4807, or by emailat: [email protected]

Online0Mill Valley 2018 SLURRY SEAL PROJECT 5/29/18 SFONLINE2:00 PM

Training tower painting.Hard copies also available for review at Santa Clara Builders Exchange

Paper & Online0Millbrae FIRE STATION 37 TRAINING TOWER PAINTING 5/22/18 2:00 PM

NBD

Tenant improvement

Online4Milpitas BIG AL'S 5/29/18 2:00 PM

Pavement maintenance and edge treatments to allow proper drainage along Blanchard Drive between Vineland Avenue and Winchester Boulevard. Length of street to berehabilitated is approximately 1,500 lineal feet. Street widths vary between 27’ to 34’. DependingProject Contact: Julie BehzadEmail: [email protected]

Online0Monte Sereno BLANCHARD DRIVE STREET IMPROVEMENTS 5/21/18 2:00 PM

Project consists of: Audio; Lighting; Rigging; Soft Goods; Stage; Video.All Demolition and disposal of existing Theater lighting, audio, sound equipment, stage material, riggingmaterial. Installation and testing of all components. Training of District personal in operation of installed components. 2-year warranty on parts and labor.PREVAILING WAGE

Paper & Online0Monterey MONTEREY HIGH SCHOOL THEATER MODERNIZATION 5/24/18 3:00 PM

Bid opening will occur at the Community Human Services office located at 2560 Garden Road #201B, Monterey.Remodel downstairs bathroom for ADA compliance - includingenlarging door/Remodel upstairs and downstairs kitchens with new counter tops, sink, faucets, and install new exhaust hood at first floor with new ADA cabinet, as well asassociated work to bring area of work to code/Street POC to fire protection riser/Electrical service sub-panel relocation and panel upgrade including dryer for increased loads/Complywith items as noted in report by S-Tech Consulting dated November 28th, 2017 - concluded that all demolition must be performed under containment/Remove, replace and reuseexisting ceiling systems as needed to install fire sprinkler. Install building interior fire sprinkler system. Install a monitored fire alarm system/Remove existing chimney/match finishesas close as possible/Replace stair handrails at two exit stairs - one interior, one exterior/Replace (2) two windows with anodized flush fin retrofit casement windows.Tradesrequesting bids for: Demolition/Abatement, Rough Finish Carpentry, Drywall, Acoustical Ceiling, Fry Toilet Accessories, Counter Tops, Doors and Hardware, Glazing, Painting,Flooring, Plumbing, Electrical, Fire Sprinkler Systems.DBEConstruction Manager: Murrer ConstructionPhone: 831-521-0131Plans & Specs available for review at 1219 Forest Ave.Ste H, Pacific Grove, CA

Online1Monterey SAFE PLACE SHELTER - PHASE 2 5/30/18 11:00 AM

NEW NBD

Anticipated scopes: Concrete Saw Cutting, Concrete Floor Polishing, Concrete Finishing, Structural Steel, Carpentry, Décor, Insulation, Roofing, Doors and Hardware, Store FrontGlazing, Miscellaneous Interior Demo, Acoustic Ceiling, Gypsum Board Systems, EIFS / Stucco, Flooring, Interior Painting, Exterior Painting, FRP Wall Coverings, Fixtures,Plumbing, Automatic Fire Sprinkler, HVAC, Fire Alarm, and Electrical.Questions: [email protected]

Online1Monterey SAFEWAY 0173 5/30/18 5:00 PM

Page 9 of 22

Page 10: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

NBD

The City desires to obtain the services of an outside organization to help develop a storm water outfall study and analysis that will be used to evaluate the removal of the existingstorm water outfall and to design the concept for the best alternative for handling the storm water at the Ord Military Community in Seaside, California.RFP/RFQ Contact: AndreasBaerTel: (831) 242-8777

Online1Monterey RFP - ORD MILITARY COMMUNITY (OMC) STORM WATER OUTFALL STUDY 6/7/18 5:00 PM

NEW

In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalk crossings (driveway approach), curb ramps,cross gutters, storm drains, rock blanket, street lights, signage and striping, isolated street and driveway surface repairs, pavement grinding, street reconstruction, full depthreclamation, glass grid asphalt reinforcement, and hot mix asphalt paving.Project Contact: Thomas KormanEmail: [email protected]

Paper & Online0Monterey CITYWIDE ADA RAMPS AND STREET RECONSTRUCTION, PHASE 7 6/12/18 2:00 PM

Removing a Hydrojet Hose/Nozzle and Hydrojetting and Televising a Sludge Pipeline.PREVAILING WAGEProject Contact: Jerry ValladaoEmail: [email protected]

Online0Monterey County PRIMARY CLARIFIER NO. 5 SLUDGE LINE – REMOVAL OF CLOG AND HYDROJETHOSE/NOZZLE

6/5/18 2:00 PM

All licensed contractors are invited to participate in this process by submitting to MCOE a request for inclusion in the County Office’s list of qualified bidders for Calendar Year 2018(July 1, 2018- June 30, 2019).The type(s) of work in which the Contractor is interested and currently licensed to perform, such as, but not limited to, General Engineering, GeneralBuilding, or Specialty Contracting such as, Electrical, Mechanical, Plumbing, Structural, Heating, Ventilating, and Air Conditioning (HVAC), Earthwork, Pipelines, Floor Coverings,Carpentry, Concrete, Demolition, Excavation, Landscaping, Masonry, Painting, Roofing, etc.Questions: Lou Bartlett Email: [email protected]

Online0Monterey County PREQUALIFICATION FOR MONTEREY COUNTY OFFICE OF EDUCATION 6/6/18 5:00 PM

Provide preventative maintenance, prompt scheduled repair and emergency response to the City’s street lights, traffic signals, lighted crosswalks and flashing beacons at variouslocations.Project Contact: Cynthia IwanagaEmail: [email protected]

Online3Morgan Hill RFP TRAFFIC SIGNAL & STREET LIGHTING MAINTENANCE 5/21/18 11:00 AM

NBD

Construction of building pads and associated site work to allow for construction of theIncrement 2 buildings.

Online4Morgan Hill BRITTON MIDDLE SCHOOL TRANSFORMATION- INCREMENT 1, PHASE 1- MORGANHILL UNIFIED SCHOOL DISTRICT (MHUSD)

5/24/18 3:00 PM

The Work will consist of:1. Construct New Emergency Vehicle Operations Center to include:a. Relocation of dedicated driveway connecting entrance into the Holden Ranch JusticeTraining Facility and new road intersections for use as a secondary measure to enter through EVOC course into the training facility.b. Large paved lot for driving course and variousdriving curriculum.c. 180 feet by 120 feet concrete skid pad.d. Bioretention planters, irrigation system, and necessary electronics and electrical utilities and equipment to operate.e.Stormwater pollution prevention plan.f. Water Systems.g. Storm Drain System.Questions: Paulo Garcia, Project Manager, at (408) 993-4619, or by email to:[email protected]

Online0Morgan Hill SANTA CLARA COUNTY HOLDEN RANCH EMERGENCY VEHICLE OPERATIONCENTER (EVOC)

5/31/18 2:00 PM

NEW

Provide engineering plan review, map review, and/or transportation/traffic engineering services on an “on-call” basis for the Land Development Engineering Division of the City’sDevelopment Services Department.Project Contact: Maria AngelesEmail: [email protected] copies also available for review at Santa Clara Builders Exchange

Paper & Online0Morgan Hill RFQ ON-CALL ENGINEERING SURVEYOR/SERVICES 6/7/18 4:00 PM

Provide Pest Control Services at various city facilities and parks,Project Contact: Cynthia IwanagaEmail: [email protected] copies also available for review atSanta Clara Builders Exchange

Paper & Online1Morgan Hill RPF PEST CONTROL SERVICES 6/22/18 11:00 AM

NEW

Bid Package 1 will include the following trades: Demolition, Site Utilities, Earthwork, pursuant to the following Spec Sections:1. 023000 – Subsurface Investigation2. 024119 –Selective Demolition3. Division 31 – Earthwork4. Division 33 – UtilitiesPREVAILING WAGEQuestions: Mike MastagniEmail: [email protected]

Online0Morro Bay BID PACKAGE 1 - STUDENT SUPPORT CENTER 6/1/18 2:00 PM

Design, installation, and programming of new Owner-Furnished- Contractor-Installed (“OFCI”) fire station alert systems for five (5) fire stations and the Emergency CommunicationsCenter (a.k.a. “911 Dispatch”).Project Contact: David PrintyEmailL [email protected]

Online0Mountain View FIRE STATION ALERTING SYSTEM 5/24/18 2:00 PM

NEW

Div 1-3, 5-12, 21-23 & 26-28. Interior renovations of the buildings in the Pomo Cluster which consists of buildings 3, 4, 5, 6, and 7. The scope of this Project includes, but is notlimited to: Interior modernization improvements to partitions, finishes, electrical, lighting, HVAC, and Fire Alarm including exterior modernization of exit stairs.Questions: Daniel Parkby email at: [email protected]

Online0Novato POMO CLUSTER MODERNIZATION - PHASE II AT INDIAN VALLEY CAMPUS 6/28/18 SFONLINE11:00 AM

Div 1 & 28. Replace exiting fire alarm and intrusion alarm system.Questions: Nicole Wells, Project Manager, at (510) 535-2726

Online1Oakland FRUITVALE ELEMENTARY SCHOOL FIRE & INTRUSION ALARM REPLACEMENT 5/23/18 SFONLINE2:00 PM

Page 10 of 22

Page 11: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Please refer to specifications for complete scope of work.

Online1Oakland WEST GRAND AVENUE ON-RAMP IMPROVEMENT-BUS LANE PROJECT FORCONSTRUCTION ON STATE HIGHWAY FROM MARITIME STREET TO SFOBB TOLLPLAZA- MTC

5/24/18 2:00 PM

NEW

Nibbi Brothers has been selected as the General Contractor for the Brooklyn Basin I Parcel F Phase A & B Housing project in Oakland. They are in receipt of the 100% DD Set ofdocuments and are currently requesting bid proposals from qualified subcontractors for Design-Build Fire Protection. Due to Oakland Housing Authority and City of Oakland fundingfor the Project, all work will be subject to Federal Davis Bacon and local Prevailing Wage requirements as well as HUD Section 3 labor hiring requirements. In addition, this Project isrequired to comply with the City of Oakland Local and Small Local Business Enterprise Program, Local Employment Program, and Oakland Apprenticeship Workforce DevelopmentPartnership System. If additional labor requirements are applicable, MidPen will share them with Nibbi Brothers. Compliance with such laws will be monitored by the Owner and/orthe City. Appropriate wage determinations will be issued at the time of subcontractor selection.Questions: Noe Valenzuela, Senior Precon Manager, at: [email protected]

Online1Oakland BROOKLYN BASIN I PARCEL F PHASE A & B (DESIGN-BUILD FIRE PROTECTIONPACKAGE)

5/29/18 SFONLINE2:00 PM

NEW

Bridge removal (portion), structural excavation and backfill, structural concrete, drill and bond dowel, furnishing and driving steel piles and micropiles, traffic control, andenvironmental protection.Project Contact: Nader Rabahat 510-238-6605Email: [email protected]

Online0Oakland SEISMIC RETROFIT OF 23RD AVENUE OH (BRIDGE #33C-0148) 6/21/18 2:00 PM

Div 1-3, 5, 9-11 & 15-16. Work generally involves the construction of a liquid aluminum sulfate storage and feed system at the existing wastewater treatment plant located at Districtheadquarters at 450 Walnut Meadows Drive, Oakley, California and performing related required work, as shown on the Drawings and Specifications.

Online0Oakley WASTEWATER RECYCLING FACILITY ALUM STORAGE AND FEED PROJECT 5/24/18 SFONLINE2:00 PM

Construction of a new Outdoor Learning Center in the central area of the existing campus. Remove portions of the existing concrete walks and install new walks compliant withaccessibility codes. Construction of a concrete paver, tiered area with cast in place concrete elements and an outdoor secure markerboard. Install and connect all undergroundutilities and all other required elements to provide a fully functioning learning area.PREVAILING WAGEProject Contact: Cindy NaberEmail: [email protected]

Online0Oceano FAIRGROVE ELEMENTARY OUTDOOR LEARNING CENTER/SITE WORK 5/21/18 2:00 PM

Repaving of the Linda Mar Park and Ride Lot in Pacifica (approximately 55,000 square feet). Included are the following construction elements: placement of signs and barricades todefine the work area, traffic control, pollution control, demolition of asphalt pavement, preparation and placement of cement treated base (CTB) material, asphalt paving, transport(trucking) and disposal of excess pavement demolition material and site clean-up activities.Project Contact: Kevin Kelley 650-622-7892Email: [email protected]

Online1Pacifica LINDA MAR PARK 'N RIDE REPAVING - SAMTRANS 6/12/18 2:00 PM

NBD

Replaces the existing boardwalk at the Lucy Evans Baylands Nature Interpretive Center with a new accessible boardwalk of the same length and on the same alignment as theexisting boardwalk.Project Contact: Elizabeth AmesEmail: [email protected]

Online6Palo Alto BAYLANDS BOARDWALK REPLACEMENT PROJECT 5/22/18 3:00 PM

Remove existing roofs and install a new roofs at the Cubberley Community Center Pavilion WingProject Contact: Jimmy Chen 650-496-6920

Online0Palo Alto CUBBERLEY PAVILION WING RE-ROOF PROJECT 5/22/18 3:00 PM

NEW

Repair 1,500 feet of a 12” clay sewer pipe using Cured-In-Place Pipe (CIPP) method.Project Contact: Romel AntonioEmail: [email protected]

Online0Palo Alto LOWER PAGE MILL ROAD 12" SEWER REHAB PROJECT 5/31/18 3:00 PM

NEW

Provide professional services for on-call soils and material testing for various capitalimprovement projectsProject Contact: Holly Boyd

Paper & Online0Palo Alto RFP PROFESSIONAL SERVICES ON-CALL SOILS & MATERIALS TESTING SERVICES 6/7/18 3:00 PM

By means of this Request for Qualifications (RFQ), the District invites proposals from qualified developers or Developer's Teams (Developer) to plan, design, finance, construct andoperate an income-generating proposed Project. The selected proposed Project will be sited at the District’s North County Campus located at 2800 Buena Vista Drive, Paso Robles,California 93446 pursuant to a long term revenue-generating ground lease identifying the District as the Lessor and Developer as Lessee. The selected Developer will, upon theGoverning Board’s direction, have an opportunity to submit further detailed Project Proposals to the District and its Governing Board.Questions: [email protected]

Online0Paso Robles RFQ - DEVELOPER OWNED AND OPERATED PROJECT AT CUESTA COLLEGENORTH COUNTY CAMPUS

6/19/18 4:00 PM

Page 11 of 22

Page 12: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

This project proposal includes, but is not limited to: the replacement of the existing improvements at the facility, which includes the demolition of the existing structures and thedesign and phased construction of a standard 14-bed barracks/messhall (4,093± sf), a 3-bay apparatus building (1,999± sf), administration building (512± sf), a building (400± sf), avehicle wash rack with treatment/recycling equipment, a generator/pump/storage building with generator, transfer switch and fuel supply, a hose wash rack, and a fuel storage tankcanopy. Also included in the project are: site perimeter fencing and gates, grading and trenching, landscaping, irrigation, approximately 100,000 square feet of paving and flatworkinstallation of approximately 2280 Lf of 8” sanitary sewer, replacement and connections for all utilities, curbing, sidewalks, landscaping, appurtenances and demolition of the existingbarracks, apparatus building and miscellaneous out-buildings, utilities, paving and other associated improvements.PREVAILING WAGEProject Contact: Jonathan PikeEmail:[email protected]

Online0Paso Robles PASO ROBLES FIRE STATION - REPLACE FACILITY 6/27/18 1:00 PM

NEW

The Phase I Airport Area Infrastructure Improvements Project (project) proposes replacing existing sewer mains, lift station, and various linear infrastructure improvements located inthe vicinity of the Paso Robles Municipal Airport (Airport) in the City of El Paso de Robles, California. The project includes sewer system, water pipeline, and recycled water pipelineimprovements located within the right-of-way along Airport Road, and Dry Creek Road. In addition to the Airport, surrounding land uses consist primarily of active vineyards andother agricultural lands, a golf course, and rural residential and commercial developments.Project Contact: Ditas EsperanzaEmail: [email protected]

Online0Paso Robles AIRPORT INFRASTRUCTURE PROJECT - PHASE 1 6/29/18 5:00 PM

NEW

Div 1 & 28. The Project consists of supply and installation of all the security cameras, NVRs, cabling, connectivity, and programming required for installing a complete videosurveillance system for this newly constructed campus.

Online0Pinole PINOLE VALLEY HIGH SCHOOL SECURITY VIDEO SURVEILLANCE 6/1/18 SFONLINE2:00 PM

This Project is a public works project and is subject to Prevailing Wage rate laws. In general, the Work consists of application of a fluid applied membrane, installation of new taperedinsulation, installation of a modified bitumen roof system and single-ply modified bitumen roof system as shown on the L-527 College Complex Sector 13 Roof ReplacementDrawings and Specifications prepared by Steelhead Engineering. Refer to Terracon hazardous material report dated 8/28/15 regarding existing roof and Salas O’Brien Air HandlingUnit Replacement drawings for reference. Demolition work will be completed by others. Roof must be protected from water intrusion during adverse weather conditions. Work to becoordinated with mechanical contractor and be substantially complete by July 9, 2018 to allow completion of mechanical work. The Project is located at Los Medanos College, 2700East Leland Road, Pittsburg, CA.All questions related to this Project are to be directed in writing, no later than May 9, 2018 prior to 2PM for any addenda to be issued by JovanEsprit, Contracts Manager, Contra Costa Community College District. Email: [email protected]; COPY: [email protected] AND [email protected]

Online3Pittsburg L-527 COLLEGE COMPLEX SECTOR 13 ROOF REPLACEMENT AT LOS MEDANOSCOLLEGE

5/21/18 SFONLINE2:00 PM

The work of this Contract consists in general of the installation of a sidewalk path and repairing basement roof along the East side of the Railroad Ave from California Theatre to East3rd Street. The scope of work encompasses, but is not necessarily limited to, furnishing all labor, materials, equipment and incidentals for the installation of concrete sidewalk,repairing basement, concrete landscape, reinforcing steel, aggregate base, paving, ADA concrete curb ramps, grading, demolition and crosswalk striping & pavement markings andsidewalk repair. Bids are required for the entire work described herein.Questions should be directed in writing to SM Saklaen, Project Engineer, by email to:[email protected]

Online1Pittsburg DOWNTOWN SIDEWALK REPLACEMENT 5/30/18 SFONLINE2:00 PM

Removing and replacing parapet walls including waterproofing/flashing systems, followed by exterior painting of entire Fire Station No. 4 building.

Online1Pleasanton FIRE STATION NO 4-REPAIR TO UPPER PARAPET WALLS 5/31/18 2:00 PM

NEW

Div 1 & 7-8. Project consists of the replacement of all the existing casement and fixed windows with new Marvin Ultimate Insert of Marvin Integrity Insert insulated glass double hunginsert windows and insulated glass fixed windows at the Pt. Reyes Station Public Safety Building, 101 4th Street, Point Reyes.

Online0Point Reyes POINT REYES STATION PUBLIC SAFETY BUILDING WINDOWS REPALCEMENT 6/6/18 SFONLINE1:00 PM

Selective demolition and renovation of the existing Ceramics Classroom C-14.Project Contact:Salom Samad Email: [email protected]

Online4Redwood City CERAMICS CLASSROOM RENOVATION WOODSIDE HIGH SCHOOL - SEQUOIAUNION HIGH SCHOOL DISTRICT

5/22/18 2:00 PM

Demolition and removal of existing walkway an ramp, and construction of new concrete walkway and ramp, demolition and removal of several items in the bathroom and installationof new items for ADA compliant restroom, such as water closet, shower, lavatory, urinal, toilet partition with door, laminate folding counter, steel stud wall, painting and associatedcomponents.Project Contact: Donald SnamanEmail: [email protected]

Online3Redwood City C-DOCK RESTROOM PROJECT - PORT OF REDWOOD CITY 5/30/18 10:00 AM

NEW

Concrete rehabilitation and protective coatings on metallic appurtenances in Pass 1 of the Chlorine Contact Tank (CCT).

Online1Redwood City CHLORINE CONTACT TANK (CCT) PASS 1 SURFACE REHABILITATION - SILICONVALLEY CLEAN WATER (SVCW)

5/31/18 2:00 PM

NEW

Please refer to specifications for complete scope of work.

Online0Redwood City MAGICAL BRIDGE PLAYGROUND 6/13/18 3:00 PM

Page 12 of 22

Page 13: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

NEW

Repairing the exterior envelope of Cañada Vista Housing, which includes removal, repair and re-installation of windows, sliding doors, and exterior doors. Replacement of the siding,cement plastering and the concrete slab on the exterior of the buildings.Project Contact: Thomas LoEmail: [email protected]

Online0Redwood City CANADA COLLEGE VISTA HOUSING ENVELOPE REPAIR PROJECT - REBID 6/19/18 2:00 PM

NEW

THIS PROJECT IS A REBIDDiv 1-2, 6-7 & 9. The Project consists of: South exterior wall rehabilitation including but not limited to existing exterior siding windows anddoors.(Previously scheduled bid date was 4/30/18)

Online0Richmond CESAR CHAVEZ ELEMENTARY SCHOOL SOUTH EXTERIOR WALL REPAIRS - REBID 5/30/18 SFONLINE2:00 PM

NEW

The scope of work includes a development of six (6) single-family residential units, each with two stories above grade and a basement garage.PLEASE NOTE: The County has NOTyet approved these Plans so there may be some minor changes.Contact Jerome Draper, Draper Planning Group Land Use and Environmental Planning Services, at (415) 457-3431opt-3, or by email at: www.draperplangroup.com with any questions.

Online0San Anselmo DRAPER / KARUNA LOTS 3, 4 & 5 7/31/18 SFONLINE5:00 PM

NEW

New 4 Story Hotel with 103 Rooms and parking garage

Online0San Carlos HYATT PLACE 5/31/18 2:00 PM

NEW

On-Call Special Inspection and testing services for the Peninsula Corridor Electrification Project (PCEP) and JPB Capital Construction Program.Project Contact: Cathy HoangEmail:[email protected]

Online0San Carlos ON-CALL SPECIAL INSPECTION & TESTING SERVICES - CALTRAIN 6/11/18 2:00 PM

NBD

Div 1-2, 5, 7 & 9. The Work includes the installation of a steelframed passenger shelter, approximately 2,600 sq. ft., located just outside the Pier 27 Cruise Terminal in the City andCounty of San Francisco.Questions: Joe Roger, Project Engineer, at (415) 274-0556.(Previously scheduled bid date was 1/22/18)

Online4San Francisco PIER 27 PASSENGER SHELTER - REBID 5/23/18 SFONLINE1:30 PM

NBD

Div 1-2, 4-5 & 7-10. The Work to be completed under this contract is located at Fire Station 24, 100 Hoffman Avenue, and Fire Station 34, located at 499 41st Avenue.AT FIRESTATION 24, 100 HOFFMAN AVE: The Work includes, but is not limited to, comprehensive cleaning, repair and restoration of historic building exteriors, including, but not limited to,hazardous material abatement work, masonry and mortar cleaning, repair and restoration, grout joint repointing, wood window repair and painting, cement plaster cleaning andrepair, and exterior painting. Work will be done in accordance with historic treatment procedures and protections.AT FIRE STATION 34, 499 41ST AVE: The Work includes, but isnot limited to, comprehensive cleaning, repair and restoration of historic building exteriors, including, but not limited to, hazardous material abatement work, masonry and mortarcleaning, repair and restoration, grout joint repointing, steel window repair and painting, cement plaster cleaning and repair, and exterior painting. Work will be done in accordancewith historic treatment procedures and protections.Questions: Sherry Katz, Project Manager, at (415) 557-4759.

Online5San Francisco E.S.E.R. BOND 2014 EXTERIOR ENVELOPE AT FIRE STATIONS 24 AND 34 5/23/18 SFONLINE2:30 PM

NBD

The Project is generally described as: Remedial work to three (3) traction elevator as defined in specifications by William Duff Architects dated 3/26/2018 and any such subsequentaddendums and instructions. Additionally, a 12-month full preventive maintenance service contract, as described in these Specifications, shall be included as part of the Project.

Online1San Francisco 1235 MISSION STREET OFFICE BUILDING - SCOPE 5 ELEVATORS 5/24/18 SFONLINE11:00 AM

The objective of the Project is to provide as-needed sewer cleaning and inspection at locations to be determined within the City of San Francisco. Questions: Contract Services at(415) 551-4603, or by email at: [email protected]

Online0San Francisco AS-NEEDED SEWER CLEANING AND INSPECTION (FY19) 5/24/18 SFONLINE2:00 PM

Invitation to Bid #78-0190 is to furnish all labor and materials to complete the necessary Tenant Improvements for the University of California, Hastings College of Law. The 200McAllister 6th Floor Tenant Improvements Project will be performed at one (1) building of Hastings College of Law campus. It is located at 200 McAllister Street, San Francisco,California. Work on the Project must be in accordance with the engineering Drawings and Specifications.

Online2San Francisco 200 MCALLISTER 6TH FLOOR TENANT IMPROVEMENTS - UC HASTINGS COLLEGEOF LAW

5/30/18 SFONLINE4:00 PM

NBD

Div 1-5, 7-11, 22-23, 26, 28, 31-33, 40-41 & 43. The objective of the Project is to demolish the existing pump station and reconstruct the Mariposa Street Wastewater Dry WeatherPump Station Building, wet-well, electrical services, and the associated appurtenances.Questions: Contract Services at (415) 551-4603, or by email at: [email protected]

Online10San Francisco MARIPOSA DRY WEATHER PUMP STATION IMPROVEMENTS 5/31/18 SFONLINE2:00 PM

NBDSan Francisco Public Works (Public Works), City and County of San Francisco (City), is seekingto award master agreements (“contracts”) to Consultants and/or joint venture teamsto providelearning and training services on an as-needed basis. Consultants may respond withqualifications on one or more of the following Service Scope Types:Type 1: ProjectManagement Type 2: Facilitation and Presentation Training for Technical Professionals Type 3: Strategic Planning and Professional Development Coaching Type 4: Negotiation,Mediation, and Departmental Partnering Training Type 5: Organizational Development and Learning, Strategic Planning Development and Evaluation, and ProcessImprovement.Questions regarding the RFQ must be submitted no later than 4PM Pacific Time, May 4,2018, by email to the Contract Manager at: [email protected]

Online1San Francisco RFQ AS-NEEDED LEARNING AND TRAINING SERVICES NO. 3 5/31/18 SFONLINE4:00 PM

Page 13 of 22

Page 14: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

The Presidio Trust has a requirement for a qualified firm to provide all supervision, labor, supplies and materials, equipment, transportation, services, employee training and testing,insurance, permits and agreements required to perform engineering and design services for Substation 568, 12kV switchgear and distribution transformer replacement, andassessment of the 4.16kV switchgear and possible relocation of the 4.16kV equipment into the substation building at the Presidio of San Francisco.All questions regarding thisInvitation shall be made to Tasha Newton, Senior Contract Specialist, via email at: [email protected] or call (415) 561-4887. RFI’s must be received by Tasha Newton [email protected] no later than3PM, Tuesday, May 15, 2018.Email submissions will be accepted and are preferred to: [email protected]

Online0San Francisco RFP SUBSTATION 568 SWITCHGEAR REPLACEMENT AT PRESIDIO OF SANFRANCISCO

6/1/18 SFONLINE3:00 PM

NEW

Provide environmental remediation services on an as-needed basis for San Francisco International Airport.Project Contact: Liborio YapEmail: [email protected]

Online0San Francisco RFQ AS-NEEDED ENVIRONMENTAL REMEDIATION SERVICES- SFIA 6/4/18 2:00 PM

NBD

The Work to be done under this Contract consists of bridge rehabilitation work, cleaning and painting, fender system and substructure repair and electrical and mechanical workalong Third Street at Mission Channel, in San Francisco, CA, all as shown on the Drawings and as specified in these Specifications. Questions: Thomas Roitman, Project Manager,at (415) 558-4077, or by email at: [email protected]

Online4San Francisco THIRD STREET BRIDGE REHABILITATION PROJECT 6/6/18 SFONLINE2:30 PM

The Advertisement for Bids is for the award of a Job Order Contract (JOC). Work is accomplished by issuing Task Orders to the successful contractor during the term of theContract. The scope of work may include repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, hospital facilities,structures, or other real property. Work on healthcare facilities may be under the jurisdiction of California’s Office of Statewide Health Planning and Development [OSHPD].

Online0San Francisco JOB ORDER CONTRACT J39 GENERAL BUILDING SERVICES OSHPD (CONTRACT#JOC-39)

6/6/18 SFONLINE2:30 PM

THIS PROJECT IS A REBIDDiv 1-3, 5-6, 9, 13 & 16. The scope of the 22 Fillmore Transit Priority Project includes rerouting the 22 Fillmore transit line from Potrero Hill such that itcontinues along 16th Street and terminates at Mission Bay.To facilitate this reroute, new Overhead Contact System (OCS) infrastructure and traction power ductbank will beinstalled. In addition, transit bulbs and transit boarding islands will be constructed to enable more efficient passenger boarding and alighting. Pedestrian bulbs, raised crosswalks,and curb ramps will be constructed to enhance pedestrian safety. Traffic signals and traffic signal communication infrastructure will also be added or upgraded. Other project scopeincludes streetscape, streetlight, and roadway rehabilitation improvements.In order to provide minimal overall disruption to the public, the 22 Fillmore Transit Priority Project willincorporate other planned projects on 16th Street. The San Francisco Public Utilities Commission (SFPUC) has incorporated its water and sewer main replacement scope in thisProjects.The above description of the Work is a general summary only and does not modify the requirements set out in the Specifications, Drawings or other ContractDocuments.(Previously scheduled bid date was 11/16/17)

Online0San Francisco 22 FILLMORE TRANSIT PRIORITY PROJECT SFMTA - REBID 6/7/18 SFONLINE3:00 PM

The Advertisement for Bids is for the award of a Job Order Contract (JOC). Work is accomplished by issuing Task Orders to the successful Contractor during the term of theContract. The scope of work may include repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, hospital facilities,structures, or other real property.Work on healthcare facilities may be under the jurisdiction of California’s Office of Statewide Health Planning and Development [OSHPD].

Online0San Francisco JOB ORDER CONTRACT J40 GENERAL BUILDING SERVICES OSHPD (CONTRACT#JOC-40)

6/13/18 SFONLINE2:30 PM

NEW

Div 1-3, 5, 26 & 31-34. The Work is located at various intersections throughout San Francisco, CA and consists of new traffic signal installations, curb ramp and bulboutconstruction, drainage work, existing island removal, traffic control, and all associated work. Questions: Steven T. Lee, Project Manager, at (415) 558-5226.

Online0San Francisco CONTRACT 64 NEW TRAFFIC SIGNALS 6/13/18 SFONLINE2:30 PM

NEW

THIS PROJECT IS A REBIDDiv 1-3, 5-7, 9-10, 12, 26, 31-33 & 36. Work will consist of site grading and formation, shoreline reconstruction including a beach and revetment, in-water sediment cap, hardscape, landscaping, custom site furnishings, site lighting, irrigation, minor restoration of historic gantry crane (non-functional), use of shipyard relics asinterpretive elements, building relocation, site utilities, and construction of a parking area.For more information, contact the Project Engineer, Erica Petersen, at (415) 274-0559.(Previously scheduled bid date was 8/24/17)

Online0San Francisco CRANE COVE PARK, CONSTRUCTION PACKAGE 2 - PARK IMPROVEMENTS - REBID 6/14/18 SFONLINE10:30 AM

The Advertisement for Bids is for the award of a Job Order Contract (JOC). Work is accomplished by issuing Task Orders to the successful contractor during the term of theContract. The scope of work may include repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, hospital facilities,structures, or other real property. Work on healthcare facilities may be under the jurisdiction of California’s Office of Statewide Health Planning and Development [OSHPD].

Online0San Francisco JOB ORDER CONTRACT J41 GENERAL BUILDING SERVICES OSHPD (CONTRACT#JOC-41)

6/20/18 SFONLINE2:30 PM

Page 14 of 22

Page 15: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

NBD

Div 1, 3, 5-10, 21-23, 26-27, 31, 33, 40, 42-43 & 48. The objective of the Project is to sequentially remove, replace, and upgrade the existing deficient and deteriorated digesterbiogas internal combustion cogeneration systems at the Oceanside Water Pollution Control Plant (OSP). OSP must remain in operation during the contract work so, detailedconstruction activity sequencing, temporary power cabling, and temporary process equipment have been included as part of the contract work. The contract improvement work alsoincludes: selective demolition; civil work (site excavation, yard piping/utilities, paving restoration); hazardous material mitigation; architectural work; structural work; mechanical work(digester biogas gas conditioning and storage, compressor equipment, heat exchanger and pump assemblies, exhaust gas conditioning systems, the relocation of dual gas fueledboiler assemblies, retrofit and extension of the mechanical biogas, No. 3 water, compressed air, commercially supplied (PG&E) natural gas and plant hot water pipe systems, andinstallation of above ground diesel fuel tank); electrical work (electrical power system upgrades, new motor control center and electrical substation, lighting system upgrades,packaged stand-by diesel engine generator assembly, diesel fuel leak monitoring system, and modification of the fixed gas monitoring system); instrumentation & controls work; and,start-up testing and commissioning.

Online4San Francisco OCEANSIDE WATER POLLUTION CONTROL PLANT DIGESTER GAS UTILIZATIONUPGRADES

6/21/18 SFONLINE2:00 PM

Buildings A, B, and C removal of existing VCT flooring and rubber base, prepare the floor for new vinyl roll product and/or carpet roll product. Install new walk off material and rubberbase.

Online1San Jose BOYNTON HIGH SCHOOL REPLACE FLOORING - CAMPBELL UNION HIGH SCHOOLDISTRICT

5/21/18 3:00 PM

The Project entails Repairs and renovations to the student cafeteria and study spaces to improve student service functions. The designs will include reorganization of the space,electrical improvements, interior finishing upgrades and lighting improvements for student collaboration space. Contractor must coordinate its work with a scheduled power shut-down, as well as ongoing day-to-day operations of an active school site.Project Contact: Mark Miller at 408-531-6194Email: [email protected]

Online1San Jose GULLO STUDENT SPACE REPURPOSE & RENOVATION EVERGREEN VALLEYCOLLEGE (EVC)

5/22/18 2:00 PM

NEW

At the five (5) Performing Arts Centers (PACs), remove and save existing wireless microphones and install new wireless microphones systems, components, and antennadistribution units to provide a turnkey system at each site.

Online0San Jose PERFORMING ARTS CENTER WIRELESS MICROPHONES - CAMPBELL UNION HIGHSCHOOL DISTRICT

5/22/18 3:00 PM

NEW

Complete refurbishment of T-Wing portables interior and exterior with new wall board overlay, new receptacle covers and switches, prepare for new flooring, new ceiling tiles, lightlenses, windows, and blinds. Paint all exterior including doors, trim, gutters, downspouts, etc. Inspect roofing to complete any repairs to metal roof and apply water barrier sealant.

Online1San Jose LEIGH HIGH SCHOOL T-WING REFURBISHMENT - CAMPBELL UNION HIGH SCHOOLDISTRICT

5/22/18 3:30 PM

Cleaning and inspection reinforced T-lock lined concrete or reinforced cured-in-place lined concrete sewer pipes, utilizing any combination of equipment and cleaningmethods.Project Contact: Titus Raceles 408-535-8304

Online0San Jose 8679-DOWNER - CANOAS COLLECTOR SYSTEM CLEANING - REBID 5/24/18 3:00 PM

NEW NBD

Demo asphalt overlay of temporary class room building ADA ramps and repave/seal and stripe parking lots used for temporary housing. As well as install permanent power tomodular restroom bld installed in parking lot, Demo distribution panel, overhead utilities, and remove wood poles used for overhead utilities.Project Contact: Brian CameronEmail:[email protected]

Online1San Jose INDEPENDENCE HIGH SCHOOL GHKLK MODERNIZATION (REPAVING PARKINGLOTS) - ESUHSD

5/29/18 2:00 PM

NBD

Please refer to specifications for complete scope of work.

Online4San Jose CUNNINGHAM FLOOD DETENTION CERTIFICATION PROJECT - SCVWD 5/30/18 2:00 PM

Replacement of approximately 41,000 square feet of built-up roofing with specified thermoplastic membrane roofing. A portion of roof replacement requires tapered insulation.ProjectContact: Sylvia Sosa 408-925-1583

Online2San Jose HUGH GILLIS HALL ROOF REPLACEMENT- SJSU 5/31/18 2:00 PM

NEW

Demolition, clearing and grubbing, remove and replace protective surfacing, remove and replace play equipment panels.Project Contact: Katy Martin 408-535-8300

Online0San Jose 8117-BRIGADOON PARK PLAYGROUND RENOVATION 5/31/18 3:00 PM

NEW

Plumbing, Automatic Fire Sprinkler, HVAC, and Electrical.The proposed project consists of select fixture and refrigeration cases change out, modification of cart storage area to newDrive-up & Go staging area, polished flooring, and minor décor package. The project will be constructed in multiple phases while the store remains in operation once a Contractorhas been selected.

Online0San Jose SAFEWAY STORE #1476 6/4/18 5:00 PM

Page 15 of 22

Page 16: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Video surveillance, electrical work, security electronics, HVAC systems, work station furniture.Project Contact: Michael Llagan 408-993-4647Email; [email protected]

Online2San Jose JUVENILE HALL VIDEO SURVEILLANCE & SECURITY SYSTEMS UPGRADEPROJECT

6/5/18 2:00 PM

Provide design-build and construction manager services with lump sum pricing for the design, preconstruction, and construction of multiple projects under a two-year masterenabling agreement (MEA).

Online2San Jose RFQ TASK ORDER-CONSTRUCTION AGREEMENT FOR MULTIPLE PROJECTS -MASTER ENABLING AGREEMENT- SJSU

6/5/18 3:00 PM

NBD

Remove and install surveillance camera systems and provide monitoring, technical support, and cloud storage services for the Happy Hollow Zoo.Project Contact: Theresa Porter408-535-7048Email: [email protected]

Online1San Jose RFB CAMERA SYSTEMS HAPPY HOLLOW ZOO 6/8/18 3:00 PM

NBD

1-3, 5-6, 9-10, 20, 23, 26-28, 31-32 & 34. The Work, in general, includes furnishing all equipment, tools, required materials, labor, management, coordination, professional services,and any other services required to install and test TPSS equipment and to provide AC Switchgear, AC equipment house, Isolation Switch and other associated ancillary items asindicated in the Contract Drawings and Contract Specifications.The Work is for Replacement of BART traction power substation ASL (TPSS ASL) near San Leandro Station on SanLeandro Street, in the City of San Leandro. This Work shall include installation of equipment at four (4) locations, all as outlined in Contract Drawings and Contract Specifications.The major TPSS equipment will be procured and delivered under a separate Procurement Contract No. 15EK-210, awarded to Powell Electrical Systems, Inc. (Powell). The Work ofthis Contract includes coordination with Contract No. 15EK-210, Procurement of Traction Power Substations Phase 1. The Contractor shall complete all Work indicated, specifiedand directed to be performed under this Contract within four hundred and ten (410) Days after the effective date of the Notice to Proceed.Bidder License Requirement: ClassificationC-10 - California Electrical License and an A - General Engineering Contractor or B - General Building Contractor License, and be in good standing with the Contractors' StateLicense Board.Questions: Leo Berry-Lawhorn, at (510) 464-7546 or email, at: [email protected]

Online4San Leandro TRACTION POWER SUBSTATION REPLACEMENT ASL INSTALLATION - BART #15EK-140

5/22/18 SFONLINE2:00 PM

Replacing the current Operations Shop (metal building) with an upgraded and complete metal building.Project Contact: Julie JenkensEmails: [email protected]

Online0San Leandro WATER POLLUTION CONTROL PLANT (WPCP) OPERATIONS SHOP UPGRADE 5/22/18 3:00 PM

NBD

Installing concrete curb ramps, applying asphalt rubber chip seal and slurry seal, and removing and reinstalling traffic stripes and markings on City streets.Project Contact: JohnO'Driscoll 510-577-3494Email: [email protected]

Online2San Leandro ANNUAL STREET SEALING 2017-18 6/5/18 3:00 PM

Removal and replacement of one (1) existing relocatable classroom in place including, but not limited to, affiliated electrical, low voltage telecom/data and security, fire alarm servicework, the extension of an existing parking lot to add 14 parking stalls, removal and replacement of existing vehicle access gates, and widening of an existing fire lane.

Online2San Lorenzo DEL REY ELEMENTARY SCHOOL RELOCATABLE - SAN LORENZO UNIFIEDSCHOOL DISTRICT

5/21/18 2:00 PM

Dry rot repair and railing replacement at Bohannon Middle School, Edendale Middle School, Hesperian Elementary School & Washington Manor Middle School.

Online0San Lorenzo CAMPUS WIDE DRY ROT REPAIR & RAILING REPLACEMENT AT VARIOUS SCHOOLSITES- SAN LORENZO UNIFIED SCHOOL DISTRICT

5/22/18 10:30 AM

NEW

At all sites: Replace existing landscape street frontage with new drought tolerant planting, irrigation, and decomposed granite paving.At Hesperian E.S.: Install new wheel stops inexisting parking lot and chain link fencing.

Online0San Lorenzo LANDSCAPE RENOVATIONS CORVALLIS, DAYTON, HESPERIAN, 7 LORENZOMANOR ELEMENTARY SCHOOLS- SAN LORENZO UNIFIED SCHOOL DISTRICT

6/6/18 10:30 AM

Savant Construction Inc. requests sub bids on May 21, 2018 at 12:00 p.m.Renovation of a retail development in San Luis Obispo, California. Completed plans call for the renovationof a 30,851-square-foot, one-story above grade retail development.Tenant improvement for a retail grocery store. Work to include all new interior decor, electrical and HVACdistribution, lightin and refrigeration compressor rack for food cases. New kitchen prep and service areas with walk-in coolers and freezers. New offices and accessible publicrestrooms.

Online0San Luis Obispo SPROUTS #427 5/21/18 12:00 PM

NBD

Install new Sidings and Windows for the CSTI Buildings 901, 903, 908, 910 and 904 (Alternative Bid Item) at California Army National Guard Training Site, Camp San LuisObispo.Questions: Chief Warrant Officer Four Tom ClarkeEmail: [email protected]

Online3San Luis Obispo G1012 CSTI BUILDINGS SIDINGS AND WINDOWS 5/23/18 2:00 PM

In general, the project consists of the removal of existing storm drain facilities and installing new storm drain pipes, manholes and catch basins.PREVAILING WAGEProject Contact:Lyle Nemeth at (805) 783-7738

Online0San Luis Obispo SOUTHWOOD AND ELLEN WAY DRAINAGE IMPROVEMENTS 5/24/18 2:00 PM

Page 16 of 22

Page 17: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

In general the project consists of applying slurry seal to pavement areas 2 & 3. The project also consists of AC repairs. Work ancillary to these maintenance and rehabilitationtreatments includes, but is not limited to, protection and/or adjustment of existing utility covers, upgrading of select utility frames and covers, striping and markings, and traffic control.Additive alternatives extend the project limits and include additional bulbouts construction and striping and markings on Laurel Lane.PREVAILING WAGEProject Manager: HaiNguyen at (805) 781-7108

Online0San Luis Obispo ROADWAY SEALING AND LAUREL LANE COMPLETE STREETS 2018 5/24/18 2:00 PM

NEW

In general the project consists of the replacement of the roof-mounted Chiller unit. All work will be performed on the roof level.PREVAILING WAGEProject Manager: Mike McGuire at(805) 783-7716

Online0San Luis Obispo CITY HALL CHILLER REPLACEMENT 5/31/18 2:00 PM

NEW

Removal and replacement of asphalt paving including but not limited to: base construction, paving, sealing, striping and all related work to provide a complete project.PREVAILINGWAGEQuestions: Karen BrightEmail: [email protected]

Online0San Luis Obispo ADULT SCHOOL PAVING IMPROVEMENT 6/1/18 2:00 PM

The City of San Luis Obispo is requesting sealed Statements of Qualification from Control Systems Integration Subcontractors for the City’s Water Resource Recovery FacilityProject. The City has determined that all general contractors, electrical subcontractors, and control systems integrators interested in bidding on this Project must be prequalified priorto submitting a bid. Candidates with a proven record as a control systems integrator and substantial experience as a supplier/integrator of real-time computer data acquisition,control and communication systems utilized on large scale municipal wastewater, recycled water, or potable water treatment plant construction are invited to participate in theprequalification process. Candidates must complete the prequalification package and be deemed prequalified by City to be eligible to submit bids for the control systems integrationscope of the Project to prequalified general contractors.Project Manager: Justin PickardEmail: [email protected]

Online3San Luis Obispo CONTROL SYSTEMS INTEGRATION SUBCONTRACTORS FOR WATER RESOURCERECOVERY FACILITY

6/5/18 2:00 PM

The City of San Luis Obispo is requesting sealed Statements of Qualification from Electrical Subcontractors for the City’s Water Resource Recovery Facility Project. The City hasdetermined that electrical subcontractors interested in bidding on this Project must be prequalified prior to submitting a bid (to general contractors). Electrical subcontractorsspecifically experienced with large-scale municipal wastewater, recycled water, or potable water treatment plant construction are invited to participate in the prequalification process.Candidates must complete the prequalification package and be deemed prequalified by City to be eligible to submit bids for the electrical scope of the Project to prequalified generalcontractors.Project Manager: Justin PickardEmail: [email protected]

Online3San Luis Obispo ELECTRICAL SUBCONTRACTORS FOR WATER RESOURCE RECOVERY FACILITY 6/5/18 2:00 PM

The City of San Luis Obispo is requesting sealed Statements of Qualification from General Contractors for the City’s Water Resource Recovery Facility Project. The City hasdetermined that all general contractors, electrical subcontractors, and control systems integrators interested in bidding on this Project must be prequalified prior to submitting a bid.General contractors specifically experienced with large-scale municipal wastewater, recycled water, or potable water treatment plant construction are invited to participate in theprequalification process. Each general contractor wishing to bid on the contract to construct the Project must fully complete the Prequalification Package and provide all informationand materials requested and satisfy the prequalification criteria.Project Manager: Justin PickardEmail: [email protected]

Online3San Luis Obispo GENERAL CONTRACTORS FOR WATER RESOURCE RECOVERY FACILITY 6/5/18 2:00 PM

Remove and replace concrete sidewalk.Project Contact: Otis Chan 650-522-7305

Online1San Mateo 2017-18 SIDEWALK REPAIR PROJECT 5/23/18 2:00 PM

Please refer to specifications for complete scope of work.

Online2San Mateo E. HILLSDALE BOULEVARD STREET REHABILITATION PROJECT 5/23/18 2:00 PM

NEW

Demolition; On-site storage of existing handrails; installation of concrete treads.

Online1San Mateo 2ND & EL CAMINO GARAGE STAIR IMPROVEMENTS 6/1/18 2:00 PM

NEW

Please refer to specifications for complete scope of work.Project Contact: Jimmy Vo 650-522-7319

Online0San Mateo 2018 SANITARY SEWER REHABILITATION PROJECT - VARIOUS LOCATIONS 6/6/18 2:00 PM

Feasibility of a stairs at the South side of the landfill (Facing J Hart Clinton Drive) and Identify all the environmental document and permitting process.

Online0San Mateo RFP EAST THIRD AVENUE LANDFILL STAIRWAY EVALUATION 6/7/18 4:00 PM

NEW

Refrigeration cases change out, new checkstands, polished flooring, and minor décor package. The project will be constructed in multiple phases while the store remains inoperation.

Online1San Mateo SAFEWAY #0970 6/11/18 5:00 PM

Page 17 of 22

Page 18: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Crack sealing, pavement repair, and placing either a cape or slurry seal on various streets in the El Granada, Montara, Princeton by the Sea, La Honda, Emerald Lake Hills, OakKnoll Manor, Palomar Park, and District 4 areas.Project Contact: Alex Zhang 650-599-1411Email: [email protected]

Online0San Mateo County 2018 COUNTYWIDE CAPE & SLURRY SEAL PROJECT 5/23/18 2:00 PM

Replacing the existing roadway structural section by mixing cement with existing native materials, grading and compacting, placing asphalt concrete pavement, replacing portion ofexisting concrete curb, gutter and sidewalk, reconstructing curb ramps, constructing concrete valley gutters, and conforming areas adjacent to the new improvements, replacingexisting drainage inlet.Project Contact: John SchabowskiEmail: [email protected]

Online0San Mateo County RECONSTRUCTION OF CRONER AVENUE FROM ORANGE AVENUE TO CITY OFMENLO PARK LIMIT NEAR NORTH LEMON AVENUE - WEST MENLO PARK AREACOUNTY ROAD NUMBER 554

5/23/18 2:30 PM

The Work to be done consists, in general, of the repair of Madera Lane Bridge over El Corte De Madera Creek: Replace exterior concrete girders, patch spalled concrete, constructpolyester concrete overlay, regrade and pave the roadway approaches, and replace bridge and approach railings for 60 foot long, 21 foot wide reinforced concrete T-beam bridge,as well as any other items and details not mentioned above, but required by the Project Plans, Standard Specifications and these Special Provisions, and the directions of theEngineer.Project Contact: Anthony Lum 650-599-1491Email: [email protected]

Online0San Mateo County PREVENTATIVE MAINTENANCE MADERA LANE BRIDGE - SAN GREGORIO AREA 5/24/18 2:30 PM

NEW

Provide dedicated part-time staff to work as a contract building inspector, and to assist with program administration and program management services, for the County’s Second UnitAmnesty Program.Project Contact: William GibsonEmail: [email protected] copies also available for review at Santa Clara Builders Exchange

Paper & Online0San Mateo County RFP CONTRACT BUILDING INSPECTION & PROGRAM ADMINISTRATION SERVICES:SAN MATEO COUNTY SECOND UNIT AMNESTY PROGRAM

6/11/18 5:00 PM

NEW

This Project involves the removal and installation of new benches at Lagoon Park. The Project will include the demolition and removal of existing benches, footings, as well as theinstallation of new elements including, but not limited to: benches, concrete pads, concrete footings and stabilized decomposed granite.Questions: Lisa Bui, Project Manager, at(415) 473-6214, or by email at: [email protected]

Online2San Rafael LAGOON PARK BENCH REPLACEMENT PROJECT 5/22/18 SFONLINE1:00 PM

Div 1-2, 7, 9 & 26. The Project consists of the installation of replacement electrical utilities for an existing campus. Underground conduit is required for future PG&E wiring from thestreet to a future relocated electrical switchgear and transformer. Conduit and wiring is required to reconnect utilities that are to be relocated out of the area of future demolition of thecanopy and music building.Questions: Greystone West, Theresa Novotny, at Cell: 415.328.4959 | Main: 707.933.0624 | Email: [email protected]

Online0San Rafael TERRA LINDA HIGH SCHOOL ELECTRICAL RELOCATION PROJECT 5/22/18 SFONLINE2:00 PM

Project consists of all the associated work described in the attached specifications and plans and the provisions of this document for removal of existing wood deck and trellis,installation of restroom, utility connections (water, sewer, electrical), installation of shade canopy and repair of existing chain link entry gates.

Online0San Rafael BRET HARTE PARK RESTROOM INSTALLATION 5/24/18 SFONLINE11:00 AM

The Contract is for biosolids hauling services, approximately 6,400 wet tons annually, Monday through Saturday, from the CMSA Facility located at 1301 Andersen Drive, SanRafael, CA 94901, to the beneficial reuse locations as directed by the CMSA staff. Questions: Jacky Wong at 415) 459-1455 x130, or by email at: [email protected]

Online0San Rafael BIOSOLIDS HAULING SERVICES 5/31/18 SFONLINE1:30 PM

NEW

Div 1-2, 10 & 31-32. The Project consists of: Site preparation, abatement and demolition of buildings K, L, M & O.PLEASE NOTE: The bidder must be on the plan holder’s list tosubmit a bid. CONTACT: Dan Zaich at: [email protected]

Online1San Rafael SAN RAFAEL HIGH SCHOOL BUILDING ABATEMENT AND DEMOLITION 5/31/18 SFONLINE2:30 PM

The Project consists of asphalt concrete replacement and re-grading for surface drainage improvements in several areas within CMSA facility. Contractor is responsible forsawcutting; excavation, removal and disposal of asphalt roadway, gravel section, and PCC curbs and gutters; cold planing and disposal of asphalt pavement; elevation adjustment ofutility vaults, construction of gravel drainage channel, PCC curb, sidewalk, and gutters; installation of header boards; placement of aggregate base and hot mix asphalt; cleanup ofthe project area; and other items of work as shown on the Plans.Questions: Jacky Wong at 415) 459-1455 x130, or by email at: [email protected]

Online0San Rafael PAVEMENT REHABILITATION PROJECT 6/19/18 SFONLINE1:30 PM

NBD

The scope of new work includes tenant improvements of an existing space. Trades include new MEP & Fire Protection systems connected to existing base building systems &utilities. No change to existing core or exterior walls.Trades Needed: Demo, Drywall, Acoustical Ceiling, Painting, Doors/Frames/Hardware, Painting, Flooring, Masonry, Concrete,Plumbing, HVAC, Electric, Structural SteelQuestions: Gina Smith, Construction Coordinator, at Eckinger Construction Co, 2340 Shepler Church Ave, Canton, OH 44706 at (330) 453-2566, or by email at: www.eckinger.com

Online1San Ramon WEST ELM STORE AT BISHOP RANCH 5/22/18 SFONLINE3:00 PM

Page 18 of 22

Page 19: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Tenant improvement consisting of a new tenant build-out in a leased space in an existing exterior multi tenant mall building. Structural scope includes new structural framing at mainentries & support/attachment of wood ceiling finish, and mechanical units within the leased space. Non-structural scope includes interior partitions, new finishes, and associatedmechanical, electrical & plumbing work. The existing fire sprinkler & life safety systems are to be modified as required for tenant build-out.Fire sprinkler & life safety system to beunder separate permit. Storage shelving to be under separate permit (only as required by local jurisdiction. Exterior signage under separate permit.Questions: Gina Smith,Construction Coordinator, at Eckinger Construction Co, 2340 Shepler Church Ave, Canton, OH 44706 at (330) 453-2566, or by email at: www.eckinger.com PLEASE NOTE: SomeGCs are asking for bids on different dates. Please confirm with each GC prior to submitting your bid.

Online0San Ramon POTTERY BARN AT BISHOP RANCH 5/24/18 SFONLINE10:00 AM

Tenant improvement consisting of a new tenant build-out in a leased space in an existing exterior multi tenant mall building. Structural scope includes new structural framing at mainentries & support/attachment of hood. Non-structural scope includes interior partitions, new finishes & associated mechanical, electrical & plumbing work. Fire alarm & sprinklersystem to be modified as required for tenant build-out.Fire sprinkler & life safety system to be under separate permit. Storage shelving to be under separate permit (only as requiredby local jurisdiction. Exterior signage under separate permit.Questions: Gina Smith, Construction Coordinator, at Eckinger Construction Co, 2340 Shepler Church Ave, Canton, OH44706 at (330) 453-2566, or by email at: www.eckinger.com PLEASE NOTE: Some GCs are asking for bids on different dates. Please confirm with each GC prior to submitting yourbid.

Online0San Ramon WILLIAMS-SONOMA AT BISHOP RANCH 5/24/18 SFONLINE10:00 AM

The Work consists of roof removal and replacement. The Work includes, but is not limited to, all labor, materials and equipment required for a complete roofing system.All inquiriesshall be emailed to Michelle Sandusky at: [email protected] prior to May 18, 2018, at 2PM.

Online1San Ramon CALIFORNIA HIGH SCHOOL ROOF REPLACEMENT 5/24/18 SFONLINE2:00 PM

Div 1 & 26. The Work consists of replacing the main electrical service for the site.All questions regarding the above referenced Project must be documented in writing prior to 3PMMay 22, 2018. All inquiries shall be emailed to Michelle Sandusky at: [email protected].

Online1San Ramon ELECTRICAL SERVICE UPGRADE SRVUSD SERVICE CENTER 5/30/18 2:00 PM

169 Residential Units Mixed Use Development which includes 4 levels of residential, Club Room, Fitness and Leasing Office at Podium Level, over 6,178 sq. ft. commercial (shell) atStreet Level, and one level subterranean parking 152 stalls.Requirements:1. Textura web-based billing (include fees in bid)2. Current California Contractors License3. Insurancerequirements per ROEM Builders Contract4. Non-Prevailing WageOCIP or CCIP not required - units will not be sold or converted (from rental) before 15 years after completion of theconstruction.General:1. All Trades and Suppliers (CSI Divisions 2-16).2. Bidder acknowledges that the plans and specifications may not be complete, but bids shall include all workinferable from the plans and specifications or otherwise required for a complete and finished installation consistent with the intent of the Plans, Specifications, and CBC.3. All bidsshould include labor, material, applicable add alternates, or value engineering recommendations.Questions: Rich Jensen at (408) 828-4023, or by email at: [email protected]

Online0San Ramon SAN RAMON VALLEY APARTMENTS 6/5/18 SFONLINE5:00 PM

Removal and installation of thermoplastic striping, resurfacing ·county roads with Type II micro-surfacing and all work needed to complete application.Project Contact; HerbertNaraval 408-494-1308Email: [email protected]

Paper & Online0Santa ClaraCounty

2018 MICRO-SURFACING OF COUNTY ROADS AT VARIOUS LOCATIONS 5/24/18 2:00 PM

NEW

Removal and replacement of sound wall panels and installation of concrete posts along various County expressways.Project Contact: Herbert Naraval 408-494-1308Email:[email protected] copies also available for review at Santa Clara Builders Exchange

Paper & Online0Santa ClaraCounty

2018 SOUNDWALL REPAIR & REPLACEMENT PROJECT 5/24/18 2:00 PM

NBD

One-year contract for rail grinding services.Project Contact: Florante TanadaEmail: [email protected]

Online1Santa ClaraCounty

MAINTENANCE SERVICE CONTRACT FOR RAIL GRINDING - SCVTA 5/31/18 2:00 PM

Please refer to specifications for complete scope of work.

Online1Santa ClaraCounty

STEVENS CREEK BANK & ACCESS/TRAIL ROAD REPAIR DOWNSTREAM OF ELCAMINO REAL (SR 82) PROJECT - SCVWD

6/6/18 2:00 PM

NEW

For purposes of this Contract, Work consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to repair, rehabilitate, and restripe11 VTA parking lots including asphalt plugs, monolithic concrete repairs to curbs and gutters, slurry seal, and restriping.Project Contact: Del SabetiEmail: [email protected]

Online0Santa ClaraCounty

REHABILITATE 11 VTA PARK & RIDE LOTS - SCVTA 6/21/18 1:30 PM

Page 19 of 22

Page 20: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Riverside Project Description: The Riverside Project, from Beach Street to Third Street, generally involves the undergrounding of overhead utilities within an establishedundergrounding district, reconstruction of the water line, reconstruction of sidewalks and streetscape elements, installation of decorative streetlights and landscaping and finalpaving. The arterial street is the main corridor to the Beach Area and Boardwalk. This project will involve working with the contractor, city staff, projects designer, utility companiesand area businesses and residents on construction phasing and staging, traffic control, co-ordination with a hotel project that is under construction, and utility coordination. TrailProject Description: The City of Santa Cruz, in coordination with Santa Cruz County Regional Transportation Commission (RTC), is to construct, in two phases, a 2.1-milebicycle/pedestrian trail adjacent to an existing rail line that is owned by the RTC. The Trail Project would be constructed in two phases. Phase I includes 1.3 mile trail from NaturalBridges Drive to California Street. Phase II includes .8 mile of trail from California Street to Pacific Avenue.RFP/RFQ Contact: Nathan NguyenTel:(831) 420-5188

Paper & Online0Santa Cruz RFQ FOR CONSTRUCTION MANAGEMENT SERVICES - RIVERSIDE UNDERGROUNDAND STREETSCAPE PROJECT AND RAIL TRAIL SEGMENT 7 (PHASE I & II)PROJECT

5/22/18 2:00 PM

This project is for licensed contractors with a Type B, General Building Contractor license to remove and replace with new existing siding, windows, trim, gutters and down spouts.Also, replace interior affected wall coverings and paint.PREVAILING WAGEQuestions: Scott Moats at 831-454-5497

Online1Santa Cruz 1070 EMELINE SIDING AND WINDOW REPLACEMENT - REBID 5/23/18 2:30 PM

The work to be done in general consists of removing existing headwall and wood fencing at the upstream end of the culvert and steel railing atop the downstream end- wall. Minorgrading to reform approximately 25 feet of drainage channel upstream of new culvert inlet including installation of post-construction erosion control measures and basic landscaping.Installation of angled pipe extension, construction of reinforced concrete headwall, fabrication/installation ofsteel pedestrian handrail, and installation of traffic rated guardrailbordering both sides of the street. Project Contact: Steve WolfmanEmail: [email protected]

Online0Santa Cruz PARK WAY & ALLERTON STREET STORM DRAIN DISASTER REPAIRS 5/24/18 2:00 PM

NEW

The proposed project will entail removal and replacement of approximately 52,000 sq ft of roofing and associated components at Santa Cruz High School.PREVAILINGWAGEProject Contact: Trevor MillerEmail: [email protected]

Paper & Online1Santa Cruz RE-ROOFING AT SANTA CRUZ HIGH SCHOOL 5/30/18 1:00 PM

The work to be done consists in general of removing the existing concrete storm drain channel, repairing the base material, and installing a new concrete storm drain channel withdebris rack and overflow section. The work includes replacing a portion of the adjacent storm drain system and paving the roadway shoulder.Project Contact: David GlucsEmail:[email protected]

Paper & Online0Santa Cruz PLYMOUTH STREET STORM CHANNEL EMERGENCY REPAIR 5/31/18 2:00 PM

NEW

This project involves the construction of full depth recycling, culvert replacement, asphalt concrete overlay, asphalt concrete dikes, striping, pavement markings, and re-establishingstreet monuments. Project is located on two streets - Granite Creek Road and Branciforte Drive in Central Santa Cruz County.Project Contact: Casey CarlsonEmail:[email protected]

Online0Santa Cruz 2018 FULL DEPTH RECYCLE & OVERLAY PROJECT 5/31/18 2:00 PM

NEW

Replacement of existing smoke detectors in Building 1 to 7 with new, code compliant detectors. Modifications to the existing XLS fire alarm panel are also required. The work shownin the Contract Documents for building 8 to 14 is not in the scope of the work and will be part of a future phase.Project Contact: Luis RoaEmail: [email protected]

Online1Santa Cruz CROWN MERRILL APARTMENTS - PERMANENT SMOKE DETECTOR INSTALLATION- REBID

6/5/18 10:00 AM

NEW

Replacement of existing MXL fire alarm control units with new XLS units, modules and power supplies. All work associated with the replacement of the devices within the individualapartment buildings and apartment dwelling units (smoke detectors, combination carbon monoxide/smoke detectors, heat detectors, occupant notification appliances, powersupplies, etc.) shown in the Contract Documents is no longer included as the scope of the Project. This work will be performed in a future phase.Project Contact: Luis RoaEmail:[email protected]

Online1Santa Cruz RACHEL CARSON COLLEGE APARTMENTS - SMOKE DETECTORS & UNITREPLACEMENT - REBID

6/5/18 11:00 AM

The project involves the construction of Midwest Guardrail System with Terminal End Systems, thermoplastic striping, pavement markers, and thermoplastic pavement markings inthe northern portion of Santa Cruz County. Project Contact: Jeffrey delosSantosEmail: [email protected]

Online0Santa CruzCounty

NORTH COUNTY GUARDRAIL & STRIPING 5/24/18 2:00 PM

Page 20 of 22

Page 21: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

SMART is soliciting qualified submittals for Transit-Oriented Development on its +/- 5.4-acre property at Railroad Square in Santa Rosa, CA.The Sonoma-Marin Area Rail TransitDistrict (SMART) is seeking submittals for Transit-Oriented Development (TOD) on its +/- 5.4 acre property at Railroad Square in Santa Rosa. Following the review of submittals,SMART will select one or more development teams with which to negotiate and enter into an exclusive negotiating agreement (ENA) to develop the site.The Transit OrientedDevelopment project and goals are characterized by a development that is physically and functionally integrated with the transit facility; enhances surrounding area connections totransit stations; provides residential, commercial and/or mixed-use development, including housing and convenience goods and services with office space possibly included in themix; promotes and enhances ridership; expands sales and local tax base, sales and income tax base; and generally encourages revitalization the transit station area andcommunity.This Solicitation is intended to establish a short list of qualified developers who possess demonstrated expertise and experience in similar TOD projects and who havethe development capacity and financial strength to expeditiously develop the SMART property. Once the short list is established, SMART will review the submittals and thereaftermay in, its sole discretion, enter into an Exclusive Negotiating Agreement (ENA) with the selected developer. SMART is open to the consideration of a variety of project sizes,structures and business arrangements, including but not limited to: development contracts; long-term ground and facility leases; sale of fee interests and/or a combination ofarrangements. The intent of this Solicitation is to garner development concepts that may determine the nature, scope and specifics of ENA.View and Download SolicitationDocuments at:http://sonomamarintrain.org/railroad-square-projectEmail Questions To: [email protected];

Online0Santa Rosa SMART TRANSIT ORIENTED DEVELOPMENT AT RAILROAD SQUARE 5/28/18 Online Only2:00 PM

NBD

Modernization of the Saratoga High School 800 Wing.

Online1Saratoga SARATOGA HIGH SCHOOL 800 WNG PROJECT- LOS GATOS-SARATOGA JOINTUNION HIGH SCHOOL DISTRICT

5/24/18 1:00 PM

Div 5-6, 26 & 31-33. The Project is located east of Bridgeway between Napa and Locust Street and is described as follows: Work shall include demolition of existing park features,grading of site, installation of underground utilities and site lighting, new parking lot and walkways, shoreline access area, foundations for the restroom and trash enclosurestructures, bike racks and removable bollards, placement of planting soil, installation of partial irrigation, and hydroseeding the finish-graded disturbed soils to protect against rainyseason erosion and prepare the site for a subsequent phase of planting and finish irrigation elements.All bid questions must be in writing and can be emailed to Andrew Davidson at:[email protected]

Online3Sausalito DUNPHY PARK IMPROVEMENT PROJECT 5/22/18 SFONLINE2:00 PM

NBD

Project consists of: Existing Conditions; Concrete; Metals; Wood and Plastic; Thermal and Moisture Protection; Doors and Windows; Finishes; Specialties; Food Service Equipment;Roller Window Shades; Plumbing; HVAC; Mechanical General; Electrical; Structured Cabling; Fire Alarm System Existing; Earthwork; Exterior Improvements; Utilities.PREVAILINGWAGEProject Contact: Tom MillmanEmail: [email protected]

Paper & Online4Seaside HAYES/CENTRAL COAST HIGH SCHOOL KITCHEN/RESTROOM - MODERNIZATION 5/23/18 2:00 PM

Abatement of hazardous material within the existing walls which includes Asbestos Containing Material and Lead Paint.PREVAILING WAGE

Paper & Online0Seaside CENTRAL COAST HIGH SCHOOL ABATEMENT OF HAZARDOUS MATERIALPROJECT

5/23/18 2:00 PM

The scope of work will consist of all labor, material, equipment and services necessary to complete the work identified in plans titled David Cutino Park ADA Improvements and in thespecifications, including but not limited to: ADA paving around restrooms, perimeter paving, drainage, site furnishing improvements, and utility upgrades and general nature andextent of the work and appurtenant facilities as shown on the plans and specifications under the title David Cutino Park ADA Improvements.Project Contact: Leslie LlanteroEmail:[email protected]

Paper & Online1Seaside CUTINO PARK ADA IMPROVEMENTS 5/24/18 4:00 PM

The scope of the work will consist of all labor, material, equipment and services necessary to complete the work identified in plans titled City Hall Boiler Replacement and in thespecifications, including but not limited to: the furnishing of all labor, materials, equipment, and services necessary for, and reasonably incidental to providing and installing completehot water heating system, and other mechanical work as shown or indicated in the Drawings and Specifications.Project Contact: Leslie LlanteroEmail: [email protected]

Paper & Online0Seaside OLDEMEYER CENTER BOILER REPLACEMENT 5/24/18 4:00 PM

The Work of this Contract may consist of the following:1. Remove and Dispose of designated areas to a depth of 10.5”. Includes 92 SY of earth and capping off irrigation, 40 SY ofconc, (3) wood planters and (1) CMU planter.2. Excavate designated trench for roughly 60 LF and install new surface drain with connecting drain pipe to existing designatedlocation.3. Install & Compact AB to excavated areas to 8”4. Install & Compact AC with fine aggregate spec to 2.5”.5. Sawcut perimeter line at turf line, install a boarder-board at atotal 85’.6. Finish entire AC area with Patch as needed, Seal & Slurry at 900 SY.PREVAILING WAGE

Paper & Online0Seaside MARSHALL ELEMENTARY SCHOOL ASPHALT 5/25/18 10:00 AM

NBD

Project consists of: Site Demo; Selective Building Demo; Concrete; Structural Steel and Misc Iron; Metal Stairs; Metal Railings; Thermoplastic Sheet Waterproofing; Joint Sealers;Expansion Joint Covers; Aluminum Windows; Glass Glazing; Lath and Plaster; Painting; Mechanical General; Plumbing; HVAC; Electrical; Structured Cabling; Fire Alarm SystemExiting; Earthwork; Exterior Improvements; Utilities. PREVAILING WAGEProject Contact: Tom MillmanEmail: [email protected]

Online2Seaside SEASIDE HIGH SCHOOL CORROSION REPAIR 5/29/18 2:00 PM

The work consists of upgrading the existing kitchen, including the replacement of a type I hood. An existing office shall be demolished to provide additional area in the cafeteria. Anadjacent classroom shall be reduced in size to allow for a relocated office, and added refrigerated and dry storage.PREVAILING WAGE

Online0Shandon SHANDON ELEMENTARY SCHOOL – KITCHEN UPGRADE 5/29/18 2:00 PM

Page 21 of 22

Page 22: PROJECTS BY LOCATION The San Francisco Builders · PDF filePROJECTS BY LOCATION The San Francisco Builders Exchange Tuesday, March 13, 2018 To view plans online go to Location Plan

Plan ## Of Add.Location Bid DatePlan Name Bid Time Plans

Traffic control; excavation; removals; hot mix asphalt paving; slurry seal; concrete curb, gutter, and paving; pervious concrete paving; signing and striping; utility adjustments; stormdrainage modifications; bioretention planting and irrigation; and signal and lighting modifications.

Online5South SanFrancisco

WATER QUALITY CONTROL PLANT WET WEATHER & DIGESTER IMPROVEMENTSPROJECT

5/22/18 2:00 PM

NEW

* Install ceiling treatments* Replace lighting, minor electrical* Provide new sinks in laundry rooms* Painting as required* Replace flooring and carpet* Other misc. items includingreplacing old non repairable door closures, provide motions sensors,fans, mirrors.* Replace all beige outlets & switches to white* Contractor to remove existing furniture (surplus,dispose or relocate)* Contactor to provide an electrical permit if required

Online0Stanford STERN HALL- RETROFIT BASEMENT COMMON ROOMS RFP (LARKIN, ZAPATA,BURBANK, TWAIN & DONNER)

5/29/18 10:00 AM

The project consists of the construction of a new 11,000 SF retail center and associated site improvements. FLINT is the selected general contractor and is seeking competitive bidsfor subcontractor trade work.

Online2Sunnyvale EL CAMINO SHOPPING CENTER 5/22/18 2:00 PM

Perform roof restoration to five classroom buildings and the GLC building utilizing Tremco Alpha Guard BIO NR, 2 part, bio-based, liquid applied urethane roofing system.ProjectContact: Brian Slaughter Email: [email protected].

Online1Sunnyvale ROOF RESTORATION NIMITZ ELEMENTARY SCHOOL - CUPERTINO UNIONSCHOOL DISTRICT

5/23/18 1:00 PM

NBD

Demolition, sealing, trenching and shoring, dewatering, piping, junction structures, diversion structures, sampling ports, roof drain connections, pump station, wet well, flow meterand sampling vault and all associated appurtenances, curb drop inlet, HDPE piping (force main and gravity), electrical conduits, control devices, wiring, SCADA system installationand testing, and repairing all disturbed paved and unpaved areas ready for use,Project Contact: Lisa Vo 408-730-7608Email: [email protected]

Online1Sunnyvale SMART STATION STORM WATER MANAGEMENT SYSTEM UPGRADE RE-BID 5/30/18 3:00 PM

NEW

Provide on-call maintenance and repair emergency services and non-emergency services for sewage spill cleanups, cleaning of large sanitary sewer lines and miscellaneous repairsin support of municipal services.Project Contact : Deborah Cordova 408-730-7708Email: [email protected] copies also available for review at Santa Clara BuildersExchange

Paper & Online0Sunnyvale SEWER LINE ON-CALL MAINTENANCE & REPAIR SERVICES 6/1/18 3:00 PM

NEW

Renovating and repairing pump and irrigation systems at Braly and Ponderosa ParksProject Contact: Lisa Vo 408-730-7608Email: [email protected]

Online0Sunnyvale PARK IRRIGATION & PUMP SYSTEMS REHABILITATION 6/6/18 3:00 PM

NEW

This project will place new hot mix asphalt overlay at Main Street in Templeton, CA. Work includes cold plane asphalt concrete road surfaces, placing hot mix asphalt overlay, digoutrepairs, and other such items or detail work not mentioned herein that are required by the Plans, the Standard Specifications, Standard Plans, or Special Provisions.Bid Contact: JRBeard(805) [email protected]

Online0Templeton 2016-17 ASPHALT OVERLAY, MAIN STREET IN TEMPLETON 6/14/18 3:00 PM

NBD

Div 1-7, 9, 20, 27, 34, 41. The Work shall include providing all materials, labor, supervision, hardware, tools, equipment, and appurtenances necessary for the upgrading of BART's34.5 kiloVolt (kV) subtransmission system. The Work involves upgrading of the 34.5 kV system that includes replacement and installation of sections of34.5 kV feeder cable circuits(MLC and MRC circuits), on M2 and MI tracks between MVS Switching Station, MTF, MSS, MCC, MPS, MMS and MTW Substations as described in Contract Specifications Section01 11 00 Summary of Work.Questions: Sunni Gunawardena, or by email at: [email protected]

Online6Various 34.5 KV CABLE REPLACEMENT M-LINE MVS SWITCHING STATION & MTF, MSS,MPS & MTW SUBSTATIONS - BART #15EJ-171

6/12/18 SFONLINE2:00 PM

The Project includes, but is not limited to, performing the following Work:• Mobilization• Clearing and Grubbing• Excavation and Grading• Installation of Underground DrainageSystem• HMA Paving• Sport Court Surfacing, Color Coat and Striping• Fencing• Utility Relocation and Adjustment• Site Furnishings• Sport Court Lighting and Associated ElectricalWork• Irrigation and Landscape Work• Traffic and Pedestrian ControlQuestions: Joe Sadri at (925) 943-5899 x2217, or by email at: [email protected]

Online0Walnut Creek PICKLEBALL - TENNIS COURT ADDITIONS AT HEATHER FARM PARK 5/23/18 SFONLINE2:30 PM

The Project may include multiple components necessary to achieve the objectives of the Facilities Services office of the Judicial Council. Any one of the components or combinationthereof may be changed, including terminated, in the same manner as the Project, as indicated herein, without changing in any way the remaining component(s). The provisions ofthis Agreement shall apply to each component without regard to the status of the remaining component(s). Construction Manager shall invoice for each component separately andthe Judicial Council shall compensate Construction Manager for each component separately on a proportionate basis based on the level and scope of work completed for eachcomponent.Questions regarding the RFP should be submitted in writing to the Judicial Council of California to: [email protected] no later than May 18, 2018,by 3PM.Hard copies of proposals must be delivered to: Judicial Council of California Attn.: Lenore Fraga-Roberts - RFP-FSO-CMS-2018-10-JP455 Golden Gate Avenue, 6th FloorSan Francisco, CA 94102

Online0Yreka CONSTRUCTION MANAGEMENT SERVICES YREKA COURTHOUSE 6/1/18 Online Only3:00 PM

Page 22 of 22