project stage 2 : design development
TRANSCRIPT
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
1
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE
PROJECT STAGE 2 : DESIGN DEVELOPMENT
ARCHITECTURAL DESIGN REPORT
FOR HERITAGE IMPACT ASSESSMENTIssued : 11.08.16 REV B1
Issued to : Port Arthur Historic Site Management AuthorityPort Arthur ,Tasmania
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
2
Transmittal, Distribution & Quality Control
Rev Document Document Issue and Purpose Revision Description Issue To Issued by Date Format / Copies
ADRAFT STAGE 2 DESIGN DEVELOPMENT PROJECT REPORT AND GATE REVIEW Issue for Client Review and Response Client Review Client HPA 3.08.16 Electronic as PDF
BDRAFT STAGE 2 DESIGN DEVELOPMENT PROJECT REPORT AND GATE REVIEW
Updated Issue for Client Review and Response ADD IMAGE FILES Project Team HPA 09.08.16 via website as PDF
B1DESIGN DEVELOPMENT STAGE 2
ARCHITECTURAL DESIGN REPORT- FOR HIAFor Inclusion with Heritage Impact Assessment Report and Statutory Application
Extracted from main Report sections with modeling shots added at section 3
All Engineering and Cost Plan financial information removed
PAHSMA HPA 11.08.16 via website as PDF
A
PLEASE CONSIDER THE ENVIRONMENTAL CONSEQUENCES OF PRINTING THIS DOCUMENT IF PRINTING PLEASE PRINT THIS DOCUMENT AT A3 LANDSCAPE - COLOUR SINGLE SIDED
This is a print version of the document- there are no hyperlinked versions.
The information contained this document is regarded by the Authors as ‘commercial in confidence’ as it contains intellectual property and commercial offer information. It is not for distribution beyond the Client executive assessment group for this project. Distribution to any third party for any purpose requires written approval from the Author.
This document is to be filed and archived in storage by PAHSMA. It should be filed with the Return Brief, Addendum to The Return Brief. and related listed documents in the document Register. Subsequent revisions should be filed accordingly. Filing of the document whether by electronic or printed version should contain the endorsed / signed version.
Printing Abbreviations
Abbreviations are used in this document as follows:Abbreviations are used in this document as follows:
PA Port Arthur
VC Visitor Centre
PAVC Port Arthur Visitor Centre
PAHSMA Port Arthur Historic Site Management Authority
PAHS Port Arthur Historic Site
PCG Project Control Group
PWG Project Working Group
HPA HPA Projects Pty Ltd
RS Rosevear Stephenson Pty Ltd
ESD Environmentally Sustainable Design
AHC Australian Heritage Commission
BCA Building Code of Australia
AS Australian Standards
DDA Disability Discrimination Act
WH&S Work Health & Safety
OHS Occupational Health and Safety
sqm Square Meter
FB Food and Beverage
Filing , Storage and Archive
The Report and the information within it is confidential and may be privileged. If you have received the Report in error please notify HPA Projects immediately. You should not copy it for any purpose, or disclose its contents to any other person. The Report is qualified in itsentirety by and should be considered in the light of HPA Projects Terms of Engagement and the following:1. The Report is provided solely for your use and benefit unless expressly permitted and then only in connection with the purpose in respect ofwhich the Report is provided. Unless required by law, you shall not provide the Report to any third party without HPA Projects ’s priorwritten consent, which HPA may at its discretion grant, withhold or grant subject to conditions. Possession of the Reportdoes not carry with it the right to commercially reproduce, publish, sale, hire, lend, redistribute, abstract, excerpt or summarize the Report orto use the name of HPA Projects in any manner without first obtaining the prior written consent of HPA.2. HPA Projects has used its reasonable endeavors to ensure that the data contained in the Report reflects the most accurate andtimely information available to it and is based on information that was current as of the date of the Report.3. The Report is based on estimates, assumptions and other information developed by HPA Projects and its sub consultants from its independent research effort, general knowledge of the industry and consultations with you, your employees and your representatives. No warranty or representation is made by HPA that any of the projected values or results contained in the Report will actually be achieved.In addition, the Report is based on information that was obtained on or before the date in which the Report was prepared. Circumstancesand events may occur following the date on which such information was obtained that are beyond our control and which may affect thefindings or projections contained in the Report. We may not be held responsible for such circumstances or events and specifically disclaimany responsibility therefore.4. HPA has relied on information provided by you and by third parties (Information Providers) to produce the Report and arriveat its conclusions. HPA has not verified information provided by Information Providers (unless specifically noted otherwise)and we assume no responsibility and make no representations with respect to the adequacy, accuracy or completeness of suchinformation. No responsibility is assumed for inaccuracies in reporting by Information Providers including, without limitation, by youremployees or your representatives or for inaccuracies in any other data source whether provided in writing or orally used in preparing orpresenting the Report.5. In no event, regardless of whether HPA’s consent has been provided, shall HPA assume any liability orresponsibility to any third party to whom the Report is disclosed or otherwise made available.6. The conclusions in the Report must be viewed in the context of the entire Report including, without limitation, any assumptions made anddisclaimers provided. The conclusions in this Report must not be excised from the body of the Report under any circumstances.7. Without the prior written consent of HPA , the Report is not to be used in conjunction with any public or private offering ofsecurities or other similar purpose where it might be relied upon to any degree by any person other than you.8. All intellectual property rights (including, but not limited to copyright, database rights and trade-marks rights) in the Report including anyforecasts, drawings, spreadsheets, plans or other materials provided are the property of HPA Projects.
Notice of Confidentiality and Disclaimer
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
3
Contents
A Transmittal , Distribution & Quality ControlTransmittal , Distribution & Quality Control 23
B ContentsContents 45
1 OverviewOverview 6
2 ARCHITECTUREARCHITECTURE 8Redevelopment OverviewRedevelopment OverviewSurvey and Proposed New built formSurvey and Proposed New built form 15
3 Key ElementsKey Elements 18Site PlanSite PlanFloor Plan Level 1Floor Plan Level 1Floor Plan Level 2Floor Plan Level 2
4 Design Statement and MaterialsDesign Statement and Materials 13Rendering 1 - Arrival ForecourtRendering 1 - Arrival Forecourt 14Rendering 2 - Departure ForecourtRendering 2 - Departure Forecourt 15Rendering 3 - Jetty RoadRendering 3 - Jetty Road 16
5 Modeling and Site View AnalysisModeling and Site View Analysis 17
Study 1 - GOVERNMENT GARDENS Study 1 - GOVERNMENT GARDENS 18Study 2 - MEMORIAL PRECINCTStudy 2 - MEMORIAL PRECINCT 19Study 3 - COMMANDANTS COTTAGE Study 3 - COMMANDANTS COTTAGE 21Study 4 - HOSPITAL HILLStudy 4 - HOSPITAL HILL 22Study 5 - PENITENTIARYStudy 5 - PENITENTIARY 23Study 6 - GOVERNMENT COTTAGEStudy 6 - GOVERNMENT COTTAGE 24
B
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
4
1. Overview
Port Arthur Historic Site, Mason cove portion, 2013 (PAHSMA)
This document provides Architectural detail and analysis of the Port Arthur Visitor Centre Redevelopment Project. The document has been extracted from the Stage 2 Design Development report and is issued in support of the Project Heritage Impact Assessment prepared by MacKay Strategic for the Port Arthur Historic Site Management Authority (PAHSMA).
Architectural detail is provided in the form of drawings, modeling and artist impression renderings. Analysis of the proposal is provided on the basis of significant vistas as identified in the Heritage Impact Assessment Report and the Port Arthur Historic Site Landscape Management Plan.
Following approval of Stage 1 Master plan, Stage 2 Design Development was instructed to proceed by PAHSMA in May 2016 comprising engagement of a broader project team, development of design, engineering, detailed cost planning, compliance review and preparation for submittal to State and Commonwealth Authorities for statutory approval.
The project comprises:
• Extension to the existing Visitor Centre building providing an increase in floor area to ease congestion at the site entry;
• Additional staff and food and beverage facilities.
• Replacement of redundant services infrastructure;
• General renovation to the existing Visitor Centre building to achieve contemporary compliance with codes and standards.
• Refurbishment of the existing Interpretation Gallery
• Enlargement of existing external pedestrian gathering zones on arrival at the Historic site (arrival forecourt) and site orientation (departure forecourt)
• Minor car park and road work alterations
The drawings and diagrams contained within the report are provided for illustration purposes and should be read in conjunction with the Architectural drawing package Issue E. 27.08.16 and the Heritage Impact Assessment Report.
Penitentiary
Separate Prison
Wharf
Church
Site Entry
Admin and Works Yard
Car park and Visitor Centre
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
5
2. Architecture - Redevelopment Overview
EXISTING BUILDING (blue)
PROPOSED EXTENSION TO EXISTING BUILDING (red)
The redevelopment project comprises an 876m2 extension on two levels to the existing building, replacement of services infrastructure equipment and general renovation to the existing Visitor Centre building. Externally, enlarged forecourt areas are proposed. There are minor works proposed to the existing car park and roads adjacent the building.
EXISTING CAR PARK
ARRIVAL FORECOURT
DEPARTURE FORECOURT
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
6DEVELOPMENT OVERLAY TO SURVEY
2. Architecture - Survey and New built form
EXISTING BUILDING
PROPOSED EXTENSION
EXISTING TREE REMOVED
EXISTING BUILT FORM REMOVED
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
7
MAIN STAIR
STAFF OFFICES / THREE CAPES & LOCKER FACILITIES
DEPARTURE FORECOURT
Key Elements
3 . Architecture - Key Elements
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
8
ARRIVAL FORECOURT Key Elements
3. Architecture - Key Elements
NEW MAIN ENTRANCE
NEW ENTRANCE CANOPY
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
9
Key Elements
3. Architecture - Key Elements
NEW MAIN ENTRANCE AND FOYER
NEW ENTRANCE CANOPY
RESTAURANT
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
10
D DSITE PLAN
ARRIVAL FORECOURT
ENTRY
Loading / Receiving / Waste
NEW STAIR AND RAMP
Existing Road
DEPARTURE FORECOURT
3. Architecture - Site Plan
Services Roof Well
DISABLED CAR PARKING
FORECOURT ACCESS GATE
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
11
D D
GROUND LEVEL
ARRIVAL FORECOURT
CAFE
ENTRY FOYER
RETAIL
TICKETING
ENTRY
MAIN STAIR
Loading / Receiving / Waste
RESTAURANT
NEW STAIR
Existing Road
Existing Road
External cafe seating deck
Coach parking
Canopy Awning
3. Architecture - Level 2 Plan
Kitchen
Kitchen
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
12
STAIR
EXHIBITION GALLERY
STAFF OFFICES
3 CAPES
DEPARTURE FORECOURT
LOWER LEVEL
STORE
LOCKERS
STAFF RM
MEETINGRM
PLANT
STORE
3. Architecture - Level 1 Plan
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
13
4. Architecture - Design Statement and Materials
DESIGN STATEMENT
The ambition of the building is to emphasize the emotional encounter with Port Arthur, and as such the building itself aims to be calm and restrained in its expression, be clear about its position in time, provide orientation and surveillance, and be in proud service to the site.
In broad terms the work is; the removal of the existing lean-to shop to give space to the arrival court, the extension of the existing building section to the south to provide a new tall volume entry, the decanting of Felons and Administration into a new lower height addition to the south and the provision of a new broad stair to make a grand and more legible connection between arrival and site access. A new deep awning unites the old and the new and provides a generous covered area for external gathering at arrival.
An uncomplicated and recessive palette of materials is proposed. The existing building, as presented at arrival, has vertical timber battens added and the whole refinished in black satin stain, the battens give a new order to the expression which is is carried over into the glazing for the new entry to unite the two. The addition is in charcoal black brick with deep openings to acknowledge the solid and void character of the place - a timeless and modest material of permanence, the depth and proportion of window openings providing a sense of passive overview.
Internally, the rationale is to declutter and provide light filled open spaces that seek not to distract the visitors purpose. Thresholds between areas are articulated to identify space and use, and to clarify the process of transit through the building. Glazing is provided where a view to the site is available to orientate the visitor.
Landscaping is limited to the extension, legibility and rationalization of the arrival and site access courts and the minimum clearing and management of the bushland, is required for the new footprint, and to achieve view corridors from selected locations.
Craig Rosevear Architect
Black brick
Blackened timber
Black anodised aluminium
Material Palette Reference imagesThe proposed external material palette
comprises black painted timber (top), black anodized panel and black brick (bottom).
View from Jetty Road looking north
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
14
4. Architectural Rendering 1 - Arrival Forecourt
View of Arrival Forecourt
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
15
4. Architectural Rendering 2 - Departure Forecourt
View looking south over Departure Forecourt down Jetty Road
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
16
4. Architectural Rendering 3 - Jetty Road
View from Jetty Road looking north
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
17
5. Architecture - Modeling & Site View Analysis
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
1 2
34
5
The Por t A r thu r H i s to r ic S i te Landscape Management Plan identifies significant vistas. Those which are relevant to the Project (as determined on site and instructed by PAHSMA) are shown above.
These views are studied in the following sheets using photomontage and 3 D modeling of proposed built form. As the proposed built form is largely shrouded by trees the images provide existing condition (TOP image), modeled form (middle image no trees) and proposed built form in landscape (lower image)
NOTE : All photographic images, proposed built form montage images and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
6
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
View point 6Government Cottage TerraceS 43o08’720” E 147o50’915”50mm camera lens height RL14.5 AHD
View point 6
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
18
5. Architecture - Modeling & Site View Analysis
insert RS modeling t image
insert RS modeling image
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
1
VIEW POINT 1
GOVERNMENT GARDENS LOOKING TOWARDS VISITOR CENTRE
As the proposed built form is largely shrouded by trees the images provide existing condition (TOP image), modeled form (middle image no trees) and proposed built form in landscape as photo montage (lower image)
NOTE : All photographic images , proposed montage image and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
Existing
Model
Montage
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
19
5. Architecture - Modeling & Site View Analysis
insert RS modeling t image
insert RS modeling image
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
2
VIEW POINT 2
MEMORIAL PRECINCT LOOKING TOWARDS VISITOR CENTRE
As the proposed built form is largely shrouded by trees the images provide existing condition (TOP image), and proposed built form in landscape as photo montage (lower image). Refer following sheet for detail and modeling.
NOTE : All photographic images , proposed montage image and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
20
5. Architecture - Modeling & Site View Analysis
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
2
VIEW POINT 2
MEMORIAL PRECINCT LOOKING TOWARDS VISITOR CENTRE - DETAIL
As the proposed built form is largely shrouded by trees the images provide modeled form (top image- no trees) and proposed built form in landscape as photo montage (lower image)
NOTE : All photographic images , proposed montage image and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
Model
Montage
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
21
5. Architecture - Modeling & Site View Analysis
insert RS modeling image
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
3
VIEW POINT 3
COMMANDANTS COTTAGE LOOKING TOWARDS VISITOR CENTRE
As the proposed built form is largely shrouded by trees the images provide existing condition (TOP image), modeled form (middle image no trees) and proposed built form in landscape as photo montage (lower image)
NOTE : All photographic images , proposed montage image and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
Existing
Model
Montage
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
22
5. Architecture- Site View Analysis
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
4VIEW POINT 4
HOSPITAL HILL LOOKING TOWARDS VISITOR CENTRE, OVERLOOKING PENITENTIARY
As the proposed built form is largely shrouded by trees the images provide existing condition (TOP image), modeled form (middle image no trees) and proposed built form photo montage (lower image)
NOTE : All photographic images , proposed montage image and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
Existing
Model
Montage
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
23
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
5
5. Architecture- Site View Analysis
VIEW POINT 5
PENITENTIARY LOOKING TOWARDS VISITOR CENTRE, OVERLOOKING CREEK & CRICKET PITCH
As the proposed built form is largely shrouded by trees the images provide existing condition (TOP image), modeled form (middle image no trees) and proposed built form in landscape (lower image)
NOTE : All photographic images , proposed montage image and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
Existing
Model
Montage
Port Arthur Historic Site_Redevelopment of Visitor Centre Project _ Stage 2 Design Development - Project Report & Milestone Gate Review 20160803
PORT ARTHUR HISTORIC SITEREDEVELOPMENT OF VISITOR CENTRE PROJECTSTAGE 2 DESIGN DEVELOPMENT - PROJECT REPORT & MILESTONE GATE REVIEW
24
View point 4
North
View point 5
View point 1
View point 2
PAVC Redevelopment - Site View Analysis
View point 1Government Gardens FountainS 43o05’756” E 147o5’967”50mm camera lens height RL6.5 AHD
View point 2Memorial GardenS 43o08’787” E 147o151’093”50mm camera lens height RL6.5 AHD
View point 3Commandants Cottage VerandahS 43o08’923” E 147o151’062”50mm camera lens height RL17.5 AHD
View point 4Hospital Hill from Smith O Brien’sS 43o08’939” E 147o50’998”50mm camera lens height RL25.5 AHD
View point 5Penitentiary steps northwest endS 43o08’863” E 147o50’996”50mm camera lens height RL3.5 AHD
6
5. Architecture - Site View Analysis
VIEW POINT 6
GOVERNMENT COTTAGE LOOKING TOWARDS VISITOR CENTRE,
As the proposed built form is largely shrouded by trees the images provide existing condition (TOP image), modeled form (middle image no trees) and proposed built form in landscape (lower image)
NOTE : All photographic images , proposed montage image and camera view point in model are referenced to GPS coordinates and Australian Height Datum (AHD)
Existing
Model
Montage