Project 1: Understanding Different types of Professions and Drawings in the Built Environment
Topic: Mechanical and Electrical EngineerMechanical and Electrical Drawings
Group : NGMembers : Lew Quo Ming (Leader)
Michelle Wong Sook YinKok Xuan YingMelvyn Poh Ern MengLiew Cherng Qing (Mike)Mohammad Hafiz bin Zainal
Tutor : Miss Noorul Iffa Mohd NayanMiss Ann See PengMs. Thivilojana
![Page 2: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/2.jpg)
Content- Responsibilities- Scope of work- Tasks at different stage of construction- Types and Functions of drawings
![Page 3: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/3.jpg)
Who are Mechanical & Electrical
Engineers?- work with architects and structural engineers.- Instrumental part of the design team.
Sizing and layout of Heating Ventilation and Air Conditioning (HVAC) , routing treated air and design of lighting & communications system.
![Page 4: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/4.jpg)
Mechanical Engineer provide solutions to development of processes and products, ranging from small component to extremely large plant, machinery or vehicles.[ construction industry : HVAC]
Scope of Work
Electrical Engineer work on development of lighting and communication systems.
![Page 5: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/5.jpg)
What do they do?
![Page 6: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/6.jpg)
Before Construction- Implementing cost-effective equipment modifications.
(help improve safety and reliability)- Developing and evaluating theoretical designs.- Research, analyze, planning (mathematical modeling ).- Recommending modifications following prototype test
results. (Design & Experimenting )
![Page 7: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/7.jpg)
During ConstructionMonitoring and commissioning systems.
Direct and coordinate manufacturing, construction,installation and maintenance activities.
![Page 8: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/8.jpg)
After ConstructionMake sure a system can function again reliably and will perform consistently in specified operating environments.
Inspect complete installations and observe operations, ensure operational compliance (teamwork).
![Page 9: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/9.jpg)
Mechanical and Electrical Drawings
![Page 10: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/10.jpg)
Typical Electrical Layouts
![Page 11: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/11.jpg)
Base Sheet
![Page 12: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/12.jpg)
Step1: draw light fixtures
Step2: Place electrical outlets
Step3: Draw electrical symbols
Step4: Switch locations and characteristics
![Page 13: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/13.jpg)
![Page 14: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/14.jpg)
![Page 15: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/15.jpg)
![Page 16: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/16.jpg)
![Page 17: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/17.jpg)
![Page 18: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/18.jpg)
![Page 19: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/19.jpg)
![Page 20: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/20.jpg)
![Page 21: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/21.jpg)
![Page 22: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/22.jpg)
![Page 23: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/23.jpg)
![Page 24: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/24.jpg)
![Page 25: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/25.jpg)
![Page 26: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/26.jpg)
![Page 27: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/27.jpg)
Summary
![Page 28: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/28.jpg)
ReferenceJefferis,A., Madsen,D.A., Madsen,D.P. (1986). Architectural Drafting
and Design, United State : Delmar Cengage Learning. Bownass. D (2001), Building Services Design Methology, USA and
Canada , Spon Press. Graduate Prospects Ltd. (2015) “Mechanical Engineer Job
Description”, “Typical work activities” Retrieved February 24th 2015 http://www.prospects.ac.uk/mechanical_engineer_job_description.htm
Graduate Prospects Ltd. (2015) “Electrical Engineer Job Description”, “Typical work activities” Retrieved February 24th 2015 http://www.prospects.ac.uk/electrical_engineer_job_description.htm
CAREERPLANNER.COM (1997-2015) “Job Duties and Tasks for : Electrical Engineer” Retrieved February 24th 2015 http://job-descriptions.careerplanner.com/electrical-engineers.cfm
![Page 29: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/29.jpg)
Q&A
![Page 30: project slide](https://reader030.vdocuments.us/reader030/viewer/2022032513/55d105c6bb61eb6b2d8b47d1/html5/thumbnails/30.jpg)
THANK YOU