1 I. Criteria for Project Selection Models • A. Realism – 1. The model should reflect the reality of the manager's decision situation, including the multiple objectives of both the firm and its managers. – 2. Need a common measurement system to evaluate projects. – 3. Must take into account the firms limitations on facilities, capital, personnel, etc. – 4. Should include risk factor. Project Selection

Upload: unknown139

Post on 04-Oct-2015

5 views

Category:

Documents


2 download

DESCRIPTION

Project Selection in portfolio management and project management

TRANSCRIPT

  • * I. Criteria for Project Selection ModelsA. Realism1. The model should reflect the reality of the manager's decision situation, including the multiple objectives of both the firm and its managers.2. Need a common measurement system to evaluate projects.3. Must take into account the firms limitations on facilities, capital, personnel, etc.4. Should include risk factor.

    Project Selection

  • *Project SelectionB. Capability1. Must deal with multiple time frames2. Must simulate various situations. a) Internal situations (e.g., strikes) b) External situations (e.g., interest rate changes)3. Must optimize the decision.

  • *Project SelectionC. Flexibility1. Must provide valid results within range of conditions the firm might experience.2. Should be easily modified or self-adjusting to changes in the firm's environment.

  • *Project SelectionD. Ease of Use1. Reasonably convenient, low execution time, easy to use and understand2. Should need no special interpretation, no hard-to-acquire data, no excessive personnel or unavailable equipment.3. Model's variables should rate one to one with real world variables that the manager finds significant to the project.4. Expected outcomes should be easily simulated

  • *Project SelectionE. Cost 1. Data gathering and modeling costs should be low relative to the project cost.2. All costs should be considered, and their total should definitely not be greater than the potential benefits of the project.

  • *Project SelectionF. Easy Computerization1. Convenient to gather and store information in a computerized data base.2. Easy to manipulate the data in the model such as through a spreadsheet.

  • *II. The Nature of the Project Selection ModelsA. Two basic model types1. Numeric - use numbers as inputs.2. Nonnumeric - don't use numbers as inputs.B. Important model facts to remember1. Models don't make decisions; people do.2. Models only partially reflect reality. True model optimality only exists within the limited framework of the model itself

    Project Selection

  • *C. Necessary for evaluation of a model to develop a fist of the firm's objectives.1. List generated by top management.2. Items on the list should be weighted to represent the degree of contribution the item has on the set of goals.3. Projects are accepted or rejected based on how much their predicted outcomes contribute to goal achievement.4.Some suggested list categories.a) Production, marketing finance, personnel, administrative

    Project Selection

  • *Project Selection5.Some list factors are recurring, others have one-time impact.6. Ranges of uncertainty are helpful for hard-to-estimate factors.7.Thresholds or critical values of acceptance or rejection can be assigned.8. Items will contain differing levels of specificity.

  • *Project SelectionIII. Type of Project Selection ModelsA. Nonnumeric Models1.The Sacred Cowa) Suggested by a senior and powerful officialb) Stopped at successful conclusion or when suggesting official realizes it was a mistake2.The Operating Necessitya) Project is required to keep the system goingb) Ask if system is still worth operating..3.The Competitive Necessitya) Needed to compete.b) Operating necessity projects take precedence over competitive necessity projects

  • *4. The Product Extension Linea) Judged on degree to which it fits the firm's existing product line, fills a gap, strengthens a weak link or extends a line into a new desirable direction5.Comparative Benefit Modela) Q Sort1) Divide a list of projects into groups of good - fair - poor.2) Rank projects within groups.3) One person or a selecting committee does it.b) Models widely used.c) Peer review - outside referee picks projects.

    Project Selection

  • *B. Numeric Models - Profit - Profitability1.Payback Perioda) Initial fixed investment in the project divided by the estimated annual cash inflows from the project.2. Average Rate of Return (ARR)a.) Ratio of average annual profit to the initial or average investment in the project. b.) Both payback and ARR methods ignore the time value of money3. Discounted Cash Flow - Present Value Methoda) Determine net present value (NPV) of all cash flows by discounting them by the required rate of return (hurdle rate).b) Project is acceptable if sum of the NPV is positive.

    Project Selection

  • *5. Profitability Index (benefit-cost ratio)a) NPV of all future expected cash flows divided by the initial cash investment.b) Acceptable if ratio is greater than 1.0.6. Other Profitability Modelsa) Subdivide net cash flows into the elements that comprise the net flow.b) Introduce terms to consider risk.c) Consider effects on other projects in the organization.d) Pacifico's Methode) Dean's Profitability Method

    Project Selection

  • *7. Advantages of profit-profitability numeric modelsa) Undiscounted models simple to use and easy to understand.b) Cash flows come from readily available accounting information.c) Output in familiar terms for decision makers.d) Models usually provide "absolute" go/nogo decisions.e) Some models account for risk.f) Dean's model incorporates impact of project on the rest of the organization

    Project Selection

  • *8.Disadvantages of profit-profitability numeric modelsa) Ignore all nonmonetary factors except risk.b) Undiscounted models ignore time value of money and timing of cash flows.c) Present value models are shortrun biased.d) Payback model ignores cash flows beyond the payback period.e) Sensitive to data errors from early years of project.f) All discounting nonlinear, so effects of parameter changes are not obvious to most managers.g) Models with research risk can mislead the decision maker.h) Some only apply to projects resulting in new products.i) Not clear how cash flows are properly defined for project evaluation purposes.

    Project Selection

  • *C. Numeric Models - Scoring1. Unweighted 0-1 Factor Modela) List relevant factors on a preprinted form and have top management evaluators determine whether or not the project qualifies for each of the factors. Sum the responses and see if the project qualifies for enough factors to accept.b) Weighs all factors as equally important.c) No gradation of degree which factor is met.2. Unweighted Factor Scoring Modela) Grade level of how well a factor is met by a project on a graded scale, usually 5 pt. (e.g.,5-very good 1 -very bad).b) All factors still weighted equally

    Project Selection

  • *3. Weighted Factor Scoring Modela) Add weights reflecting the relative importance of the factors and multiply the weight of each factor by its score. Sum these values and compare to a threshold value.b) This method can provide a sensitivity analysis to point out area for project improvement.c) Don't include marginally relevant factors4. Constrained Weighted Factor Modela) Similar to above except additional criteria enter the model as constraints (things that must be present or absent in order for the project to be acceptable) rather than as Weighted factors

    Project Selection

  • *5. Dean and Nishry's Modela) Integer programming model that selects the highest scoring project from the scoring model, and then selects them one after another until the resources and depleted6. Goal Programming with Multiple Objectivesa) Variation of the general linear programming method which optimizes an objective function with multiple objectives.

    Project Selection

  • *7. Advantages of Numeric Scoring Modelsa) Allow multiple criteria to be used for evaluation and decision.b) Structurally simple and easy to use.c) A direct reflection of management policy.d) Easily altered to meet changes in the environment and in management policy.e) Weighted scoring models allow for the fact that some factorsare more important than others.f) Easy sensitivity analysis to see trade-offs between several criteria.

    Project Selection

  • *8. Disadvantages of Numeric Scoring Modelsa) Output is a relative measure, no utility is reflected, thus no direct indication of project support.b) Generally linear, elements are assumed to be 'independent.c) Tendency to include too many criteria.d) Unweighted models assume equal importance of all criteria.e) To the extent to which profit-profitability is included in the scoring model, its advantages and disadvantages appear.

    Project Selection

  • *D. Suggestions on Model Selection1. Scoring models are suggested

    Project Selection

  • *IV. Analysis Under High UncertaintyA. Uncertainty in Organizations1. Most uncertainty is about the timing and the costs.2. Three areas of uncertaintya) Timing of project and cash flows.b) What will the project accomplish.c) Side effects or unforeseen consequences3. Pro-forma documents help reduce uncertainty.a) Monte Carlo Simulation - exposes the many possible consequences of a project.1) Risk Analysis

  • *B. Risk Analysis1. Focuses decision maker's attention on the nature and the extent of the uncertainty of some variables in the decision-making process.2. Uses probability distributions for each of the uncertain variables, instead of the point estimates that financial analysis utilizes.3. Decision AnalysisC. General Simulation Analysis1. Avoid the full-cost approach. Only count costs and times that are really results of the new proposed project.

    Project Selection

  • *V. Comments on the Information Base for Evaluation-SelectionA. Comments on Accounting Data1. Costs and revenue are assumed to vary linearly with associated changes in inputs and outputs.2. The standards used to provide cost-revenue information may or may not be accurate representations of the physical systems they are supposed to represent.3.Incremental analysis should be used to guard against the full-cost approach.

    Project Selection

  • *B. Comment on Measurements1.Subjective vs. Objectivea. Objective - Measurement taken by reference to an external system.b. Subjective - Reference to a standard that is internal to the system. 2.Quantitative vs. Qualitativea. Difference is that one may apply the law of addition to quantitative data and not to qualitative3.Reliable vs. Unreliablea. Data source is reliable if repetitions of a measurement vary by less than a prespecified amount

    Project Selection

  • *4. Valid vs. Invalida. Validity - extent to which a piece of information means what we think it means. C. Comment on Technological Shock1. Dealing in projects unfamiliar to the organization will usually lead to underestimating costs and time. This is mostly due to the system reacting in ways that we did not predict.2. Whenever possible include build past knowledge of system actions and reactions into estimates of future project performance.

    Project Selection

  • *VI. Project Proposals A. Proposal Overview1.Project Proposal - set of documents submitted for evaluation.2.Can be extensive, usually to prospective outside clients, or brief, usually internal projects.B. The Technical Approach1. General Description of problem to be attacked.2.Method for resolving critical problems presented.3. Tests and inspection procedures noted.

    Project Selection

  • *C. The Implementation Plan1.Contains estimates of the time required, the cost, and the materials used.2. PERT-CPM, time charts, etc. here, also milestones for the project and period by period resource usage.D. The Plan for Logistic Support and Administration1. Description of the ability of the proposer to supply the routine facilities equipment and skills needed during the project.2.Section describing how the project will be administered.E. Past Experience1.Describes past experience of the proposing group.2. List of key personnel with their titles and qualifications.

    Project Selection

  • *VII. The Past and Future of Project Evaluation/Selection ModelsA. Post WW II - mostly payback period was used.B. 50's and 60's - profit-profitability was majority.1.Led to short time-horizon projectsC. 70s - High interest rates raised cut-off rate. Projects with long term payoff horizons were cut back.

    Project Selection

  • *D. Late seventies early eighties - Mostly profit, but a growth in multiple criterion models.E. Recently - Computers are making sensitivity analysis easy, but math programming models are still not being used. Scoring models are now being used.F. Future - More usage of the math programming and scoring models.

    Project Selection