Project procedures. Issues addressed. Overall project structure Project roles Project Manager Scientific Co-ordinator WP leaders Partners Internal project committees General Assembly Management Committee External advisory groups Project procedures Preparation of deliverables - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Project procedures

1

Project procedures

Page 2: Project procedures

2

Issues addressed

Overall project structureProject roles

• Project Manager• Scientific Co-ordinator• WP leaders• Partners

Internal project committees• General Assembly• Management Committee

External advisory groupsProject procedures

• Preparation of deliverables • Quality control• Communication process• Meetings• Reporting

Page 3: Project procedures

3

Overall project structure

Project Manager

Maria Legal (PLANET)

Maria Legal (PLANET)

Work-package Leaders

Management Committee

Franco Malerba; Nicoletta Corrocher (UB) Yannis Caloghirou, Nicholas Vonortas, Aimilia Protogerou

(NTUA), Maria Legal, Soumi Papadopoulou (PLANET), Maureen McKelvey (IMIT), Slavo Radosevic (UC)L

Franco Malerba; Nicoletta Corrocher (UB) Yannis Caloghirou, Nicholas Vonortas, Aimilia Protogerou

(NTUA), Maria Legal, Soumi Papadopoulou (PLANET), Maureen McKelvey (IMIT), Slavo Radosevic (UC)L

Scientific Co-ordinator

Franco Malerba (UB)Franco Malerba (UB)

Project Partners

GENERAL ASSEMBLY

Authorised representatives of all partnersAuthorised representatives of all partners

Page 4: Project procedures

4

Project Roles

Project Manager

Scientific Co-ordinator

WP leaders

Partners

Page 5: Project procedures

5

Project Manager (PM): role and responsibilitiesContact point of project co-ordinator for all project partners

Sole contact point vis a vis the European Commission for all issues

• All requests by the EC for the project (or concerning specific partners) will be directed via the project manager

• All requests by partners related to contractual issues should be performed via the project manager

Page 6: Project procedures

6

Project Manager (PM): role and responsibilities cont’dOverall co-ordination of project execution in terms of contractual & administrative issues i.e.

• Monitors compliance of partners with their obligations under the Grant Agreement (GA; contract) and consortium agreement (CA)

• Oversees the implementation of amendments to the GA or CA (if/when required)

• Reviews that deliverables are consistent with the Description of Work• Monitors the day-to-day implementation of project work plan (in

consultation with Scientific Co-ordinator)• Submits deliverables according to timeplan• Aims to ensure smooth inter-partner co-operation• Organizes project meetings and reviews (develops agendas, minutes and

action plans)• Identifies key risks to the project and counter-measures• Disseminates key project results to EC policy-makers

Financial management of project in close collaboration with the appointed financial manager :

• Submission of financial statements (prepared by partners) • Receipt of EU financial contributions and distribution among project

partners in accordance with Annex I• Informing the Commission on the distribution of funds to partners

Page 7: Project procedures

7

Scientific Co-ordinator (SC): role & responsibilitiesCo-ordinator of the scientific / research activities of the project:

• Ensures that scientific objectives of the project are met • Ensures the high quality of project results according to DoW

Consults the Scientific Coordination Committee on key scientific issues e.g. technical implementation risks etc.

Key responsibilities:• Monitoring of scientific progress through the development of technical

work-plans per semester (in collaboration with work-package leaders) • Identification of synergies between work-packages and relevant actions• Monitoring the activities of work-package leaders • Final quality control of all technical project deliverables• Synchronization and integration of results achieved at project level• Reporting of scientific progress to Project Manager and Scientific

Coordination Committee• Scientific organisation of workshops and final project conference

(foreseen in WP8)• Disseminates key project results to EC policy-makers

Page 8: Project procedures

8

Work-package Leaders: Roles & ResponsibilitiesWork-package Leaders shall co-ordinate the implementation of activities in their respective work-package. Responsibilities include:

• Develop WP-specific action-plans (per trimester) determining required actions/inputs from involved partners in order to produce intermediate results and deliverables

• Monitor closely (on a day-to-day basis) implementation of action-plans

• Co-ordinate the communication (e.g. by email, concalls, meetings) between partners involved in the work-package.

• Consult the Scientific Co-ordinator on key scientific issues, potential risks and deviations from plan (in cc: always also the Project Manager)

• Monitor WP progress and report to the Scientific Co-ordinator and Project Manager (e.g. in Progress Reports).

• Integrate all inputs and edit draft and final deliverables prior to forwarding to the Scientific Co-ordinator and Project Manager

Page 9: Project procedures

9

Partners: Role & ResponsibilitiesAll project partners are required to carry out the project jointly and severally vis a vis the European Commision taking all necessary actions to ensure the project is carried out in accordance with the contract (Grant Agreement).

Each partner should:• Carry out the work to be performed as identified in the Description

of Work (Annex I) • Ensure that tasks assigned are correctly and timely performed i.e.

deliver requested inputs on time and at the expected quality. • Document its activities in 6-monthly interim reports• Inform promptly the Project Manager any change in its legal

name, address, name of legal representative and any change with regard to its legal / organizational status

• Inform the Project Manager on any event, potential risk/problem which may affect the implementation of the project

• Take part in project meetings and review meetings (with the EC)• Disseminate the projects’ results to the research community and

public• Abide to fundamental ethical principles and avoid any conflicts of

interest

Page 10: Project procedures

10

Partners: Role & Responsibilities (cont’d)

Each partner has identified a key contact person who is the principle person of contact for the organisation in terms of the:

• scientific, contractual and in some cases financial issues (if a separate financial contact person does not exist).

The Scientific Co-ordinator and the Project Manager shall communicate with the contact person at a first instance for specific issues pertaining to the partner.

List of contact details for all partners is maintained by Project Coordinator

Page 11: Project procedures

11

Internal project committees

General Assembly

Management Committee

Page 12: Project procedures

12

General Assembly

The General Assembly consists of one authorized representative per partner (and optional deputy) . The Assembly is in charge of managing all high-level decisions related to the Grant Agreement (contract) and Consortium Agreement e.g.

• Amendments to the terms of the Grant Agreement or Consortium Agreement

• Decisions on accession of new partners or termination of existing partner’s participation

• Re-allocation of project budget among work packages or budget transfers among partners

• Decisions on significant changes in work-packages

Page 13: Project procedures

13

General Assembly: decision-making mechanisms

High-level decisions require unanimity by all partners. If unanimity is not achieved, a General Assembly can be called again within 30 days where a decision can be taken by a majority of 75% of votesOther issues require a simple majority of two-thirds. The Assembly is called and chaired by the Project Manager when deemed necessary or requested by a partner. For urgent or minor decisions, decisions can be taken via teleconference meetings followed by written consent (sent by fax to the Project Manager).

Page 14: Project procedures

14

Management Committee

The Management Committee (MC) will monitor the overall progress of the project. It will:

• Achievement of scheduled milestones and project objectives

• Identify risks/problems and appropriate measures• Oversee the process of external refereeing of key

project deliverables by the external advisory groups• Review Progress Reports and Periodic Reports • Dissemination and exploitation of project results

The MC will be chaired by the Scientific Co-ordinator and Project Manager and will meet every 6 months or when needed. Members will interact also via conference calls and electronic mail.

Page 15: Project procedures

15

Project Procedures

Preparation of deliverables

Quality control

Knowledge management

Communication process

Meetings

Page 16: Project procedures

16

Procedure for preparation of deliverablesAll deliverables should use the standard TEMPLATE for deliverables (to be used also for outlines and drafts)

WP leader should develop an initial structure (proposal) of the deliverable and indicative distribution of sections among partners

Once the structure and allocation is agreed among partners involved, the WP leader will monitor the smooth collection of all inputs.

• if internal WP meetings / workshops are needed, these shall be organised by the WP leader in a location convenient to all partners, in consultation with the Scientific Coordinator and Project Manager

Each deliverable shall be integrated, finalized and edited by the WP Leader.

Subsequently, the WP Leader shall forward it to the Scientific Co-ordinator (cc: Project Manager) at least 3 weeks prior to the deadline who will initiate the process for internal or external review as appropriate (see next slides).

Page 17: Project procedures

17

Classification of review level for deliverablesAll deliverables shall be reviewed internally by another partner with relevant know-how e.g. WP leader of another WP: mainly drafts and deliverables that are not critical or “parts” of subsequent reports

The Scientific Co-ordinator and the Project Manager will develop a list with review level classification for all deliverables, which shall be made known to all project partners

• This list will indicate apart from the review level also the names of internal (within the project) or external reviewers.

Page 18: Project procedures

18

Internal review of deliverables (quality control)Deliverables that require internal review shall be reviewed by the designated internal reviewers (project partner with relevant know-how) • at least 3 weeks prior to deadline submission

and returned back to the WP leader at least 10 days prior to the deadline.

The WP leader should send the final version of deliverables 3 days prior to deadline (to the Project Manager and Scientific Coordinator).

Page 19: Project procedures

19

Knowledge Management and document repository

All deliverables and other background material shall be made available to project partners via a web-based tool

WP Leaders will have the ability to upload documents to the repository (with a username & password)

The Project Manager will ensure that all final versions of deliverables (as submitted to the EC) are uploaded

Moreover, all major reports and research results will be made publicly available through the project website (to be monitored by the Scientific Co-ordinator)

Page 20: Project procedures

20

Communication via the project mailing listEvery project should use two emailing lists:

1.A technical project mailing list to be used by persons who are involved in the scientific/technical implementation of the project are included

2.A project mailing list to be used by partners when they wish to address an issue affecting all project partners. The Project Manager and Scientific Coordinator shall use this mailing list for issues pertaining to all partners (e.g. preparation of plenary meetings, distribution of minutes etc.)

Page 21: Project procedures

21

Bilateral, intra-WP electronic communicationWP leaders are responsible for co-ordinating intra-WP communication means. (Via “informal” mailing lists per work-package).

In order to ensure the smooth co-operation and development of “communication history”, ALL bilateral, intra-WP and other email communications should have the Project Manager copied in cc, even on apparently minor issues;

Page 22: Project procedures

22

Communication via conference callsTelephone conference calls can be organised among project partners (e.g. among work-package partners, members of the Scientific Coordination Committee).

Brief minutes should be distributed by the WP leader (or other designated person) via email to:• the affected partners and • the Scientific Coordinator • and Project Manager

Page 23: Project procedures

23

Project meetings and Reviews

Plenary project meetings (involving all partners) will be organised approximately every 6 months at a different location

It is important that all partners are present at plenary meetings, even if they do not have an active role in the given period.

The Project Manager shall distribute:• the agenda at least 2 weeks prior to meetings• minutes & action plan within 10 days after meetings

Other meetings e.g. intra-WP workshops can be organised if considered necessary.

THIS WILL BE CLARIFIED WITH THE Project Officer: Annual reviews may be be held for the evaluation of the project’ progress by the EC

Page 24: Project procedures

24

Reporting

PERIODIC REPORTS will be submitted to the Commission at the end of each reporting period (usually every 12 months)

Detailed presentation on preparation of financial statements (to be included in periodic reports) follows in part 2 of the presentation on “Financial Management”.

In order to monitor the progress of the project, 6-monthly interim progress reports shall be prepared:

• All partners are required to record their activities and effort (in person-months) per work-package

Page 25: Project procedures

25

Project Management Manual

The roles and procedures shall be documented in an easy-to-use project management manual (internal document), that is being prepared by project manager. The descriptions are in line with the:• provisions of the Grant Agreement (Annex II –

General Conditions)• Consortium Agreement

Page 26: Project procedures

26

Financial Management

Page 27: Project procedures

27

Issues addressed

Financial Issues• Payment mechanisms• Guarantee Fund• Financial Statements• Eligible – Non eligible expenses• Important Notes• Certificates• Reporting Requirements

Page 28: Project procedures

28

Payment Mechanisms (1)

Pre financing shall be paid to the coordinator within 45 days following the date of entry into force of the grant agreement

5% of total Community Funding paid as a contribution to the Guarantee Fund

Interim Payments• Corresponding to the costs accepted for the period• Payments until 10% retention is reached

Final Payment • Including reimbursement of the 5% contribution from the

guarantee fund• Taking into account the declaration of receipts at participant

level

Page 29: Project procedures

29

Payment mechanisms (2)

Commission has 105 days to evaluate and execute the corresponding payment

• No tacit approval of reports• EC will pay interests on late payment

After reception of reports the Commission may• Approve the reports and deliverables, in whole or

in part or make the approval subject to certain conditions

• Reject giving justification, if appropriate start the procedure for termination

• Suspend the time limit requesting revision / completion

• Suspend the paymentBank Account Details Form to be distributed in order to be completed by each partner

Page 30: Project procedures

30

Guarantee Fund: Principles (1)

No financial collective responsibility like FP6

Instead Establishment of a participants Guarantee fund in order to cover risks

The Fund belongs collectively to all beneficiaries of grant agreements under the FP7

The Fund is managed by the Commission on behalf of the beneficiaries and is kept in the European Investment Bank (EIB)

Page 31: Project procedures

31

Guarantee Fund: Principles (2)

All beneficiaries contribute to the Fund to insure against financial losses of the project funded under FP7

The contribution equals to 5% of the EC financial contribution to each project and it is disbursed when the pre-financing is paid

Financial interest generated by the Fund will serve to cover financial risk

The amount contributed to the Fund will be reimbursed at the end of the action

Page 32: Project procedures

32

Financial Issues: Preparation of Financial StatementsThe financial statement (form C) is a report that has to be completed by each contractor, presenting his costs for the reporting period, in a standard form.

Costs shall fulfill some initial conditions :• be necessary for the project• be incurred during the duration of the project• exclude any profit margin

All costs must be reported in EUR. Accounts in currencies other than EUR shall be reported on the basis of exchange rate that would have applied either:

• On the date that actual costs were incurred or• On the basis of the rate applicable on the 1st day of the

month following the end of the reporting period.

Page 33: Project procedures

33

Financial Issues: Eligible expensesThe eligible costs of the project are:

• Actual, economic and necessary for the implementation of the project

• In accordance with the usual accounting principles of the contractor

• Incurred during the duration of the project

• Recorded in the accounts of the contractor

Page 34: Project procedures

34

Financial Issues: Non eligible costsThe non eligible costs of the project are:

• Any identifiable indirect taxes, including VAT or duties• Interest owed• Provisions for possible future losses or charges• Exchange losses• Costs declared, incurred or reimbursed in respect of

another Community project• Costs related to return on capital• Debt and debt service charges• Excessive or reckless expenditure

Page 35: Project procedures

35

Financial Issues: Important Notes (1)Timesheets

• Timesheets should be kept for all people charged to the project

• The person in charge of the work designated by the contractor should certify the timesheets

• Certified time sheets must include the person’s identity and its time spent on the project (the project needs to be identified by acronym and contract number)

• Productive hours must be calculated according to the contractor’s normal practices

• Contractors may use a standard model for time sheets• Planet may provide you with template for timesheets, if

required

Receipts of all costs shall be kept by each contractor

Page 36: Project procedures

36

Financial Issues: Important Notes (2)Personnel. Persons included under personnel costs• Must be directly hired• Work on the sole technical supervision and

responsibility of the beneficiary• Be remunerated in accordance with the

normal practices of the beneficiary

Page 37: Project procedures

37

Financial Issues: Important Notes (3)No cost reporting model (FC,FCF, AC) – though different ways of claiming indirect costs

Indirect cost models:

• For all beneficiaries:• Either actual overhead or simplified method• Flat rate of 20% of direct costs minus

subcontracting• Non profit Public Bodies, Secondary and Higher

Education establishments, Research Organizations and SMEs unable to identify real indirect costs per project, option flat rate of 60%

Page 38: Project procedures

38

Financial Issues: Important notes (4)

The reimbursement rates in FP7 projects are:

Maximum reimbursement rates of eligible

costs

Research and technological development

Demonstration Activities

Management of the

consortium activities

Other activities

Network of excellence

50% or 75% - 100% 100%

Collaborative project

50% or 75% 50% 100% 100%

Coordination and support

action- - 100% 100%

Page 39: Project procedures

39

Certificates: types of certificatesCertificate on the financial statement (CFS – Form D)

Certificate on the methodology for personnel and indirect costs (CoM - Form E)

Certificate on the methodology for average personnel costs if average system applied by the beneficiary (CoMAv – Form E)

Page 40: Project procedures

40

Certificates: Who delivers them?Beneficiaries have free choice of external auditorExternal auditors must be Independent and QualifiedCompetent public officer (research organisation, public bodies, higher education establishments)

Page 41: Project procedures

41

Certificates: Periodicity of the submissionCertificate on the Financial Statements (CFS• Requested EC contribution (cumulative) less

than 375.000 Euros: • No CFS to be submitted (not even at the end of the project)

• Requested EC contribution (cumulative) equal of more than 375.000 Euros:• Certificate on the Financial Statements has to be submitted:

- CFS every time equal or exceeding 375.000 - If Certificate on the Methodology (CoM)

accepted by the Commission: no interim CFS but only at the end of the project