project planning and organisation. 1.0 [email protected]

44
Project Planning and organisation

Upload: carlton-hemsley

Post on 31-Mar-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

ProjectPlanning and organisation

Page 2: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

1.0

Page 3: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

[email protected]

www.nordforce.se

Page 4: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

What is a Project?

Reach a defined goalWith limited resources

Within a fixed time

Page 5: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se
Page 6: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Planning

To think about:• What are we supposed to achieve?• How do we get there?

Page 7: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se
Page 8: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se
Page 9: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se
Page 10: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se
Page 11: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se
Page 12: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Too little planning

• No unified picture of what should be done• Great risk to deliver the wrong thing• Time is lost on rework• Frustration of not having control of the

situation• Badwill, usually the client discovers that

something is wrong

Page 13: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Too much planning

• You never get closer to the goal• Increased risk that taget is moving• Constant re-planning• Never get to know the system • Everyone gets frustrated by not getting to

work

Page 14: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

What is the right planning?

Page 15: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se
Page 16: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Some useful tools

• Mile stone plan• Responsibility matrix• Customer interaction tools• Risk analysis

Page 17: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Sys Mek E&P Tst Berör Sub milstolpe DefinitionVM NF 1 2 3 4 5 6

När alla elmek komponenter är valda samt utrymme

för elektronik bestämt Date: 2003-02-07

När layout vagnkort är klar

Date: 2003-02-12

När VM levererat en tom styrlåda med

elmek komponenter Date: 2003-02-15

När komplett programvara exekverar felfritt på så bra

labbruska som möjligt Date: 2003-02-19

När layout på styrkort är klar

Date: 2003-02-21

När VM tillhandahåller ett system att testa elektronik i,

inklusive modifierad IPEK vagn Date: 2003-02-24

När monterade kretskort kör rätt programvara på bänk

med trummor och via kabeln Date: 2003-03-06

När mekanik, elektronik och programvara är testad

9

10

11

12

13

14

15

16

Milestone plan

Page 18: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

10 When the system architecture description isapproved by Product owner andSystem architect

2013-12-12

Page 19: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

A good milestone plan

• ”Helicopter view”• State oriented, what not how• 10-15 milestones• Find “soul of the project” i.e. what is special

(difficult / risky) in this particular project?• Promotes communication internal/external• Suitable MS candidates: external events, big

risks (difficult things, not done in the past), natural deliverables

Page 20: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Responsibility matrixRole Role Role Role

Task

Task Resp

Task

Task Resp

Task

Page 21: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Legend

R= Responsible (incl. execution)E=ExecutesD=Makes decision I=Should be informedA=Advisor

Page 22: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Responsibility matrixCTO System

ArchitectProduct owner

System Architecture

I R D

Page 23: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Roles that tend to lead to success

• Project manager• System architect• Client ”nagger”• Integration responsible• Test responsible• CM responsible• Team leads (scrum masters)

Page 24: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

A good responsibility matrix

• ”Helicopter view”• Identified all external stakeholders• Identified internal roles in the project• Identified major responsibilities• Contract between the project and its

surroundings e.g. line managers and customers

Page 25: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Customer interaction

One person’s view limited by language

Not the complete Requirements

Page 26: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Customer interaction tools

• System plays• Continuous participation • Fixed meeting times• Nagging

Page 27: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Risk analysis

• Identify risks• Anticipate probability 1-5• Anticipate impact 1-5• Multiply• Sort the list• Follwow up

Page 28: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Risk Proba- bility

Impact Weight

OS version buggy

4 5 20

The flu 4 5 50

Late delivery of compiler 3.1

5 3 15

Page 29: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Planning

Find the soul of this particular project!• What are the unique ”things”? • Where are the greatest risk?• What should we prioritize?• What are the real requirements?

Page 30: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Production DevelopmentRepeat the same thing Do something newOver and over again and different

Page 31: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

All Right, so how do I join you?

If you wanna be one of the non-conformists, all you

have to do is dress just like us and listen to the same

music we do

Source: South Park

Page 32: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

The execution phase

Work according to the plan

... Improvise a lot

Page 33: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Project manager tasks

Ensure it is always is clear what should be deliveredMake sure there is always up to date plansEnsure that team members are motivatedEnsure that clients and stakeholders "feel good"Make sure the necessary rules are followedMake sure that the momentum is sustainedEnsure that decisions are madeNag, nag and nagFix resourcesReport to Steering Group

(Page 1 of 22)

Page 34: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Leadership in a project

• Client contact• Visualize goals• Fix prerequisites• Ensure decisions are

made• Follow up• Keep up the pace• Motivate

Page 35: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Motivation

Clear goal

Project wanted / anchored

Competence & methodology

reas

onable

chall

enge

EncouragmentTrust

Participation

Page 36: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

ClientClient

The ProjectThe Project

Demands Demands

The important interface

LucidityRealism

Page 37: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Behold the turtle, he makes progress only when his neck is out.

-- DR. JAMES B. CONANT, HARVARD UNIV. PRESIDENT

Page 38: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

... A few words about testing

Page 39: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

I’m gonna make this

work

I’m gonna test that this works

Page 40: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

I’m gonna make this

work

I’m gonna test that this works

Page 41: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

I’m gonna make this

work

I’m gonna break this!

Page 42: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

The bitter truth

If you want to survive you have to deliver on time and with the right quality

... Despite that the customers are always changing their mind... And subcontractors fail... And the computer “says no”

Page 43: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

The way to succed

• Focus on client• Make a proper milestone plan• Define responsibilities• Try to follow the plan (PMs responsibility)• Improvise• Work hard

Page 44: Project Planning and organisation. 1.0 ulf.bergqvist@nordforce.se

Thank you!