Project Description
• Project Area: 40 acres.
• Project Location: South side of Booneville Road, and west of future 105th Street.
• Project Size: 100,000-150,000 sq. ft.
• Property taxable valuation: $50,000,000.
Map of Site
InfrastructureElectric• The project site is located approximately
between the Booneville Substation to the west and the West Grand Substation to the east.
• MidAmerican Energy is currently in the process of seeking approval from the City for the construction of the new Sugar Creek Substation located just west of the West Grand Substation.
• MidAmerican Energy’s electric transmission lines are located on the southern boundary of the project site.
Map of Electric Facilities
Infrastructure
Fiber Optic• Currently, AT&T, Level 3, Sprint, and
CenturyLink have long haul fiber optic lines running along the right-of-way of Raccoon River Drive, located approximately ¼ mile to the south of the project site.
• AT&T also has fiber optic cable running within the right-of-way of MidAmerican Energy’s transmission lines located along the southern portion of the project site.
Map of Fiber Optic Cable Locations
Infrastructure
Sanitary Sewer• Extension of a 36 inch line from the WRA’s Sugar
Creek line located at the intersection of future Grand Avenue alignment and Sugar Creek.
• Estimated cost approximately $2,782,500.
Map of Sanitary Sewer
Infrastructure
Water (Primary)• Extension of a 12 inch water line from 88th and
Grand Avenue westerly along the future alignment of Grand Avenue.
• Estimated cost $1,420,000.
Water (Secondary)• Extension of a 12 inch water line from the
intersection of Booneville Road and 88th Street westerly along the right-of-way of Booneville Road.
• Estimated cost $1,420,000.
Map of Primary Water Line
Infrastructure
Streets• Extension of 105th Street from its intersection at
Raccoon River Drive northerly to Booneville Road.
• Estimated cost $9,670,000.
Map of Streets
Business Assistance
• Expedited permit processing of site plan, zone change and platting of 60-90 days to approval.
• The City’s first review comments on project submittals of one week or less.
• Assigned case planner to act as your liaison.
IncentivesBased upon an estimated $50,000,000 of property tax valuation, (the Microsoft Phase II project was 110,000 sq. ft. and had a value of $53,100,000):• The City of West Des Moines would construct the
sanitary truck lines necessary to service the project: $2,782,500;
• West Des Moines Water Works would construct the water line along future Grand Avenue to service the site: $1,420,000;
• West Des Moines Water Works would construct the secondary water line along Booneville Road necessary to serve the site: $1,420,000; and
Incentives (continued)
• The City of West Des Moines would construct 105th Street from Raccoon River Drive to Booneville Road: $9,670,000.
• Total value of incentives: $15,292,500.