PROJECT MANUAL FOR CONSTRUCTION OF 2012 DOMESTIC WATER HEATER REPLACEMENT FOR THE GENESEE COUNTY JAIL GENESEE COUNTY PURCHASING DEPARTMENT OWNER: COUNTY OF GENESEE. GENESEE COUNTY ADMINISTRATION BUILDING. 1101 BEACH STREET FLINT, MI 48502 ENGINEER: PO Box 3748, Flint, MI 48502 INVITATION FOR BIDS: #12-024 PROJECT NUMBER: 12C0051 DATE: August 7, 2012

Upload: vuongtuyen

Post on 23-Mar-2018

215 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

PROJECT MANUAL FOR

CONSTRUCTION OF 2012 DOMESTIC WATER HEATER REPLACEMENT FOR THE GENESEE COUNTY JAIL

GENESEE COUNTY PURCHASING DEPARTMENT

OWNER: COUNTY OF GENESEE.

GENESEE COUNTY ADMINISTRATION BUILDING. 1101 BEACH STREET FLINT, MI 48502

ENGINEER:

PO Box 3748, Flint, MI 48502

INVITATION FOR BIDS: #12-024

PROJECT NUMBER: 12C0051

DATE: August 7, 2012

Page 2: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

PROJECT MANUAL FOR

CONSTRUCTION OF 2012 DOMESTIC WATER HEATER REPLACEMENT FOR THE GENESEE COUNTY JAIL

GENESEE COUNTY IFB: #12-024 PROJECT NUMBER 12C0051

The specifications and other contract documents have been prepared under the direction of the following design professional licensed by the State of Michigan.

Douglas A. Scott, PE Professional Engineer No. 42673 The plans, specifications and contract documents have been reviewed by Eric F. Hopson, Genesee County Purchasing Director and final copies released on August 7, 2012.

Page 3: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

GENESEE COUNTY PURCHASING DEPARTMENT GENESEE COUNTY ADMINISTRATION BLDG.

1101 BEACH STREET, ROOM 200, FLINT, MICHIGAN 48502

TELEPHONE (810) 257-3030 FAX (810) 257-3380

ERIC F. HOPSON Purchasing Director August 7, 2012 GENESEE COUNTY INVITATION FOR BIDS #12-024 Sealed bids will be received until 2:00 p.m. (EDT), Thursday, August 23, 2012, at the Genesee County Purchasing Department, 1101 Beach Street, Room 200, Flint, MI, 48502 for CONSTRUCTION OF 2012 DOMESTIC WATER HEATER REPLACEMENT FOR THE GENESEE COUNTY JAIL. This procurement is conducted in accordance with the Genesee County Purchasing Regulations, a copy of which is on file and available for inspection at the Genesee County Purchasing Department. A mandatory pre-bid conference and site inspection will be held on Tuesday, August 14, 2012, at 10:00 a.m. (EDT), in the HR Training Room, Ground Floor, Genesee County Administration Building, 1101 Beach Street, Flint, MI 48502. Bids will only be accepted from the firms represented at this meeting. Each bidder is responsible for labeling the exterior of the sealed envelope containing the bid response with the bid number, bid name, bid due date and time, and your firm’s name. The bid request number and due date for this IFB are:

DUE DATE: THURSDAY, AUGUST 23, 2012 @ 2:00 PM (EDT) IFB NUMBER: #12-024

Eric F. Hopson ERIC F. HOPSON, PURCHASING DIRECTOR bid2\2012\12-024 Attachments

GENESEE COUNTY IS AN EQUAL OPPORTUNITY EMPLOYER

Page 4: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

CONTENTS BIDDING AND AGREEMENT FORMS 00000 Notice of Invitation For Bids 00100 Instructions to Bidders 00300 Bid Form 00411 Bid Bond 00500 Agreement 00610 Performance Bond 00620 Payment Bond 00640 Maintenance & Guaranty Bond 00670 Notice of Award 00672 Notice to Proceed 00673 Application for Payment 00674 Change Order 00680 Certificate of Substantial Completion 00690 Consent of Surety for Adjustment of Retainage 00692 Consent of Surety for Final Payment CONDITIONS OF THE CONTRACT 00700 Standard General Conditions 00810 Supplementary Conditions EXHIBITS Exhibit A. Genesee County Standard Terms and Conditions Exhibit B. Genesee County Insurance Checklist Exhibit C. Genesee County Major Contract Addendum Exhibit D. Prevailing Wage Rates PROJECT DRAWINGS

C-1 Cover P-1 Details, Legend, General Notes and Specifications - Plumbing P-2 Partial Enlarged First Floor Plan – Plumbing – Demolition P-3 Partial Enlarged First Floor Plan – Plumbing – New Work P-4 Details – Plumbing E-1 Partial Enlarged First Floor Plan – Electrical – Demolition E-2 Partial Enlarged First Floor Plan – Electrical – New Work

Page 5: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

GENESEE COUNTY PURCHASING DEPARTMENT GENESEE COUNTY ADMINISTRATION BLDG. 1101 BEACH STREET, ROOM 200

FLINT, MICHIGAN 48502 TELEPHONE (810) 257-3030

FAX (810) 257-3380 WWW.GC4ME.COM

ERIC F. HOPSON Purchasing Director August 7, 2012

NOTICE OF INVITATION FOR BIDS

IFB #12-024 CONSTRUCTION OF 2012 DOMESTIC WATER HEATER REPLACEMENT

FOR THE GENESEE COUNTY JAIL Sealed bids will be received until 2:00 p.m. (EDT), Thursday, August 23, 2012, at the Genesee County Purchasing Department, 1101 Beach Street, Room 200, Flint, MI, 48502 for the CONSTRUCTION OF 2012 DOMESTIC WATER HEATER REPLACEMENT FOR THE GENESEE COUNTY JAIL. The work can generally be described as the construction and replacement of two water heaters with high efficiency boilers in accordance with Drawings, Specifications and other Contract Documents prepared by ROWE Professional Services Company. A mandatory pre-bid conference and site inspection will be held on Tuesday, August 14, 2012, at 10:00 a.m. (EDT), in the HR Training Room, Ground Floor, Genesee County Administration Building, 1101 Beach Street, Flint, MI 48502. Please note that Genesee County will receive bids only from the firms represented at the mandatory pre-bid conference and site inspection. A copy of the complete Invitation for Bids/Contract Documents may be downloaded from the following site: http://www.gc4me.com/departments/purchasing/open_bids.php, and then click on the name of the IFB. The bidder is responsible for checking the website for addenda issued prior to the bid opening. Full Scale Plan Sets (22x34) may be obtained at the office of ROWE Professional Services Company and upon the payment of $35.00 per set plus $5.00 per set if mailed. Plans and specifications will not be mailed until payment is received. The non-refundable fee shall be in check form and shall be drawn payable to ROWE Professional Services Company. The Engineer's address is ROWE Professional Services Company, PO Box 3748, 540 S. Saginaw St., Suite 200, Flint, MI 48502 and the telephone number is (810) 341-7500. Each bid shall be accompanied by an acceptable form of Bid Guaranty in an amount equal to at least five per cent (5%) of the amount of the Bid payable to Genesee County Purchasing Department as a guaranty that if the bid is accepted, the Bidder will execute the Contract and file acceptable Performance, Labor and Material Payment and Maintenance and Guarantee Bonds within seven (7) days of receipt of a Notice of Award, and as a condition precedent to the award of the Contract. The Invitation for Bids may be canceled by Genesee County at any time for any reason. Genesee County, hereinafter called the Owner, reserves the right to reject any or all bids, to waive any informality or irregularity in any bid, and to negotiate with the successful bidder in the best interest of Genesee County. All inquiries shall be directed to Mr. Doug Scott, PE, Project Manager, Rowe Professional Services Company, at Phone: 810.341.7500, Fax: 810.341.7573 or Email: [email protected]

GENESEE COUNTY INVITATION FOR BIDS #12-024

Eric F. Hopson ERIC F. HOPSON, PURCHASING DIRECTOR

GENESEE COUNTY IS AN EQUAL OPPORTUNITY EMPLOYER

Page 6: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-1

INSTRUCTIONS TO BIDDERS ARTICLE 1 - DEFINED TERMS 1.01 Terms used in these Instructions to Bidders will have the meanings indicated in the

General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof:

A. Bidder: The individual or entity who submits a Bid directly to OWNER. B. Issuing Office: The Genesee County Purchasing Department, 1101 Beach Street,

Room 200, Flint, MI 48502. C. Successful Bidder: The lowest responsible Bidder submitting a responsive Bid to

whom OWNER (on the basis of OWNER’s evaluation as hereinafter provided) makes an award.

ARTICLE 2 - COPIES OF BIDDING DOCUMENTS 2.01 Complete sets of the Bidding Documents in the number and for the fee, if any, stated in

IFB #12-024 shall be obtained from the Engineer. The fee is non-refundable unless specifically stated otherwise in the IFB. Payment of the plan fee, and any applicable shipping charges must be received by the Engineer before copies of the bidding documents are issued. Before issuance of bidding documents, the name, address, phone number and fax number of the person to whom the documents are issued shall be provided to the Engineer.

2.02 Complete sets of Bidding Documents must be obtained from the Genesee County

website (http://www.gc4me.com/departments/purchasing/open_bids.php) or the Engineer; neither OWNER nor ENGINEER assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 If requested by the prospective bidders, the Engineer will provide an electronic copy of a

spreadsheet containing the unit price pay items and estimated quantities as an aid in preparation of unit price bids. The Engineer assumes no responsibility for the accuracy or completeness of any bid prepared using such electronic file.

2.04 OWNER and ENGINEER in making copies of Bidding Documents available on the

above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.

ARTICLE 3 - QUALIFICATIONS OF BIDDERS 3.01 To demonstrate Bidder’s qualifications to perform the Work, within five days of

OWNER’s request Bidder shall submit written evidence such as financial data, previous experience, present commitments, and such other data as may be called for below.

A. List of related project experience complete with dollar value of contract, type of work,

project owner and project owner’s representative and phone number.

Page 7: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-2

B. Current work now under contract or anticipated during the life of the project. Include project name, type, dollar value, completion date and percentage presently complete.

C. Equipment list. Provide list of construction equipment presently owned and/or

leased. ARTICLE 4 - EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE 4.01 Subsurface and Physical Conditions

A. The Supplementary Conditions identify:

1. Those reports of explorations and tests of subsurface conditions at or contiguous to the Site that Engineer has used in preparing the Bidding Documents.

2. Those drawings of physical conditions in or relating to existing surface and

subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in paragraph 4.01.A will be made

available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.02 of the General Conditions has been identified and established in paragraph 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions or information contained in such reports or shown or indicated in such drawings.

4.02 Underground Facilities

A. Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site is based upon information and data furnished to OWNER and ENGINEER by owners of such Underground Facilities, including OWNER, or others.

4.03 Hazardous Environmental Condition

A. The Supplementary Conditions identify those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has used in preparing the Bidding Documents.

B. Copies of reports and drawings referenced in paragraph 4.03.A will be made

available by OWNER to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in paragraph 4.06 of the General Conditions has been identified and established in paragraph 4.06 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any “technical data” or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

Page 8: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-3

4.04 Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General Conditions.

4.05 On request, OWNER will provide Bidder access to the Site to conduct such

examinations, investigations, explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.06 Reference is made to Article 7 of the Supplementary Conditions for the identification of

the general nature of other work that is to be performed at the Site by OWNER or others (such as utilities and other prime contractors) that relates to the Work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such other work.

4.07 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, including any Addenda and the other related data identified in the Bidding Documents;

B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and

Site conditions that may affect cost, progress, and performance of the Work; C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and

Regulations that may affect cost, progress, or performance of the Work; D. carefully study all reports of explorations and tests of subsurface conditions at or

contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition, if any, at the Site which have been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions;

E. obtain and carefully study (or assume responsibility for doing so) all additional or

supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including any specific means,

Page 9: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-4

methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents, and safety precautions and programs incident thereto;

F. agree at the time of submitting its Bid that no further examinations, investigations,

explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the Work at the price bid and within the times and in accordance with the other terms and conditions of the Bidding Documents;

G. become aware of the general nature of the work to be performed by OWNER and

others at the Site that relates to the Work as indicated in the Bidding Documents; H. correlate the information known to Bidder, information and observations obtained

from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents;

I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or

discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by ENGINEER is acceptable to Bidder; and

J. determine that the Bidding Documents are generally sufficient to indicate and convey

understanding of all terms and conditions for the performance of the Work. 4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that

Bidder has complied with every requirement of this Article 4, that without exception the Bid is premised upon performing and furnishing the Work required by the Bidding Documents and applying any specific means, methods, techniques, sequences, and procedures of construction that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that Bidder has discovered in the Bidding Documents and the written resolutions thereof by ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.

ARTICLE 5 - PRE-BID CONFERENCE 5.01 A mandatory pre-bid conference and site inspections will be held at 10:00 am Tuesday,

August 14, 2012 in the HR Training Room, Ground Floor, County Administration Building, 1101 Beach Street, Flint, MI 48502. Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are required to attend and participate in the conference. Please note that Genesee County will receive bids only from the firms represented at the mandatory pre-bid conference and site inspection. Oral statements may not be relied upon and will not be binding or legally effective.

ARTICLE 6 - SITE AND OTHER AREAS 6.01 The Site is identified in the Bidding Documents. All additional lands and access thereto

required for temporary construction facilities, construction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in

Page 10: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-5

existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding Documents.

ARTICLE 7 - INTERPRETATIONS AND ADDENDA 7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted

to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

7.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed

advisable by OWNER or ENGINEER. In such an event, an addendum will be posted on the Purchasing Department website (http://www.gc4me.com/departments/purchasing/open_bids.php). All bidders shall be responsible for routinely checking the Genesee County Purchasing Department website for issued addenda and other relevant information. The OWNER and Engineer shall not be responsible for the failure of a prospective bidder to obtain addenda and other information issued at any time, related to this IFB.

ARTICLE 8 - BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of

5% of Bidder’s maximum Bid price and in the form of a certified or bank check, money order or a Bid Bond [on the form attached] issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the General Conditions, and Exhibit A. Genesee County Standard Terms and Conditions.

8.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed

the Contract Documents, furnished the required contract security and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 7 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of seven days after the Effective Date of the Agreement or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.

8.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance

of receiving the award will be returned within seven days after the Bid opening. ARTICLE 9 - CONTRACT TIMES 9.01 The number of days within which, or the dates by which, the Work is to be (a)

Substantially Completed and (b) also completed and ready for final payment are set forth in the Agreement.

Page 11: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-6

ARTICLE 10 - LIQUIDATED DAMAGES 10.01 Provisions for liquidated damages, if any, are set forth in the Agreement. ARTICLE 11 - SUBSTITUTE AND “OR-EQUAL” ITEMS 11.01 The Contract, if awarded, will be on the basis of materials and equipment specified or

described in the Bidding Documents without consideration of possible substitute or “or-equal” items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and may be supplemented in the General Requirements.

ARTICLE 12 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS 12.01 If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers,

individuals, or entities to be submitted to OWNER in advance of a specified date prior to the Effective Date of the Agreement, the apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to OWNER a list of all such Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful Bidder to submit a substitute, without an increase in the Bid.

12.02 If apparent Successful Bidder declines to make any such substitution, OWNER may

award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.06 of the General Conditions.

12.03 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual,

or entity against whom CONTRACTOR has reasonable objection. ARTICLE 13 - PREPARATION OF BID 13.01 The Bid form is included with the Bidding Documents. Additional copies may be

obtained from the issuing office.

Page 12: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-7

13.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the Bid signed. A Bid price shall be indicated for each [section, Bid item, alternative, adjustment unit price item, and unit price item] listed therein, or the words “No Bid,” “No Change,” or “Not Applicable” entered.

13.03 A Bid by a corporation shall be executed in the corporate name by the president or a

vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.

13.04 A Bid by a partnership shall be executed in the partnership name and signed by a

partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature.

13.05 A Bid by a limited liability company shall be executed in the name of the firm by a

member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown below the signature.

13.06 A Bid by an individual shall show the Bidder’s name and official address. 13.07 A Bid by a joint venture shall be executed by each joint venturer in the manner indicated

on the Bid form. The official address of the joint venture must be shown below the signature.

13.08 All names shall be typed or printed in ink below the signatures. 13.09 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of

which shall be filled in on the Bid form. 13.10 The address and telephone number for communications regarding the Bid shall be

shown. 13.11 The bidder shall submit all applicable documents as required by the Genesee County

Major Contract Addendum as provided in the Exhibit section. 13.12 The bidder shall submit the Genesee County Insurance Checklist with the bid. ARTICLE 14 - BASIS OF BID; EVALUATION OF BIDS 14.01 Lump Sum

A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid form.

B. Bids shall be evaluated by the Owner in accordance with the Genesee County Standard Terms and Conditions as provided in the exhibit section of the documents.

ARTICLE 15 - SUBMITTAL OF BID

Page 13: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-8

15.01 Bids may be submitted by either completing the bidding forms in the bound documents provided or by completing copies made from the bidding forms in the documents provided. A bid shall include the completed bid form, bid security and other material identified for inclusion with the bid.

15.02 A Bid must be received no later than the date and time prescribed and at the place

indicated in IFB #12-024 and shall be enclosed in an opaque sealed envelope plainly marked with the Bid #, Project #, Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to Genesee County Purchasing Department, Room 200 County Administration Building, 1101 Beach Street, Flint, MI 48502.

15.03 Bids submitted by facsimile will not be considered. ARTICLE 16 - MODIFICATION AND WITHDRAWAL OF BID 16.01 A Bid may be modified or withdrawn by an appropriate document duly executed in the

manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids.

16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with

OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 17 - OPENING OF BIDS 17.01 Bids will be opened at the time and place indicated in IFB #12-024 and, unless obviously

non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE

18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid form,

but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 19 - AWARD OF CONTRACT 19.01 OWNER reserves the right to reject any or all Bids, including without limitation,

nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER further reserves the right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be non-responsible. OWNER may also reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder. OWNER also reserves the right to waive all informalities not

Page 14: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00100-9

involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.

19.02 More than one Bid for the same Work from an individual or entity under the same or

different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest.

19.03 In evaluating Bids, OWNER will consider whether or not the Bids comply with the

prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.

19.04 In evaluating Bidders, OWNER will consider the qualifications of Bidders and may

consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.

19.05 OWNER may conduct such investigations as OWNER deems necessary to establish the

responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals, or entities to perform the Work in accordance with the Contract Documents.

19.06 If the Contract is to be awarded, OWNER will award the Contract to the Bidder whose

Bid is in the best interests of the Project. ARTICLE 20 - CONTRACT SECURITY AND INSURANCE 20.01 Article 5 of the General Conditions, as may be modified by the Supplementary

Conditions, and Exhibit A. Genesee County Standard Terms and Conditions sets forth OWNER’s requirements as to Bonds and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by such Bonds.

ARTICLE 21 - SIGNING OF AGREEMENT 21.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be

accompanied by the required number of unsigned counterparts of the Agreement with the other Contract Documents which are identified in the Agreement as attached thereto. Within 7 days thereafter, Successful Bidder shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER. Within ten days thereafter, OWNER shall deliver one fully signed counterpart to Successful Bidder with a complete set of the Drawings with appropriate identification.

Page 15: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00300-1

BID FORM PROJECT IDENTIFICATION: IFB #12-024 Construction of 2012 Domestic Water Heater

Replacement for the Genesee County Jail CONTRACT IDENTIFICATION AND NUMBER: 12C0051 THIS BID IS SUBMITTED TO: Genesee County Purchasing Department Room 200 County Administration Building, 1101 Beach Street, Room 200 Flint, MI 48502

1.01 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an

Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.

2.01 Bidder accepts all of the terms and conditions of IFB #12-024 and Instructions to

Bidders, including without limitation those dealing with the disposition of Bid security. The Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.

3.01 In submitting this Bid, Bidder represents, as set forth in the Agreement, that:

A. Bidder has examined and carefully studied the Bidding Documents, the other related data identified in the Bidding Documents, and the following Addenda, receipt of all which is hereby acknowledged.

Addendum No. Addendum Date

B. Bidder has visited the Site and become familiar with and is satisfied as to the

general, local and Site conditions that may affect cost, progress, and performance of the Work.

C. Bidder has reviewed the Genesee County Standard Terms and Conditions and other

related documents as provided in the Exhibit section of the contract documents. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress and performance of the Work.

D. Bidder has carefully studied all: (1) reports of explorations and tests of subsurface

conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions, and (2) reports and drawings of a Hazardous Environmental Condition, if any, which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.

Page 16: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00300-2

E. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, including applying the specific means, methods, techniques, sequences, and procedures of construction expressly required by the Bidding Documents to be employed by Bidder, and safety precautions and programs incident thereto.

F. Bidder does not consider that any further examinations, investigations, explorations,

tests, studies, or data are necessary for the determination of this Bid for performance of the Work at the price(s) bid and within the times and in accordance with the other terms and conditions of the Bidding Documents.

G. Bidder is aware of the general nature of work to be performed by OWNER and

others at the Site that relates to the Work as indicated in the Bidding Documents. H. Bidder has correlated the information known to Bidder, information and observations

obtained from visits to the Site, reports and drawings identified in the Bidding Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Bidding Documents.

I. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or

discrepancies that Bidder has discovered in the Bidding Documents, and the written resolution thereof by ENGINEER is acceptable to Bidder.

J. The Bidding Documents are generally sufficient to indicate and convey

understanding of all terms and conditions for the performance of the Work for which this Bid is submitted.

4.01 Bidder further represents that this Bid is genuine and not made in the interest of or on

behalf of any undisclosed individual or entity and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any individual or entity to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over OWNER.

5.01 Bidder will complete the Work in accordance with the Contract Documents for the

following price(s):

LUMP SUM BID PRICE:

_______________________________________________________($___________________) (use words) (figures)

5.02 There are leaking joints throughout the existing building. The Owner intends to have

these joints replaced by the Contractor during this project. The actual quantities are unknown. The following unit prices shall be used to perform this work.

Page 17: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00300-3

A. The Contractor shall provide unit prices for removal and replacement of existing piping fittings as directed by the Owner/Engineer. The fittings are located throughout the existing building.

B. Contractor shall provide all material and labor as required for complete replacement including but not limited to: pipe (copper), joint materials, insulation, etc.

C. Provide the following unit prices:

1” 90° Elbow $______________ Cross Tee $______________ 2” 90° Elbow $______________ Cross Tee $______________ 3” 90° Elbow $______________ Cross Tee $______________ 4” 90° Elbow $______________ Cross Tee $______________ 5” 90° Elbow $______________ Cross Tee $______________ 6” 90° Elbow $______________ Cross Tee $______________

D. This work must be approved by the Owner prior to performing work.

6.01 Bidder agrees that the Work will be substantially completed and completed and ready for final payment in accordance with paragraph 14.07.B of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.

6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of

failure to complete the Work within the times specified above, which shall be stated in the Agreement.

7.01 The required bid security in the form of _______________ is attached to and made a

condition of this Bid. 8.01 The terms used in this Bid with initial capital letters have the meanings indicated in the

Instructions to Bidders, the General Conditions, and the Supplementary Conditions.

SUBMITTED on ____________________________, 20____

Page 18: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00300-4

Note to Bidders - Complete only one of the following three sections as appropriate for your business status: individual, partnership or corporation.

If Bidder is: An Individual Name (typed or printed):

By:

(Individual’s signature) Doing business as: Business address:

Phone No:

Fax No:

A Partnership Partnership Name:

By:

(Signature of general partner)

Name (typed or printed): Business address:

Phone No: Fax No: A Corporation Corporation Name:

State of Incorporation:

Type (general business, professional, service, limited liability)

By:

(Signature)

Name (typed or printed):

Title:

Business address:

Phone No:

Fax No:

Page 19: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00411-1

PENAL SUM FORM BID BOND

BIDDER (Name and Address):

SURETY (Name and Address of Principal Place of Business):

OWNER (Name and Address): Genesee County Purchasing Department Room 200 County Administration Building, 1101 Beach Street, Room 200 Flint, MI 48502

BID BID DUE DATE: August 23, 2012 PROJECT (Brief Description Including Location):

BOND BOND NUMBER: DATE (Not later than bid due date): PENAL SUM: (Words) (Figures)

IN WITNESS WHEREOF, Surety and Bidder, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Bid Bond to be duly executed on its behalf by its authorized officer, agent, or representative.

BIDDER SURETY Seal) (Seal)Bidder’s Name and Corporate Seal Surety’s Name and Corporate Seal By: By: Signature and Title Signature and Title Attest: Attest: Signature and Title Signature and Title

Note: (1) Above addresses are to be used for giving required notice.

(2) Any singular reference to Bidder, Surety, OWNER or other party shall be considered plural where applicable.

Page 20: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00411-2

1. Bidder and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to pay to OWNER upon default of Bidder the penal sum set forth on the face of this Bond. 2. Default of Bidder shall occur upon the failure of Bidder to deliver within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents. 3. This obligation shall be null and void if:

3.1. OWNER accepts Bidder's Bid and Bidder delivers within the time required by the Bidding Documents (or any extension thereof agreed to in writing by OWNER) the executed Agreement required by the Bidding Documents and any performance and payment Bonds required by the Bidding Documents, or

3.2. All Bids are rejected by OWNER, or

3.3. OWNER fails to issue a Notice of Award to Bidder within the time specified in the Bidding Documents (or any extension thereof agreed to in writing by Bidder and, if applicable, consented to by Surety when required by paragraph 5 hereof).

4. Payment under this Bond will be due and payable upon default by Bidder and within 30 calendar days after receipt by Bidder and Surety of written notice of default from OWNER, which notice will be given with reasonable promptness, identifying this Bond and the Project and including a statement of the amount due. 5. Surety waives notice of and any and all defenses based on or arising out of any time extension to issue Notice of Award agreed to in writing by OWNER and Bidder, provided that the total time for issuing Notice of Award including extensions shall not in the aggregate exceed 120 days from

Bid due date without Surety's written consent. 6. No suit or action shall be commenced under this Bond prior to 30 calendar days after the notice of default required in paragraph 4 above is received by Bidder and Surety and in no case later than one year after Bid due date. 7. Any suit or action under this Bond shall be commenced only in a court of competent jurisdiction located in the state in which the Project is located. 8. Notices required hereunder shall be in writing and sent to Bidder and Surety at their respective addresses shown on the face of this Bond. Such notices may be sent by personal delivery, commercial courier or by United States Registered or Certified Mail, return receipt requested, postage pre-paid, and shall be deemed to be effective upon receipt by the party concerned. 9. Surety shall cause to be attached to this Bond a current and effective Power or Attorney evidencing the authority of the officer, agent or representative who executed this Bond on behalf of Surety to execute, seal and deliver such Bond and bind the Surety thereby. 10. This Bond is intended to conform to all applicable statutory requirements. Any applicable requirement of any applicable statute that has been omitted from this Bond shall be deemed to be included herein as if set forth at length. If any provision of this Bond conflicts with any applicable statute, then the provision of said statute shall govern and the remainder of this Bond that is not in conflict therewith shall continue in full force and effect. 11. The term "Bid" as used herein includes a Bid, offer or proposal as applicable.

Page 21: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00500-1

STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR ON THE BASIS OF A STIPULATED PRICE THIS AGREEMENT is by and between (hereinafter called OWNER) and (hereinafter called CONTRACTOR).

OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 - WORK 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract

Documents. The Work is generally described as follows:

Replacement of two water heaters with high-efficiency boilers ARTICLE 2 - THE PROJECT 2.01 The Project for which the Work under the Contract Documents may be the whole or only

a part is generally described as follows:

2012 Domestic Water Heater Replacement ARTICLE 3 - ENGINEER 3.01 The Project has been designed by ROWE Professional Services Company who is

hereinafter called ENGINEER and who is to act as OWNER’s representative, assume all duties and responsibilities, and have the rights and authority assigned to ENGINEER in the Contract Documents in connection with the completion of the Work in accordance with the Contract Documents.

ARTICLE 4 - CONTRACT TIMES 4.01 Time of the Essence

A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract.

4.02 Dates for Substantial Completion and Final Payment

A. Based on receiving Notice to Proceed no later than August 30, 2012, the Work will be substantially completed on or before November 9, 2012, and completed and ready for final payment in accordance with paragraph 14.07 of the General Conditions on or before November 26, 2012.

Page 22: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00500-2

4.03 Liquidated Damages

A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER $500.00 for each day that expires after the time specified in paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER $500.00 for each day that expires after the time specified in paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment.

ARTICLE 5 - CONTRACT PRICE 5.01 OWNER shall pay CONTRACTOR for completion of the Work in accordance with the

Contract Documents an amount in current funds equal to the sum of the amounts determined pursuant to paragraphs 5.01.A, 5.01.B, and 5.01.C below:

A. For all Work other than Unit Price Work, a Lump Sum of:

($____________)

(use words) (figure)

All specific cash allowances are included in the above price and have been computed in accordance with paragraph 11.02 of the General Conditions.

ARTICLE 6 - PAYMENT PROCEDURES 6.01 Submittal and Processing of Payments

A. CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General Conditions. Applications for Payment will be processed by ENGINEER as provided in the General Conditions.

6.02 Progress Payments; Retainage.

Monthly progress payments will not be made by the OWNER. Upon final completion and acceptance of the WORK, in accordance with paragraph 14.07 of the General Conditions, and receipt of written consent of the Surety for final payment, the OWNER shall make a single, one-time final payment. This final payment shall be determined by the Unit Price Schedule and the number of units completed.

Page 23: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00500-3

6.03 Final Payment

A. Upon final completion and acceptance of the Work in accordance with paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price as recommended by ENGINEER as provided in said paragraph 14.07.

ARTICLE 7 - INTEREST 7.01 All moneys not paid when due as provided in Article 14 of the General Conditions shall

bear interest at the rate of 8% per annum. ARTICLE 8 - CONTRACTOR’S REPRESENTATIONS 8.01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the

following representations:

A. CONTRACTOR has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents.

B. CONTRACTOR has visited the Site and become familiar with and is satisfied as to

the general, local, and Site conditions that may affect cost, progress, and performance of the Work.

C. CONTRACTOR is familiar with and is satisfied as to all federal, state, and local Laws

and Regulations that may affect cost, progress, and performance of the Work. D. CONTRACTOR has carefully studied all: (1) reports of explorations and tests of

subsurface conditions at or contiguous to the Site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General Conditions and (2) reports and drawings of a Hazardous Environmental Condition, if any, at the Site which has been identified in the Supplementary Conditions as provided in paragraph 4.06 of the General Conditions.

E. CONTRACTOR has obtained and carefully studied (or assumes responsibility for

having done so) all additional or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or performance of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, including applying the specific means, methods, techniques, sequences, and procedures of construction, if any, expressly required by the Contract Documents to be employed by CONTRACTOR, and safety precautions and programs incident thereto

F. CONTRACTOR does not consider that any further examinations, investigations,

explorations, tests, studies, or data are necessary for the performance of the Work at

Page 24: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00500-4

the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents.

G. CONTRACTOR is aware of the general nature of work to be performed by OWNER

and others at the Site that relates to the Work as indicated in the Contract Documents.

H. CONTRACTOR has correlated the information known to CONTRACTOR,

information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.

I. CONTRACTOR has given ENGINEER written notice of all conflicts, errors,

ambiguities, or discrepancies that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.

J. The Contract Documents are generally sufficient to indicate and convey

understanding of all terms and conditions for performance and furnishing of the Work.

ARTICLE 9 - CONTRACT DOCUMENTS 9.01 Contents

A. The Contract Documents consist of the following:

1. This Agreement (pages 1 to 6, inclusive);

2. Performance Bond (pages 1 to 2, inclusive);

3. Payment Bond (pages 1 to 2, inclusive);

4. Maintenance and Guaranty Bond (pages 1 to 2, inclusive);

5. General Conditions (pages 1 to 42, inclusive);

6. Supplementary Conditions (pages 1 to 5, inclusive);

7. Specifications as listed in the table of contents of the Project Manual;

8. Drawings consisting of a cover sheet and sheets numbered _____ through _____, inclusive, with each sheet bearing the following general title: ______________________;

9. Addenda (numbers _____ to _____, inclusive);

10. Exhibits to this Agreement (enumerated as follows):

a. Notice to Proceed (pages 1 to 1, inclusive); b. CONTRACTOR’s Bid (pages 1 to 4, inclusive);

Page 25: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00500-5

c. Genesee County Standard Terms and Conditions d. Insurance Checklist e. Major Contract Addendum 2007 f. Prevailing Wage Rates g. Documentation submitted by CONTRACTOR prior to Notice of Award (pages

_____ to _____, inclusive); h. ________________________________________________________;

11. The following which may be delivered or issued on or after the Effective Date of

the Agreement and are not attached hereto:

a. Written Amendments; b. Work Change Directives; c. Change Order(s).

B. The documents listed in paragraph 9.01.A are attached to this Agreement (except as

expressly noted otherwise above). C. There are no Contract Documents other than those listed above in this Article 9. D. The Contract Documents may only be amended, modified, or supplemented as

provided in paragraph 3.05 of the General Conditions. ARTICLE 10 - MISCELLANEOUS 10.01 Terms

A. Terms used in this Agreement will have the meanings indicated in the General Conditions.

10.02 Assignment of Contract

A. No assignment by a party hereto of any rights under or interests in the Contract will be binding on another party hereto without the written consent of the party sought to be bound; and, specifically but without limitation, moneys that may become due and moneys that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents.

10.03 Successors and Assigns

A. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns, and legal representatives to the other party hereto, its partners, successors, assigns, and legal representatives in respect to all covenants, agreements, and obligations contained in the Contract Documents.

10.04 Severability

Page 26: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00500-6

A. Any provision or part of the Contract Documents held to be void or unenforceable under any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents shall be reformed to replace such stricken provision or part thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the stricken provision.

10.05 Other Provisions

None

Page 27: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00500-7

IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in duplicate. One counterpart each has been delivered to OWNER and CONTRACTOR. All portions of the Contract Documents have been signed or identified by OWNER and CONTRACTOR or on their behalf. This Agreement will be effective on, (which is the Effective Date of the Agreement). OWNER: CONTRACTOR: Genesee County Purchasing Department By: By: [CORPORATE SEAL] [CORPORATE SEAL]

Attest Attest Address for giving notices Address for giving notices Genesee County Purchasing Department Room 200 County Administration Building,1101 Beach Street, G-29

Flint, MI 48502 Designated Representative: Designated Representative: Name Name Title Title Address Address Ph. Ph. Facsimile

Facsimile

Page 28: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00610-2

PERFORMANCE BOND Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY (Name and Address of Principal Place of Business): OWNER Genesee County Purchasing Department

Room 200 County Administration Building, 1101 Beach Street Flint, MI 48502

CONTRACT Date: Amount: Description (Name and Location): BOND Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Signature: Name and Title: Name and Title:

(Attach Power of Attorney) (Space is provided below for signatures of additional parties, if required) CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Signature: Name and Title: Name and Title:

Page 29: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00610-2

1. The CONTRACTOR and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Contract, which is incorporated herein by reference. 2. If the CONTRACTOR performs the Contract, the Surety and the CONTRACTOR have no obligation under this Bond, except to participate in conferences as provided in paragraph 3.1. 3. If there is no OWNER Default, the Surety's obligation under this Bond shall arise after:

3.1. The OWNER has notified the CONTRACTOR and the Surety at the addresses described in paragraph 10 below, that the OWNER is considering declaring a CONTRACTOR Default and has requested and attempted to arrange a conference with the CONTRACTOR and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Contract. If the OWNER, the CONTRACTOR and the Surety agree, the CONTRACTOR shall be allowed a reasonable time to perform the Contract, but such an agreement shall not waive the OWNER's right, if any, subsequently to declare a CONTRACTOR Default; and

3.2. The OWNER has declared a CONTRACTOR Default and

formally terminated the CONTRACTOR's right to complete the Contract. Such CONTRACTOR Default shall not be declared earlier than twenty days after the CONTRACTOR and the Surety have received notice as provided in paragraph 3.1; and

3.3. The OWNER has agreed to pay the Balance of the Contract

Price to:

3.3.1.The Surety in accordance with the terms of the Contract; 3.3.2.Another contractor selected pursuant to paragraph 4.3 to

perform the Contract. 4. When the OWNER has satisfied the conditions of paragraph 3, the Surety shall promptly and at the Surety's expense take one of the following actions:

4.1. Arrange for the CONTRACTOR, with consent of the OWNER, to perform and complete the Contract; or

4.2. Undertake to perform and complete the Contract itself, through

its agents or through independent contractors; or

4.3. Obtain bids or negotiated proposals from qualified contractors acceptable to the OWNER for a contract for performance and completion of the Contract, arrange for a contract to be prepared for execution by the OWNER and the contractor selected with the OWNER's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the Bonds issued on the Contract, and pay to the OWNER the amount of damages as described in paragraph 6 in excess of the Balance of the Contract Price incurred by the OWNER resulting from the CONTRACTOR Default; or

4.4. Waive its right to perform and complete, arrange for completion,

or obtain a new contractor and with reasonable promptness under the circumstances;

4.4.1 After investigation, determine the amount for which it may

be liable to the OWNER and, as soon as practicable after the amount is determined, tender payment therefor to the OWNER; or

4.4.2 Deny liability in whole or in part and notify the OWNER

citing reasons therefor. 5. If the Surety does not proceed as provided in paragraph 4 with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the OWNER to the Surety demanding that the Surety perform its obligations under this Bond, and the OWNER shall be entitled to enforce any remedy available to the OWNER. If the Surety proceeds as provided in paragraph 4.4, and the OWNER refuses the payment tendered or the Surety has

denied pliability, in whole or in part, without further notice the OWNER shall be entitled to enforce any remedy available to the OWNER. 6. After the OWNER has terminated the CONTRACTOR's right to complete the Contract, and if the Surety elects to act under paragraph 4.1, 4.2, or 4.3 above, then the responsibilities of the Surety to the OWNER shall not be greater than those of the CONTRACTOR under the Contract, and the responsibilities of the OWNER to the Surety shall not be greater than those of the OWNER under the Contract. To a limit of the amount of this Bond, but subject to commitment by the OWNER of the Balance of the Contract Price to mitigation of costs and damages on the Contract, the Surety is obligated without duplication for:

6.1. The responsibilities of the CONTRACTOR for correction of defective Work and completion of the Contract;

6.2. Additional legal, design professional and delay costs resulting

from the CONTRACTOR's Default, and resulting from the actions or failure to act of the Surety under paragraph 4; and

6.3. Liquidated damages, or if no liquidated damages are specified in

the Contract, actual damages caused by delayed performance or non-performance of the CONTRACTOR.

7. The Surety shall not be liable to the OWNER or others for obligations of the CONTRACTOR that are unrelated to the Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the OWNER or its heirs, executors, administrators, or successors. 8. The Surety hereby waives notice of any change, including changes of time, to the Contract or to related subcontracts, purchase orders and other obligations. 9. Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the Work or part of the Work is located and shall be instituted within two years after CONTRACTOR Default or within two years after the CONTRACTOR ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 10. Notice to the Surety, the OWNER or the CONTRACTOR shall be mailed or delivered to the address shown on the signature page. 11. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the Contract was be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12. Definitions.

12.1 Balance of the Contract Price: The total amount payable by the OWNER to the CONTRACTOR under the Contract after all proper adjustments have been made, including allowance to the CONTRACTOR of any amounts received or to be received by the OWNER in settlement of insurance or other Claims for damages to which the CONTRACTOR is entitled, reduced by all valid and proper payments made to or on behalf of the CONTRACTOR under the Contract.

12.2. Contract: The agreement between the OWNER and the

CONTRACTOR identified on the signature page, including all Contract Documents and changes thereto.

12.3. CONTRACTOR Default: Failure of the CONTRACTOR, which

has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Contract.

12.4. OWNER Default: Failure of the OWNER, which has neither been

remedied nor waived, to pay the CONTRACTOR as required by the Contract or to perform and complete or comply with the other terms thereof.

Page 30: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00620-2

PAYMENT BOND Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. CONTRACTOR (Name and Address): SURETY (Name and Address of Principal Place of Business): OWNER Genesee County Purchasing Department

Room 200 County Administration Building, 1101 Beach Street Flint, MI 48502

CONTRACT Date: Amount: Description (Name and Location): BOND Date (Not earlier than Contract Date): Amount: Modifications to this Bond Form: Surety and Contractor, intending to be legally bound hereby, subject to the terms printed on the reverse side hereof, do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Signature: Name and Title: Name and Title:

(Attach Power of Attorney) (Space is provided below for signatures of additional parties, if required) CONTRACTOR AS PRINCIPAL SURETY Company: (Corp. Seal) Company: (Corp. Seal) Signature: Signature: Name and Title: Name and Title:

Page 31: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00620-2

1. The CONTRACTOR and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the OWNER to pay for labor, materials and equipment furnished for use in the performance of the Contract, which is incorporated herein by reference. 2. With respect to the OWNER, this obligation shall be null and void if the CONTRACTOR:

2.1. Promptly makes payment, directly or indirectly, for all sums due Claimants, and

2.2. Defends, indemnifies and holds harmless the OWNER from all

claims, demands, liens or suits by any person or entity who furnished labor, materials or equipment for use in the performance of the Contract, provided the OWNER has promptly notified the CONTRACTOR and the Surety (at the addresses described in paragraph 12) of any claims, demands, liens or suits and tendered defense of such claims, demands, liens or suits to the CONTRACTOR and the Surety, and provided there is no OWNER Default.

3. With respect to Claimants, this obligation shall be null and void if the CONTRACTOR promptly makes payment, directly or indirectly, for all sums due. 4. The Surety shall have no obligation to Claimants under this Bond until:

4.1. Claimants who are employed by or have a direct contract with the CONTRACTOR have given notice to the Surety (at the addresses described in paragraph 12) and sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and, with substantial accuracy, the amount of the claim.

4.2. Claimants who do not have a direct contract with the CONTRACTOR:

1. Have furnished written notice to the CONTRACTOR and sent a

copy, or notice thereof, to the OWNER, within 90 days after having last performed labor or last furnished materials or equipment included in the claim stating, with substantial accuracy, the amount of the claim and the name of the party to whom the materials were furnished or supplied or for whom the labor was done or performed; and

2. Have either received a rejection in whole or in part from the CONTRACTOR, or not received within 30 days of furnishing the above notice any communication from the CONTRACTOR by which the CONTRACTOR had indicated the claim will be paid directly or indirectly; and

3. Not having been paid within the above 30 days, have sent a written notice to the Surety and sent a copy, or notice thereof, to the OWNER, stating that a claim is being made under this Bond and enclosing a copy of the previous written notice furnished to the CONTRACTOR.

5. If a notice required by paragraph 4 is given by the OWNER to the CONTRACTOR or to the Surety that is sufficient compliance. 6. When the Claimant has satisfied the conditions of paragraph 4, the Surety shall promptly and at the Surety's expense take the following actions:

6.1. Send an answer to the Claimant, with a copy to the OWNER, within 45 days after receipt of the claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed.

6.2. Pay or arrange for payment of any undisputed amounts.

7. The Surety's total obligation shall not exceed the amount of this Bond, and the amount of this Bond shall be credited for any payments made in good faith by the Surety. 8. Amounts owed by the OWNER to the CONTRACTOR under the Contract shall be used for the performance of the Contract and to satisfy claims, if any, under any Performance Bond. By the CONTRACTOR furnishing and the OWNER accepting this Bond, they agree that all funds earned by the CONTRACTOR in the performance of the Contract are dedicated to satisfy obligations of the CONTRACTOR and the Surety under this Bond, subject to the OWNER's priority to use the funds for the completion of the Work.

9. The Surety shall not be liable to the OWNER, Claimants or others for obligations of the CONTRACTOR that are unrelated to the Contract. The OWNER shall not be liable for payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligations to make payments to, give notices on behalf of, or otherwise have obligations to Claimants under this Bond. 10. The Surety hereby waives notice of any change, including changes of time, to the Contract or to related Subcontracts, purchase orders and other obligations. 11. No suit or action shall be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the location in which the Work or part of the Work is located or after the expiration of one year from the date (1) on which the Claimant gave the notice required by paragraph 4.1 or paragraph 4.2.3, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. 12. Notice to the Surety, the OWNER or the CONTRACTOR shall be mailed or delivered to the addresses shown on the signature page. Actual receipt of notice by Surety, the OWNER or the CONTRACTOR, however accomplished, shall be sufficient compliance as of the date received at the address shown on the signature page. 13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the Contract was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is, that this Bond shall be construed as a statutory Bond and not as a common law bond. 14. Upon request of any person or entity appearing to be a potential beneficiary of this Bond, the CONTRACTOR shall promptly furnish a copy of this Bond or shall permit a copy to be made. 15. DEFINITIONS

15.1. Claimant: An individual or entity having a direct contract with the CONTRACTOR or with a Subcontractor of the CONTRACTOR to furnish labor, materials or equipment for use in the performance of the Contract. The intent of this Bond shall be to include without limitation in the terms "labor, materials or equipment" that part of water, gas, power, light, heat, oil, gasoline, telephone service or rental equipment used in the Contract, architectural and engineering services required for performance of the Work of the CONTRACTOR and the CONTRACTOR's Subcontractors, and all other items for which a mechanic's lien may be asserted in the jurisdiction where the labor, materials or equipment were furnished.

15.2. Contract: The agreement between the OWNER and the

CONTRACTOR identified on the signature page, including all Contract Documents and changes thereto.

15.3. OWNER Default: Failure of the OWNER, which has neither been

remedied nor waived, to pay the CONTRACTOR as required by the Contract or to perform and complete or comply with the other terms thereof.

Page 32: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00640-1

MAINTENANCE AND GUARANTY BOND KNOW ALL MEN BY THESE PRESENTS, That ,

Contractor, as principal and

as surety, are held and firmly

bound unto ,

in the sum of Dollars

($ )

good and lawful money of the United States of America, to be paid to Owner, its legal representatives and assigns, for which payment well and truly made, we bind ourselves, our heirs, executors, administrators, successors and assigns, and each and every one of them jointly and severally, firmly by these presents. Sealed with our seals and dated this day of , A.D., 20 .

WHEREAS, the above named principal has entered into a certain written contract with _________________, dated this day of , A.D., 20 , wherein the said principal covenanted and agreed as follows, to wit: NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that by and under said contract, the above named principal has agreed with the said Owner that for a period of one year from the date of payment of Final Estimate, to keep in good order and repair any defect in all the work done under said contract either; by the principal or his sub-contractors, or his material suppliers, that may develop during said period due to improper materials, defective equipment, workmanship or arrangements, and any other work affected in making good such imperfections, shall also be made good all without expense to the Owner, excepting only such part or parts of said work as may have been disturbed without the consent or approval of the principal after the final acceptance of the work, and that whenever directed so to do by the Owner, by notice served WILL PROCEED at once to make such repairs as directed by said Owner; and in case of failure so to do within one week from the date of service of such notice, or within reasonable time not less than one week, as shall be fixed in said notice, then the said Owner shall have the right to purchase such materials and employ such labor and equipment as may be necessary for the purpose, and to undertake, do and make such repairs, and charge the expense thereof to, and receive same from said principal or surety. If any repair is necessary to be made at once to protect life and property, then and in that case, the said Owner may take immediate steps to repair or barricade such defects without notice to the contractor. In such accounting the said Owner shall not be held to obtain the lowest figures for the doing of the work, or any part thereof, but all sums actually paid therefore shall be charged to the principal or surety. In this connection the judgment of said Owner is final and conclusive. If the said principal for a period of one(1) year from the date of payment of Final Estimate, shall keep said work so constructed under said contract in good order and repair,

Page 33: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00640-2

excepting only such part or parts of said work which may have been disturbed without the consent or approval of said principal after the final acceptance of the same, and shall whenever notice is given as hereinbefore specified, at once proceed to make repair as in said notice directed, or shall reimburse said Owner for any expense incurred by making such repairs, should the principal or surety fail to do as hereinbefore specified, and shall fully indemnify, defend and save harmless the said Owner from all suits and actions for damage of every name and description brought or claimed against it for or on account of any injury or damage to person or property received or sustained by any party or parties, by or from any of the acts of omissions or through the negligence of said principal, servants, agents or employees in the prosecution of the work included in said contract, and from any and all claims arising under the Workmen’s Compensation Act, so-called, of the State of Michigan, then the above obligation shall be void, otherwise to remain in full force and effect. IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed by their respective authorized officers this day of A.D., 20 . Signed, Sealed and Delivered

In the Presence of: (L.S.) (L.S.) (L.S.) NOTE; Bond must show complete NAME AND ADDRESS OF LOCAL AGENT AND HOME COMPANY.

Page 34: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00670-1

File 401 NOTICE OF AWARD Dated ________________________ TO:

(BIDDER) ADDRESS: Contract:

(Insert name of Contract as it appears in the Bidding Documents) Project: OWNER's Contract No. _______________________________ You are notified that your Bid dated __________________________________ for the above Contract has been considered. You are the apparent Successful Bidder and have been awarded a Contract for

(Indicate total Work, alternates or sections or Work awarded) The Contract Price of your Contract is _________________________________________________ Dollars ($ _________________). copies of each of the proposed Contract Documents (except Drawings) accompany this Notice of Award. sets of the Drawings will be delivered separately or otherwise made available to you immediately. You must comply with the following conditions precedent within 7 days of the date you receive this Notice of Award. 1. Deliver to the OWNER fully executed counterparts of the Contract Documents.

[Each of the Contract Documents must bear your signature. 2. Deliver with the executed Contract Documents the Contract security (Bonds) as

specified in the Instructions to Bidders (Article 20), [and] General Conditions (paragraph 5.01) [and Supplementary Conditions (paragraph SC-5.01).]

Page 35: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00670-2

3. (List other conditions precedent).

Failure to comply with these conditions within the time specified will entitle OWNER to consider your Bid in default, to annul this Notice of Award and to declare your Bid security forfeited. Within ten days after you comply with the above conditions, OWNER will return to you one fully executed counterpart of the Contract Documents.

(OWNER)

By:

(AUTHORIZED SIGNATURE)

(TITLE)

Copy to ENGINEER

Page 36: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00672-1

File 401 NOTICE TO PROCEED Dated ___________________________ TO:

(CONTRACTOR) ADDRESS:

Contract: (Insert name of Contract as it appears in the Contract Documents)

Project: OWNER'S CONTRACT NO. _____________________________

You are notified that the Contract Times under the above contract will commence to run on _________________. By that date, you are to start performing your obligations under the Contract Documents. In accordance with Article 4 of the Agreement the date of Substantial Completion is _______________________ and the date of readiness for final payment is____________________.

Before you may start any Work at the Site, paragraph 2.05.C of the General Conditions provides that you and Owner must each deliver to the other (with copies to Engineer and other identified additional insureds) certificates of insurance which each is required to purchase and maintain in accordance with the Contract Documents.

Also, before you may start any Work at the Site, you must (add other requirements, if any)

(OWNER)

By:

(AUTHORIZED SIGNATURE)

(TITLE)

Copy to ENGINEER

Page 37: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00673-1

APPLICATION FOR PAYMENT

To (Owner): Contract For: Project Number: Contractor: For Period Ending: Recommendation Number: Page: 1 of STATEMENT OF WORK: Work to Date: Amount Retained: Subtotal: Previous Payments Recommended: Amount Due This Application: CONTRACTOR'S CERTIFICATION: The undersigned CONTRACTOR certifies that : (1) all previous progress payments received from OWNER on account of Work done under the Contract referred to above have been applied to discharge in full all obligations of CONTRACTOR incurred in connection with Work covered by prior Applications for Payment, (2) title to all Work, materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for Payment will pass to OWNER at time of payment free and clear of all liens, claims, security interest and encumbrances (except such as are covered by Bond acceptable to OWNER indemnifying OWNER against any such lien, claim, security interest or encumbrance); and (3) all Work covered by this Application for Payment is in accordance with the Contract Documents and not defective as that term is defined in the Contract Documents. Dated ______________________________ ____________________________________

CONTRACTOR

By:__________________________________(Authorized Signature)

Engineer's Recommendation: Payment of the amount due this application is recommended.

ROWE Professional Services Company

Dated:_____________________________ By:__________________________________ (Authorized Signature)

Page 38: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00674-1

File 420 CHANGE ORDER No. ______________ PROJECT: OWNER: CONTRACT NO: DATE OF ISSUANCE: CONTRACTOR: ENGINEER: ROWE Professional Services Company You are directed to make the following changes in the Contract Documents: Description: Reason for Change Order: Attachments: (List documents supporting change) CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES

Original contract price: Original contract times: Substantial completion: Ready for final payment: Net change from previous change orders:

Net change from previous change orders:

Contract price prior to this change order:

Contract times prior to this change order:

Net increase/decrease of this change order:

Net increase/decrease of this change order:

Contract price with all approved change orders:

Contract times with all approved change orders:

Substantial completion: Ready for final payment:

RECOMMENDED: ROWE Professional Services Company DATE

APPROVED:

OWNER DATE

ACCEPTED:

CONTRACTOR DATE

Page 39: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00680-1

File 492 CERTIFICATE OF SUBSTANTIAL COMPLETION DATE OF ISSUANCE ____________________ OWNER CONTRACTOR Contract: Project: OWNER's Contract No. ___________________ ENGINEER's Project No. _________________ This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the following specified parts thereof: To OWNER And To CONTRACTOR The Work to which this Certificate applies has been inspected by authorized representatives of OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be substantially complete in accordance with the Contract Documents on ______________________________ DATE OF SUBSTANTIAL COMPLETION A tentative list of items to be completed or corrected is attached hereto. This list may not be all-inclusive, and the failure to include an item in it does not alter the responsibility of CONTRACTOR to complete all the Work in accordance with the Contract Documents. The items in the tentative list shall be completed or corrected by CONTRACTOR within _______ days of the above date of Substantial Completion.

Page 40: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00680-2

The responsibilities between OWNER and CONTRACTOR for security, operation, safety, maintenance, heat, utilities, insurance and warranties and guarantees shall be as follows: OWNER:

CONTRACTOR:

The following documents are attached to and made a part of this Certificate: This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents nor is it a release of CONTRACTOR's obligation to complete the Work in accordance with the Contract Documents. Executed by ENGINEER on _______________________

Date

___________________________________________ ENGINEER

By: __________________________________________

(Authorized Signature) CONTRACTOR accepts this Certificate of Substantial Completion on _____________________

Date __________________________________________

CONTRACTOR

By: __________________________________________ (Authorized Signature)

OWNER accepts this Certificate of Substantial Completion on _______________________

Date _______________________________________

OWNER

By: _______________________________________ (Authorized Signature)

Page 41: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00690-1

File 434 CONSENT OF SURETY

Request for Adjustment of Retainage PROJECT TITLE: [Project Name] PROJECT NO.: [Job Number] OWNER: Genesee County Purchasing Department PROJECT MANAGER CONTRACT NO. RESIDENT PROJECT ENGINEER CONTRACTOR The Contractor, , hereby requests that the percentage of progress payment estimates retained by the Owner under the provisions of the Contract Documents be REDUCED to _______%.

by: Contractor Representative Date

The Surety on the Performance Bond for said Project _________________________ hereby approved the foregoing request. Surety Company

by: Attorney-in-fact Date

Approval IS/IS NOT recommended: The percentage of completion as of is ______% and the present percentage of elapsed time as of is %.

by: ROWE Professional Services Company Approval IS/IS NOT recommended:

by: ROWE Professional Services Company Date APPROVED/DISAPPROVED

by: ___________________________________________ For the Owner

Power of Attorney must be attached to original copy

Page 42: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00692-1

File 434 CONSENT OF SURETY For Final Payment PROJECT NAME: [Project Name] OWNER: Genesee County Purchasing Department PROJECT NO.: 12C0051 TYPE OF CONTRACT: replacement of two water heaters with high efficiency boilers AMOUNT OF CONTRACT: In accordance with the provisions of the above-named contract between the Owner and the Contractor, the following named surety: on the Payment bond of the following-named Contractor: hereby approves of final payment to the Contractor, and further agrees that said final payment to the Contractor shall not relieve the Surety Company named herein of any of its obligations to the Owner as set forth in said Surety company’s bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand and seal this day of _______________________, 20 .

____________________________ (Name of Surety Company)

____________________________ (Signature of Authorized Representative)

TITLE _______________________

(Corporate Seal)

Page 43: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-1

This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the Controlling Law.

STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT

Prepared by ENGINEERS JOINT CONTRACT DOCUMENTS COMMITTEE and Issued and Published Jointly By PROFESSIONAL ENGINEERS IN PRIVATE PRACTICE a practice division of the NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS ___________________ AMERICAN CONSULTING ENGINEERS COUNCIL ___________________ AMERICAN SOCIETY OF CIVIL ENGINEERS This document has been approved and endorsed by The Associated General Contractors of America Construction Specifications Institute

These General Conditions have been prepared for use with the Owner-Contractor Agreements (No. 1910-8-A-1 or 1910-8-A-2) (1996 Editions). Their provisions are interrelated and a change in one may necessitate a change in the other. Comments concerning their usage are contained in the EJCDC User’s Guide (No. 1910-50). For guidance in the preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. 1910-17) (1996 Edition).

EJCDC No. 1910-8 (1996 Edition)

Page 44: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-2

Copyright © 1996

National Society of Professional Engineers 1420 King Street, Alexandria, VA 22314

American Consulting Engineers Council

1015 15th Street N.W., Washington, DC 20005

American Society of Civil Engineers 345 East 47th Street, New York, NY 10017

Page 45: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-3

TABLE OF CONTENTS

Page ARTICLE 1 - DEFINITIONS AND TERMINOLOGY ...........................................................................................6

1.01 Defined Terms................................................................................................................................6 ARTICLE 2 - PRELIMINARY MATTERS ...........................................................................................................10

2.01 Delivery of Bonds.........................................................................................................................10 2.02 Copies of Documents..................................................................................................................10 2.03 Commencement of Contract Times; Notice to Proceed ........................................................10 2.04 Starting the Work .........................................................................................................................11 2.05 Before Starting Construction......................................................................................................11 2.06 Preconstruction Conference ......................................................................................................11 2.07 Initial Acceptance of Schedules ................................................................................................11

ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE .................................................12 3.01 Intent ..............................................................................................................................................12 3.02 Reference Standards ..................................................................................................................12 3.03 Reporting and Resolving Discrepancies ..................................................................................12 3.04 Amending and Supplementing Contract Documents .............................................................12 3.05 Reuse of Documents...................................................................................................................13

ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS ............................................................................................................................13 4.01 Availability of Lands.....................................................................................................................13 4.02 Subsurface and Physical Conditions ........................................................................................13 4.03 Differing Subsurface or Physical Conditions ...........................................................................14 4.04 Underground Facilities ................................................................................................................14 4.05 Reference Points .........................................................................................................................15 4.06 Hazardous Environmental Condition at Site............................................................................15

ARTICLE 5 - BONDS AND INSURANCE ..........................................................................................................17 5.01 Performance, Payment, and Other Bonds...............................................................................17 5.02 Licensed Sureties and Insurers .................................................................................................17 5.03 Certificates of Insurance .............................................................................................................17 5.04 CONTRACTOR’s Liability Insurance ........................................................................................17 5.05 OWNER’s Liability Insurance.....................................................................................................18 5.06 Property Insurance ......................................................................................................................18 5.07 Waiver of Rights...........................................................................................................................19 5.08 Receipt and Application of Insurance Proceeds .....................................................................20 5.09 Acceptance of Bonds and Insurance; Option to Replace......................................................20

ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES .....................................................................................20 6.01 Supervision and Superintendence ............................................................................................20 6.02 Labor; Working Hours .................................................................................................................21 6.03 Services, Materials, and Equipment .........................................................................................21 6.04 Progress Schedule ......................................................................................................................21 6.05 Substitutes and “Or-Equals”.......................................................................................................21 6.06 Concerning Subcontractors, Suppliers, and Others ...............................................................23 6.07 Patent Fees and Royalties .........................................................................................................24 6.08 Permits ..........................................................................................................................................24 6.09 Laws and Regulations.................................................................................................................24 6.10 Taxes .............................................................................................................................................24 6.11 Use of Site and Other Areas ......................................................................................................25 6.12 Record Documents......................................................................................................................25 6.13 Safety and Protection..................................................................................................................25

Page 46: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-4

6.14 Safety Representative.................................................................................................................26 6.15 Hazard Communication Programs ............................................................................................26 6.16 Emergencies.................................................................................................................................26 6.17 Shop Drawings and Samples ....................................................................................................26 6.18 Continuing the Work....................................................................................................................27 6.19 CONTRACTOR’s General Warranty and Guarantee.............................................................27 6.20 Indemnification .............................................................................................................................28

ARTICLE 7 - OTHER WORK ...............................................................................................................................29 7.01 Related Work at Site ...................................................................................................................29 7.02 Coordination .................................................................................................................................29

ARTICLE 8 - OWNER’S RESPONSIBILITIES..................................................................................................29 8.01 Communications to Contractor ..................................................................................................29 8.02 Replacement of ENGINEER ......................................................................................................29 8.03 Furnish Data .................................................................................................................................29 8.04 Pay Promptly When Due ............................................................................................................29 8.05 Lands and Easements; Reports and Tests .............................................................................30 8.06 Insurance ......................................................................................................................................30 8.07 Change Orders.............................................................................................................................30 8.08 Inspections, Tests, and Approvals ............................................................................................30 8.09 Limitations on OWNER’s Responsibilities ...............................................................................30 8.10 Undisclosed Hazardous Environmental Condition .................................................................30 8.11 Evidence of Financial Arrangements ........................................................................................30

ARTICLE 9 - ENGINEER’S STATUS DURING CONSTRUCTION ...............................................................30 9.01 OWNER’S Representative .........................................................................................................30 9.02 Visits to Site ..................................................................................................................................30 9.03 Project Representative................................................................................................................30 9.04 Clarifications and Interpretations...............................................................................................31 9.05 Authorized Variations in Work ...................................................................................................31 9.06 Rejecting Defective Work ...........................................................................................................31 9.07 Shop Drawings, Change Orders and Payments.....................................................................31 9.08 Determinations for Unit Price Work...........................................................................................31 9.09 Decisions on Requirements of Contract Documents and Acceptability of Work ...............31 9.10 Limitations on ENGINEER’s Authority and Responsibilities .................................................32

ARTICLE 10 - CHANGES IN THE WORK; CLAIMS........................................................................................32 10.01 Authorized Changes in the Work...............................................................................................32 10.02 Unauthorized Changes in the Work ..........................................................................................32 10.03 Execution of Change Orders......................................................................................................32 10.04 Notification to Surety ...................................................................................................................33 10.05 Claims and Disputes ...................................................................................................................33

ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK ...............................33 11.01 Cost of the Work ..........................................................................................................................33 11.02 Cash Allowances .........................................................................................................................35 11.03 Unit Price Work ............................................................................................................................36

ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES .............................36 12.01 Change of Contract Price ...........................................................................................................36 12.02 Change of Contract Times .........................................................................................................37 12.03 Delays Beyond CONTRACTOR’s Control ...............................................................................37 12.04 Delays Within CONTRACTOR’s Control .................................................................................37 12.05 Delays Beyond OWNER’s and CONTRACTOR’s Control ....................................................37 12.06 Delay Damages ...........................................................................................................................37

ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK .................................................................................................................................38

Page 47: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-5

13.01 Notice of Defects..........................................................................................................................38 13.02 Access to Work ............................................................................................................................38 13.03 Tests and Inspections .................................................................................................................38 13.04 Uncovering Work .........................................................................................................................38 13.05 OWNER May Stop the Work......................................................................................................39 13.06 Correction or Removal of Defective Work ...............................................................................39 13.07 Correction Period .........................................................................................................................39 13.08 Acceptance of Defective Work ..................................................................................................39 13.09 OWNER May Correct Defective Work......................................................................................40

ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION .........................................................40 14.01 Schedule of Values......................................................................................................................40 14.02 Progress Payments .....................................................................................................................40 14.03 CONTRACTOR’s Warranty of Title...........................................................................................42 14.04 Substantial Completion ...............................................................................................................42 14.05 Partial Utilization ..........................................................................................................................43 14.06 Final Inspection ............................................................................................................................43 14.07 Final Payment ..............................................................................................................................43 14.08 Final Completion Delayed ..........................................................................................................44 14.09 Waiver of Claims..........................................................................................................................44

ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION....................................................................44 15.01 OWNER May Suspend Work.....................................................................................................44 15.02 OWNER May Terminate for Cause...........................................................................................44 15.03 OWNER May Terminate For Convenience .............................................................................45 15.04 CONTRACTOR May Stop Work or Terminate........................................................................45

ARTICLE 16 - DISPUTE RESOLUTION............................................................................................................46 16.01 Methods and Procedures ...........................................................................................................46

ARTICLE 17 - MISCELLANEOUS ......................................................................................................................46 17.01 Giving Notice ................................................................................................................................46 17.02 Computation of Times .................................................................................................................46 17.03 Cumulative Remedies .................................................................................................................46 17.04 Survival of Obligations ................................................................................................................46 17.05 Controlling Law ............................................................................................................................46

Page 48: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-6

GENERAL CONDITIONS

ARTICLE 1 - DEFINITIONS AND TERMINOLOGY

1.01 Defined Terms

A. Wherever used in the Contract Documents and printed with initial or all capital letters, the terms listed below will have the meanings indicated which are applicable to both the singular and plural thereof.

1. Addenda--Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the Contract Documents.

2. Agreement--The written instrument

which is evidence of the agreement between OWNER and CONTRACTOR covering the Work.

3. Application for Payment--The form

acceptable to ENGINEER which is to be used by CONTRACTOR during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents.

4. Asbestos--Any material that contains

more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration.

5. Bid--The offer or proposal of a bidder

submitted on the prescribed form setting forth the prices for the Work to be performed.

6. Bidding Documents--The Bidding

Requirements and the proposed Contract Documents (including all Addenda issued prior to receipt of Bids).

7. Bidding Requirements--The

Advertisement or Invitation to Bid, Instructions to Bidders, Bid security form, if any, and the Bid form with any supplements.

8. Bonds--Performance and payment

bonds and other instruments of security. 9. Change Order--A document

recommended by ENGINEER which is signed by CONTRACTOR and OWNER and authorizes an addition, deletion, or revision in the Work or

an adjustment in the Contract Price or the Contract Times, issued on or after the Effective Date of the Agreement.

10. Claim--A demand or assertion by

OWNER or CONTRACTOR seeking an adjustment of Contract Price or Contract Times, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Claim.

11. Contract--The entire and integrated

written agreement between the OWNER and CONTRACTOR concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral.

12. Contract Documents--The Contract

Documents establish the rights and obligations of the parties and include the Agreement, Addenda (which pertain to the Contract Documents), CONTRACTOR’s Bid (including documentation accompanying the Bid and any post Bid documentation submitted prior to the Notice of Award) when attached as an exhibit to the Agreement, the Notice to Proceed, the Bonds, these General Conditions, the Supplementary Conditions, the Specifications and the Drawings as the same are more specifically identified in the Agreement, together with all Written Amendments, Change Orders, Work Change Directives, Field Orders, and ENGINEER’s written interpretations and clarifications issued on or after the Effective Date of the Agreement. Approved Shop Drawings and the reports and drawings of subsurface and physical conditions are not Contract Documents. Only printed or hard copies of the items listed in this paragraph are Contract Documents. Files in electronic media format of text, data, graphics, and the like that may be furnished by OWNER to CONTRACTOR are not Contract Documents.

13. Contract Price--The moneys payable by

OWNER to CONTRACTOR for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of paragraph 11.03 in the case of Unit Price Work).

14. Contract Times--The number of days or

the dates stated in the Agreement to: (i) achieve Substantial Completion; and (ii) complete the

Page 49: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-8

Work so that it is ready for final payment as evidenced by ENGINEER’s written recommendation of final payment.

15. CONTRACTOR--The individual or entity

with whom OWNER has entered into the Agreement.

16. Cost of the Work--See paragraph

11.01.A for definition. 17. Drawings--That part of the Contract

Documents prepared or approved by ENGINEER which graphically shows the scope, extent, and character of the Work to be performed by CONTRACTOR. Shop Drawings and other CONTRACTOR submittals are not Drawings as so defined.

18. Effective Date of the Agreement--The

date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to sign and deliver.

19. ENGINEER--The individual or entity

named as such in the Agreement. 20. ENGINEER's Consultant--An individual

or entity having a contract with ENGINEER to furnish services as ENGINEER’s independent professional associate or consultant with respect to the Project and who is identified as such in the Supplementary Conditions.

21. Field Order--A written order issued by

ENGINEER which requires minor changes in the Work but which does not involve a change in the Contract Price or the Contract Times.

22. General Requirements--Sections of

Division 1 of the Specifications. The General Requirements pertain to all sections of the Specifications.

23. Hazardous Environmental Condition--

The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, or Radioactive Material in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto in connection with the Work.

24. Hazardous Waste--The term Hazardous

Waste shall have the meaning provided in Section 1004 of the Solid Waste Disposal Act

(42 USC Section 6903) as amended from time to time.

25. Laws and Regulations; Laws or

Regulations--Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction.

26. Liens--Charges, security interests, or

encumbrances upon Project funds, real property, or personal property.

27. Milestone--A principal event specified in

the Contract Documents relating to an intermediate completion date or time prior to Substantial Completion of all the Work.

28. Notice of Award--The written notice by

OWNER to the apparent successful bidder stating that upon timely compliance by the apparent successful bidder with the conditions precedent listed therein, OWNER will sign and deliver the Agreement.

29. Notice to Proceed--A written notice

given by OWNER to CONTRACTOR fixing the date on which the Contract Times will commence to run and on which CONTRACTOR shall start to perform the Work under the Contract Documents.

30. OWNER--The individual, entity, public

body, or authority with whom CONTRACTOR has entered into the Agreement and for whom the Work is to be performed.

31. Partial Utilization--Use by OWNER of a

substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work.

32. PCBs--Polychlorinated biphenyls. 33. Petroleum--Petroleum, including crude

oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils.

34. Project--The total construction of which

the Work to be performed under the Contract Documents may be the whole, or a part as may

Page 50: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-9

be indicated elsewhere in the Contract Documents.

35. Project Manual--The bound

documentary information prepared for bidding and constructing the Work. A listing of the contents of the Project Manual, which may be bound in one or more volumes, is contained in the table(s) of contents.

36. Radioactive Material--Source, special

nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time.

37. Resident Project Representative--The

authorized representative of ENGINEER who may be assigned to the Site or any part thereof.

38. Samples--Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged.

39. Shop Drawings--All drawings, diagrams,

illustrations, schedules, and other data or information which are specifically prepared or assembled by or for CONTRACTOR and submitted by CONTRACTOR to illustrate some portion of the Work.

40. Site--Lands or areas indicated in the

Contract Documents as being furnished by OWNER upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by OWNER which are designated for the use of CONTRACTOR.

41. Specifications--That part of the Contract

Documents consisting of written technical descriptions of materials, equipment, systems, standards, and workmanship as applied to the Work and certain administrative details applicable thereto.

42. Subcontractor--An individual or entity

having a direct contract with CONTRACTOR or with any other Subcontractor for the performance of a part of the Work at the Site.

43. Substantial Completion--The time at

which the Work (or a specified part thereof) has progressed to the point where, in the opinion of ENGINEER, the Work (or a specified part thereof) is sufficiently complete, in accordance with the Contract Documents, so that the Work

(or a specified part thereof) can be utilized for the purposes for which it is intended. The terms “substantially complete” and “substantially completed” as applied to all or part of the Work refer to Substantial Completion thereof.

44. Supplementary Conditions--That part of

the Contract Documents which amends or supplements these General Conditions.

45. Supplier--A manufacturer, fabricator,

supplier, distributor, materialman, or vendor having a direct contract with CONTRACTOR or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by CONTRACTOR or any Subcontractor.

46. Underground Facilities--All underground

pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

47. Unit Price Work--Work to be paid for on

the basis of unit prices. 48. Work--The entire completed

construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents.

49. Work Change Directive--A written

statement to CONTRACTOR issued on or after the Effective Date of the Agreement and signed by OWNER and recommended by ENGINEER ordering an addition, deletion, or revision in the Work, or responding to differing or unforeseen subsurface or physical conditions under which the Work is to be performed or to emergencies. A Work Change Directive will not change the Contract Price or the Contract Times but is evidence that the parties expect that the change ordered or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations by

Page 51: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-10

the parties as to its effect, if any, on the Contract Price or Contract Times.

50. Written Amendment--A written

statement modifying the Contract Documents, signed by OWNER and CONTRACTOR on or after the Effective Date of the Agreement and normally dealing with the nonengineering or nontechnical rather than strictly construction-related aspects of the Contract Documents.

1.02 Terminology

A. Intent of Certain Terms or Adjectives

1. Whenever in the Contract Documents the terms “as allowed,” “as approved,” or terms of like effect or import are used, or the adjectives “reasonable,” “suitable,” “acceptable,” “proper,” “satisfactory,” or adjectives of like effect or import are used to describe an action or determination of ENGINEER as to the Work, it is intended that such action or determination will be solely to evaluate, in general, the completed Work for compliance with the requirements of and information in the Contract Documents and conformance with the design concept of the completed Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). The use of any such term or adjective shall not be effective to assign to ENGINEER any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility contrary to the provisions of paragraph 9.10 or any other provision of the Contract Documents.

B. Day

1. The word “day” shall constitute a

calendar day of 24 hours measured from midnight to the next midnight.

C. Defective

1. The word “defective,” when modifying

the word “Work,” refers to Work that is unsatisfactory, faulty, or deficient in that it does not conform to the Contract Documents or does not meet the requirements of any inspection, reference standard, test, or approval referred to in the Contract Documents, or has been damaged prior to ENGINEER’s recommendation of final payment (unless responsibility for the protection thereof has been assumed by

OWNER at Substantial Completion in accordance with paragraph 14.04 or 14.05).

D. Furnish, Install, Perform, Provide

1. The word “furnish,” when used in

connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition.

2. The word “install,” when used in

connection with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use.

3. The words “perform” or “provide,” when

used in connection with services, materials, or equipment, shall mean to furnish and install said services, materials, or equipment complete and ready for intended use.

4. When “furnish,” “install,” “perform,” or

“provide” is not used in connection with services, materials, or equipment in a context clearly requiring an obligation of CONTRACTOR, “provide” is implied.

E. Unless stated otherwise in the Contract

Documents, words or phrases which have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 - PRELIMINARY MATTERS

2.01 Delivery of Bonds

A. When CONTRACTOR delivers the executed Agreements to OWNER, CONTRACTOR shall also deliver to OWNER such Bonds as CONTRACTOR may be required to furnish.

2.02 Copies of Documents

A. OWNER shall furnish to CONTRACTOR up to ten copies of the Contract Documents. Additional copies will be furnished upon request at the cost of reproduction.

2.03 Commencement of Contract Times; Notice to Proceed

A. The Contract Times will commence to run

on the thirtieth day after the Effective Date of the

Page 52: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-11

Agreement or, if a Notice to Proceed is given, on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 30 days after the Effective Date of the Agreement. In no event will the Contract Times commence to run later than the sixtieth day after the day of Bid opening or the thirtieth day after the Effective Date of the Agreement, whichever date is earlier.

2.04 Starting the Work

A. CONTRACTOR shall start to perform the Work on the date when the Contract Times commence to run. No Work shall be done at the Site prior to the date on which the Contract Times commence to run.

2.05 Before Starting Construction

A. CONTRACTOR’s Review of Contract Documents: Before undertaking each part of the Work, CONTRACTOR shall carefully study and compare the Contract Documents and check and verify pertinent figures therein and all applicable field measurements. CONTRACTOR shall promptly report in writing to ENGINEER any conflict, error, ambiguity, or discrepancy which CONTRACTOR may discover and shall obtain a written interpretation or clarification from ENGINEER before proceeding with any Work affected thereby; however, CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless CONTRACTOR knew or reasonably should have known thereof.

B. Preliminary Schedules: Within ten days

after the Effective Date of the Agreement (unless otherwise specified in the General Requirements), CONTRACTOR shall submit to ENGINEER for its timely review:

1. a preliminary progress schedule indicating the times (numbers of days or dates) for starting and completing the various stages of the Work, including any Milestones specified in the Contract Documents;

2. a preliminary schedule of Shop Drawing

and Sample submittals which will list each required submittal and the times for submitting, reviewing, and processing such submittal; and

3. a preliminary schedule of values for all

of the Work which includes quantities and prices of items which when added together equal the Contract Price and subdivides the Work into component parts in sufficient detail to serve as

the basis for progress payments during performance of the Work. Such prices will include an appropriate amount of overhead and profit applicable to each item of Work.

C. Evidence of Insurance: Before any Work at

the Site is started, CONTRACTOR and OWNER shall each deliver to the other, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance which either of them or any additional insured may reasonably request) which CONTRACTOR and OWNER respectively are required to purchase and maintain in accordance with Article 5.

2.06 Preconstruction Conference

A. Within 20 days after the Contract Times start to run, but before any Work at the Site is started, a conference attended by CONTRACTOR, ENGINEER, and others as appropriate will be held to establish a working understanding among the parties as to the Work and to discuss the schedules referred to in paragraph 2.05.B, procedures for handling Shop Drawings and other submittals, processing Applications for Payment, and maintaining required records.

2.07 Initial Acceptance of Schedules

A. Unless otherwise provided in the Contract Documents, at least ten days before submission of the first Application for Payment a conference attended by CONTRACTOR, ENGINEER, and others as appropriate will be held to review for acceptability to ENGINEER as provided below the schedules submitted in accordance with paragraph 2.05.B. CONTRACTOR shall have an additional ten days to make corrections and adjustments and to complete and resubmit the schedules. No progress payment shall be made to CONTRACTOR until acceptable schedules are submitted to ENGINEER.

1. The progress schedule will be acceptable to ENGINEER if it provides an orderly progression of the Work to completion within any specified Milestones and the Contract Times. Such acceptance will not impose on ENGINEER responsibility for the progress schedule, for sequencing, scheduling, or progress of the Work nor interfere with or relieve CONTRACTOR from CONTRACTOR’s full responsibility therefor.

2. CONTRACTOR’s schedule of Shop

Drawing and Sample submittals will be acceptable to ENGINEER if it provides a

Page 53: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-12

workable arrangement for reviewing and processing the required submittals.

3. CONTRACTOR’s schedule of values

will be acceptable to ENGINEER as to form and substance if it provides a reasonable allocation of the Contract Price to component parts of the Work.

ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE

3.01 Intent A. The Contract Documents are

complementary; what is called for by one is as binding as if called for by all.

B. It is the intent of the Contract Documents to describe a functionally complete Project (or part thereof) to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that may reasonably be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the intended result will be provided whether or not specifically called for at no additional cost to OWNER.

C. Clarifications and interpretations of the Contract Documents shall be issued by ENGINEER as provided in Article 9.

3.02 Reference Standards

A. Standards, Specifications, Codes, Laws, and Regulations

1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents.

2. No provision of any such standard,

specification, manual or code, or any instruction of a Supplier shall be effective to change the duties or responsibilities of OWNER, CONTRACTOR, or ENGINEER, or any of their subcontractors, consultants, agents, or employees from those set forth in the Contract Documents, nor shall any such provision or

instruction be effective to assign to OWNER, ENGINEER, or any of ENGINEER’s Consultants, agents, or employees any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents.

3.03 Reporting and Resolving Discrepancies

A. Reporting Discrepancies

1. If, during the performance of the Work, CONTRACTOR discovers any conflict, error, ambiguity, or discrepancy within the Contract Documents or between the Contract Documents and any provision of any Law or Regulation applicable to the performance of the Work or of any standard, specification, manual or code, or of any instruction of any Supplier, CONTRACTOR shall report it to ENGINEER in writing at once. CONTRACTOR shall not proceed with the Work affected thereby (except in an emergency as required by paragraph 6.16.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in paragraph 3.04; provided, however, that CONTRACTOR shall not be liable to OWNER or ENGINEER for failure to report any such conflict, error, ambiguity, or discrepancy unless CONTRACTOR knew or reasonably should have known thereof.

B. Resolving Discrepancies

1. Except as may be otherwise specifically

stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambiguity, or discrepancy between the provisions of the Contract Documents and:

a. the provisions of any standard,

specification, manual, code, or instruction (whether or not specifically incorporated by reference in the Contract Documents); or

b. the provisions of any Laws or

Regulations applicable to the performance of the Work (unless such an interpretation of the provisions of the Contract Documents would result in violation of such Law or Regulation).

3.04 Amending and Supplementing Contract Documents

Page 54: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-13

A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof in one or more of the following ways: (i) a Written Amendment; (ii) a Change Order; or (iii) a Work Change Directive.

B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work may be authorized, by one or more of the following ways: (i) a Field Order; (ii) ENGINEER’s approval of a Shop Drawing or Sample; or (iii) ENGINEER’s written interpretation or clarification.

3.05 Reuse of Documents

A. CONTRACTOR and any Subcontractor or Supplier or other individual or entity performing or furnishing any of the Work under a direct or indirect contract with OWNER: (i) shall not have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereof) prepared by or bearing the seal of ENGINEER or ENGINEER’s Consultant, including electronic media editions; and (ii) shall not reuse any of such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of OWNER and ENGINEER and specific written verification or adaption by ENGINEER. This prohibition will survive final payment, completion, and acceptance of the Work, or termination or completion of the Contract. Nothing herein shall preclude CONTRACTOR from retaining copies of the Contract Documents for record purposes. ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE POINTS

4.01 Availability of Lands

A. OWNER shall furnish the Site. OWNER shall notify CONTRACTOR of any encumbrances or restrictions not of general application but specifically related to use of the Site with which CONTRACTOR must comply in performing the Work. OWNER will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. If CONTRACTOR and OWNER are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of any delay in OWNER’s furnishing the Site, CONTRACTOR may make a Claim therefor as provided in paragraph 10.05.

B. Upon reasonable written request, OWNER shall furnish CONTRACTOR with a current statement of record legal title and legal description of the lands upon which the Work is to be performed and OWNER’s interest therein as necessary for giving notice of or filing a mechanic's or construction lien against such lands in accordance with applicable Laws and Regulations.

C. CONTRACTOR shall provide for all additional lands and access thereto that may be required for temporary construction facilities or storage of materials and equipment.

4.02 Subsurface and Physical Conditions

A. Reports and Drawings: The Supplementary Conditions identify:

1. those reports of explorations and tests of subsurface conditions at or contiguous to the Site that ENGINEER has used in preparing the Contract Documents; and

2. those drawings of physical conditions

in or relating to existing surface or subsurface structures at or contiguous to the Site (except Underground Facilities) that ENGINEER has used in preparing the Contract Documents.

B. Limited Reliance by CONTRACTOR on

Technical Data Authorized: CONTRACTOR may rely upon the general accuracy of the “technical data” contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such “technical data” is identified in the Supplementary Conditions. Except for such reliance on such “technical data,” CONTRACTOR may not rely upon or make any Claim against OWNER, ENGINEER, or any of ENGINEER’s Consultants with respect to:

1. the completeness of such reports and drawings for CONTRACTOR’s purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by CONTRACTOR, and safety precautions and programs incident thereto; or

2. other data, interpretations, opinions, and

information contained in such reports or shown or indicated in such drawings; or

3. any CONTRACTOR interpretation of or

conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information.

Page 55: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-14

4.03 Differing Subsurface or Physical Conditions

A. Notice: If CONTRACTOR believes that any subsurface or physical condition at or contiguous to the Site that is uncovered or revealed either:

1. is of such a nature as to establish that any “technical data” on which CONTRACTOR is entitled to rely as provided in paragraph 4.02 is materially inaccurate; or

2. is of such a nature as to require a

change in the Contract Documents; or

3. differs materially from that shown or indicated in the Contract Documents; or

4. is of an unusual nature, and differs

materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents;

then CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by paragraph 6.16.A), notify OWNER and ENGINEER in writing about such condition. CONTRACTOR shall not further disturb such condition or perform any Work in connection therewith (except as aforesaid) until receipt of written order to do so.

B. ENGINEER’s Review: After receipt of written notice as required by paragraph 4.03.A, ENGINEER will promptly review the pertinent condition, determine the necessity of OWNER's obtaining additional exploration or tests with respect thereto, and advise OWNER in writing (with a copy to CONTRACTOR) of ENGINEER’s findings and conclusions.

C. Possible Price and Times Adjustments

1. The Contract Price or the Contract Times, or both, will be equitably adjusted to the extent that the existence of such differing subsurface or physical condition causes an increase or decrease in CONTRACTOR’s cost of, or time required for, performance of the Work; subject, however, to the following:

a. such condition must meet any one

or more of the categories described in paragraph 4.03.A; and

b. with respect to Work that is paid for on a Unit Price Basis, any adjustment in Contract Price will be subject to the provisions of paragraphs 9.08 and 11.03.

2. CONTRACTOR shall not be entitled to

any adjustment in the Contract Price or Contract Times if:

a. CONTRACTOR knew of the existence of such conditions at the time CONTRACTOR made a final commitment to OWNER in respect of Contract Price and Contract Times by the submission of a Bid or becoming bound under a negotiated contract; or

b. the existence of such condition

could reasonably have been discovered or revealed as a result of any examination, investigation, exploration, test, or study of the Site and contiguous areas required by the Bidding Requirements or Contract Documents to be conducted by or for CONTRACTOR prior to CONTRACTOR's making such final commitment; or

c. CONTRACTOR failed to give the

written notice within the time and as required by paragraph 4.03.A.

3. If OWNER and CONTRACTOR are

unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, a Claim may be made therefor as provided in paragraph 10.05. However, OWNER, ENGINEER, and ENGINEER’s Consultants shall not be liable to CONTRACTOR for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by CONTRACTOR on or in connection with any other project or anticipated project.

4.04 Underground Facilities

A. Shown or Indicated: The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnished to OWNER or ENGINEER by the owners of such Underground Facilities, including OWNER, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions:

Page 56: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-15

1. OWNER and ENGINEER shall not be responsible for the accuracy or completeness of any such information or data; and

2. the cost of all of the following will be

included in the Contract Price, and CONTRACTOR shall have full responsibility for:

a. reviewing and checking all such

information and data, b. locating all Underground Facilities

shown or indicated in the Contract Documents,

c. coordination of the Work with the

owners of such Underground Facilities, including OWNER, during construction, and

d. the safety and protection of all such

Underground Facilities and repairing any damage thereto resulting from the Work.

B. Not Shown or Indicated

1. If an Underground Facility is uncovered

or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, CONTRACTOR shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or performing any Work in connection therewith (except in an emergency as required by paragraph 6.16.A), identify the owner of such Underground Facility and give written notice to that owner and to OWNER and ENGINEER. ENGINEER will promptly review the Underground Facility and determine the extent, if any, to which a change is required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. During such time, CONTRACTOR shall be responsible for the safety and protection of such Underground Facility.

2. If ENGINEER concludes that a change

in the Contract Documents is required, a Work Change Directive or a Change Order will be issued to reflect and document such consequences. An equitable adjustment shall be made in the Contract Price of Contract Times, or both, to the extent that they are attributable to the existence or location of any Underground Facility that was not shown or indicated or not shown or indicated with

reasonable accuracy in the Contract Documents and that CONTRACTOR did not know of and could not reasonably have been expected to be aware of or to have anticipated. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment in Contract Price or Contract Times, OWNER or CONTRACTOR may make a Claim therefor as provided in paragraph 10.05.

4.05 Reference Points

A. OWNER shall provide engineering surveys to establish reference points for construction which in ENGINEER’s judgment are necessary to enable CONTRACTOR to proceed with the Work. CONTRACTOR shall be responsible for laying out the Work, shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations without the prior written approval of OWNER. CONTRACTOR shall report to ENGINEER whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations, and shall be responsible for the accurate replacement or relocation of such reference points or property monuments by professionally qualified personnel.

4.06 Hazardous Environmental Condition at Site

A. Reports and Drawings: Reference is made to the Supplementary Conditions for the identification of those reports and drawings relating to a Hazardous Environmental Condition identified at the Site, if any, that have been utilized by the ENGINEER in the preparation of the Contract Documents.

B. Limited Reliance by CONTRACTOR on Technical Data Authorized: CONTRACTOR may rely upon the general accuracy of the “technical data” contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such “technical data” is identified in the Supplementary Conditions. Except for such reliance on such “technical data,” CONTRACTOR may not rely upon or make any Claim against OWNER, ENGINEER or any of ENGINEER’s Consultants with respect to:

1. the completeness of such reports and drawings for CONTRACTOR’s purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of construction to be employed by

Page 57: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-16

CONTRACTOR and safety precautions and programs incident thereto; or

2. other data, interpretations, opinions and

information contained in such reports or shown or indicated in such drawings; or

3. any CONTRACTOR interpretation of or

conclusion drawn from any “technical data” or any such other data, interpretations, opinions or information.

C. CONTRACTOR shall not be responsible for

any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. CONTRACTOR shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by CONTRACTOR, Subcontractors, Suppliers, or anyone else for whom CONTRACTOR is responsible.

D. If CONTRACTOR encounters a Hazardous Environmental Condition or if CONTRACTOR or anyone for whom CONTRACTOR is responsible creates a Hazardous Environmental Condition, CONTRACTOR shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by paragraph 6.16); and (iii) notify OWNER and ENGINEER (and promptly thereafter confirm such notice in writing). OWNER shall promptly consult with ENGINEER concerning the necessity for OWNER to retain a qualified expert to evaluate such condition or take corrective action, if any.

E. CONTRACTOR shall not be required to resume Work in connection with such condition or in any affected area until after OWNER has obtained any required permits related thereto and delivered to CONTRACTOR written notice: (i) specifying that such condition and any affected area is or has been rendered safe for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed safely. If OWNER and CONTRACTOR cannot agree as to entitlement to or on the amount or extent, if any, of any adjustment in Contract Price or Contract Times, or both, as a result of such Work stoppage or such special conditions under which Work is agreed to be resumed by CONTRACTOR, either party may make a Claim therefor as provided in paragraph 10.05.

F. If after receipt of such written notice CONTRACTOR does not agree to resume such

Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then OWNER may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. If OWNER and CONTRACTOR cannot agree as to entitlement to or on the amount or extent, if any, of an adjustment in Contract Price or Contract Times as a result of deleting such portion of the Work, then either party may make a Claim therefor as provided in paragraph 10.05. OWNER may have such deleted portion of the Work performed by OWNER’s own forces or others in accordance with Article 7.

G. To the fullest extent permitted by Laws and Regulations, OWNER shall indemnify and hold harmless CONTRACTOR, Subcontractors, ENGINEER, ENGINEER’s Consultants and the officers, directors, partners, employees, agents, other consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition, provided that such Hazardous Environmental Condition: (i) was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be included within the scope of the Work, and (ii) was not created by CONTRACTOR or by anyone for whom CONTRACTOR is responsible. Nothing in this para-graph 4.06.E shall obligate OWNER to indemnify any individual or entity from and against the consequences of that individual’s or entity’s own negligence.

H. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER’s Consultants, and the officers, directors, partners, employees, agents, other consultants, and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to a Hazardous Environmental Condition created by CONTRACTOR or by anyone for whom CONTRACTOR is responsible. Nothing in this paragraph 4.06.F shall obligate CONTRACTOR to indemnify any individual or entity from and against the consequences of that individual’s or entity’s own negligence.

Page 58: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-17

I. The provisions of paragraphs 4.02, 4.03, and 4.04 are not intended to apply to a Hazardous Environmental Condition uncovered or revealed at the Site. ARTICLE 5 - BONDS AND INSURANCE

5.01 Performance, Payment, and Other Bonds

A. CONTRACTOR shall furnish performance and payment Bonds, each in an amount at least equal to the Contract Price as security for the faithful performance and payment of all CONTRACTOR’s obligations under the Contract Documents. These Bonds shall remain in effect at least until one year after the date when final payment becomes due, except as provided otherwise by Laws or Regulations or by the Contract Documents. CONTRACTOR shall also furnish such other Bonds as are required by the Contract Documents.

B. All Bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the current list of “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies” as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All Bonds signed by an agent must be accompanied by a certified copy of such agent’s authority to act.

C. If the surety on any Bond furnished by CON-TRACTOR is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements of paragraph 5.01.B, CONTRACTOR shall within 20 days thereafter substitute another Bond and surety, both of which shall comply with the requirements of paragraphs 5.01.B and

5.02 Licensed Sureties and Insurers

A. All Bonds and insurance required by the Contract Documents to be purchased and maintained by OWNER or CONTRACTOR shall be obtained from surety or insurance companies that are duly licensed or authorized in the jurisdiction in which the Project is located to issue Bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions.

5.03 Certificates of Insurance

A. CONTRACTOR shall deliver to OWNER, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by OWNER or any other additional insured) which CONTRACTOR is required to purchase and maintain. OWNER shall deliver to CONTRACTOR, with copies to each additional insured identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by CONTRACTOR or any other additional insured) which OWNER is required to purchase and maintain.

5.04 CONTRACTOR’s Liability Insurance

A. CONTRACTOR shall purchase and maintain such liability and other insurance as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from CONTRACTOR’s performance of the Work and CONTRACTOR’s other obligations under the Contract Documents, whether it is to be performed by CONTRACTOR, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable:

1. claims under workers’ compensation, disability benefits, and other similar employee benefit acts;

2. claims for damages because of bodily

injury, occupational sickness or disease, or death of CONTRACTOR’s employees;

3. claims for damages because of bodily

injury, sickness or disease, or death of any person other than CONTRACTOR’s employees;

4. claims for damages insured by

reasonably available personal injury liability coverage which are sustained: (i) by any person as a result of an offense directly or indirectly related to the employment of such person by CONTRACTOR, or (ii) by any other person for any other reason;

5. claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including loss of use resulting therefrom; and

6. claims for damages because of bodily

injury or death of any person or property

Page 59: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-18

damage arising out of the ownership, maintenance or use of any motor vehicle.

B. The policies of insurance so required by this

paragraph 5.04 to be purchased and maintained shall:

1. with respect to insurance required by paragraphs 5.04.A.3 through 5.04.A.6 inclusive, include as additional insureds (subject to any customary exclusion in respect of professional liability) OWNER, ENGINEER, ENGINEER's Consultants, and any other individuals or entities identified in the Supplementary Conditions, all of whom shall be listed as additional insureds, and include coverage for the respective officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of all such additional insureds, and the insurance afforded to these additional insureds shall provide primary coverage for all claims covered thereby;

2. include at least the specific coverages

and be written for not less than the limits of liability provided in the Supplementary Conditions or required by Laws or Regulations, whichever is greater;

3. include completed operations insurance;

4. include contractual liability insurance

covering CONTRACTOR’s indemnity obligations under paragraphs 6.07, 6.11, and 6.20;

5. contain a provision or endorsement that

the coverage afforded will not be canceled, materially changed or renewal refused until at least thirty days prior written notice has been given to OWNER and CONTRACTOR and to each other additional insured identified in the Supplementary Conditions to whom a certificate of insurance has been issued (and the certificates of insurance furnished by the CONTRACTOR pursuant to paragraph 5.03 will so provide);

6. remain in effect at least until final

payment and at all times thereafter when CONTRACTOR may be correcting, removing, or replacing defective Work in accordance with paragraph 13.07; and

7. with respect to completed operations

insurance, and any insurance coverage written on a claims-made basis, remain in effect for at least two years after final payment (and

CONTRACTOR shall furnish OWNER and each other additional insured identified in the Supplementary Conditions, to whom a certificate of insurance has been issued, evidence satisfactory to OWNER and any such additional insured of continuation of such insurance at final payment and one year thereafter).

5.05 OWNER’s Liability Insurance

A. In addition to the insurance required to be provided by CONTRACTOR under paragraph 5.04, OWNER, at OWNER’s option, may purchase and maintain at OWNER’s expense OWNER’s own liability insurance as will protect OWNER against claims which may arise from operations under the Contract Documents.

5.06 Property Insurance

A. Unless otherwise provided in the Supplementary Conditions, OWNER shall purchase and maintain property insurance upon the Work at the Site in the amount of the full replacement cost thereof (subject to such deductible amounts as may be provided in the Supplementary Conditions or required by Laws and Regulations). This insurance shall:

1. include the interests of OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER’s Consultants, and any other individuals or entities identified in the Supplementary Conditions, and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them, each of whom is deemed to have an insurable interest and shall be listed as an additional insured;

2. be written on a Builder’s Risk “all-risk” or

open peril or special causes of loss policy form that shall at least include insurance for physical loss or damage to the Work, temporary buildings, false work, and materials and equipment in transit, and shall insure against at least the following perils or causes of loss: fire, lightning, extended coverage, theft, vandalism and malicious mischief, earthquake, collapse, debris removal, demolition occasioned by enforcement of Laws and Regulations, water damage, and such other perils or causes of loss as may be specifically required by the Supplementary Conditions;

3. include expenses incurred in the repair

or replacement of any insured property

Page 60: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-19

(including but not limited to fees and charges of engineers and architects);

4. cover materials and equipment stored at

the Site or at another location that was agreed to in writing by OWNER prior to being incorporated in the Work, provided that such materials and equipment have been included in an Application for Payment recommended by ENGINEER;

5. allow for partial utilization of the Work by OWNER;

6. include testing and startup; and

7. be maintained in effect until final

payment is made unless otherwise agreed to in writing by OWNER, CONTRACTOR, and ENGINEER with 30 days written notice to each other additional insured to whom a certificate of insurance has been issued.

B. OWNER shall purchase and maintain such

boiler and machinery insurance or additional property insurance as may be required by the Supplementary Conditions or Laws and Regulations which will include the interests of OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER’s Consultants, and any other individuals or entities identified in the Supplementary Conditions, each of whom is deemed to have an insurable interest and shall be listed as an insured or additional insured.

C. All the policies of insurance (and the certificates or other evidence thereof) required to be purchased and maintained in accordance with paragraph 5.06 will contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days prior written notice has been given to OWNER and CONTRACTOR and to each other additional insured to whom a certificate of insurance has been issued and will contain waiver provisions in accordance with paragraph 5.07.

D. OWNER shall not be responsible for purchasing and maintaining any property insurance specified in this paragraph 5.06 to protect the interests of CONTRACTOR, Subcontractors, or others in the Work to the extent of any deductible amounts that are identified in the Supplementary Conditions. The risk of loss within such identified deductible amount will be borne by CONTRACTOR, Subcontractors, or others suffering any such loss, and if any of them wishes property insurance cover-age within the limits of such amounts, each may

purchase and maintain it at the purchaser’s own expense.

E. If CONTRACTOR requests in writing that other special insurance be included in the property insurance policies provided under paragraph 5.06, OWNER shall, if possible, include such insurance, and the cost thereof will be charged to CONTRACTOR by appropriate Change Order or Written Amendment. Prior to commencement of the Work at the Site, OWNER shall in writing advise CONTRACTOR whether or not such other insurance has been procured by OWNER.

5.07 Waiver of Rights

A. OWNER and CONTRACTOR intend that all policies purchased in accordance with paragraph 5.06 will protect OWNER, CONTRACTOR, Subcontractors, ENGINEER, ENGINEER’s Consultants, and all other individuals or entities identified in the Supplementary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them) in such policies and will provide primary coverage for all losses and damages caused by the perils or causes of loss covered thereby. All such policies shall contain provisions to the effect that in the event of payment of any loss or damage the insurers will have no rights of recovery against any of the insureds or additional insureds thereunder. OWNER and CONTRACTOR waive all rights against each other and their respective officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them for all losses and damages caused by, arising out of or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work; and, in addition, waive all such rights against Subcontractors, ENGINEER, ENGINEER’s Consultants, and all other individuals or entities identified in the Supplementary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them) under such policies for losses and damages so caused. None of the above waivers shall extend to the rights that any party making such waiver may have to the proceeds of insurance held by OWNER as trustee or otherwise payable under any policy so issued.

B. OWNER waives all rights against CONTRACTOR, Subcontractors, ENGINEER, ENGINEER’s Consultants, and the officers, directors, partners, employees, agents, and other

Page 61: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-20

consultants and subcontractors of each and any of them for:

1. loss due to business interruption, loss of use, or other consequential loss extending beyond direct physical loss or damage to OWNER’s property or the Work caused by, arising out of, or resulting from fire or other peril whether or not insured by OWNER; and

2. loss or damage to the completed Project

or part thereof caused by, arising out of, or resulting from fire or other insured peril or cause of loss covered by any property insurance maintained on the completed Project or part thereof by OWNER during partial utilization pursuant to paragraph 14.05, after Substantial Completion pursuant to paragraph 14.04, or after final payment pursuant to paragraph 14.07.

C. Any insurance policy maintained by OWNER

covering any loss, damage or consequential loss referred to in paragraph 5.07.B shall contain provisions to the effect that in the event of payment of any such loss, damage, or consequential loss, the insurers will have no rights of recovery against CONTRACTOR, Subcontractors, ENGINEER, or ENGINEER’s Consultants and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them.

5.08 Receipt and Application of Insurance Proceeds

A. Any insured loss under the policies of

insurance required by paragraph 5.06 will be adjusted with OWNER and made payable to OWNER as fiduciary for the insureds, as their interests may appear, subject to the requirements of any applicable mortgage clause and of paragraph 5.08.B. OWNER shall deposit in a separate account any money so received and shall distribute it in accordance with such agreement as the parties in interest may reach. If no other special agreement is reached, the damaged Work shall be repaired or replaced, the moneys so received applied on account thereof, and the Work and the cost thereof covered by an appropriate Change Order or Written Amendment.

B. OWNER as fiduciary shall have power to adjust and settle any loss with the insurers unless one of the parties in interest shall object in writing within 15 days after the occurrence of loss to OWNER’s exercise of this power. If such objection be made, OWNER as fiduciary shall make settlement with the insurers in accordance with such agreement as the parties in interest may reach. If

no such agreement among the parties in interest is reached, OWNER as fiduciary shall adjust and settle the loss with the insurers and, if required in writing by any party in interest, OWNER as fiduciary shall give bond for the proper performance of such duties.

5.09 Acceptance of Bonds and Insurance; Option to Replace

A. If either OWNER or CONTRACTOR has any

objection to the coverage afforded by or other provisions of the Bonds or insurance required to be purchased and maintained by the other party in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the objecting party shall so notify the other party in writing within 10 days after receipt of the certificates (or other evidence requested) required by paragraph 2.05.C. OWNER and CONTRACTOR shall each provide to the other such additional information in respect of insurance provided as the other may reasonably request. If either party does not purchase or maintain all of the Bonds and insurance required of such party by the Contract Documents, such party shall notify the other party in writing of such failure to purchase prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. Without prejudice to any other right or remedy, the other party may elect to obtain equivalent Bonds or insurance to protect such other party's interests at the expense of the party who was required to provide such coverage, and a Change Order shall be issued to adjust the Contract Price accordingly. 5.10 Partial Utilization, Acknowledgment of Property Insurer

A. If OWNER finds it necessary to occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in paragraph 14.05, no such use or occupancy shall commence before the insurers providing the property insurance pursuant to paragraph 5.06 have acknowledged notice thereof and in writing effected any changes in coverage necessitated thereby. The insurers providing the property insurance shall consent by endorsement on the policy or policies, but the property insurance shall not be canceled or permitted to lapse on account of any such partial use or occupancy. ARTICLE 6 - CONTRACTOR’S RESPONSIBILITIES

6.01 Supervision and Superintendence

A. CONTRACTOR shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such

Page 62: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-21

skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction, but CONTRACTOR shall not be responsible for the negligence of OWNER or ENGINEER in the design or specification of a specific means, method, technique, sequence, or procedure of construction which is shown or indicated in and expressly required by the Contract Documents. CONTRACTOR shall be responsible to see that the completed Work complies accurately with the Contract Documents.

B. At all times during the progress of the Work, CONTRACTOR shall assign a competent resident superintendent thereto who shall not be replaced without written notice to OWNER and ENGINEER except under extraordinary circumstances. The superintendent will be CONTRACTOR’s representative at the Site and shall have authority to act on behalf of CONTRACTOR. All communications given to or received from the superintendent shall be binding on CONTRACTOR.

6.02 Labor; Working Hours

A. CONTRACTOR shall provide competent, suitably qualified personnel to survey, lay out, and construct the Work as required by the Contract Documents. CONTRACTOR shall at all times maintain good discipline and order at the Site.

B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during regular working hours, and CONTRACTOR will not permit overtime work or the performance of Work on Saturday, Sunday, or any legal holiday without OWNER’s written consent (which will not be unreasonably withheld) given after prior written notice to ENGINEER.

6.03 Services, Materials, and Equipment

A. Unless otherwise specified in the General Requirements, CONTRACTOR shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work.

B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All warranties and guarantees specifically called for by the Specifications shall expressly run to the benefit of OWNER. If required by ENGINEER, CONTRACTOR shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. All materials and equipment shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents.

6.04 Progress Schedule

A. CONTRACTOR shall adhere to the progress schedule established in accordance with paragraph 2.07 as it may be adjusted from time to time as provided below.

1. CONTRACTOR shall submit to ENGINEER for acceptance (to the extent indicated in paragraph 2.07) proposed adjustments in the progress schedule that will not result in changing the Contract Times (or Milestones). Such adjustments will conform generally to the progress schedule then in effect and additionally will comply with any provisions of the General Requirements applicable thereto.

2. Proposed adjustments in the progress

schedule that will change the Contract Times (or Milestones) shall be submitted in accordance with the requirements of Article 12. Such adjustments may only be made by a Change Order or Written Amendment in accordance with Article 12.

6.05 Substitutes and “Or-Equals”

A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or “or-equal” item or no substitution is permitted, other items of material or equipment or material or equipment of other Suppliers may be submitted to ENGINEER for review under the circumstances described below.

Page 63: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-22

1. “Or-Equal” Items: If in ENGINEER’s sole discretion an item of material or equipment proposed by CONTRACTOR is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by ENGINEER as an “or-equal” item, in which case review and approval of the proposed item may, in ENGINEER’s sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this paragraph 6.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if:

a. in the exercise of reasonable

judgment ENGINEER determines that: (i) it is at least equal in quality, durability, appearance, strength, and design characteristics; (ii) it will reliably perform at least equally well the function imposed by the design concept of the completed Project as a functioning whole, and;

b. CONTRACTOR certifies that: (i)

there is no increase in cost to the OWNER; and (ii) it will conform substantially, even with deviations, to the detailed requirements of the item named in the Contract Documents.

2. Substitute Items

a. If in ENGINEER’s sole discretion an

item of material or equipment proposed by CONTRACTOR does not qualify as an “or-equal” item under paragraph 6.05.A.1, it will be considered a proposed substitute item.

b. CONTRACTOR shall submit

sufficient information as provided below to allow ENGINEER to determine that the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by ENGINEER from anyone other than CONTRACTOR.

c. The procedure for review by

ENGINEER will be as set forth in paragraph 6.05.A.2.d, as supplemented in the General Requirements and as ENGINEER may

decide is appropriate under the circumstances.

d. CONTRACTOR shall first make

written application to ENGINEER for review of a proposed substitute item of material or equipment that CONTRACTOR seeks to furnish or use. The application shall certify that the proposed substitute item will perform adequately the functions and achieve the results called for by the general design, be similar in substance to that specified, and be suited to the same use as that specified. The application will state the extent, if any, to which the use of the proposed substitute item will prejudice CONTRACTOR’s achievement of Substantial Completion on time, whether or not use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) to adapt the design to the proposed substitute item and whether or not incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty. All variations of the proposed substitute item from that specified will be identified in the application, and available engineering, sales, maintenance, repair, and replacement services will be indicated. The application will also contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and claims of other contractors affected by any resulting change, all of which will be considered by ENGINEER in evaluating the proposed substitute item. ENGINEER may require CONTRACTOR to furnish additional data about the proposed substitute item.

B. Substitute Construction Methods or

Procedures: If a specific means, method, technique, sequence, or procedure of construction is shown or indicated in and expressly required by the Contract Documents, CONTRACTOR may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by ENGINEER. CONTRACTOR shall submit sufficient information to allow ENGINEER, in ENGINEER’s sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. The procedure for review by ENGINEER will be similar to that provided in sub-paragraph 6.05.A.2.

Page 64: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-23

C. Engineer’s Evaluation: ENGINEER will be

allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to paragraphs 6.05.A and 6.05.B. ENGINEER will be the sole judge of acceptability. No “or-equal” or substitute will be ordered, installed or utilized until ENGINEER’s review is complete, which will be evidenced by either a Change Order for a substitute or an approved Shop Drawing for an “or-equal.” ENGINEER will advise CONTRACTOR in writing of any negative determination.

D. Special Guarantee: OWNER may require CONTRACTOR to furnish at CONTRACTOR’s expense a special performance guarantee or other surety with respect to any substitute.

E. ENGINEER’s Cost Reimbursement: ENGINEER will record time required by ENGINEER and ENGINEER’s Consultants in evaluating substitute proposed or submitted by CONTRACTOR pursuant to paragraphs 6.05.A.2 and 6.05.B and in making changes in the Contract Documents (or in the provisions of any other direct contract with OWNER for work on the Project) occasioned thereby. Whether or not ENGINEER approves a substitute item so proposed or submitted by CONTRACTOR, CONTRACTOR shall reimburse OWNER for the charges of ENGINEER and ENGINEER’s Consultants for evaluating each such proposed substitute.

F. CONTRACTOR’s Expense: CONTRACTOR shall provide all data in support of any proposed substitute or “or-equal” at CONTRACTOR’s expense.

6.06 Concerning Subcontractors, Suppliers, and Others

A. CONTRACTOR shall not employ any

Subcontractor, Supplier, or other individual or entity (including those acceptable to OWNER as indicated in paragraph 6.06.B), whether initially or as a replacement, against whom OWNER may have reasonable objection. CONTRACTOR shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom CONTRACTOR has reasonable objection.

B. If the Supplementary Conditions require the identity of certain Subcontractors, Suppliers, or other individuals or entities to be submitted to OWNER in advance for acceptance by OWNER by a specified date prior to the Effective Date of the Agreement, and if CONTRACTOR has submitted a list thereof in

accordance with the Supplementary Conditions, OWNER’s acceptance (either in writing or by failing to make written objection thereto by the date indicated for acceptance or objection in the Bidding Documents or the Contract Documents) of any such Subcontractor, Supplier, or other individual or entity so identified may be revoked on the basis of reasonable objection after due investigation. CONTRACTOR shall submit an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity, and the Contract Price will be adjusted by the difference in the cost occasioned by such replacement, and an appropriate Change Order will be issued or Written Amendment signed. No acceptance by OWNER of any such Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, shall constitute a waiver of any right of OWNER or ENGINEER to reject defective Work.

C. CONTRACTOR shall be fully responsible to OWNER and ENGINEER for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as CONTRACTOR is responsible for CONTRACTOR’s own acts and omissions. Nothing in the Contract Documents shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between OWNER or ENGINEER and any such Subcontractor, Supplier or other individual or entity, nor shall it create any obligation on the part of OWNER or ENGINEER to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations.

D. CONTRACTOR shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with CONTRACTOR.

E. CONTRACTOR shall require all Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work to communicate with ENGINEER through CONTRACTOR.

F. The divisions and sections of the Specifications and the identifications of any Drawings shall not control CONTRACTOR in dividing the Work among Subcontractors or Suppliers or delineating the Work to be performed by any specific trade.

Page 65: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-24

G. All Work performed for CONTRACTOR by a

Subcontractor or Supplier will be pursuant to an appropriate agreement between CONTRACTOR and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of OWNER and ENGINEER. Whenever any such agreement is with a Subcontractor or Supplier who is listed as an additional insured on the property insurance provided in paragraph 5.06, the agreement between the CONTRACTOR and the Subcontractor or Supplier will contain provisions whereby the Subcontractor or Supplier waives all rights against OWNER, CONTRACTOR, ENGINEER, ENGINEER’s Consultants, and all other individuals or entities identified in the Supplementary Conditions to be listed as insureds or additional insureds (and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them) for all losses and damages caused by, arising out of, relating to, or resulting from any of the perils or causes of loss covered by such policies and any other property insurance applicable to the Work. If the insurers on any such policies require separate waiver forms to be signed by any Subcontractor or Supplier, CONTRACTOR will obtain the same.

6.07 Patent Fees and Royalties

A. CONTRACTOR shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if to the actual knowledge of OWNER or ENGINEER its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by OWNER in the Contract Documents. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER’s Consultants, and the officers, directors, partners, employees or agents, and other consultants of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the

Work of any invention, design, process, product, or device not specified in the Contract Documents.

6.08 Permits

A. Unless otherwise provided in the Supplementary Conditions, CONTRACTOR shall obtain and pay for all construction permits and licenses. OWNER shall assist CONTRACTOR, when necessary, in obtaining such permits and licenses. CONTRACTOR shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement. CONTRACTOR shall pay all charges of utility owners for connections to the Work, and OWNER shall pay all charges of such utility owners for capital costs related thereto, such as plant investment fees.

6.09 Laws and Regulations

A. CONTRACTOR shall give all notices and comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, neither OWNER nor ENGINEER shall be responsible for monitoring CONTRACTOR’s compliance with any Laws or Regulations.

B. If CONTRACTOR performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, CONTRACTOR shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work; however, it shall not be CONTRACTOR’s primary responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve CONTRACTOR of CONTRACTOR’s obligations under paragraph 3.03.

C. Changes in Laws or Regulations not known at the time of opening of Bids (or, on the Effective Date of the Agreement if there were no Bids) having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Times. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any such adjustment, a Claim may be made therefor as provided in paragraph 10.05.

6.10 Taxes

Page 66: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-25

A. CONTRACTOR shall pay all sales, consumer, use, and other similar taxes required to be paid by CONTRACTOR in accordance with the Laws and Regulations of the place of the Project which are applicable during the performance of the Work.

6.11 Use of Site and Other Areas

A. Limitation on Use of Site and Other Areas

1. CONTRACTOR shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. CONTRACTOR shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work.

2. Should any claim be made by any such

owner or occupant because of the performance of the Work, CONTRACTOR shall promptly settle with such other party by negotiation or otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law.

3. To the fullest extent permitted by Laws

and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER’s Consultant, and the officers, directors, partners, employees, agents, and other consultants of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against OWNER, ENGINEER, or any other party indemnified hereunder to the extent caused by or based upon CONTRACTOR's performance of the Work.

B. Removal of Debris During Performance of

the Work: During the progress of the Work CONTRACTOR shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations.

C. Cleaning: Prior to Substantial Completion of the Work CONTRACTOR shall clean the Site and make it ready for utilization by OWNER. At the completion of the Work CONTRACTOR shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition all property not designated for alteration by the Contract Documents.

D. Loading Structures: CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses or pressures that will endanger it.

6.12 Record Documents

A. CONTRACTOR shall maintain in a safe place at the Site one record copy of all Drawings, Specifications, Addenda, Written Amendments, Change Orders, Work Change Directives, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all approved Shop Drawings will be available to ENGINEER for reference. Upon completion of the Work, these record documents, Samples, and Shop Drawings will be delivered to ENGINEER for OWNER.

6.13 Safety and Protection

A. CONTRACTOR shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. CONTRACTOR shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to:

1. all persons on the Site or who may be affected by the Work;

2. all the Work and materials and

equipment to be incorporated therein, whether in storage on or off the Site; and

3. other property at the Site or adjacent

thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction.

Page 67: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-26

B. CONTRACTOR shall comply with all

applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. CONTRACTOR shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. All damage, injury, or loss to any property referred to in paragraph 6.13.A.2 or 6.13.A.3 caused, directly or indirectly, in whole or in part, by CONTRACTOR, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by CONTRACTOR (except damage or loss attributable to the fault of Drawings or Specifications or to the acts or omissions of OWNER or ENGINEER or ENGINEER’s Consultant, or anyone employed by any of them, or anyone for whose acts any of them may be liable, and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of CONTRACTOR or any Subcontractor, Supplier, or other individual or entity directly or indirectly employed by any of them). CONTRACTOR’s duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and ENGINEER has issued a notice to OWNER and CONTRACTOR in accordance with paragraph 14.07.B that the Work is acceptable (except as otherwise expressly provided in connection with Substantial Completion).

6.14 Safety Representative

A. CONTRACTOR shall designate a qualified and experienced safety representative at the Site whose duties and responsibilities shall be the prevention of accidents and the maintaining and supervising of safety precautions and programs.

6.15 Hazard Communication Programs

A. CONTRACTOR shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers at the Site in accordance with Laws or Regulations.

6.16 Emergencies

A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, CONTRACTOR is obligated to act to prevent threatened damage, injury, or loss. CONTRACTOR shall give ENGINEER prompt written notice if CONTRACTOR believes that any significant changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If ENGINEER determines that a change in the Contract Documents is required because of the action taken by CONTRACTOR in response to such an emergency, a Work Change Directive or Change Order will be issued.

6.17 Shop Drawings and Samples

A. CONTRACTOR shall submit Shop Drawings to ENGINEER for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. All submittals will be identified as ENGINEER may require and in the number of copies specified in the General Requirements. The data shown on the Shop Drawings will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show ENGINEER the services, materials, and equipment CONTRACTOR proposes to provide and to enable ENGINEER to review the information for the limited purposes required by paragraph 6.17.E.

B. CONTRACTOR shall also submit Samples to ENGINEER for review and approval in accordance with the acceptable schedule of Shop Drawings and Sample submittals. Each Sample will be identified clearly as to material, Supplier, pertinent data such as catalog numbers, and the use for which intended and otherwise as ENGINEER may require to enable ENGINEER to review the submittal for the limited purposes required by paragraph 6.17.E. The numbers of each Sample to be submitted will be as specified in the Specifications.

C. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawings and Sample submittals acceptable to ENGINEER as required by paragraph 2.07, any related Work performed prior to ENGINEER’s review and approval of the pertinent submittal will be at the sole expense and responsibility of CONTRACTOR.

D. Submittal Procedures

1. Before submitting each Shop Drawing or Sample, CONTRACTOR shall have determined and verified:

Page 68: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-27

a. all field measurements, quantities,

dimensions, specified performance criteria, installation requirements, materials, catalog numbers, and similar information with respect thereto;

b. all materials with respect to intended

use, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work;

c. all information relative to means,

methods, techniques, sequences, and procedures of construction and safety precautions and programs incident thereto; and

d. CONTRACTOR shall also have

reviewed and coordinated each Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents.

2. Each submittal shall bear a stamp or

specific written indication that CONTRACTOR has satisfied CONTRACTOR’s obligations under the Contract Documents with respect to CONTRACTOR’s review and approval of that submittal.

3. At the time of each submittal,

CONTRACTOR shall give ENGINEER specific written notice of such variations, if any, that the Shop Drawing or Sample submitted may have from the requirements of the Contract Documents, such notice to be in a written communication separate from the submittal; and, in addition, shall cause a specific notation to be made on each Shop Drawing and Sample submitted to ENGINEER for review and approval of each such variation.

E. ENGINEER’s Review

1. ENGINEER will timely review and

approve Shop Drawings and Samples in accordance with the schedule of Shop Drawings and Sample submittals acceptable to ENGINEER. ENGINEER’s review and approval will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of

the completed Project as a functioning whole as indicated by the Contract Documents.

2. ENGINEER’s review and approval will

not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and approval of a separate item as such will not indicate approval of the assembly in which the item functions.

3. ENGINEER’s review and approval of

Shop Drawings or Samples shall not relieve CONTRACTOR from responsibility for any variation from the requirements of the Contract Documents unless CONTRACTOR has in writing called ENGINEER’s attention to each such variation at the time of each submittal as required by paragraph 6.17.D.3 and ENGINEER has given written approval of each such variation by specific written notation thereof incorporated in or accompanying the Shop Drawing or Sample approval; nor will any approval by ENGINEER relieve CONTRACTOR from responsibility for complying with the requirements of paragraph 6.17.D.1.

F. Resubmittal Procedures

1. CONTRACTOR shall make corrections

required by ENGINEER and shall return the required number of corrected copies of Shop Drawings and submit as required new Samples for review and approval. CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by ENGINEER on previous submittals.

6.18 Continuing the Work

A. CONTRACTOR shall carry on the Work and adhere to the progress schedule during all disputes or disagreements with OWNER. No Work shall be delayed or postponed pending resolution of any disputes or disagreements, except as permitted by paragraph 15.04 or as OWNER and CONTRACTOR may otherwise agree in writing.

6.19 CONTRACTOR’s General Warranty and Guarantee

A. CONTRACTOR warrants and guarantees to

OWNER, ENGINEER, and ENGINEER’s Consultants that all Work will be in accordance with

Page 69: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-28

the Contract Documents and will not be defective. CONTRACTOR’s warranty and guarantee hereunder excludes defects or damage caused by:

1. abuse, modification, or improper maintenance or operation by persons other than CONTRACTOR, Subcontractors, Suppliers, or any other individual or entity for whom CONTRACTOR is responsible; or

2. normal wear and tear under normal usage.

B. CONTRACTOR’s obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of CONTRACTOR’s obligation to perform the Work in accordance with the Contract Documents:

1. observations by ENGINEER; 2. recommendation by ENGINEER or

payment by OWNER of any progress or final payment;

3. the issuance of a certificate of

Substantial Completion by ENGINEER or any payment related thereto by OWNER;

4. use or occupancy of the Work or any

part thereof by OWNER; 5. any acceptance by OWNER or any

failure to do so; 6. any review and approval of a Shop

Drawing or Sample submittal or the issuance of a notice of acceptability by ENGINEER;

7. any inspection, test, or approval by

others; or 8. any correction of defective Work by

OWNER.

6.20 Indemnification

A. To the fullest extent permitted by Laws and Regulations, CONTRACTOR shall indemnify and hold harmless OWNER, ENGINEER, ENGINEER’s Consultants, and the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other

dispute resolution costs) arising out of or relating to the performance of the Work, provided that any such claim, cost, loss, or damage:

1. is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the Work itself), including the loss of use resulting therefrom; and

2. is caused in whole or in part by any

negligent act or omission of CONTRACTOR, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work or anyone for whose acts any of them may be liable, regardless of whether or not caused in part by any negligence or omission of an individual or entity indemnified hereunder or whether liability is imposed upon such indemnified party by Laws and Regulations regardless of the negligence of any such individual or entity.

B. In any and all claims against OWNER or

ENGINEER or any of their respective consultants, agents, officers, directors, partners, or employees by any employee (or the survivor or personal representative of such employee) of CONTRACTOR, any Subcontractor, any Supplier, or any individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, the indemnification obligation under paragraph 6.20.A shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for CONTRACTOR or any such Subcontractor, Supplier, or other individual or entity under workers’ compensation acts, disability benefit acts, or other employee benefit acts.

C. The indemnification obligations of CONTRACTOR under paragraph 6.20.A shall not extend to the liability of ENGINEER and ENGINEER’s Consultants or to the officers, directors, partners, employees, agents, and other consultants and subcontractors of each and any of them arising out of:

1. the preparation or approval of, or the failure to prepare or approve, maps, Drawings, opinions, reports, surveys, Change Orders, designs, or Specifications; or

2. giving directions or instructions, or

failing to give them, if that is the primary cause of the injury or damage.

Page 70: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-29

ARTICLE 7 - OTHER WORK

7.01 Related Work at Site

A. OWNER may perform other work related to the Project at the Site by OWNER’s employees, or let other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then:

1. written notice thereof will be given to CONTRACTOR prior to starting any such other work; and

2. if OWNER and CONTRACTOR are

unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times that should be allowed as a result of such other work, a Claim may be made therefor as provided in paragraph 10.05.

B. CONTRACTOR shall afford each other

contractor who is a party to such a direct contract and each utility owner (and OWNER, if OWNER is performing the other work with OWNER’s employees) proper and safe access to the Site and a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work and shall properly coordinate the Work with theirs. Unless otherwise provided in the Contract Documents, CONTRACTOR shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. CONTRACTOR shall not endanger any work of others by cutting, excavating, or otherwise altering their work and will only cut or alter their work with the written consent of ENGINEER and the others whose work will be affected. The duties and responsibilities of CONTRACTOR under this paragraph are for the benefit of such utility owners and other contractors to the extent that there are comparable provisions for the benefit of CONTRACTOR in said direct contracts between OWNER and such utility owners and other contractors.

C. If the proper execution or results of any part of CONTRACTOR’s Work depends upon work performed by others under this Article 7, CONTRACTOR shall inspect such other work and promptly report to ENGINEER in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper

execution and results of CONTRACTOR’s Work. CONTRACTOR’s failure to so report will constitute an acceptance of such other work as fit and proper for integration with CONTRACTOR’s Work except for latent defects and deficiencies in such other work.

7.02 Coordination

A. If OWNER intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions:

1. the individual or entity who will have authority and responsibility for coordination of the activities among the various contractors will be identified;

2. the specific matters to be covered by

such authority and responsibility will be itemized; and

3. the extent of such authority and

responsibilities will be provided.

B. Unless otherwise provided in the Supplementary Conditions, OWNER shall have sole authority and responsibility for such coordination. ARTICLE 8 - OWNER’S RESPONSIBILITIES

8.01 Communications to Contractor

A. Except as otherwise provided in these General Conditions, OWNER shall issue all communications to CONTRACTOR through ENGINEER.

8.02 Replacement of ENGINEER

A. In case of termination of the employment of ENGINEER, OWNER shall appoint an engineer to whom CONTRACTOR makes no reasonable objection, whose status under the Contract Documents shall be that of the former ENGINEER.

8.03 Furnish Data

A. OWNER shall promptly furnish the data required of OWNER under the Contract Documents.

8.04 Pay Promptly When Due

A. OWNER shall make payments to CONTRACTOR promptly when they are due as provided in paragraphs 14.02.C and 14.07.C.

Page 71: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-30

8.05 Lands and Easements; Reports and Tests

A. OWNER’s duties in respect of providing lands and easements and providing engineering surveys to establish reference points are set forth in paragraphs 4.01 and 4.05. Paragraph 4.02 refers to OWNER’s identifying and making available to CONTRACTOR copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by ENGINEER in preparing the Contract Documents.

8.06 Insurance

A. OWNER’s responsibilities, if any, in respect to purchasing and maintaining liability and property insurance are set forth in Article 5.

8.07 Change Orders

A. OWNER is obligated to execute Change Orders as indicated in paragraph 10.03.

8.08 Inspections, Tests, and Approvals

A. OWNER’s responsibility in respect to certain inspections, tests, and approvals is set forth in paragraph 13.03.B.

8.09 Limitations on OWNER’s Responsibilities

A. The OWNER shall not supervise, direct, or have control or authority over, nor be responsible for, CONTRACTOR’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. OWNER will not be responsible for CONTRACTOR’s failure to perform the Work in accordance with the Contract Documents.

8.10 Undisclosed Hazardous Environmental Condition

A. OWNER’s responsibility in respect to an

undisclosed Hazardous Environmental Condition is set forth in paragraph 4.06.

8.11 Evidence of Financial Arrangements

A. If and to the extent OWNER has agreed to furnish CONTRACTOR reasonable evidence that financial arrangements have been made to satisfy OWNER’s obligations under the Contract Documents, OWNER’s responsibility in respect

thereof will be as set forth in the Supplementary Conditions. ARTICLE 9 - ENGINEER’S STATUS DURING CONSTRUCTION

9.01 OWNER’S Representative

A. ENGINEER will be OWNER’s representative during the construction period. The duties and responsibilities and the limitations of authority of ENGINEER as OWNER’s representative during construction are set forth in the Contract Documents and will not be changed without written consent of OWNER and ENGINEER.

9.02 Visits to Site

A. ENGINEER will make visits to the Site at intervals appropriate to the various stages of construction as ENGINEER deems necessary in order to observe as an experienced and qualified design professional the progress that has been made and the quality of the various aspects of CONTRACTOR’s executed Work. Based on information obtained during such visits and observations, ENGINEER, for the benefit of OWNER, will determine, in general, if the Work is proceeding in accordance with the Contract Documents. ENGINEER will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. ENGINEER’s efforts will be directed toward providing for OWNER a greater degree of confidence that the completed Work will conform generally to the Contract Documents. On the basis of such visits and observations, ENGINEER will keep OWNER informed of the progress of the Work and will endeavor to guard OWNER against defective Work.

B. ENGINEER’s visits and observations are subject to all the limitations on ENGINEER’s authority and responsibility set forth in paragraph 9.10, and particularly, but without limitation, during or as a result of ENGINEER's visits or observations of CONTRACTOR's Work ENGINEER will not supervise, direct, control, or have authority over or be responsible for CONTRACTOR’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work.

9.03 Project Representative

Page 72: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-31

A. If OWNER and ENGINEER agree, ENGINEER will furnish a Resident Project Representative to assist ENGINEER in providing more extensive observation of the Work. The responsibilities and authority and limitations thereon of any such Resident Project Representative and assistants will be as provided in paragraph 9.10 and in the Supplementary Conditions. If OWNER designates another representative or agent to represent OWNER at the Site who is not ENGINEER’s Consultant, agent or employee, the responsibilities and authority and limitations thereon of such other individual or entity will be as provided in the Supplementary Conditions.

9.04 Clarifications and Interpretations

A. ENGINEER will issue with reasonable promptness such written clarifications or interpretations of the requirements of the Contract Documents as ENGINEER may determine necessary, which shall be consistent with the intent of and reasonably inferable from the Contract Documents. Such written clarifications and interpretations will be binding on OWNER and CONTRACTOR. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a written clarification or interpretation, a Claim may be made therefor as provided in paragraph 10.05.

9.05 Authorized Variations in Work

A. ENGINEER may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Times and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on OWNER and also on CONTRACTOR, who shall perform the Work involved promptly. If OWNER and CONTRACTOR are unable to agree on entitlement to or on the amount or extent, if any, of any adjustment in the Contract Price or Contract Times, or both, as a result of a Field Order, a Claim may be made therefor as provided in paragraph 10.05.

9.06 Rejecting Defective Work

A. ENGINEER will have authority to disapprove or reject Work which ENGINEER believes to be defective, or that ENGINEER believes will not produce a completed Project that conforms to the Contract Documents or that will prejudice the

integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. ENGINEER will also have authority to require special inspection or testing of the Work as provided in paragraph 13.04, whether or not the Work is fabricated, installed, or completed.

9.07 Shop Drawings, Change Orders and Payments

A. In connection with ENGINEER’s authority as

to Shop Drawings and Samples, see paragraph 6.17.

B. In connection with ENGINEER’s authority as to Change Orders, see Articles 10, 11, and 12.

C. In connection with ENGINEER’s authority as to Applications for Payment, see Article 14.

9.08 Determinations for Unit Price Work

A. ENGINEER will determine the actual quantities and classifications of Unit Price Work performed by CONTRACTOR. ENGINEER will review with CONTRACTOR the ENGINEER’s preliminary determinations on such matters before rendering a written decision thereon (by recommendation of an Application for Payment or otherwise). ENGINEER’s written decision thereon will be final and binding (except as modified by ENGINEER to reflect changed factual conditions or more accurate data) upon OWNER and CONTRACTOR, subject to the provisions of paragraph 10.05.

9.09 Decisions on Requirements of Contract Documents and Acceptability of Work

A. ENGINEER will be the initial interpreter of

the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. Claims, disputes and other matters relating to the acceptability of the Work, the quantities and classifications of Unit Price Work, the interpretation of the requirements of the Contract Documents pertaining to the performance of the Work, and Claims seeking changes in the Contract Price or Contract Times will be referred initially to ENGINEER in writing, in accordance with the provisions of paragraph 10.05, with a request for a formal decision.

B. When functioning as interpreter and judge under this paragraph 9.09, ENGINEER will not show partiality to OWNER or CONTRACTOR and will not be liable in connection with any interpretation or

Page 73: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-32

decision rendered in good faith in such capacity. The rendering of a decision by ENGINEER pursuant to this paragraph 9.09 with respect to any such Claim, dispute, or other matter (except any which have been waived by the making or acceptance of final payment as provided in paragraph 14.07) will be a condition precedent to any exercise by OWNER or CONTRACTOR of such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any such Claim, dispute, or other matter.

9.10 Limitations on ENGINEER’s Authority and Responsibilities

A. Neither ENGINEER’s authority or

responsibility under this Article 9 or under any other provision of the Contract Documents nor any decision made by ENGINEER in good faith either to exercise or not exercise such authority or responsibility or the undertaking, exercise, or performance of any authority or responsibility by ENGINEER shall create, impose, or give rise to any duty in contract, tort, or otherwise owed by ENGINEER to CONTRACTOR, any Subcontractor, any Supplier, any other individual or entity, or to any surety for or employee or agent of any of them.

B. ENGINEER will not supervise, direct, control, or have authority over or be responsible for CONTRACTOR’s means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of CONTRACTOR to comply with Laws and Regulations applicable to the performance of the Work. ENGINEER will not be responsible for CONTRACTOR’s failure to perform the Work in accordance with the Contract Documents.

C. ENGINEER will not be responsible for the acts or omissions of CONTRACTOR or of any Subcontractor, any Supplier, or of any other individual or entity performing any of the Work.

D. ENGINEER’s review of the final Application for Payment and accompanying documentation and all maintenance and operating instructions, schedules, guarantees, Bonds, certificates of inspection, tests and approvals, and other documentation required to be delivered by paragraph 14.07.A will only be to determine generally that their content complies with the requirements of, and in the case of certificates of inspections, tests, and approvals that the results certified indicate compliance with, the Contract Documents.

E. The limitations upon authority and responsibility set forth in this paragraph 9.10 shall also apply to ENGINEER’s Consultants, Resident Project Representative, and assistants. ARTICLE 10 - CHANGES IN THE WORK; CLAIMS

10.01 Authorized Changes in the Work

A. Without invalidating the Agreement and without notice to any surety, OWNER may, at any time or from time to time, order additions, deletions, or revisions in the Work by a Written Amendment, a Change Order, or a Work Change Directive. Upon receipt of any such document, CONTRACTOR shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided).

B. If OWNER and CONTRACTOR are unable to agree on entitlement to, or on the amount or extent, if any, of an adjustment in the Contract Price or Contract Times, or both, that should be allowed as a result of a Work Change Directive, a Claim may be made therefor as provided in paragraph 10.05.

10.02 Unauthorized Changes in the Work

A. CONTRACTOR shall not be entitled to an increase in the Contract Price or an extension of the Contract Times with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in paragraph 3.04, except in the case of an emergency as provided in paragraph 6.16 or in the case of uncovering Work as provided in paragraph 13.04.B.

10.03 Execution of Change Orders

A. OWNER and CONTRACTOR shall execute appropriate Change Orders recommended by ENGINEER (or Written Amendments) covering:

1. changes in the Work which are: (i) ordered by OWNER pursuant to paragraph 10.01.A, (ii) required because of acceptance of defective Work under paragraph 13.08.A or OWNER’s correction of defective Work under paragraph 13.09, or (iii) agreed to by the parties;

2. changes in the Contract Price or Contract Times which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed in accordance with a Work Change Directive; and

3. changes in the Contract Price or Contract Times which embody the substance of any written decision

Page 74: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-33

rendered by ENGINEER pursuant to paragraph 10.05; provided that, in lieu of executing any such Change Order, an appeal may be taken from any such decision in accordance with the provisions of the Contract Documents and applicable Laws and Regulations, but during any such appeal, CONTRACTOR shall carry on the Work and adhere to the progress schedule as provided in paragraph 6.18.A.

10.04 Notification to Surety

A. If notice of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Times) is required by the provisions of any Bond to be given to a surety, the giving of any such notice will be CONTRACTOR’s responsibility. The amount of each applicable Bond will be adjusted to reflect the effect of any such change.

10.05 Claims and Disputes

A. Notice: Written notice stating the general nature of each Claim, dispute, or other matter shall be delivered by the claimant to ENGINEER and the other party to the Contract promptly (but in no event later than 30 days) after the start of the event giving rise thereto. Notice of the amount or extent of the Claim, dispute, or other matter with supporting data shall be delivered to the ENGINEER and the other party to the Contract within 60 days after the start of such event (unless ENGINEER allows additional time for claimant to submit additional or more accurate data in support of such Claim, dispute, or other matter). A Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of paragraph 12.01.B. A Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of paragraph 12.02.B. Each Claim shall be accompanied by claimant's written statement that the adjustment claimed is the entire adjustment to which the claimant believes it is entitled as a result of said event. The opposing party shall submit any response to ENGINEER and the claimant within 30 days after receipt of the claimant’s last submittal (unless ENGINEER allows additional time).

B. ENGINEER’s Decision: ENGINEER will render a formal decision in writing within 30 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any. ENGINEER’s written decision on such Claim, dispute, or other matter will be final and binding upon OWNER and CONTRACTOR unless:

1. an appeal from ENGINEER’s decision is taken within the time limits and in accordance with the dispute resolution procedures set forth in Article 16; or

2. if no such dispute resolution procedures

have been set forth in Article 16, a written notice of intention to appeal from ENGINEER’s written decision is delivered by OWNER or CONTRACTOR to the other and to ENGINEER within 30 days after the date of such decision, and a formal proceeding is instituted by the appealing party in a forum of competent jurisdiction within 60 days after the date of such decision or within 60 days after Substantial Completion, whichever is later (unless otherwise agreed in writing by OWNER and CONTRACTOR), to exercise such rights or remedies as the appealing party may have with respect to such Claim, dispute, or other matter in accordance with applicable Laws and Regulations.

C. If ENGINEER does not render a formal

decision in writing within the time stated in paragraph 10.05.B, a decision denying the Claim in its entirety shall be deemed to have been issued 31 days after receipt of the last submittal of the claimant or the last submittal of the opposing party, if any.

D. No Claim for an adjustment in Contract Price or Contract Times (or Milestones) will be valid if not submitted in accordance with this paragraph 10.05. ARTICLE 11 - COST OF THE WORK; CASH ALLOWANCES; UNIT PRICE WORK

11.01 Cost of the Work

A. Costs Included: The term Cost of the Work means the sum of all costs necessarily incurred and paid by CONTRACTOR in the proper performance of the Work. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, the costs to be reimbursed to CONTRACTOR will be only those additional or incremental costs required because of the change in the Work or because of the event giving rise to the Claim. Except as otherwise may be agreed to in writing by OWNER, such costs shall be in amounts no higher than those prevailing in the locality of the Project, shall include only the following items, and shall not include any of the costs itemized in paragraph 11.01.B.

Page 75: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-34

1. Payroll costs for employees in the direct employ of CONTRACTOR in the performance of the Work under schedules of job classifications agreed upon by OWNER and CONTRACTOR. Such employees shall include without limitation superintendents, foremen, and other personnel employed full time at the Site. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include, but not be limited to, salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers’ compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, shall be included in the above to the extent authorized by OWNER.

2. Cost of all materials and equipment

furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers’ field services required in connection therewith. All cash discounts shall accrue to CONTRACTOR unless OWNER deposits funds with CONTRACTOR with which to make payments, in which case the cash discounts shall accrue to OWNER. All trade dis-counts, rebates and refunds and returns from sale of surplus materials and equipment shall accrue to OWNER, and CONTRACTOR shall make provisions so that they may be obtained.

3. Payments made by CONTRACTOR to

Subcontractors for Work performed by Subcontractors. If required by OWNER, CONTRACTOR shall obtain competitive bids from subcontractors acceptable to OWNER and CONTRACTOR and shall deliver such bids to OWNER, who will then determine, with the advice of ENGINEER, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor’s Cost of the Work and fee shall be determined in the same manner as CONTRACTOR’s Cost of the Work and fee as provided in this paragraph 11.01.

4. Costs of special consultants (including

but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work.

5. Supplemental costs including the

following:

a. The proportion of necessary trans-portation, travel, and subsistence expenses of CONTRACTOR’s employees incurred in discharge of duties connected with the Work.

b. Cost, including transportation and

maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property of CONTRACTOR.

c. Rentals of all construction

equipment and machinery, and the parts thereof whether rented from CONTRACTOR or others in accordance with rental agreements approved by OWNER with the advice of ENGINEER, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work.

d. Sales, consumer, use, and other

similar taxes related to the Work, and for which CONTRACTOR is liable, imposed by Laws and Regulations.

e. Deposits lost for causes other than

negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for permits and licenses.

f. Losses and damages (and related

expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by CONTRACTOR in connection with the performance of the Work (except losses and damages within the deductible amounts of property insurance established in accordance with paragraph 5.06.D), provided such losses and damages have resulted from causes other than the

Page 76: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-35

negligence of CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of OWNER. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining CONTRACTOR’s fee.

g. The cost of utilities, fuel, and

sanitary facilities at the Site.

h. Minor expenses such as telegrams, long distance telephone calls, telephone service at the Site, expressage, and similar petty cash items in connection with the Work.

i. When the Cost of the Work is used

to determine the value of a Change Order or of a Claim, the cost of premiums for additional Bonds and insurance required because of the changes in the Work or caused by the event giving rise to the Claim.

j. When all the Work is performed on the basis of cost-plus, the costs of premiums for all Bonds and insurance CONTRACTOR is required by the Contract Documents to purchase and maintain.

B. Costs Excluded: The term Cost of the Work

shall not include any of the following items:

1. Payroll costs and other compensation of CONTRACTOR’s officers, executives, principals (of partnerships and sole proprietorships), general managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by CONTRACTOR, whether at the Site or in CONTRACTOR’s principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in paragraph 11.01.A.1 or specifically covered by paragraph 11.01.A.4, all of which are to be considered administrative costs covered by the CONTRACTOR’s fee.

2. Expenses of CONTRACTOR’s principal

and branch offices other than CONTRACTOR’s office at the Site.

3. Any part of CONTRACTOR’s capital expenses, including interest on CONTRACTOR’s capital employed for the Work and charges against CONTRACTOR for delinquent payments.

4. Costs due to the negligence of

CONTRACTOR, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property.

5. Other overhead or general expense

costs of any kind and the costs of any item not specifically and expressly included in paragraphs 11.01.A and 11.01.B.

C. CONTRACTOR’s Fee: When all the Work is

performed on the basis of cost-plus, CONTRACTOR’s fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order or when a Claim for an adjustment in Contract Price is determined on the basis of Cost of the Work, CONTRACTOR’s fee shall be determined as set forth in paragraph 12.01.C.

D. Documentation: Whenever the Cost of the Work for any purpose is to be determined pursuant to paragraphs 11.01.A and 11.01.B, CONTRACTOR will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to ENGINEER an itemized cost breakdown together with supporting data.

11.02 Cash Allowances

A. It is understood that CONTRACTOR has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums as may be acceptable to OWNER and ENGINEER. CONTRACTOR agrees that:

1. the allowances include the cost to CON-TRACTOR (less any applicable trade discounts) of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and

2. CONTRACTOR’s costs for unloading

and handling on the Site, labor, installation costs, overhead, profit, and other expenses contemplated for the allowances have been

Page 77: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-36

included in the Contract Price and not in the allowances, and no demand for additional payment on account of any of the foregoing will be valid.

B. Prior to final payment, an appropriate

Change Order will be issued as recommended by ENGINEER to reflect actual amounts due CONTRACTOR on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted.

11.03 Unit Price Work

A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performed by CONTRACTOR will be made by ENGINEER subject to the provisions of paragraph 9.08.

B. Each unit price will be deemed to include an amount considered by CONTRACTOR to be adequate to cover CONTRACTOR’s overhead and profit for each separately identified item.

C. OWNER or CONTRACTOR may make a Claim for an adjustment in the Contract Price in accordance with paragraph 10.05 if:

1. the quantity of any item of Unit Price Work performed by CONTRACTOR differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and

2. there is no corresponding adjustment

with respect any other item of Work; and

3. if CONTRACTOR believes that CONTRACTOR is entitled to an increase in Contract Price as a result of having incurred additional expense or OWNER believes that OWNER is entitled to a decrease in Contract Price and the parties are unable to agree as to the amount of any such increase or decrease.

ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES

12.01 Change of Contract Price

A. The Contract Price may only be changed by a Change Order or by a Written Amendment. Any Claim for an adjustment in the Contract Price shall be based on written notice submitted by the party making the Claim to the ENGINEER and the other party to the Contract in accordance with the provisions of paragraph 10.05.

B. The value of any Work covered by a Change Order or of any Claim for an adjustment in the Contract Price will be determined as follows:

1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of paragraph 11.03 ); or

2. where the Work involved is not covered

by unit prices contained in the Contract Documents, by a mutually agreed lump sum (which may include an allowance for overhead and profit not necessarily in accordance with paragraph 12.01.C.2); or

3. where the Work involved is not covered

by unit prices contained in the Contract Documents and agreement to a lump sum is not reached under paragraph 12.01.B.2, on the basis of the Cost of the Work (determined as provided in paragraph 11.01) plus a CONTRACTOR’s fee for overhead and profit (determined as provided in paragraph 12.01.C).

C. CONTRACTOR’s Fee: The

CONTRACTOR’s fee for overhead and profit shall be determined as follows:

1. a mutually acceptable fixed fee; or

2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work:

a. for costs incurred under paragraphs

11.01.A.1 and 11.01.A.2, the CONTRACTOR’s fee shall be 15 percent;

b. for costs incurred under paragraph

11.01.A.3, the CONTRACTOR’s fee shall be five percent;

Page 78: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-37

c. where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of paragraph 12.01.C.2.a is that the Subcontractor who actually performs the Work, at whatever tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under paragraphs 11.01.A.1 and 11.01.A.2 and that any higher tier Subcontractor and CONTRACTOR will each be paid a fee of five percent of the amount paid to the next lower tier Subcontractor;

d. no fee shall be payable on the basis

of costs itemized under paragraphs 11.01.A.4, 11.01.A.5, and 11.01.B;

e. the amount of credit to be allowed

by CONTRACTOR to OWNER for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in CONTRACTOR’s fee by an amount equal to five percent of such net decrease; and

f. when both additions and credits are

involved in any one change, the adjustment in CONTRACTOR’s fee shall be computed on the basis of the net change in accordance with paragraphs 12.01.C.2.a through 12.01.C.2.e, inclusive.

12.02 Change of Contract Times

A. The Contract Times (or Milestones) may only be changed by a Change Order or by a Written Amendment. Any Claim for an adjustment in the Contract Times (or Milestones) shall be based on written notice submitted by the party making the claim to the ENGINEER and the other party to the Contract in accordance with the provisions of paragraph 10.05.

B. Any adjustment of the Contract Times (or Milestones) covered by a Change Order or of any Claim for an adjustment in the Contract Times (or Milestones) will be determined in accordance with the provisions of this Article 12.

12.03 Delays Beyond CONTRACTOR’s Control

A. Where CONTRACTOR is prevented from completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of CONTRACTOR, the Contract Times (or Milestones) will be extended in an amount equal to the time lost due to such delay if a Claim is made

therefor as provided in paragraph 12.02.A. Delays beyond the control of CONTRACTOR shall include, but not be limited to, acts or neglect by OWNER, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God.

12.04 Delays Within CONTRACTOR’s Control

A. The Contract Times (or Milestones) will not be extended due to delays within the control of CONTRACTOR. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of CONTRACTOR.

12.05 Delays Beyond OWNER’s and CONTRACTOR’s Control

A. Where CONTRACTOR is prevented from

completing any part of the Work within the Contract Times (or Milestones) due to delay beyond the control of both OWNER and CONTRACTOR, an extension of the Contract Times (or Milestones) in an amount equal to the time lost due to such delay shall be CONTRACTOR’s sole and exclusive remedy for such delay.

12.06 Delay Damages

A. In no event shall OWNER or ENGINEER be liable to CONTRACTOR, any Subcontractor, any Supplier, or any other person or organization, or to any surety for or employee or agent of any of them, for damages arising out of or resulting from:

1. delays caused by or within the control of CONTRACTOR; or

2. delays beyond the control of both

OWNER and CONTRACTOR including but not limited to fires, floods, epidemics, abnormal weather conditions, acts of God, or acts or neglect by utility owners or other contractors performing other work as contemplated by Article 7.

B. Nothing in this paragraph 12.06 bars a

change in Contract Price pursuant to this Article 12 to compensate CONTRACTOR due to delay, interference, or disruption directly attributable to actions or inactions of OWNER or anyone for whom OWNER is responsible.

Page 79: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-38

ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK

13.01 Notice of Defects

A. Prompt notice of all defective Work of which OWNER or ENGINEER has actual knowledge will be given to CONTRACTOR. All defective Work may be rejected, corrected, or accepted as provided in this Article 13.

13.02 Access to Work

A. OWNER, ENGINEER, ENGINEER’s Con-sultants, other representatives and personnel of OWNER, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspecting, and testing. CONTRACTOR shall provide them proper and safe conditions for such access and advise them of CONTRACTOR’s Site safety procedures and programs so that they may comply therewith as applicable.

13.03 Tests and Inspections

A. CONTRACTOR shall give ENGINEER timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests.

B. OWNER shall employ and pay for the services of an independent testing laboratory to perform all inspections, tests, or approvals required by the Contract Documents except:

1. for inspections, tests, or approvals covered by paragraphs 13.03.C and 13.03.D below;

2. that costs incurred in connection with

tests or inspections conducted pursuant to paragraph 13.04.B shall be paid as provided in said paragraph 13.04.B; and

3. as otherwise specifically provided in the

Contract Documents.

C. If Laws or Regulations of any public body having jurisdiction require any Work (or part thereof) specifically to be inspected, tested, or approved by an employee or other representative of such public body, CONTRACTOR shall assume full responsibility for arranging and obtaining such inspections, tests, or approvals, pay all costs in

connection therewith, and furnish ENGINEER the required certificates of inspection or approval.

D. CONTRACTOR shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, or approvals required for OWNER’s and ENGINEER’s acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to CONTRACTOR’s purchase thereof for incorporation in the Work. Such inspections, tests, or approvals shall be performed by organizations acceptable to OWNER and ENGINEER.

E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by CONTRACTOR without written concurrence of ENGINEER, it must, if requested by ENGINEER, be uncovered for observation.

F. Uncovering Work as provided in paragraph 13.03.E shall be at CONTRACTOR’s expense unless CONTRACTOR has given ENGINEER timely notice of CONTRACTOR’s intention to cover the same and ENGINEER has not acted with reasonable promptness in response to such notice.

13.04 Uncovering Work

A. If any Work is covered contrary to the written request of ENGINEER, it must, if requested by ENGINEER, be uncovered for ENGINEER’s observation and replaced at CONTRACTOR’s expense.

B. If ENGINEER considers it necessary or advisable that covered Work be observed by ENGINEER or inspected or tested by others, CONTRACTOR, at ENGINEER’s request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as ENGINEER may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that such Work is defective, CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement or reconstruction (including but not limited to all costs of repair or replacement of work of others); and OWNER shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount thereof,

Page 80: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-39

OWNER may make a Claim therefor as provided in paragraph 10.05. If, however, such Work is not found to be defective, CONTRACTOR shall be allowed an increase in the Contract Price or an extension of the Contract Times (or Milestones), or both, directly attributable to such uncovering, exposure, observation, inspection, testing, replacement, and reconstruction. If the parties are unable to agree as to the amount or extent thereof, CONTRACTOR may make a Claim therefor as provided in paragraph 10.05.

13.05 OWNER May Stop the Work

A. If the Work is defective, or CONTRACTOR fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, OWNER may order CONTRACTOR to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of OWNER to stop the Work shall not give rise to any duty on the part of OWNER to exercise this right for the benefit of CONTRACTOR, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them.

13.06 Correction or Removal of Defective Work

A. CONTRACTOR shall correct all defective Work, whether or not fabricated, installed, or completed, or, if the Work has been rejected by ENGINEER, remove it from the Project and replace it with Work that is not defective. CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others).

13.07 Correction Period

A. If within one year after the date of Substantial Completion or such longer period of time as may be prescribed by Laws or Regulations or by the terms of any applicable special guarantee required by the Contract Documents or by any specific provision of the Contract Documents, any Work is found to be defective, or if the repair of any damages to the land or areas made available for CONTRACTOR’s use by OWNER or permitted by Laws and Regulations as contemplated in paragraph 6.11.A is found to be defective, CONTRACTOR shall promptly, without cost to OWNER and in accordance

with OWNER’s written instructions: (i) repair such defective land or areas, or (ii) correct such defective Work or, if the defective Work has been rejected by OWNER, remove it from the Project and replace it with Work that is not defective, and (iii) satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. If CONTRACTOR does not promptly comply with the terms of such instructions, or in an emergency where delay would cause serious risk of loss or damage, OWNER may have the defective Work corrected or repaired or may have the rejected Work removed and replaced, and all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by CONTRACTOR.

B. In special circumstances where a particular item of equipment is placed in continuous service before Substantial Completion of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Specifications or by Written Amendment.

C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this paragraph 13.07, the correction period hereunder with respect to such Work will be extended for an additional period of one year after such correction or removal and replacement has been satisfactorily completed.

D. CONTRACTOR’s obligations under this paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this paragraph 13.07 shall not be construed as a substitute for or a waiver of the provisions of any applicable statute of limitation or repose.

13.08 Acceptance of Defective Work

A. If, instead of requiring correction or removal and replacement of defective Work, OWNER (and, prior to ENGINEER’s recommendation of final payment, ENGINEER) prefers to accept it, OWNER may do so. CONTRACTOR shall pay all Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) attributable to OWNER’s evaluation of and determination to accept such defective Work (such

Page 81: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-40

costs to be approved by ENGINEER as to reasonableness) and the diminished value of the Work to the extent not otherwise paid by CONTRACTOR pursuant to this sentence. If any such acceptance occurs prior to ENGINEER’s recommendation of final payment, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and OWNER shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. If the parties are unable to agree as to the amount thereof, OWNER may make a Claim therefor as provided in paragraph 10.05. If the acceptance occurs after such recommendation, an appropriate amount will be paid by CONTRACTOR to OWNER.

13.09 OWNER May Correct Defective Work

A. If CONTRACTOR fails within a reasonable time after written notice from ENGINEER to correct defective Work or to remove and replace rejected Work as required by ENGINEER in accordance with paragraph 13.06.A, or if CONTRACTOR fails to perform the Work in accordance with the Contract Documents, or if CONTRACTOR fails to comply with any other provision of the Contract Documents, OWNER may, after seven days written notice to CONTRACTOR, correct and remedy any such deficiency.

B. In exercising the rights and remedies under this paragraph, OWNER shall proceed expeditiously. In connection with such corrective and remedial action, OWNER may exclude CONTRACTOR from all or part of the Site, take possession of all or part of the Work and suspend CONTRACTOR’s services related thereto, take possession of CONTRACTOR’s tools, appliances, construction equipment and machinery at the Site, and incorporate in the Work all materials and equipment stored at the Site or for which OWNER has paid CONTRACTOR but which are stored elsewhere. CONTRACTOR shall allow OWNER, OWNER’s representatives, agents and employees, OWNER’s other contractors, and ENGINEER and ENGINEER’s Consultants access to the Site to enable OWNER to exercise the rights and remedies under this paragraph.

C. All Claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred or sustained by OWNER in exercising the rights and remedies under this paragraph 13.09 will be charged against CONTRACTOR, and a Change Order will be issued incorporating the necessary revisions in the Contract

Documents with respect to the Work; and OWNER shall be entitled to an appropriate decrease in the Contract Price. If the parties are unable to agree as to the amount of the adjustment, OWNER may make a Claim therefor as provided in paragraph 10.05. Such claims, costs, losses and damages will include but not be limited to all costs of repair, or replacement of work of others destroyed or damaged by correction, removal, or replacement of CONTRACTOR’s defective Work.

D. CONTRACTOR shall not be allowed an extension of the Contract Times (or Milestones) because of any delay in the performance of the Work attributable to the exercise by OWNER of OWNER’s rights and remedies under this paragraph 13.09. ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION

14.01 Schedule of Values

A. The schedule of values established as provided in paragraph 2.07.A will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to ENGINEER. Progress payments on account of Unit Price Work will be based on the number of units completed.

14.02 Progress Payments

A. Applications for Payments

1. At least 20 days before the date established for each progress payment (but not more often than once a month), CONTRACTOR shall submit to ENGINEER for review an Application for Payment filled out and signed by CONTRACTOR covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Documents. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, or other documentation warranting that OWNER has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect OWNER’s interest therein, all of which must be satisfactory to OWNER.

Page 82: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-41

2. Beginning with the second Application for Payment, each Application shall include an affidavit of CONTRACTOR stating that all previous progress payments received on account of the Work have been applied on account to discharge CONTRACTOR’s legitimate obligations associated with prior Applications for Payment.

3. The amount of retainage with respect to

progress payments will be as stipulated in the Agreement.

B. Review of Applications

1. ENGINEER will, within 10 days after

receipt of each Application for Payment, either indicate in writing a recommendation of payment and present the Application to OWNER or return the Application to CONTRACTOR indicating in writing ENGINEER’s reasons for refusing to recommend payment. In the latter case, CONTRACTOR may make the necessary corrections and resubmit the Application.

2. ENGINEER’s recommendation of any

payment requested in an Application for Payment will constitute a representation by ENGINEER to OWNER, based on ENGINEER’s observations on the Site of the executed Work as an experienced and qualified design professional and on ENGINEER's review of the Application for Payment and the accompanying data and schedules, that to the best of ENGINEER’s knowledge, information and belief:

a. the Work has progressed to the

point indicated;

b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Substantial Completion, to the results of any subsequent tests called for in the Contract Documents, to a final determination of quantities and classifications for Unit Price Work under paragraph 9.08, and to any other qualifications stated in the recommendation); and

c. the conditions precedent to

CONTRACTOR’s being entitled to such payment appear to have been fulfilled in so far as it is ENGINEER’s responsibility to observe the Work.

3. By recommending any such payment ENGINEER will not thereby be deemed to have represented that: (i) inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to ENGINEER in the Contract Documents; or (ii) that there may not be other matters or issues between the parties that might entitle CONTRACTOR to be paid additionally by OWNER or entitle OWNER to withhold payment to CONTRACTOR.

4. Neither ENGINEER’s review of

CONTRACTOR’s Work for the purposes of recommending payments nor ENGINEER’s recommendation of any payment, including final payment, will impose responsibility on ENGINEER to supervise, direct, or control the Work or for the means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for CONTRACTOR’s failure to comply with Laws and Regulations applicable to CONTRACTOR’s performance of the Work. Additionally, said review or recommendation will not impose responsibility on ENGINEER to make any examination to ascertain how or for what purposes CONTRACTOR has used the moneys paid on account of the Contract Price, or to determine that title to any of the Work, materials, or equipment has passed to OWNER free and clear of any Liens.

5. ENGINEER may refuse to recommend

the whole or any part of any payment if, in ENGINEER’s opinion, it would be incorrect to make the representations to OWNER referred to in paragraph 14.02.B.2. ENGINEER may also refuse to recommend any such payment or, because of subsequently discovered evidence or the results of subsequent inspections or tests, revise or revoke any such payment recommendation previously made, to such extent as may be necessary in ENGINEER’s opinion to protect OWNER from loss because:

a. the Work is defective, or completed

Work has been damaged, requiring correction or replacement;

b. the Contract Price has been

reduced by Written Amendment or Change Orders;

Page 83: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-42

c. OWNER has been required to correct defective Work or complete Work in accordance with paragraph 13.09; or

d. ENGINEER has actual knowledge

of the occurrence of any of the events enumerated in paragraph 15.02.A.

C. Payment Becomes Due

1. Ten days after presentation of the

Application for Payment to OWNER with ENGINEER’s recommendation, the amount recommended will (subject to the provisions of paragraph 14.02.D) become due, and when due will be paid by OWNER to CONTRACTOR.

D. Reduction in Payment

1. OWNER may refuse to make payment

of the full amount recommended by ENGINEER because:

a. claims have been made against

OWNER on account of CONTRACTOR’s performance or furnishing of the Work;

b. Liens have been filed in connection

with the Work, except where CONTRACTOR has delivered a specific Bond satisfactory to OWNER to secure the satisfaction and discharge of such Liens;

c. there are other items entitling

OWNER to a set-off against the amount recommended; or

d. OWNER has actual knowledge of

the occurrence of any of the events enumerated in paragraphs 14.02.B.5.a through 14.02.B.5.c or paragraph 15.02.A.

2. If OWNER refuses to make payment of

the full amount recommended by ENGINEER, OWNER must give CONTRACTOR immediate written notice (with a copy to ENGINEER) stating the reasons for such action and promptly pay CONTRACTOR any amount remaining after deduction of the amount so withheld. OWNER shall promptly pay CONTRACTOR the amount so withheld, or any adjustment thereto agreed to by OWNER and CONTRACTOR, when CONTRACTOR corrects to OWNER’s satisfaction the reasons for such action.

3. If it is subsequently determined that

OWNER’s refusal of payment was not justified,

the amount wrongfully withheld shall be treated as an amount due as determined by paragraph 14.02.C.1.

14.03 CONTRACTOR’s Warranty of Title

A. CONTRACTOR warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to OWNER no later than the time of payment free and clear of all Liens.

14.04 Substantial Completion

A. When CONTRACTOR considers the entire Work ready for its intended use CONTRACTOR shall notify OWNER and ENGINEER in writing that the entire Work is substantially complete (except for items specifically listed by CONTRACTOR as incomplete) and request that ENGINEER issue a certificate of Substantial Completion. Promptly thereafter, OWNER, CONTRACTOR, and ENGINEER shall make an inspection of the Work to determine the status of completion. If ENGINEER does not consider the Work substantially complete, ENGINEER will notify CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers the Work substantially complete, ENGINEER will prepare and deliver to OWNER a tentative certificate of Substantial Completion which shall fix the date of Substantial Completion. There shall be attached to the certificate a tentative list of items to be completed or corrected before final payment. OWNER shall have seven days after receipt of the tentative certificate during which to make written objection to ENGINEER as to any provisions of the certificate or attached list. If, after considering such objections, ENGINEER concludes that the Work is not substantially complete, ENGINEER will within 14 days after submission of the tentative certificate to OWNER notify CONTRACTOR in writing, stating the reasons therefor. If, after consideration of OWNER’s objections, ENGINEER considers the Work substantially complete, ENGINEER will within said 14 days execute and deliver to OWNER and CONTRACTOR a definitive certificate of Substantial Completion (with a revised tentative list of items to be completed or corrected) reflecting such changes from the tentative certificate as ENGINEER believes justified after consideration of any objections from OWNER. At the time of delivery of the tentative certificate of Substantial Completion ENGINEER will deliver to OWNER and CONTRACTOR a written recommendation as to division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, and protection of the Work, maintenance,

Page 84: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-43

heat, utilities, insurance, and warranties and guarantees. Unless OWNER and CONTRACTOR agree otherwise in writing and so inform ENGINEER in writing prior to ENGINEER’s issuing the definitive certificate of Substantial Completion, ENGINEER’s aforesaid recommendation will be binding on OWNER and CONTRACTOR until final payment.

B. OWNER shall have the right to exclude CONTRACTOR from the Site after the date of Substantial Completion, but OWNER shall allow CONTRACTOR reasonable access to complete or correct items on the tentative list.

14.05 Partial Utilization

A. Use by OWNER at OWNER’s option of any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which OWNER, ENGINEER, and CONTRACTOR agree constitutes a separately functioning and usable part of the Work that can be used by OWNER for its intended purpose without significant interference with CONTRACTOR’s performance of the remainder of the Work, may be accomplished prior to Substantial Completion of all the Work subject to the following conditions.

1. OWNER at any time may request CONTRACTOR in writing to permit OWNER to use any such part of the Work which OWNER believes to be ready for its intended use and substantially complete. If CONTRACTOR agrees that such part of the Work is substantially complete, CONTRACTOR will certify to OWNER and ENGINEER that such part of the Work is substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. CONTRACTOR at any time may notify OWNER and ENGINEER in writing that CONTRACTOR considers any such part of the Work ready for its intended use and substantially complete and request ENGINEER to issue a certificate of Substantial Completion for that part of the Work. Within a reasonable time after either such request, OWNER, CONTRACTOR, and ENGINEER shall make an inspection of that part of the Work to determine its status of completion. If ENGINEER does not consider that part of the Work to be substantially complete, ENGINEER will notify OWNER and CONTRACTOR in writing giving the reasons therefor. If ENGINEER considers that part of the Work to be substantially complete, the provisions of paragraph 14.04 will apply with respect to certification of Substantial Completion of that part of the Work and the division of

responsibility in respect thereof and access thereto.

2. No occupancy or separate operation of

part of the Work may occur prior to compliance with the requirements of paragraph 5.10 regarding property insurance.

14.06 Final Inspection

A. Upon written notice from CONTRACTOR that the entire Work or an agreed portion thereof is complete, ENGINEER will promptly make a final inspection with OWNER and CONTRACTOR and will notify CONTRACTOR in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. CONTRACTOR shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies.

14.07 Final Payment

A. Application for Payment

1. After CONTRACTOR has, in the opinion of ENGINEER, satisfactorily completed all corrections identified during the final inspection and has delivered, in accordance with the Contract Documents, all maintenance and operating instructions, schedules, guarantees, Bonds, certificates or other evidence of insurance certificates of inspection, marked-up record documents (as provided in paragraph 6.12), and other documents, CONTRACTOR may make application for final payment following the procedure for progress payments.

2. The final Application for Payment shall

be accompanied (except as previously delivered) by: (i) all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by subparagraph 5.04.B.7; (ii) consent of the surety, if any, to final payment; and (iii) complete and legally effective releases or waivers (satisfactory to OWNER) of all Lien rights arising out of or Liens filed in connection with the Work.

3. In lieu of the releases or waivers of

Liens specified in paragraph 14.07.A.2 and as approved by OWNER, CONTRACTOR may furnish receipts or releases in full and an affidavit of CONTRACTOR that: (i) the releases and receipts include all labor, services, material, and equipment for which a Lien could be filed; and (ii) all payrolls, material and equipment bills, and other indebtedness connected with the Work for which OWNER or OWNER's property

Page 85: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-44

might in any way be responsible have been paid or otherwise satisfied. If any Subcontractor or Supplier fails to furnish such a release or receipt in full, CONTRACTOR may furnish a Bond or other collateral satisfactory to OWNER to indemnify OWNER against any Lien.

B. Review of Application and Acceptance

1. If, on the basis of ENGINEER’s

observation of the Work during construction and final inspection, and ENGINEER’s review of the final Application for Payment and accompanying documentation as required by the Contract Documents, ENGINEER is satisfied that the Work has been completed and CONTRACTOR’s other obligations under the Contract Documents have been fulfilled, ENGINEER will, within ten days after receipt of the final Application for Payment, indicate in writing ENGINEER’s recommendation of payment and present the Application for Payment to OWNER for payment. At the same time ENGINEER will also give written notice to OWNER and CONTRACTOR that the Work is acceptable subject to the provisions of paragraph 14.09. Otherwise, ENGINEER will return the Application for Payment to CONTRACTOR, indicating in writing the reasons for refusing to recommend final payment, in which case CONTRACTOR shall make the necessary corrections and resubmit the Application for Payment.

C. Payment Becomes Due

1. Thirty days after the presentation to

OWNER of the Application for Payment and accompanying documentation, the amount recommended by ENGINEER will become due and, when due, will be paid by OWNER to CONTRACTOR.

14.08 Final Completion Delayed

A. If, through no fault of CONTRACTOR, final completion of the Work is significantly delayed, and if ENGINEER so confirms, OWNER shall, upon receipt of CONTRACTOR’s final Application for Payment and recommendation of ENGINEER, and without terminating the Agreement, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by OWNER for Work not fully completed or corrected is less than the retainage stipulated in the Agreement, and if Bonds have been furnished as required in paragraph 5.01, the written consent of the surety to the payment of the balance due for that

portion of the Work fully completed and accepted shall be submitted by CONTRACTOR to ENGINEER with the Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Claims.

14.09 Waiver of Claims

A. The making and acceptance of final payment will constitute:

1. a waiver of all Claims by OWNER against CONTRACTOR, except Claims arising from unsettled Liens, from defective Work appearing after final inspection pursuant to paragraph 14.06, from failure to comply with the Contract Documents or the terms of any special guarantees specified therein, or from CONTRACTOR’s continuing obligations under the Contract Documents; and

2. a waiver of all Claims by

CONTRACTOR against OWNER other than those previously made in writing which are still unsettled.

ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION

15.01 OWNER May Suspend Work

A. At any time and without cause, OWNER may suspend the Work or any portion thereof for a period of not more than 90 consecutive days by notice in writing to CONTRACTOR and ENGINEER which will fix the date on which Work will be resumed. CONTRACTOR shall resume the Work on the date so fixed. CONTRACTOR shall be allowed an adjustment in the Contract Price or an extension of the Contract Times, or both, directly attributable to any such suspension if CONTRACTOR makes a Claim therefor as provided in paragraph 10.05.

15.02 OWNER May Terminate for Cause

A. The occurrence of any one or more of the following events will justify termination for cause:

1. CONTRACTOR’s persistent failure to perform the Work in accordance with the Contract Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment or failure to adhere to the progress schedule established under paragraph 2.07 as adjusted from time to time pursuant to paragraph 6.04);

Page 86: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-45

2. CONTRACTOR’s disregard of Laws or Regulations of any public body having jurisdiction;

3. CONTRACTOR’s disregard of the

authority of ENGINEER; or

4. CONTRACTOR’s violation in any substantial way of any provisions of the Contract Documents.

B. If one or more of the events identified in

paragraph 15.02.A occur, OWNER may, after giving CONTRACTOR (and the surety, if any) seven days written notice, terminate the services of CONTRACTOR, exclude CONTRACTOR from the Site, and take possession of the Work and of all CONTRACTOR’s tools, appliances, construction equipment, and machinery at the Site, and use the same to the full extent they could be used by CONTRACTOR (without liability to CONTRACTOR for trespass or conversion), incorporate in the Work all materials and equipment stored at the Site or for which OWNER has paid CONTRACTOR but which are stored elsewhere, and finish the Work as OWNER may deem expedient. In such case, CONTRACTOR shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by OWNER arising out of or relating to completing the Work, such excess will be paid to CONTRACTOR. If such claims, costs, losses, and damages exceed such unpaid balance, CONTRACTOR shall pay the difference to OWNER. Such claims, costs, losses, and damages incurred by OWNER will be reviewed by ENGINEER as to their reasonableness and, when so approved by ENGINEER, incorporated in a Change Order. When exercising any rights or remedies under this paragraph OWNER shall not be required to obtain the lowest price for the Work performed.

C. Where CONTRACTOR’s services have been so terminated by OWNER, the termination will not affect any rights or remedies of OWNER against CONTRACTOR then existing or which may thereafter accrue. Any retention or payment of moneys due CONTRACTOR by OWNER will not release CONTRACTOR from liability.

15.03 OWNER May Terminate For Convenience

A. Upon seven days written notice to CON-TRACTOR and ENGINEER, OWNER may, without

cause and without prejudice to any other right or remedy of OWNER, elect to terminate the Contract. In such case, CONTRACTOR shall be paid (without duplication of any items):

1. for completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work;

2. for expenses sustained prior to the

effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses;

3. for all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) incurred in settlement of terminated contracts with Subcontractors, Suppliers, and others; and

4. for reasonable expenses directly

attributable to termination.

B. CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination.

15.04 CONTRACTOR May Stop Work or Terminate

A. If, through no act or fault of CONTRACTOR,

the Work is suspended for more than 90 consecutive days by OWNER or under an order of court or other public authority, or ENGINEER fails to act on any Application for Payment within 30 days after it is submitted, or OWNER fails for 30 days to pay CONTRACTOR any sum finally determined to be due, then CONTRACTOR may, upon seven days written notice to OWNER and ENGINEER, and provided OWNER or ENGINEER do not remedy such suspension or failure within that time, terminate the Contract and recover from OWNER payment on the same terms as provided in paragraph 15.03. In lieu of terminating the Contract and without prejudice to any other right or remedy, if ENGINEER has failed to act on an Application for Payment within 30 days after it is submitted, or OWNER has failed for 30 days to pay CONTRACTOR any sum finally determined to be due, CONTRACTOR may, seven days after written notice to OWNER and ENGINEER, stop the Work until payment is made of

Page 87: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00700-46

all such amounts due CONTRACTOR, including interest thereon. The provisions of this paragraph 15.04 are not intended to preclude CONTRACTOR from making a Claim under paragraph 10.05 for an adjustment in Contract Price or Contract Times or otherwise for expenses or damage directly attributable to CONTRACTOR’s stopping the Work as permitted by this paragraph. ARTICLE 16 - DISPUTE RESOLUTION

16.01 Methods and Procedures

A. Dispute resolution methods and procedures, if any, shall be as set forth in the Supplementary Conditions. If no method and procedure has been set forth, and subject to the provisions of paragraphs 9.09 and 10.05, OWNER and CONTRACTOR may exercise such rights or remedies as either may otherwise have under the Contract Documents or by Laws or Regulations in respect of any dispute. ARTICLE 17 - MISCELLANEOUS

17.01 Giving Notice

A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice.

17.02 Computation of Times

A. When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday by the law of the applicable jurisdiction, such day will be omitted from the computation.

17.03 Cumulative Remedies

A. The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents, and the provisions of this paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply.

17.04 Survival of Obligations

A. All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Agreement.

17.05 Controlling Law

A. This Contract is to be governed by the law of the state in which the Project is located.

Page 88: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00810-1

SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement the Standard General Conditions of the Construction Contract (No. 1910-8, 1996 Edition) and other provisions of the Contract Documents as indicated below. All provisions which are not so amended or supplemented remain in full force and effect. The terms used in these Supplementary Conditions will have the meanings indicated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings indicated below, which are applicable to both the singular and plural thereof. SC-3.03 Add the following new paragraph immediately after paragraph 3.30.B.

C. Interpretation of Conflicting Provisions of Contract Documents

In the event of a conflict between two or more sections of the contract documents, the contract requirements will be defined by the provisions of these sections in the following order of precedence:

• Addenda (in descending order) • Drawings • Specifications

SC-4.02 Add the following new paragraph(s) immediately after paragraph 4.02.B:

C. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER’s Consultants relied upon the following reports of explorations and tests of subsurface conditions at the Site: None

D. In the preparation of Drawings and Specifications, ENGINEER or ENGINEER’s

Consultants relied upon the following drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the Site: None

SC-5.04 Add the following new paragraph immediately after paragraph 5.04.B:

C. The limits of liability for the insurance required by paragraph 5.04 of the General Conditions shall provide coverage for not less than the amounts provided on Exhibit B - Genesee County Insurance Checklist or greater where required by Laws and Regulations.

1. The Owner’s and Contractor’s Protective Liability Insurance shall include

the following persons or entities as insureds:

a. The Genesee County Purchasing Department b. ROWE Professional Services Company c. H.T. Bernsdorff, Inc.

SC-6.06.C Add the following sentence at the end of paragraph 6.06.C:

OWNER or ENGINEER may furnish to any such Subcontractor, Supplier, or other individual or entity, to the extent practicable, information about amounts paid to

Page 89: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00810-2

CONTRACTOR on account of Work performed for CONTRACTOR by a particular Subcontractor, Supplier, or other individual or entity.

SC-7.03 Add the following new paragraph immediately after paragraph GC-7.02:

SC-7.03 Claims Between Contractors

A. Should CONTRACTOR cause damage to the work or property of any separate contractor at the Site, or should any claim arising out of CONTRACTOR’s performance of the Work at the Site be made by any separate contractor against CONTRACTOR, OWNER, ENGINEER, ENGINEER’s Consultants, or the construction coordinator, CONTRACTOR shall promptly attempt to settle with such separate contractor by agreement, or to otherwise resolve the dispute by arbitration or at law.

B. CONTRACTOR shall, to the fullest extent permitted by Laws and

Regulations, indemnify and hold harmless OWNER, ENGINEER, ENGINEER’s Consultants, the construction coordinator and the officers, directors, partners, employees, agents and other consultants and subcontractors of each and any of them from and against all claims, costs, losses and damages (including, but not limited to, fees and charges of engineers, architects, attorneys, and other professionals and court and arbitration costs) arising directly, indirectly or consequentially out of any action, legal or equitable, brought by any separate contractor against OWNER, ENGINEER, ENGINEER’s Consultants, or the construction coordinator to the extent said claim is based on or arises out of CONTRACTOR’s performance of the Work. Should a separate contractor cause damage to the Work or property of CONTRACTOR or should the performance of work by any separate contractor at the Site give rise to any other Claim, CONTRACTOR shall not institute any action, legal or equitable, against OWNER, ENGINEER, ENGINEER’s Consultants, or the construction coordinator or permit any action against any of them to be maintained and continued in its name or for its benefit in any court or before any arbiter which seeks to impose liability on or to recover damages from OWNER, ENGINEER, ENGINEER’s Consultants or the construction coordinator on account of any such damage or Claim.

C. If CONTRACTOR is delayed at any time in performing or furnishing Work

by any act or neglect of a separate contractor, and OWNER and CONTRACTOR are unable to agree as to the extent of any adjustment in Contract Times attributable thereto, CONTRACTOR may make a Claim for an extension of times in accordance with Article 12. An extension of the Contract Times shall be CONTRACTOR’s exclusive remedy with respect to OWNER, ENGINEER, ENGINEER’s Consultants, and construction coordinator for any delay, disruption, interference, or hindrance caused by any separate contractor. This paragraph does not prevent recovery from OWNER, ENGINEER, ENGINEER’s Consultant, or construction coordinator for activities that are their respective responsibilities.

SC-8.11 Add the following new paragraph immediately after paragraph 8.11.A:

Page 90: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00810-3

B. On request of CONTRACTOR prior to the execution of any Change Order

involving a significant increase in the Contract Price, OWNER shall furnish to CONTRACTOR reasonable evidence that adequate financial arrangements have been made by OWNER to enable OWNER to fulfill the increased financial obligations to be undertaken by OWNER as a result of such Change Order.

SC-11.03.C Delete paragraph 11.03.C in its entirety and insert the following in its place:

C. The unit price of an item of Unit Price Work shall be subject to reevaluation and adjustment under the following conditions:

1. if the total cost of a particular item of Unit Price Work amounts to 10 % or

more of the Contract Price and the variation in the quantity of that particular item of Unit Price Work performed by Contractor differs by more than 25% from the estimated quantity of such item indicated in the Agreement; and

2. if there is no corresponding adjustment with respect to any other item of

Work; and

3. if CONTRACTOR believes that CONTRACTOR has incurred additional expense as a result thereof; or if OWNER believes that the quantity variation entitles OWNER to an adjustment in the unit price, either OWNER or CONTRACTOR may make a claim for an adjustment in the Contract Price in accordance with Article 10 if the parties are unable to agree as to the effect of any such variations in the quantity of Unit Price Work performed.

SC-14.05.A Add the following new paragraph immediately after paragraph 14.05.A.1, which is to read as follows:

2. OWNER may at any time request CONTRACTOR in writing to permit OWNER to take over operation of any part of the Work although it is not substantially complete. A copy of such request will be sent to ENGINEER, and within a reasonable time thereafter OWNER, CONTRACTOR, and ENGINEER shall make an inspection of that part of the Work to determine its status of completion and will prepare a list of the items remaining to be completed or corrected thereon before final payment. If CONTRACTOR does not object in writing to OWNER and ENGINEER that such part of the Work is not ready for separate operation by OWNER, ENGINEER will finalize the list of items to be completed or corrected and will deliver such lists to OWNER and CONTRACTOR together with a written recommendation as to the division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, maintenance, utilities, insurance, warranties, and guarantees for that part of the Work which will become binding upon OWNER and CONTRACTOR at the time when OWNER takes over such operation (unless they shall have otherwise agreed in writing and so informed ENGINEER). During such operation and prior to Substantial Completion of such part of the Work, OWNER shall allow CONTRACTOR reasonable access to complete or correct items on said list and to complete other related Work.

Page 91: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00810-4

Paragraph 14.05.A.2 shall be renumbered to 14.05.A.3.

SC-16 Add the following new paragraph immediately after paragraph 16.01:

SC-16.02 Mediation

A. OWNER and CONTRACTOR agree that they shall submit any and all unsettled Claims or counterclaims, disputes, or other matters in question between them arising out of or relating to the Contract Documents or the breach thereof to mediation by a mutually acceptable mediator [prior to either of them initiating against the other a demand for arbitration pursuant to paragraph SC-16.03, unless delay in initiating arbitration would irrevocably prejudice one of the parties. The 30 day time limit within which to file a demand for arbitration as provided in paragraphs SC-16.03.B and 16.03.C shall be suspended with respect to a dispute submitted to mediation within that time limit and shall remain suspended until 10 days after the termination of the mediation.] The mediator of any dispute submitted to mediation under this agreement shall not serve as arbitrator of such dispute unless otherwise agreed.

SC-16 Add the following new paragraph immediately after paragraph SC-16.02.

SC-16.03 Arbitration

A. All Claims or counterclaims, disputes, or other matters in question

between OWNER and CONTRACTOR arising out of or relating to the Contract Documents or the breach thereof (except for Claims which have been waived by the making or acceptance of final payment as provided by paragraph 14.09) not resolved under the provisions of paragraph SC-16.02 will be decided by binding arbitration in accordance with the then obtaining, subject to the limitations of this paragraph SC-16.03. This agreement to arbitrate and any other agreement or consent to arbitrate entered into will be specifically enforceable under the prevailing law of any court having jurisdiction.

B. No demand for arbitration of any Claim or counterclaim, dispute, or other

matter that is required to be referred to ENGINEER initially for decision in accordance with paragraph 9.09 will be made until the earlier of: (i) the date on which ENGINEER has rendered a written decision, or (ii) the 31st day after the parties have presented their final evidence to ENGINEER if a written decision has not been rendered by ENGINEER before that date. No demand for arbitration of any such Claim or counterclaim, dispute, or other matter will be made later than 30 days after the date on which ENGINEER has rendered a written decision in respect thereof in accordance with paragraph 10.05; and the failure to demand arbitration within said 30 day period will result in ENGINEER's decision being final and binding upon OWNER and CONTRACTOR. If ENGINEER renders a decision after arbitration proceedings have been initiated, such decision may be entered as evidence but will not supersede the arbitration proceedings, except where the decision is acceptable to the parties concerned.

Page 92: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

00810-5

C. Notice of the demand for arbitration will be filed in writing with the other

party to the Contract and with the selected arbitrator, and a copy will be sent to ENGINEER for information. The demand for arbitration will be made within the 30 day period specified in paragraph SC-16.03.B, and in all other cases within a reasonable time after the Claim or counterclaim, dispute, or other matter in question has arisen, and in no event shall any such demand be made after the date when institution of legal or equitable proceedings based on such Claim or other dispute or matter in question would be barred by the applicable statute of limitations.

D. Except as provided in paragraph SC-16.03.E, no arbitration arising out of

or relating to the Contract Documents shall include by consolidation, joinder, or in any other manner any other individual or entity (including ENGINEER, and ENGINEER's Consultants and the officers, directors, partners, agents, employees or consultants of any of them) who is not a party to this Contract unless:

1. the inclusion of such other individual or entity is necessary if

complete relief is to be afforded among those who are already parties to the arbitration; and

2. such other individual or entity is substantially involved in a

question of law or fact which is common to those who are already parties to the arbitration and which will arise in such proceedings; and

3. the written consent of the other individual or entity sought to be

included and of OWNER and CONTRACTOR has been obtained for such inclusion, which consent shall make specific reference to this paragraph; but no such consent shall constitute consent to arbitration of any dispute not specifically described in such consent or to arbitration with any party not specifically identified in such consent.

E. Notwithstanding paragraph SC-16.03.D, if a Claim or counterclaim,

dispute, or other matter in question between OWNER and CONTRACTOR involves the Work of a Subcontractor, either OWNER or CONTRACTOR may join such Subcontractor as a party to the arbitration between OWNER and CONTRACTOR hereunder. CONTRACTOR shall include in all subcontracts required by paragraph 6.06.G a specific provision whereby the Subcontractor consents to being joined in arbitration between OWNER and CONTRACTOR involving the Work of such Subcontractor. Nothing in this paragraph SC-16.03.E nor in the provisions of such subcontract consenting to joinder shall create any claim, right, or cause of action in favor of Subcontractor and against OWNER, ENGINEER, or ENGINEER's Consultants that does not otherwise exist.

F. The award rendered by the arbitrators will be final, judgment may be

entered upon it in any court having jurisdiction thereof, and it will not be subject to modification or appeal.

Page 93: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

EXHIBIT A. GENESEE COUNTY STANDARD TERMS AND CONDITIONS 1. Genesee County Purchasing Regulations: All procurements are conducted in

accordance with the Genesee County Purchasing Regulations, a copy of which is on file and available for inspection at the Genesee County Purchasing Department, 1101 Beach Street, Room 200, Flint, Michigan, 48502.

2. Evaluation and Award: The contract will be awarded to the lowest responsive and

responsible bidder whose bid is determined to be most advantageous to the County. Genesee County reserves the right to reject any or all bids, to waive any informality or irregularity in any bid, and to negotiate with the apparent successful bidder in the best interest of Genesee County.

3. Local Preference for Genesee County and Veteran Owned Businesses: Within 5

business days of bid opening, if the lowest responsive and responsible bidder is not a Genesee County Business, a Genesee County or Veteran Owned Business who has submitted a responsive bid that is no more than 5% higher than the lowest responsive bid may submit an amended bid to the Purchasing Director. A Genesee County or Veteran Owned Business who is the lowest responsive and responsible bidder may not amend their bid pursuant to this section. Amended bids submitted by Genesee County Businesses in this manner shall be considered along with other responsive bids submitted by responsible bidders.

4. Cancellation; Rejection of Bids: The Invitation for Bids may be canceled by Genesee

County at any time for any reason. Any bid received may be rejected in whole or in part when in the best interests of Genesee County.

5. Receipt of Bids: It is solely the responsibility of the bidder to assure the timely receipt

of its bid at the location indicated in IFB #12-024. LATE BIDS AND BIDS SENT BY FACSIMILE OR EMAIL WILL NOT BE ACCEPTED.

6. Tax: Genesee County is a Michigan Municipal Corporation and as such it is exempt

from Federal Excise Tax and Michigan Sales Tax. 7. Non-Discrimination: The successful bidder/Contractor covenants that it will not

discriminate against an employee or applicant of employment with respect to hire, tenure, terms, conditions, or privileges of employment, or a matter directly or indirectly related to employment, because of race, color, religion, national origin, age, sex, height, weight, marital status or a disability that is unrelated to the individual’s ability to perform the duties of a particular job or position, and that it will require the same non-discrimination assurances from any subcontractor who may be used to carry out duties described in this contract. Breach of this covenant shall be regarded as a material breach of this contract.

8. Conflict of Interest: Each bidder, by submitting a bid, represents that the bidder has

no knowledge that any employee, representative or agent of the bidder is a County employee who has directly or indirectly participated on behalf of the County in the contemplated procurement, or that any County employee who has so participated or any member of such an employee’s immediate family has a financial interest pertaining

IFB #12-024 1

Page 94: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

to the contemplated procurement from the bidder, and represents that the bidder reasonably believes that no employee, representative or agent of bidder is a County employee who has so participated and that no County employee who has so participated or member of that employee’s immediate family has a financial interest in the contemplated procurement from the bidder.

9. Inspection: All goods are received subject to inspection and testing. If goods are

defective or fail to meet the bid specifications, Genesee County shall have the right to reject the goods or to correct the defects. The contractor shall pay Genesee County for expenses incurred in correcting defects. Rejected goods will be held for forty-five days after delivery awaiting instructions from the contractor. After the forty-five day period, Genesee County will dispose of the goods without further liability to Genesee County. The contractor is responsible for the costs of handling, packing, and transportation incurred in returning or disposing of defective or non-conforming goods.

10. Bonds/Surety: If bonds (surety) are required as part of this solicitation, the bonds must be

issued by a company authorized to do business in the State of Michigan. 11. As required by Public Act 57 of 1998, H.B. 5607, MCLA § 125.1591-125.1596 a contract

for improvements between a contractor and a governmental entity exceeding $75,000 must contain the following provisions: A contractor must promptly notify the government entity if it finds (1) that a subsurface or latent physical condition at the site differs materially from those indicated in the contract, and/or (2) that an unknown physical condition at the site is of an unusual nature differing materially from that ordinarily encountered and generally recognized as occurring in the work of the character envisioned in the improvement contract. If a governmental entity receives such a notice, it must promptly investigate the physical condition, and if it determines that the physical condition is materially different and would cause an increase or decrease in cost or additional time to perform the contract, it must put its determination in writing and an equitable adjustment to the contract price and time must be made. The contractor cannot make a claim for additional costs or time due to a physical condition unless it has provided the required notice.

12. Bidder’s Representations: Each bidder, by submitting a bid, represents as follows: 1) That the bidder has read and understood the IFB documents and has submitted

its bid in accordance therewith; 2) That the bid has been submitted by a duly authorized owner, partner, or

corporate officer; 3) That the bid submitted has been prepared independently without collusion,

agreement, understanding, or planned common course of action with any other supplier of the goods or services described in the IFB, designed to limit independent offers or competition.

13. Independent Contractor: Bidder agrees that if awarded a contract, it shall be an

independent contractor and not an employee of Genesee County. The contractor shall secure, at its own expense, all personnel required in supplying goods or services under

IFB #12-024 2

Page 95: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

the awarded contract. All such personnel shall have no contractual relationship with Genesee County and shall not be considered employees of Genesee County.

14. Insurance: Each bidder must submit a completed Bidder’s Insurance Checklist, if so

stipulated in the IFB. The required coverage and minimum limits may vary dependent upon the dollar amount of the contract, length of time of the contract, and the hazard level of the work or services to be performed. The types of insurance coverage may include: workers compensation, general liability, auto liability and/or professional liability. The insurer, insurance retention group, pool, or self-insurer must be authorized/licensed to provide such coverage within the State of Michigan and meet minimum financial ratings, if applicable, as supplied by Best or S & P.

15. Genesee County Major Contract Addendum: Each bid over $40,000 submitted to

Genesee County for construction must include an executed Major Contract Addendum Affidavit(s). Bidders are required to demonstrate their efforts to involve Minority, Female, and Handicapper owned subcontractors.

In addition, Contractors performing construction for Genesee County must agree to the Local Workforce Requirement by hiring at least 50% Genesee County residents for any County project. Further information on these requirements may be obtained from: Genesee County Purchasing Department, 1101 Beach Street, Room 200, Flint, Michigan 48502, Ph.: (810) 257-3030 and Fax: (810)-257-3380.

16. Prevailing Wage Requirements: All contractors and subcontractors shall pay its

laborers and mechanics not less than the prevailing wage rates and fringe benefits for corresponding classes of laborers and mechanics employed on similar projects in the area. For the purposes of this solicitation, a Contractor shall be in compliance if the Contractor is in compliance with the Davis-Bacon Act, 40 U.S. C. §3141, et seq., and pays wages consistent with the prevailing wage rates published by the United States Department of Labor. Genesee County shall, at a minimum, take the following actions with regards to enforcement of the Prevailing Wage requirements:

A. The County shall require the Contractor to submit a certified payroll record

consistent with requirements established by the Davis Bacon Act. B. The County shall review the certified payroll record for compliance with this

Section; and C. The contract language shall reserve the right of the County to conduct on-site

interviews with the Contractor’s employees to ensure compliance with the prevailing wage requirements.

17. Indemnification: The successful bidder shall defend, indemnify, and hold harmless

Genesee County and its officers and employees from and against all claims, losses, damages, and expenses including, but not limited to, attorney’s fees arising out of or resulting from the performance of the contract.

18. Disclosure: All information in a submitted bid is subject to disclosure under the

provisions of Public Act N. 442 of 1976 known as the “Freedom of Information Act”. This Act also provides for the complete disclosure of contracts and attachments thereto.

IFB #12-024 3

Page 96: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

IFB #12-024 4

19. Clarification of Bids: Discussions may be conducted with responsible bidders who

submit bids determined to be reasonably susceptible of being selected for award for the purpose of clarification to assure full understanding of, and conformance to, the solicitation requirements.

20. Bid Considerations: All costs incurred in the preparation of a response to this IFB or

any costs prior to approval of the contract by Genesee County and formal notification to the selected bidder will be the responsibility of the respondent, and will not be reimbursed by Genesee County. Bids should be prepared simply and economically, providing a straightforward, concise description of the bidder’s ability to meet the requirements of this IFB.

21. Warranty: The bidder warrants that all goods and services furnished under a contract

resulting from the IFB shall be in conformance with the IFB documents, and that the goods are of merchantable quality as described in the Uniform Commercial Code, Section 2-314, and fit for the purpose for which they are sold. This warranty is in addition to any manufacturer’s standard warranty which may apply or any warranty provided by law, and is in addition to all other express warranties made by the bidder.

22. Applicable Law: Any contract resulting from the IFB shall be governed by the laws of

the State of Michigan. Unless otherwise provided in the contract documents, the contractor shall secure and pay for all permits, fees, duties, licenses, inspections, and approvals necessary for the execution and completion of the contract. The contractor shall give all notices and comply with all laws, ordinances, rules, regulations, and lawful orders of any public authority bearing on the performance of the contract.

23. Prime Contractor Responsibilities: The successful bidder(s) shall be required to

assume responsibility for all services offered in the bid regardless of who produces them. Further, the County will consider the successful bidder to be the sole point of contact with regard to contractual matters, including payment of any and all charges resulting from the contract.

24. Right to Inspect: Genesee County may, at reasonable times, inspect the plant, place

of business, or work site of a contractor or subcontractor which is pertinent to the performance of a contract or potential contract.

25. Right to Audit: Genesee County may at reasonable times and places, audit the books

and records of any contractor who has submitted cost or pricing data as a part of its bid, to the extent that such books and records are pertinent to such cost or pricing data for a period of three years from the date of final payment under the contract. Genesee County shall be entitled to audit the books and records of a contractor or subcontractor other than a firm fixed-price contract to the extent that such books and records are pertinent to the performance of such contract or subcontract. Such books and records shall be maintained by the contractor for a period of three years from the date of final payment under a prime contract and by the subcontractor for a period of three years from the date of final payment under a subcontract.

Page 97: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

EXHIBIT B. GENESEE COUNTY INSURANCE CHECKLIST Bid Title: CONSTRUCTION OF 2012 DOMESTIC WATER HEATER REPLACEMENT

FOR THE GENESEE COUNTY JAIL Bid Number: 12-024 Coverages Required Limits (Figures denote minimums) X 1. Workers' Compensation Statutory limits of Michigan X 2. Employers' Liability $100,000 accident/disease $500,000 policy limit, disease X 3. General Liability Including Premises/operations

$1,000,000 per occurrence with $2,000,000 aggregate X 4. Products/Completed operations $1,000,000 per occurrence with $2,000,000 Aggregate [If applicable] X 5. Automobile liability $1,000,000 combined single limit each accident-Owned, hired, nonowned X 6. Umbrella liability/Excess Coverage $ 3,000,000 BI & PD and PI X 7. Owners and Contractors Protective $ 1,000,000 per occurrence with $2,000,000 in the

Aggregate X 8. Other insurance required: Bonds as required by contract and included in the RFP. X 9. Best's rating: A VIII or better, or its equivalent (Retention Group Financial Statements) X 10. The certificate must state bid number and title X 11. Genesee County named as an additional insured on other than workers' compensation via endorsement

A copy of the endorsement must be included with the certificate. Evidence of Addition Insured under Blanket coverage within the policy language is also acceptable. However, a copy of the language applicable to this must be provided.

FAX THIS PAGE TO YOUR INSURANCE AGENT/BROKER

Insurance Agent's Statement I have reviewed the requirements with Prospective Contractor named below. In addition: _____ The above policies carry the following deductibles: _______________________________________________________________________________________ Liability policies are occurrence _____ claims made _____ _______________________________________ __________________________________________ Insurance Agent Signature

PLEASE NOTE #11 ABOVE. ADDING ADDITIONAL INSURED [AI] TO THE DESCRIPTION IS NOT

ACCEPTABLE. AN ENDORSEMENT OR COPY OF AI LANGUAGE IS REQUIRED

Prospective Contractor's Statement I understand the insurance requirements and will comply in full if awarded the contract. _______________________________________ __________________________________________ Bidder Signature Required general insurance provisions are provided in the checklist above. These are based on the contract and exposures of the work to be completed under the Contract. Modifications to this checklist may occur at any time prior to signing of the contract. Any changes will require approval by the Prospective Contractor, the department and County Risk Manager. To the degree possible, all changes will be made as soon as feasible. REVISED 04/08/2010

IFB # 12-024

Page 98: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

1

GENESEE COUNTY MAJOR CONTRACT ADDENDUM

LOCAL WORK FORCE, MINORITY, WOMAN, AND PERSONS WITH A DISABILITY PARTICIPATION

The purpose of this contract addendum is to promote the utilization of a local work force, minority-, woman-, and persons with a disability-owned business, as well as minority, female, and disabled employees in County contracts for construction valued at $40,000 or more. In accordance with this contract addendum, all County departments soliciting bids for projects estimated to cost $40,000 or more shall, at the time of solicitation, forward all bid specifications to the Genesee County Office of Equity & Diversity (GCOED), Contract Compliance Unit.

GENESEE COUNTY NON-DISCRIMINATION POLICY Genesee County is committed to a policy of Equal Employment Opportunity (EEO). The County requires that contractors, subcontractors, vendors, and suppliers of goods and services doing business with the County prohibit all unlawful discrimination based on race, color, national origin, age, sex, marital status, religion, height, weight, pregnancy or disability.

CONTRACT ADDENDUM DEFINITIONS CONTRACT(S) All types of County agreements, regardless of what they may be called, for the procurement of supplies, services, or construction. CONSTRUCTION The process of building, altering, repairing, improving, or demolishing any public structure or building, or other public improvements of any kind to any public real property. DISABILITY A determinable physical or mental disability of an individual, or the history of a disability, which may result from disease, injury, congenital condition of birth, or functional disorder. DISABLED PERSON An individual who has a disability.

seymou1m
Typewritten Text
Page 1 of 11
seymou1m
Typewritten Text
EXHIBIT C
Page 99: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

EEO STATEMENT A statement prohibiting discrimination in employment, education, housing, public accommodations, or public services based on race, color, national origin, age, sex, marital status, religion, height, weight, pregnancy, or disability. EEO PLAN A plan designed to correct or address systemic exclusions of racial and ethnic minorities, women, and persons with a disability from an employer’s work force. WOMAN-OWNED BUSINESS A business enterprise in which one or more women own more than 50% of the voting shares or interest in the business; control and operate more than 50% of the business; and for which more than 50% of the net profit or loss accrues to woman/women. The woman ownership interest in the firm must be real, substantial, and continuing. Such interest is characterized by the following factors: 1. Risk of loss/share of profit commensurate with the proportional

ownership; and 2. Receipt of the customary incidents of ownership, such as salary

and/or intangible benefits. The business must perform a useful business function according to the custom and practice in the industry. For example, acting merely as a conduit of funds to a non-woman owned firm, when that is unnecessary to accomplish the business transaction, does not constitute a useful business function according to custom and practice in the industry. GOOD FAITH EFFORT Any method which establishes that the bidder has affirmatively endeavored to give minority-, woman-, and persons-with-a-disability-owned businesses a full and equal opportunity to participate in a County contract as a subcontractor or employee. A bidder may demonstrate its good faith effort by providing evidence of the following: 1. Encouraging minority-, woman-, and persons-with-a-disability-owned

businesses to attend pre-bid meetings scheduled by the contractor or County;

seymou1m
Typewritten Text
Page 2 of 11
Page 100: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

2. Advertising in general circulation media and trade publications, as well as minority, woman, and persons with a disability focused media;

3. Providing minority-, women-, and person-with-a-disability owned

businesses with adequate information about the project, i.e., specifications and requirements;

4. Negotiating with minority-, women-, and person-with-a-disability

owned businesses in good faith and; 5. Using the services of available local, state, and federal minority-,

woman-, and persons-with-a-disability- business assistance offices for recruitment of these respective businesses.

LOCAL WORK FORCE Employees who are bona fide residents of Genesee County. PERSON(S)-WITH-A-DISABILITY-OWNED BUSINESS A business enterprise in which a disabled person or persons own more than 50% of the voting shares or interest in the business; control and operate more than 50% of the business; and for which more than 50% of the net profit or loss accrues to person(s) who are disabled. The ownership interest of the disabled person in the firm must be real, substantial, and continuing. Such interest is characterized by the following factors: 1. Risk of loss/share of profit commensurate with the proportional

ownership; and 2. Receipt of the customary incidents of ownership, such as salary

and/or intangible benefits. The business must perform a useful business function according to the custom and practice in the industry. For example, acting merely as a conduit of funds to a non-disabled person-owned firm when that is unnecessary to accomplish the business transaction does not constitute a useful business function according to custom and practice in the industry. MINORITY A citizen of the United States who is Black, Hispanic, Asian or Pacific Islander, American Indian or Alaskan Native, as such are respectively defined below:

seymou1m
Typewritten Text
Page 3 of 11
Page 101: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

a. Black (not of Hispanic Origin): A U.S. citizen having origins in any of the Black racial groups of Africa, and regarded as such by the community of which the person claims to be a part.

b. Hispanic: All persons of Mexican, Puerto Rican, Cuban, Central

or South American, or other Spanish culture or origin, regardless of race.

c. Asian or Pacific Islander: All persons having origins in any of the

original people of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands. This area includes, for example, China, India, Japan, Korea, the Philippine Islands, and Samoa.

d. American Indian or Alaskan Native: All persons having origins in

any of the original peoples of North America, and who maintain cultural identification through tribal affiliation or community recognition

MINORITY-OWNED BUSINESS A business enterprise in which a minority or minorities own more than 50% of the voting shares or interest in the business and control and operate more than 50% of the business, and with respect to which more than 50% of the net profit or loss accrues to person who are members of a minority. The minority ownership interest in the firm must be real, substantial, and continuing. Such interest is characterized by the following factors: 1. Risk of loss/share of profit commensurate with the proportional

ownership; and 2. Receipt of the customary incidents of ownership, such as salary

and/or intangible benefits. The business must perform a useful business function according to the custom and practice in the industry. For example, acting merely as a conduit of funds to a non-minority owned firm when that is unnecessary to accomplish the business transaction does not constitute a useful business function according to custom and practice in the industry.

seymou1m
Typewritten Text
Page 4 of 11
Page 102: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

MINORITY-, WOMAN-, AND PERSONS-WITH-A-DISABILITY-OWNED BUSINESS PARTICIPATION

Genesee County is committed to equal opportunity for minority-, woman-, and persons-with-a-disability-owned businesses in County contracts. All bidders, including contractors, vendors, suppliers, etc., who will utilize subcontractors are required to state in their bids how minority-, woman-, or persons-with-a-disability-owned subcontractors, vendors, and suppliers are to be included in the contract project. Bidders must provide the estimated dollar amount of payments to these categories separately. The procedures to actively include minority-, woman-, and persons-with-a-disability-owned businesses in the contract project will be considered, as one of numerous factors, in the bid evaluation. The primary contractor or vendor is required to establish its good faith effort at compliance with all requirements of this contract addendum section. The GCOED maintains a list of certified minority-, woman-, and persons-with-a-disability-owned businesses that is available to the public.

MINORITY-, WOMAN-, PERSONS-WITH-A-DISABILITY EMPLOYEE PARTICIPATION

Genesee County strongly encourages the utilization of minority, woman, and persons-with-a- disability employees in County contracts. All bidders are required to submit an Equal Employment Opportunity (“EEO”) Statement and an EEO Plan detailing the participation of minorities, women, and persons with a disability in the bidder’s work force. Note: In accordance with the directives of Proposition 06-02, the inclusion of minority and women employees in the bid is not a consideration in the bid evaluation. LOCAL WORK FORCE PARTICIPATION Subject to the remaining provisions of this paragraph, at least 50% of all employees specifically hired for this contract project should be bona fide residents of Genesee County, Michigan. Compliance with this requirement may be waived or modified by the Genesee County Board of Commissioners for good cause. The County may make reasonable inspection of the records of the contractor or vendor in order to monitor compliance with this requirement. Any other provisions of this contract addendum notwithstanding: 1. The Contractor’s Affidavit that at least 50% of the total contract work

force through contract completion (or such lesser percentage as may be required in view of any waiver) has consisted of bona fide residents of Genesee County shall be a part of the contractor’s or vendor’s final application to the County for payment, and submission of such affidavit shall be a condition of final payment becoming due.

seymou1m
Typewritten Text
Page 5 of 11
Page 103: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

MONITORING The Genesee County Office of Equity & Diversity will monitor the compliance with the provisions of this contract addendum. The contractor or vendor agrees to cooperate with the County’s staff in monitoring compliance with this contract addendum and in submitting relevant business records. The contractor or vendor shall be responsible for providing any requested supporting documentation as to its subcontractors and work force. Any knowingly false statement made in connection with this contract addendum shall constitute a material breach of the contract. Date: May 21, 2007 Genesee County Board of Commissioners Resolution 89-469, amended by Resolution 89-599 on November 7, 1989. Amended by Resolution 91-252 on April 30, 1991. Amended by Resolution 07-177 on May 21 , 2007

seymou1m
Typewritten Text
seymou1m
Typewritten Text
Page 6 of 11
Page 104: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

Attachment A

GENERAL CONTRACTOR’S AFFIDAVIT OF COMPLIANCE WITH THE GENESEE COUNTY MAJOR CONTRACT ADDENDUM

STATE OF MICHIGAN) C OUNTY OF GENESEE)

_______________________________________submits this Affidavit in support (General Contractor’s Company Name) of its bid regarding the following project: ________________________________________________________________ (Project Name) We have reviewed the Genesee County Major Contract Addendum. This bid achieves compliance with that addendum. GENERAL CONTRACTOR’S STATUS We are ________Minority-Owned Business ________Woman-Owned Business ________Person-with-a-Disability-Owned Business ________None of the above SUBCONTRACTOR SECTION The subcontractors to which we will award contracts on this project and their estimated dollar amount of this project will be: Company Name

Indicate whether Minority/Woman/ Disability-Owned Business

Dollar Amount

seymou1m
Typewritten Text
Page 7 of 11
Page 105: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

SIGNATURE SECTION ________________________________________________________________ (General Contractor’s Signature) (Title) ________________________________________________________________ (Company Name) (Street / P. O. Box) ________________________________________________________________ (Company Telephone Number) (City) (State) (Zip) NOTARIZATION SECTION Subscribed and sworn to before me this _______ Day of _______________, 20__ _________________________________ Notary Public My Commission Expires:_____________ NOTE: Attach supplemental sheets if needed. Such sheets are part of this

Affidavit.

seymou1m
Typewritten Text
Page 8 of 11
Page 106: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

Attachment B MINORITY-, WOMAN-, PERSON-WITH-A-DISABILITY-

SUBCONTRACTOR/VENDOR/SUPPLIER AFFIDAVIT RELATING TO THE GENESEE COUNTY MAJOR CONTRACT ADDENDUM

STATE OF MICHIGAN) C

OUNTY OF GENESEE)

We have reviewed the Genesee County Major Contract Addendum. We are a ________Minority-Owned Business

________Woman-Owned Business

________Person-with-a-Disability-Owned Business

within the meaning of the addendum. We are certified through the following

agency: __________________________________________________________

We have agreed to do: ______________________________________________ (Designate Type of Work)

on the ___________________________________________________ project as a subcontractor/vendor/supplier for: ________________________________________________________ for a price (General Contractor’s Name) of _________________ (Dollar Amount).

This agreement is our company’s actual agreement. SIGNATURE SECTION _________________________________________________________________ (Owner’s Signature) (Title) _________________________________________________________________ (Company Name) (Street / P. O. Box) _________________________________________________________________ (Company Telephone Number) (City) (State) (Zip) NOTARIZATION SECTION Subscribed and sworn to before me this _______ Day of _______________, 20__ _________________________________ Notary Public My Commission Expires: _____________

seymou1m
Typewritten Text
Page 9 of 11
Page 107: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

Attachment C

LOCAL WORK FORCE PARTICIPATION RELATING TO THE GENESEE COUNTY MAJOR CONTRACT ADDENDUM

STATE OF MICHIGAN) COUNTY OF GENESEE) We have reviewed the Genesee County Major Contract Addendum. We confirm

that at least 50% of the total contract work force performing the work required on

the _____________________________________________________ project

through final completion consisted of bona fide residents of Genesee County.

We understand that the submission of this Affidavit is a condition of final payment

becoming due.

SIGNATURE SECTION _________________________________________________________________ (Owner’s Signature) (Title) _________________________________________________________________ (Company Name) (Street / P. O. Box) _________________________________________________________________ (Company Telephone Number) (City) (State) (Zip) NOTARIZATION SECTION Subscribed and sworn to before me this _______ Day of _______________, 20__ _________________________________ Notary Public My Commission Expires: _____________

seymou1m
Typewritten Text
Page 10 of 11
Page 108: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed

Attachment D

WAIVER OF MINORITY, WOMEN, AND PERSONS WITH A DISABILITY-OWNED BUSINESS PARTICIPATION OR LOCAL

WORK FORCE PARTICIPATION RELATING TO THE GENESEE COUNTY MAJOR CONTRACT ADDENDUM

In compliance with the Genesee County Major Contract Addendum, the minority-, woman-, and person-with-a-disability-owned business or local work force participation may be waived by the Genesee County Board of Commissioners with respect to a County contract due to special circumstances, the unique character of the work to be performed, or the demonstrated unavailability of qualified Minority-, Woman-, or Persons-with-a-Disability-Owned Businesses, or local residents. Reason for Waiver: _________________________________________________ _________________________________________________________________ _________________________________________________________________ _________________________________________________________________ Name of Company Seeking Waiver _________________________________________________________________ Street/P. O. Box _________________________________________________________________ City State Zip Telephone Number _______________________________ _____________________________ Authorized Company Signature Title ________________________________ Date Recommendation: GCOED _______ Yes _______ No Date: _________________ Approval of Waiver: GCOED _______ Yes _______ No Date: _________________

seymou1m
Typewritten Text
Page 11 of 11
Page 109: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
Page 110: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
Page 111: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
Page 112: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
Page 113: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
Page 114: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
Page 115: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
seymou1m
Typewritten Text
IFB # 12-024
Page 116: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
seymou1m
Typewritten Text
IFB # 12-024
Page 117: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
seymou1m
Typewritten Text
IFB # 12-024
Page 118: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
seymou1m
Typewritten Text
IFB # 12-024
seymou1m
Typewritten Text
Page 119: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed
seymou1m
Typewritten Text
IFB # 12-024
Page 120: PROJECT MANUAL FOR CONSTRUCTION OF 2012 · PDF fileThe specifications and other contract documents have been prepared under the direction of the following design professional licensed