PROJECT MANAGEMENT Project Plan & Evaluation
phase
Week 6
Propedeuse ICM 2011-2012School of Communication & Media - INHOLLAND
The Project Plan includes ‘Project Plan’ & ‘Production Schedule’ (Verhaar, 173-178)
The Project Plan (please note the following):
• Must refer to previous documents (proposal)
• requires an exact description of the concrete project result in a detailed plan or design
• requires an exact description and/or design of each component
The Project Plan includes ‘Project Plan’ & ‘Production Schedule’ (Verhaar, 173-178)
The Project Plan (please note the following):
• could include a mood board OR any other visual aids. Be creative!
• Remember to strike a balance between a very professional approach and selling your project!
The Project Plan includes ‘Project Plan’ & ‘Production Schedule’ (Verhaar, 173-178)
The Production Schedule includes all technical & practical information:
• production methods & tools • production implementation (directions, scripts)• lists of artists, players, speakers• rehearsal schedule, timetables & call sheets• drawings and/or floor plans• volunteers plans• AND• anything else your project requires!
Evaluation Phase
• Proposal for evaluation plan
• what worked, what didn’t?
• e.g. do a public survey
Read :Verhaar, Chapters 2,3,4, (10 & 11 recommended)Grit, Chapters 2,3
Write 2 questions with answers from each chapter, due week 5
Project group 1:Verhaar, Chapter 1,2, Grit, Chapter 10, 11, 12
Project group 2:Verhaar, Chapter 3,4, 6Grit, Chapter 8, 9
Project group 3:Verhaar, Chapter 7, 8, 9Grit, Chapter 6, 7
Project group 4:Verhaar, Chapter 11, 12, 13Grit, Chapter 4,5
For next week