project history timeline - loop 202 (south mountain ... · south mountain freeway project history...

2
1980 1990 2000 2010 1985 1983 1988 1996 2001 2004 2013 2014 Introduced as the “Southwest Loop Highway” Part of the freeway system approved by voters through Proposion 300 State-level Environmental assessment and Design Concept Report completed and route approved by the State Transporaon Board Construcon delayed due to funding shortage during Proposion 300 meframe ADOT iniates federal- level Environmental Impact Statement and Design Concept Report Part of mulmodal transportaon system approved by voters through Proposion 400 Draſt Environmental Impact Statement (DEIS) released Final Environmental Impact Statement (FEIS) and Errata released Record of Decision (ROD) issued 2015 South Mountain Freeway Project History Timeline

Upload: others

Post on 22-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project History Timeline - Loop 202 (South Mountain ... · South Mountain Freeway Project History Timeline. 1980 1990 2000 2010 1985 1983 1988 1996 2001 2004 2013 2014 Es presentada

1980 1990 2000 2010

1985

1983 1988

1996

2001

2004

2013

2014

Introduced as the “Southwest Loop

Highway”

Part of the freeway system approved by voters

through Proposition 300

State-level Environmental assessment and Design Concept Report completed and route approved by the State Transporation Board

Construction delayed due to funding shortage

during Proposition 300 timeframe

ADOT initiates federal- level Environmental Impact Statement and Design Concept Report

Part of multimodal transportation system approved by voters through Proposition 400

Draft Environmental Impact Statement (DEIS) released

Final Environmental Impact Statement (FEIS) and Errata released

Record of Decision (ROD) issued

2015

South Mountain Freeway Project History Timeline

Page 2: Project History Timeline - Loop 202 (South Mountain ... · South Mountain Freeway Project History Timeline. 1980 1990 2000 2010 1985 1983 1988 1996 2001 2004 2013 2014 Es presentada

1980 1990 2000 2010

1985

1983 1988

1996

2001

2004

2013

2014

Es presentada como la autopista

“Southwest Loop Highway”

Parte del sistema de autopistas es aprobado

por los votantes a través de la Proposición 300

Se completan la Evaluación Medioambiental a Nivel Estatal y el Reporte del Concepto del Diseño y la Mesa Directiva de Transporte del Estado aprueba la ruta

Se retrasa la construcción debido a la escasez de

financiación durante el marco de tiempo de la

Proposición 300

ADOT inicia la Declaración del Impacto Medioambiental y el Reporte del Concepto del Diseño a nivel federal

Parte del sistema de transporte multimodal es aprobado por los votantes a través de la Proposición 400

Se publica el Borrador de la Declaración del Impacto Medioambiental (DEIS por sus siglas en inglés)

Se publica la Declaración del Impacto Medioambiental Final (FEIS por sus siglas en inglés) y la Fe de Erratas

Se emite el Registro de la Decisión (ROD por sus siglas en inglés)

2015

Cronología de la Historia del Proyecto de la Autopista South Mountain Freeway