project execution planning for building information modeling progress meeting #3 – august 26 th,...
TRANSCRIPT
![Page 1: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/1.jpg)
Project Execution Planning for Building Information ModelingProject Execution Planning for Building Information Modeling
Progress Meeting #3 – August 26th, 2008Progress Meeting #3 – August 26th, 2008
A buildingSMART Alliance project sponsored by:• The Charles Pankow Foundation• Construction Industry Institute (CII)• Penn State Office of Physical Plant (OPP)• PACE
![Page 2: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/2.jpg)
Conference Call AgendaConference Call Agenda
1. Introductions2. Progress Report3. Discussion of Project and Progress4. Set Up Next Meeting Time
![Page 3: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/3.jpg)
Team MembersTeam Members
•Board of Advisory•Deke Smith – Executive Director of buildingSMART Alliance (Industry Champion)•Victor Sanvido – Ph.D., Senior Vice President, Southland Industries•Francois Grobler – Ph.D., US Army CERL and IAI - North America•Steve Hagan – Project Knowledge Center, U.S. General Services Administration•Soad Kousheshi – President, AEC Strategy•Ed Gannon – Manager of Design Services, Penn State Office of Physical Plant•Mark Falzarano – Barton Malow Company•Mark Butler – HDR
• CIC Research Program Team Members• John Messner – Director of the CIC Research Program•Chimay Anumba – Professor and Head of Architectural Engineering•Sam Hunter – Assist. Professor of Psychology•Craig Dubler – PhD Student, Architectural Engineering (Construction)•Colleen Kasprzak – MS Student, Architectural Engineering (Operations)•Chitwan Saluja – MS Student, Architectural Engineering (Planning)•Nevena Zikic – MS Student, Architectural Engineering (Design)•Shane Goodman – BAE/MAE Student, Architectural Engineering
• Sponsor Represenatives•Bob Tener – Director, The Charles Pankow Foundation •Steve Thomas – Director of Research, The Construction Industry Institute
![Page 4: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/4.jpg)
Progress ReportProgress Report
• Continuing to develop initial concept for BIM Execution Planning Process.
• Interview process underway.• Content analysis performed on completed interviews.• Developed initial BIM goals for BIM Execution Planning
course for fall 2008, started today.
![Page 5: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/5.jpg)
Decision Matrix
Project Characteristics + BIM Objectives
Guide for Implementation
BIM Goals
BIM Execution Planning
Decision SupportTool
![Page 6: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/6.jpg)
Decision MatrixDecision Matrix
• Based on project characteristics:• Product/Building
• Is the building MEP intensive?• Organization
• Does the company have appropriate experience?• Does the company have the appropriate tools?
• Process• Is the project fast tracked?• Is the project cost driven?
• Environment• What are the local codes?• What are the critical access points?
• Commitment/Contract• What is the project delivery system?
• This information can also be used for a BIM project rating system.
![Page 7: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/7.jpg)
What’s NextWhat’s Next
• Continual Development of Guide Process• Interviews – complete list of uses• Case Study Visits• BIM Ex Course – AE 597G
• Research and Document BIM Goals• Case Study Review
![Page 8: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/8.jpg)
DiscussionDiscussion
Ways that you can help us:• Feedback• Interviewees• Case Studies• Class Presentations• Projects to test drive BIM Execution Plan Process
![Page 9: Project Execution Planning for Building Information Modeling Progress Meeting #3 – August 26 th, 2008 A buildingSMART Alliance project sponsored by: The](https://reader036.vdocuments.us/reader036/viewer/2022072014/56649ea75503460f94baa889/html5/thumbnails/9.jpg)
Thank YouThank You
Next Meeting Time?