Project Execution Plan for High Rise Building Details how the construction will be executed, monitored and controlled.
YouTube Link https://youtu.be/_gikBOisPH8
David
H M
olo
ne
y
17
th J
uly
20
16
Brief Description
The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct a high-rise building.
This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge. Can be use to demonstrate entitlement for delays and additional payment.
Project Execution Plan (PEP) details how a project will be executed, monitored and controlled. High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)
This Presentation is innovative and has many beneficial uses.
![Page 2: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/2.jpg)
Table of Contents
![Page 3: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/3.jpg)
Floor Construction
Observation Deck on Floor 124
![Page 4: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/4.jpg)
Floor Construction Cycle Time
![Page 5: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/5.jpg)
Floor Construction Cycle timeG
en
era
l It
em
s
Formwork Quantities
Column formwork = ½ set (50%)
Core wall formwork = 1 set (100%)
Slab formwork = 2 sets (200%) Table forms
Formwork types
Columns - Crane handled units
Core Walls - self climbing floor to floor
Slabs Formwork & Falsework – Table forms Crane handled
Cycle Time
7 working days cycle per floor
Programme
Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7
Columns Rebar, Shutter
& Pour 50%
Rebar, Shutter &
Pour 50%
Strip shutters
Walls Pour walls Climb up Fix Rebar Fix shutters
Floor Strike & Move
Forms
Slab
Formwork
Rebar MEP
Slab
Formwork
Rebar MEP
Slab
Formwork
Rebar MEP
Slab
Formwork
Rebar MEP
Pour slab
100%
![Page 6: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/6.jpg)
Floor Construction Overview
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 7: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/7.jpg)
Floor Construction Formwork Types
![Page 8: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/8.jpg)
Shuttering to ColumnsG
en
era
l It
em
s
Brief Description
Column formwork can be moved with only one crane lift complete with push-pull props and concreting platform with guard rails and ladder – alternatively moved by hand using transportation wheels. QUATTRO system by Peri
![Page 9: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/9.jpg)
Shuttering – Columns
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 10: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/10.jpg)
Shuttering to Core ( Lifts & Stairs)G
en
era
l It
em
s
Brief Description
Automatic climbing formwork system
lifts itself upwards on rails bolted to
the walls using hydraulic jacks
Doka Xclimb 60
![Page 11: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/11.jpg)
ⓒ David H Moloney
Ge
ne
ral It
em
s
Shuttering to Core ( Lifts & Stairs)
![Page 12: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/12.jpg)
Shuttering Self Climbing for CoreC
on
cre
te
Cycle Time 4 Days
![Page 13: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/13.jpg)
Shuttering to Floor Slabs – Table formsG
en
era
l It
em
s
Brief Description
Table forms are preassembled formwork and false units and are moved horizontally on wheels or a trolley and vertically from floor to floor by crane or by a lift fixed to the outside of the building
![Page 14: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/14.jpg)
Shuttering to Floor Slabs – Table formsG
en
era
l It
em
s
Leapfrog table forms
![Page 15: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/15.jpg)
Shuttering – Floor Slabs
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 16: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/16.jpg)
Shuttering – StairsG
en
era
l It
em
s
![Page 17: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/17.jpg)
Shuttering – Stairs
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 18: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/18.jpg)
Dubai High Rise Buildings
ⓒ David H Moloney
![Page 19: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/19.jpg)
Main Equipment
![Page 20: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/20.jpg)
Climbing Tower Cranes
Brief Description
A climbing tower crane lifts itself up using a climbing
attachment with hydraulic jacks that surrounds the mast.
The climbing attachment lifts itself up off the erected mast
and inserts a new mast section.
Ge
ne
ral It
em
s
![Page 21: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/21.jpg)
Climbing Tower CranesM
isce
llan
eo
us
![Page 22: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/22.jpg)
Climbing Tower Cranes – Tie-in AssemblyM
isce
llan
eo
us
![Page 23: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/23.jpg)
Concrete Pump – Self ClimbingG
en
era
l It
em
s
Brief Description
The concrete is pumped by a diesel powered, static concrete pump, through a fixed 125 mm pipeline, to the folding placing boom. The boom is mounted on a steel column of up to 20 metres high. The column is supported by a cross base or a system of floor frames set into the concrete floors.With floor frames , the whole column / boom assembly can climb with the building as the work progresses. For placing concrete pumping is faster than using a crane and skip and is less likely to be adversely affected by high winds.
![Page 24: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/24.jpg)
Concrete PumpM
isce
llan
eo
us
![Page 25: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/25.jpg)
Protection Screen - Self climbingG
en
era
l It
em
s
Brief Description
Protection screens enclose the top floors of a high rise enabling construction work to be carry out in great safety, and protected from the weather.
The screen will contain any debris and tools that would otherwise fall to the surface.
The Protection screen can be moved upwards hydraulically or using a tower crane.
![Page 26: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/26.jpg)
Ensuring VerticalityG
en
era
l It
em
s
Brief Description
Leave 3 holes in the floor, forming a right angle. Use a laser plumb bob and a transparent sheet on the floors above. "Jump" the laser every 5 or 6 floors.
![Page 27: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/27.jpg)
Platforms, Chutes & LiftsG
en
era
l It
em
s
![Page 28: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/28.jpg)
ⓒ David H Moloney
Ge
ne
ral It
em
s
Platforms, Chutes & Lifts
![Page 29: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/29.jpg)
General Items
![Page 30: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/30.jpg)
Contractor’s Temporary Site Facilities
ⓒ David H Moloney
Ge
ne
ral It
em
s
Brief Description
Contractors Site facilities comprise:Offices, Canteens, Toilets, Drying Rooms, Stores, Plant Yard, generators and Workshops.
![Page 31: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/31.jpg)
Dewatering
ⓒ David H Moloney
Ge
ne
ral It
em
s
Brief Description
Construction dewatering is the removal or drainage of
groundwater and or surface / rain water usually by
pumping to keep the works dry.
![Page 32: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/32.jpg)
Dewatering
ⓒ David H Moloney
Ge
ne
ral It
em
s
Brief Description
Construction dewatering is the removal or
drainage of groundwater and or surface /
rain water usually by pumping to keep the
works dry.
![Page 33: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/33.jpg)
Dewatering
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 34: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/34.jpg)
Site Hoarding examples
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 35: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/35.jpg)
Temporary Electricity Supply & Tower Lights
ⓒ David H Moloney
Ge
ne
ral It
em
s
![Page 36: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/36.jpg)
Welfare Facilities
ⓒ David H Moloney
Ge
ne
ral It
em
s
Toilets – Washing
Canteen, Drying Room, Toilet & Generator
![Page 37: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/37.jpg)
Safety & Environmental
![Page 38: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/38.jpg)
Emergency Phone Numbers & Response H
ealth,
Safe
ty &
Envir
onm
ent
![Page 39: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/39.jpg)
HSE Monitoring & Reporting - Dashboard Dashboard is a single page, graphical representation of
current HSE statistics and historical trends
Health,
Safe
ty &
Envir
onm
ent
![Page 40: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/40.jpg)
Safety PrecautionsH
ealth,
Safe
ty &
Envir
onm
ent
![Page 41: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/41.jpg)
Signs Examples H
ealth,
Safe
ty &
Envir
onm
ent
![Page 42: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/42.jpg)
Hazardous Substances Symbols H
ealth,
Safe
ty &
Envir
onm
ent
COSHH stands for the Control of Substances Hazardous to Health
Shown are the new hazard symbols
![Page 43: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/43.jpg)
Environmentally Friendly Site Air, Noise, Water & Soil PollutionH
ealth,
Safe
ty &
Envir
onm
ent
![Page 44: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/44.jpg)
Segregation of Waste H
ealth,
Safe
ty &
Envir
onm
ent
Segregation of waste for proper disposal and recycling. Less waste goes to landfill and hazardous waste is treated to make it safe.
Colour Code for Skips & Bins
![Page 45: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/45.jpg)
Water Pollution PreventionH
ealth,
Safe
ty &
Envir
onm
ent
![Page 46: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/46.jpg)
Existing Underground Utilities
ⓒ David H Moloney
Brief Description
Before digging establish the
location and route of
underground utilities.
Locator to find Utilities
Spray Paint to mark pavement
Health,
Safe
ty &
Envir
onm
ent
![Page 47: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/47.jpg)
Existing Underground Utilities & Overhead Cables - Safety Measures
ⓒ David H Moloney
Health,
Safe
ty &
Envir
onm
ent
![Page 48: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/48.jpg)
Trench - Safety Measures H
ealth,
Safe
ty &
Envir
onm
ent
![Page 49: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/49.jpg)
Trench - Safety Measures
ⓒ David H Moloney
Health,
Safe
ty &
Envir
onm
ent
![Page 50: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/50.jpg)
Earthworks
![Page 51: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/51.jpg)
Excavate & Load, Cart, Tip & Return
Brief Description
Cycle Time for 7km haulage distance using an Excavator 45 tonne weight and Dumper with a 40 tonne capacity, the cycle time is 34 minutes
Ea
rth
wo
rks
7 minutes
14 minutes
3 minutes
14 minutes 7 km
7 km
![Page 52: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/52.jpg)
Excavation for Trench with Stepped FacesE
art
hw
ork
s
![Page 53: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/53.jpg)
Excavation for Trench with Battered FacesE
art
hw
ork
s
![Page 54: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/54.jpg)
Concrete
![Page 55: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/55.jpg)
Concrete Full Scale Trial Castings of Pier
ⓒ David H Moloney
Brief Description
The full-scale trial casting(s) shall
demonstrate/document that all
requirements to the concrete and the
execution of the work are fulfilled
simultaneously using the actual
methods and performed by personnel as
for the future production.
Co
ncre
te
BIM 3D Model Shutter Fibreglass
![Page 56: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/56.jpg)
Concrete Batching Plant David H Moloney
ⓒ David H Moloney
Brief Description
Concrete batching plant comprises -
concrete mixer, control cabin, silos for
cement and fly ash, aggregate bins and
conveyor belt system to feed the mixer.
Also aggregate storage bays and water
storage tanks.
Co
ncre
te
![Page 57: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/57.jpg)
Concrete Batching Plant
ⓒ David H Moloney
Co
ncre
te
![Page 58: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/58.jpg)
Concrete Batching Plant 3Nr.
ⓒ David H Moloney
Co
ncre
te
![Page 59: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/59.jpg)
Concrete Batching Plant - Liebherr Betomix AnimationC
on
cre
te
![Page 60: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/60.jpg)
Concrete Batching Plant David H Moloney
ⓒ David H Moloney
Brief Description
.
The mixing is computer controlled
and has a dynamic screen display,
showing the process. The material
storage capacity is, to match two
days concrete production.
Co
ncre
te
![Page 61: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/61.jpg)
Concrete Batching Plant – Computer Controlled
ⓒ David H Moloney
Co
ncre
te
![Page 62: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/62.jpg)
Concrete Mix Proportions per Cu M
Brief Description
.
Details of Mix for C40
1. Concrete Grade C40
2. Cement Type = OPC
3. Slump =125mm
4. Max size aggregate = 20mm5. Max water / Cementitious ration =0.42
Co
ncre
te
Materials Qty Units
Cement 310 Kgs
Fly ash 100 Kgs
Micro-silica 12 Kgs
Washed Sand 670 Kgs
Fine Sand 106 Kgs
10mm Crushed aggregate 400 Kgs
20mm Crushed aggregates 725 Kgs
Water 145 Ltr.
Additive Rheobuild 7.5 Ltr.
Early age strength concrete is required for quick floor cycle time
![Page 63: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/63.jpg)
Reinforcement Cutting & Bending Yard
ⓒ David H Moloney
Co
ncre
te
Brief Description
Reinforcement in 12 m lengths. Delivery in 3 ton Bundles
![Page 64: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/64.jpg)
Reinforcement Cutting & Bending
ⓒ David H Moloney
Co
ncre
te
![Page 65: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/65.jpg)
Reinforcement Cutting & Bending
ⓒ David H Moloney
Co
ncre
te
![Page 66: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/66.jpg)
Reinforcement Cutting & Bending Yard David H Moloney
ⓒ David H Moloney
Reinforcement in 12 m lengths. Delivery in 3 ton Bundles Reinforcement cut to length by Shearing Machine
Reinforcement Bent to Shape by Bending Machine Reinforcement that is cut and bent is Bundled for delivery to work site
Co
ncre
te
![Page 67: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/67.jpg)
Reinforced Wall Construction Sequence
ⓒ David H Moloney
Co
ncre
te
Brief Description
The sequence to construct a reinforced concrete wall is as
follows:
Tie the reinforcement.
Erect stop-ends and the wall shutters.
Pour and vibrate the concrete mix.
Remove the shutters after the concrete has hardened.
.
Cycle Time Pour per Day
![Page 68: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/68.jpg)
Reinforced Wall Construction Sequence
ⓒ David H Moloney
Co
ncre
te
![Page 69: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/69.jpg)
Vibrating Concrete
ⓒ David H Moloney
Co
ncre
te
![Page 70: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/70.jpg)
Piling
![Page 71: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/71.jpg)
Piling Construction - Plant & Methods
Brief Description
Piling Plant, Equipment and Material;
Crawler Crane, Piling Hammer, Temporary Casing,
Piling Rig, Concrete Pump, Concrete Mixer Trucks,
Tremie Pipe and Reinforcement Cage
Pili
ng
![Page 72: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/72.jpg)
Piling Construction - Plant, Methods & SequenceP
ilin
g
![Page 73: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/73.jpg)
Piling Construction - Plant & MethodsP
ilin
g
![Page 74: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/74.jpg)
Piling Construction - Vertical PilesP
ilin
g
![Page 75: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/75.jpg)
Pile Load Test
ⓒ David H Moloney
Pili
ng
Brief Description
A jack is used to load the pile in steps and
gauges measure any settlement.
![Page 76: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/76.jpg)
Pile Load Test
ⓒ David H Moloney
Pili
ng
![Page 77: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/77.jpg)
Progress Monitoring & Administration
![Page 78: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/78.jpg)
Progress Monthly, Monitoring & Reporting - DashboardDashboard is a single page, graphical representation of current
progress and historical trends
![Page 79: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/79.jpg)
Histogram Charts for Resources & Outputs
Manpower per Discipline
Concrete per Location
Man-hours for each month of the Project
Quantity for each month of the Project
ⓒ David H Moloney
Brief Description
Histograms shows resources etc. for each month of a project.
![Page 80: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/80.jpg)
Plant & Equipment List & Worker’s Job Titles
ⓒ David H Moloney
![Page 81: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/81.jpg)
Daily Work Record
Brief Description
Daily Work Records showing the
allocation of resources, materials and
work activities carried out daily.
![Page 82: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/82.jpg)
Organogram
Brief Description
Shown are the line and
lateral relationships
between the various team
members and their relative
position in the site
organisation.
![Page 83: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/83.jpg)
Staff Directory
Brief Description
List of staff and their
contact details
![Page 84: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/84.jpg)
Quality Assurance
![Page 85: Project Execution Plan for High Rise Building](https://reader034.vdocuments.us/reader034/viewer/2022050622/587059e31a28aba2118b63bb/html5/thumbnails/85.jpg)
Quality Assurance DashboardDashboard is a single page, graphical representation of current
statistics and historical trends