Project Execution Plan for High Rise Building Details how the construction will be executed, monitored and controlled. YouTube Link https://youtu.be/_gikBOisPH8 David H Moloney 17th July 2016 Brief Description The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct a high-rise building. This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge. Can be use to demonstrate entitlement for delays and additional payment. Project Execution Plan (PEP) details how a project will be executed, monitored and controlled. High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD) This Presentation is innovative and has many beneficial uses.

Upload: david-h-moloney

Post on 21-Apr-2017

3.169 views

Category:

Engineering


20 download

TRANSCRIPT

Page 1: Project Execution Plan for High Rise Building

Project Execution Plan for High Rise Building Details how the construction will be executed, monitored and controlled.

YouTube Link https://youtu.be/_gikBOisPH8

David

H M

olo

ne

y

17

th J

uly

20

16

Brief Description

The purpose of this presentation is to give an understanding of the Methods, Plant and Sequence to construct a high-rise building.

This presentation can be used to engage Stakeholders and to get the Site Teams commitment to the programme. Also can be used for Induction Training and as a way to capture and share knowledge. Can be use to demonstrate entitlement for delays and additional payment.

Project Execution Plan (PEP) details how a project will be executed, monitored and controlled. High in Educational Value and easily understood. Recommended for Continuing Professional Development (CPD)

This Presentation is innovative and has many beneficial uses.

Page 2: Project Execution Plan for High Rise Building

Table of Contents

Page 3: Project Execution Plan for High Rise Building

Floor Construction

Observation Deck on Floor 124

Page 4: Project Execution Plan for High Rise Building

Floor Construction Cycle Time

Page 5: Project Execution Plan for High Rise Building

Floor Construction Cycle timeG

en

era

l It

em

s

Formwork Quantities

Column formwork = ½ set (50%)

Core wall formwork = 1 set (100%)

Slab formwork = 2 sets (200%) Table forms

Formwork types

Columns - Crane handled units

Core Walls - self climbing floor to floor

Slabs Formwork & Falsework – Table forms Crane handled

Cycle Time

7 working days cycle per floor

Programme

Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7

Columns Rebar, Shutter

& Pour 50%

Rebar, Shutter &

Pour 50%

Strip shutters

Walls Pour walls Climb up Fix Rebar Fix shutters

Floor Strike & Move

Forms

Slab

Formwork

Rebar MEP

Slab

Formwork

Rebar MEP

Slab

Formwork

Rebar MEP

Slab

Formwork

Rebar MEP

Pour slab

100%

Page 6: Project Execution Plan for High Rise Building

Floor Construction Overview

ⓒ David H Moloney

Ge

ne

ral It

em

s

Page 7: Project Execution Plan for High Rise Building

Floor Construction Formwork Types

Page 8: Project Execution Plan for High Rise Building

Shuttering to ColumnsG

en

era

l It

em

s

Brief Description

Column formwork can be moved with only one crane lift complete with push-pull props and concreting platform with guard rails and ladder – alternatively moved by hand using transportation wheels. QUATTRO system by Peri

Page 9: Project Execution Plan for High Rise Building

Shuttering – Columns

ⓒ David H Moloney

Ge

ne

ral It

em

s

Page 10: Project Execution Plan for High Rise Building

Shuttering to Core ( Lifts & Stairs)G

en

era

l It

em

s

Brief Description

Automatic climbing formwork system

lifts itself upwards on rails bolted to

the walls using hydraulic jacks

Doka Xclimb 60

Page 11: Project Execution Plan for High Rise Building

ⓒ David H Moloney

Ge

ne

ral It

em

s

Shuttering to Core ( Lifts & Stairs)

Page 12: Project Execution Plan for High Rise Building

Shuttering Self Climbing for CoreC

on

cre

te

Cycle Time 4 Days

Page 13: Project Execution Plan for High Rise Building

Shuttering to Floor Slabs – Table formsG

en

era

l It

em

s

Brief Description

Table forms are preassembled formwork and false units and are moved horizontally on wheels or a trolley and vertically from floor to floor by crane or by a lift fixed to the outside of the building

Page 14: Project Execution Plan for High Rise Building

Shuttering to Floor Slabs – Table formsG

en

era

l It

em

s

Leapfrog table forms

Page 15: Project Execution Plan for High Rise Building

Shuttering – Floor Slabs

ⓒ David H Moloney

Ge

ne

ral It

em

s

Page 16: Project Execution Plan for High Rise Building

Shuttering – StairsG

en

era

l It

em

s

Page 17: Project Execution Plan for High Rise Building

Shuttering – Stairs

ⓒ David H Moloney

Ge

ne

ral It

em

s

Page 18: Project Execution Plan for High Rise Building

Dubai High Rise Buildings

ⓒ David H Moloney

Page 19: Project Execution Plan for High Rise Building

Main Equipment

Page 20: Project Execution Plan for High Rise Building

Climbing Tower Cranes

Brief Description

A climbing tower crane lifts itself up using a climbing

attachment with hydraulic jacks that surrounds the mast.

The climbing attachment lifts itself up off the erected mast

and inserts a new mast section.

Ge

ne

ral It

em

s

Page 21: Project Execution Plan for High Rise Building

Climbing Tower CranesM

isce

llan

eo

us

Page 22: Project Execution Plan for High Rise Building

Climbing Tower Cranes – Tie-in AssemblyM

isce

llan

eo

us

Page 23: Project Execution Plan for High Rise Building

Concrete Pump – Self ClimbingG

en

era

l It

em

s

Brief Description

The concrete is pumped by a diesel powered, static concrete pump, through a fixed 125 mm pipeline, to the folding placing boom. The boom is mounted on a steel column of up to 20 metres high. The column is supported by a cross base or a system of floor frames set into the concrete floors.With floor frames , the whole column / boom assembly can climb with the building as the work progresses. For placing concrete pumping is faster than using a crane and skip and is less likely to be adversely affected by high winds.

Page 24: Project Execution Plan for High Rise Building

Concrete PumpM

isce

llan

eo

us

Page 25: Project Execution Plan for High Rise Building

Protection Screen - Self climbingG

en

era

l It

em

s

Brief Description

Protection screens enclose the top floors of a high rise enabling construction work to be carry out in great safety, and protected from the weather.

The screen will contain any debris and tools that would otherwise fall to the surface.

The Protection screen can be moved upwards hydraulically or using a tower crane.

Page 26: Project Execution Plan for High Rise Building

Ensuring VerticalityG

en

era

l It

em

s

Brief Description

Leave 3 holes in the floor, forming a right angle. Use a laser plumb bob and a transparent sheet on the floors above. "Jump" the laser every 5 or 6 floors.

Page 27: Project Execution Plan for High Rise Building

Platforms, Chutes & LiftsG

en

era

l It

em

s

Page 28: Project Execution Plan for High Rise Building

ⓒ David H Moloney

Ge

ne

ral It

em

s

Platforms, Chutes & Lifts

Page 29: Project Execution Plan for High Rise Building

General Items

Page 30: Project Execution Plan for High Rise Building

Contractor’s Temporary Site Facilities

ⓒ David H Moloney

Ge

ne

ral It

em

s

Brief Description

Contractors Site facilities comprise:Offices, Canteens, Toilets, Drying Rooms, Stores, Plant Yard, generators and Workshops.

Page 31: Project Execution Plan for High Rise Building

Dewatering

ⓒ David H Moloney

Ge

ne

ral It

em

s

Brief Description

Construction dewatering is the removal or drainage of

groundwater and or surface / rain water usually by

pumping to keep the works dry.

Page 32: Project Execution Plan for High Rise Building

Dewatering

ⓒ David H Moloney

Ge

ne

ral It

em

s

Brief Description

Construction dewatering is the removal or

drainage of groundwater and or surface /

rain water usually by pumping to keep the

works dry.

Page 33: Project Execution Plan for High Rise Building

Dewatering

ⓒ David H Moloney

Ge

ne

ral It

em

s

Page 34: Project Execution Plan for High Rise Building

Site Hoarding examples

ⓒ David H Moloney

Ge

ne

ral It

em

s

Page 35: Project Execution Plan for High Rise Building

Temporary Electricity Supply & Tower Lights

ⓒ David H Moloney

Ge

ne

ral It

em

s

Page 36: Project Execution Plan for High Rise Building

Welfare Facilities

ⓒ David H Moloney

Ge

ne

ral It

em

s

Toilets – Washing

Canteen, Drying Room, Toilet & Generator

Page 37: Project Execution Plan for High Rise Building

Safety & Environmental

Page 38: Project Execution Plan for High Rise Building

Emergency Phone Numbers & Response H

ealth,

Safe

ty &

Envir

onm

ent

Page 39: Project Execution Plan for High Rise Building

HSE Monitoring & Reporting - Dashboard Dashboard is a single page, graphical representation of

current HSE statistics and historical trends

Health,

Safe

ty &

Envir

onm

ent

Page 40: Project Execution Plan for High Rise Building

Safety PrecautionsH

ealth,

Safe

ty &

Envir

onm

ent

Page 41: Project Execution Plan for High Rise Building

Signs Examples H

ealth,

Safe

ty &

Envir

onm

ent

Page 42: Project Execution Plan for High Rise Building

Hazardous Substances Symbols H

ealth,

Safe

ty &

Envir

onm

ent

COSHH stands for the Control of Substances Hazardous to Health

Shown are the new hazard symbols

Page 43: Project Execution Plan for High Rise Building

Environmentally Friendly Site Air, Noise, Water & Soil PollutionH

ealth,

Safe

ty &

Envir

onm

ent

Page 44: Project Execution Plan for High Rise Building

Segregation of Waste H

ealth,

Safe

ty &

Envir

onm

ent

Segregation of waste for proper disposal and recycling. Less waste goes to landfill and hazardous waste is treated to make it safe.

Colour Code for Skips & Bins

Page 45: Project Execution Plan for High Rise Building

Water Pollution PreventionH

ealth,

Safe

ty &

Envir

onm

ent

Page 46: Project Execution Plan for High Rise Building

Existing Underground Utilities

ⓒ David H Moloney

Brief Description

Before digging establish the

location and route of

underground utilities.

Locator to find Utilities

Spray Paint to mark pavement

Health,

Safe

ty &

Envir

onm

ent

Page 47: Project Execution Plan for High Rise Building

Existing Underground Utilities & Overhead Cables - Safety Measures

ⓒ David H Moloney

Health,

Safe

ty &

Envir

onm

ent

Page 48: Project Execution Plan for High Rise Building

Trench - Safety Measures H

ealth,

Safe

ty &

Envir

onm

ent

Page 49: Project Execution Plan for High Rise Building

Trench - Safety Measures

ⓒ David H Moloney

Health,

Safe

ty &

Envir

onm

ent

Page 50: Project Execution Plan for High Rise Building

Earthworks

Page 51: Project Execution Plan for High Rise Building

Excavate & Load, Cart, Tip & Return

Brief Description

Cycle Time for 7km haulage distance using an Excavator 45 tonne weight and Dumper with a 40 tonne capacity, the cycle time is 34 minutes

Ea

rth

wo

rks

7 minutes

14 minutes

3 minutes

14 minutes 7 km

7 km

Page 52: Project Execution Plan for High Rise Building

Excavation for Trench with Stepped FacesE

art

hw

ork

s

Page 53: Project Execution Plan for High Rise Building

Excavation for Trench with Battered FacesE

art

hw

ork

s

Page 54: Project Execution Plan for High Rise Building

Concrete

Page 55: Project Execution Plan for High Rise Building

Concrete Full Scale Trial Castings of Pier

ⓒ David H Moloney

Brief Description

The full-scale trial casting(s) shall

demonstrate/document that all

requirements to the concrete and the

execution of the work are fulfilled

simultaneously using the actual

methods and performed by personnel as

for the future production.

Co

ncre

te

BIM 3D Model Shutter Fibreglass

Page 56: Project Execution Plan for High Rise Building

Concrete Batching Plant David H Moloney

ⓒ David H Moloney

Brief Description

Concrete batching plant comprises -

concrete mixer, control cabin, silos for

cement and fly ash, aggregate bins and

conveyor belt system to feed the mixer.

Also aggregate storage bays and water

storage tanks.

Co

ncre

te

Page 57: Project Execution Plan for High Rise Building

Concrete Batching Plant

ⓒ David H Moloney

Co

ncre

te

Page 58: Project Execution Plan for High Rise Building

Concrete Batching Plant 3Nr.

ⓒ David H Moloney

Co

ncre

te

Page 59: Project Execution Plan for High Rise Building

Concrete Batching Plant - Liebherr Betomix AnimationC

on

cre

te

Page 60: Project Execution Plan for High Rise Building

Concrete Batching Plant David H Moloney

ⓒ David H Moloney

Brief Description

.

The mixing is computer controlled

and has a dynamic screen display,

showing the process. The material

storage capacity is, to match two

days concrete production.

Co

ncre

te

Page 61: Project Execution Plan for High Rise Building

Concrete Batching Plant – Computer Controlled

ⓒ David H Moloney

Co

ncre

te

Page 62: Project Execution Plan for High Rise Building

Concrete Mix Proportions per Cu M

Brief Description

.

Details of Mix for C40

1. Concrete Grade C40

2. Cement Type = OPC

3. Slump =125mm

4. Max size aggregate = 20mm5. Max water / Cementitious ration =0.42

Co

ncre

te

Materials Qty Units

Cement 310 Kgs

Fly ash 100 Kgs

Micro-silica 12 Kgs

Washed Sand 670 Kgs

Fine Sand 106 Kgs

10mm Crushed aggregate 400 Kgs

20mm Crushed aggregates 725 Kgs

Water 145 Ltr.

Additive Rheobuild 7.5 Ltr.

Early age strength concrete is required for quick floor cycle time

Page 63: Project Execution Plan for High Rise Building

Reinforcement Cutting & Bending Yard

ⓒ David H Moloney

Co

ncre

te

Brief Description

Reinforcement in 12 m lengths. Delivery in 3 ton Bundles

Page 64: Project Execution Plan for High Rise Building

Reinforcement Cutting & Bending

ⓒ David H Moloney

Co

ncre

te

Page 65: Project Execution Plan for High Rise Building

Reinforcement Cutting & Bending

ⓒ David H Moloney

Co

ncre

te

Page 66: Project Execution Plan for High Rise Building

Reinforcement Cutting & Bending Yard David H Moloney

ⓒ David H Moloney

Reinforcement in 12 m lengths. Delivery in 3 ton Bundles Reinforcement cut to length by Shearing Machine

Reinforcement Bent to Shape by Bending Machine Reinforcement that is cut and bent is Bundled for delivery to work site

Co

ncre

te

Page 67: Project Execution Plan for High Rise Building

Reinforced Wall Construction Sequence

ⓒ David H Moloney

Co

ncre

te

Brief Description

The sequence to construct a reinforced concrete wall is as

follows:

Tie the reinforcement.

Erect stop-ends and the wall shutters.

Pour and vibrate the concrete mix.

Remove the shutters after the concrete has hardened.

.

Cycle Time Pour per Day

Page 68: Project Execution Plan for High Rise Building

Reinforced Wall Construction Sequence

ⓒ David H Moloney

Co

ncre

te

Page 69: Project Execution Plan for High Rise Building

Vibrating Concrete

ⓒ David H Moloney

Co

ncre

te

Page 70: Project Execution Plan for High Rise Building

Piling

Page 71: Project Execution Plan for High Rise Building

Piling Construction - Plant & Methods

Brief Description

Piling Plant, Equipment and Material;

Crawler Crane, Piling Hammer, Temporary Casing,

Piling Rig, Concrete Pump, Concrete Mixer Trucks,

Tremie Pipe and Reinforcement Cage

Pili

ng

Page 72: Project Execution Plan for High Rise Building

Piling Construction - Plant, Methods & SequenceP

ilin

g

Page 73: Project Execution Plan for High Rise Building

Piling Construction - Plant & MethodsP

ilin

g

Page 74: Project Execution Plan for High Rise Building

Piling Construction - Vertical PilesP

ilin

g

Page 75: Project Execution Plan for High Rise Building

Pile Load Test

ⓒ David H Moloney

Pili

ng

Brief Description

A jack is used to load the pile in steps and

gauges measure any settlement.

Page 76: Project Execution Plan for High Rise Building

Pile Load Test

ⓒ David H Moloney

Pili

ng

Page 77: Project Execution Plan for High Rise Building

Progress Monitoring & Administration

Page 78: Project Execution Plan for High Rise Building

Progress Monthly, Monitoring & Reporting - DashboardDashboard is a single page, graphical representation of current

progress and historical trends

Page 79: Project Execution Plan for High Rise Building

Histogram Charts for Resources & Outputs

Manpower per Discipline

Concrete per Location

Man-hours for each month of the Project

Quantity for each month of the Project

ⓒ David H Moloney

Brief Description

Histograms shows resources etc. for each month of a project.

Page 80: Project Execution Plan for High Rise Building

Plant & Equipment List & Worker’s Job Titles

ⓒ David H Moloney

Page 81: Project Execution Plan for High Rise Building

Daily Work Record

Brief Description

Daily Work Records showing the

allocation of resources, materials and

work activities carried out daily.

Page 82: Project Execution Plan for High Rise Building

Organogram

Brief Description

Shown are the line and

lateral relationships

between the various team

members and their relative

position in the site

organisation.

Page 83: Project Execution Plan for High Rise Building

Staff Directory

Brief Description

List of staff and their

contact details

Page 84: Project Execution Plan for High Rise Building

Quality Assurance

Page 85: Project Execution Plan for High Rise Building

Quality Assurance DashboardDashboard is a single page, graphical representation of current

statistics and historical trends

Page 86: Project Execution Plan for High Rise Building

Production by David H Moloney

My YouTube Channel link: https://www.youtube.com/channel/UCeJR9J7svhBd-C0ZoAH2fhQ