Florida Department of Environmental Protection FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM PROJECT COMPLETION CERTIFICATION Required Signatures: Adobe Signature Project Sponsor: _________________________________ Project Number: _________________________ Project Name: _____________________________________________________________________________ A list identifying the quantity and type of primary outdoor recreation areas and facilities and support facilities and the actual costs for each item built. (50% of the total costs must be in primary facilities) Primary Facilities/Areas Actual Cost Support Facilities/Areas Actual Cost DRP-112 (Effective 06-12-2015) Page 1 of 2

Upload: others

Post on 24-May-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Project Completion Certification - Florida Department of ... COMPLETION... · Project Completion Certification Keywords: Project Completion Certification Created Date: 6/9/2015 2:26:34

Florida Department of Environmental Protection

FLORIDA RECREATION DEVELOPMENT ASSISTANCE PROGRAM PROJECT COMPLETION CERTIFICATION

Required Signatures: Adobe Signature

Project Sponsor: _________________________________ Project Number: _________________________

Project Name: _____________________________________________________________________________

A list identifying the quantity and type of primary outdoor recreation areas and facilities and support facilities and the actual costs for each item built. (50% of the total costs must be in primary facilities)

Primary Facilities/Areas Actual Cost

Support Facilities/Areas Actual Cost

DRP-112 (Effective 06-12-2015) Page 1 of 2

Page 2: Project Completion Certification - Florida Department of ... COMPLETION... · Project Completion Certification Keywords: Project Completion Certification Created Date: 6/9/2015 2:26:34

TOTAL PROJECT COST $____________________________

I hereby certify that the above mentioned project construction or acquisition has been completed in accordance with the Project Agreement executed between ______________________________________and the Florida Department of Environmental Protection dated ___________________________; that all funds allocated for the project were expanded pursuant to the Project Agreement; that all goods and services for accomplishment of the project were negotiated and procured in accordance with applicable law and funding program requirements; that all project acquisition or construction was completed on _________________________________which was on or prior to the acquisition or construction completion date specified in the Project Agreement; and that the project was completed in accordance with the final project plans (site, architectural, engineering) prepared for the project; that all required local, state and federal environmental permits and approvals were obtained; and that the project is open and accessible to the general public for use.

Signed: _____________________________________ Signed: _____________________________________ (Liaison Agent) (Project Architect or Engineer)

Date: _______________________________________ Date: _______________________________________

DRP-112 (Effective 06-12-2015) Page 2 of 2