project closing report

15
AP PROJECTS PROJECT CLOSING REPORT 1 ROXTON-GROWELS MALL KANDIWALI

Upload: tsonu999

Post on 16-Jun-2015

595 views

Category:

Documents


1 download

DESCRIPTION

INTERIOR PROJECT COMPLETION FOR ROXTONIN GROWELS MALL-KANDIWALI MUMBAI

TRANSCRIPT

Page 1: Project Closing Report

1

AP PROJECTS

PROJECT CLOSING REPORT

ROXTON-GROWELS MALL KANDIWALI

Page 2: Project Closing Report

2

GROWELS-KANDIWALI

ROXTON-GROWELS MALL KANDIWALI

Page 3: Project Closing Report

3

CONTENTS PAGE NO.

INTRODUCTION 3

PROJECT TEAM 4

STORE LAYOUT 5

BEFORE AND AFTER 6

FINISHED STORE INTERNALLY AND EXTERNALLY 10

PROJECT PLANNING 11

PROJECT DIARY 13

ROXTON-GROWELS MALL KANDIWALI

Page 4: Project Closing Report

4

INTRODUCTION

ADDRESSROXTON FIRST FLOORGROWELS MALLAKRUTI ROADWESTERN EXPRESS HIGHWAYKANDIWALI EASTMUMBAI-400101

ROXTON-GROWELS MALL KANDIWALI

ROXTON IS OFFERING CASUAL BRANDS INTO MENS WEAR.ROXTON IS SISTER CONCERN OF RAJHANS EXPORTS WHICH IS THIRD BEST TR IMPORTERS.ROXTON PROMISES HUNDRED PLUS RETAIL OUTLETS ACROSS THE COUNTRY BY 2011.ROXTON HAS ALREADY MADE ITS PRESENCE IN CITIES LIKE DELHI,MUMBAI.CHHATTISGARH,HARIYANA & PUNJABTHE STORE HAS CUSTOMER SERVICE DESK TO HELP CUSTOMER WITH ITS RELATED SERVICES

Page 5: Project Closing Report

5

PROJECT HEAD MR. ARVIND PUROHIT

PROJECT MANAGER-SURESH TIWARI

INTERIOR DESIGNER-MR. SHAHZAD

SITE ENGG. MR. JITENDRA PRAJAPATI

MR. AMIT BHHOSLE

& SITE EXECUTION TEAM

PROJECT TEAM

ROXTON-GROWELS MALL KANDIWALI

Page 6: Project Closing Report

6

STORE LAYOUT

ROXTON-GROWELS MALL KANDIWALI

Page 7: Project Closing Report

7

BEFORE AND AFTER

ROXTON-GROWELS MALL KANDIWALI

Page 8: Project Closing Report

8

BEFORE AND AFTER

ROXTON-GROWELS MALL KANDIWALI

Page 9: Project Closing Report

9

BEFORE AND AFTER

ROXTON-GROWELS MALL KANDIWALI

Page 10: Project Closing Report

10

FINISHED STORE

ROXTON-GROWELS MALL KANDIWALI

Page 11: Project Closing Report

11

FINISHED STORE

ROXTON-GROWELS MALL KANDIWALI

Page 12: Project Closing Report

12

PROJECT PLANNING

CUSTOMER SATISFACTION

TIME MANAGMENT

PLANING

ROXTON-GROWELS MALL KANDIWALI

Page 13: Project Closing Report

13

BAR CHART

ROXTON-GROWELS MALL KANDIWALI

23/8 24/8 25/8 26/8 27/8 28/8 29/8 30/8 31/8 1|9

Material N Tool

Manpower

AP.O.P & CIVIL WORK PLAN

PLASTERING

B.O.Q.

CIVIL1,CIVIL2

TILINGB.O.

CIVIL1,CI

1 ACTUAL

Marking as per dwg, PLAN

Line

P.O.P.(PE1,P

2 ACTUAL

Griding PLAN

B.O.Q.

PE1,PH1,PH2

3 ACTUAL

Fixing of Gypsum sheet as per dwgPLAN

Drill m

PE1,PH1,PH2

4 ACTUAL

T

ADD.-THANE-RAM MARUTI ROAD

Resourc

Delay due to land lord

Delay due to architect

Delay due to Roxton

Planned activiteis

On schedule

Delay due to contractorCOLOUR CODES

Page 14: Project Closing Report

14

PROJECT DIARY

ROXTON-GROWELS MALL KANDIWALI

Project Diary Ahead w.r.t. Schedule

GROWELS-KANDIWALI On ScheduleDelay w.r.t. Schedule

Date Count down ACTIVITY DAYS

24-10-10MEETING HELD AND INFORMATION IS PASSED ON AT ROXTON OFFICE TO OPEN THE STORE AT

3.30 PM0

INVENTRY IDENTIFICATION IS STARTED JOINTLY BETWEEN ROXTON AND PMC FROM 9.00 PM

TO 10.30 PM

-30

INVENTRY IDENTIFICATION IS CONTINUED TILL 12.00AM MEAN WHILE THE VENDORE FOR FALL

CEILING & PAINTER IS ARRNAGED ,GYPSUM FALL CEILING WORK IS STARTED AT 2.30

PM,PAINTING WORK IS STARTED,AT 8.00 PM ,MEAN WHILE THE CARPENTOR IS ARRANGED

1

21-10-10 -27 3

FALL CEILING REPAIRING IS CONTINUED ,FIRST COAT OF LAMBI ON THE WALLS ARE DRYED BY

1.00 PM,FURNITURE ARE BOUGHTAT 2.30 PM,ELECTRICAL FITTINGS ARE BOUGHT AND

ELECTRICAL & FURNITURE WORK IS STARTED BY 4.00 PM,PRIMER IS STARTED BY 6.00 PM,FALL

CEILING WORK IS COMPLETED BY 8.00 PM,FIRST COAT PAINTING IS DONE BY 11.30 PM

23-10-10 -29

222-10-10 -28

SECOND COAT PAINTING IS DONE BY 4.00 AM,AND PRIMAR IS DONE ON TRIAL ROOM &

STORE ROOMS BY 70.00 AM,TRIAL ROOM AND STORE ROOMS ARE MADE BY 6.00

AM,ELECTRICALL 75% OF ELECTRICAL WORK IS DONE BY 7.00 AM,VINYL FLOORING IS STARTED

BY 2.30 PM,FACED IS ERECTED BY 5.00 PM,ELECTRICAL WORK IS COMPLETED BY 6.30

PM,FURNITURE IS COMPLETED BY 7.00 PM,PAINTING IS DONE BY 8.30 PM

Page 15: Project Closing Report

ROXTON-GROWEL MALL-KANDIWALI

CARPENTARY

ELECTRICAL

POP

PAINTIN

G

NAME BOARD

0%10%20%30%40%50%60%70%80%90%

100%

REWORKEXTRA WORKQTY IN BOQ

COST ANALYSIS