    Project Breakdown

    Structure Creation

  • 8/12/2019 Project Break Down Structure

    2/14

    A

    BB

    AB,

    CorporateResearch

    -2

    Project Planning Course Overview

    Project Planning Overview

    Facilitating Processes

    ProjectPlanningPre-conditions

    Risk Management

    Work

    Breakdown

    Structure

    Project

    Breakdown

    StructureEstimation

    Resource

    Planning

    Logical

    Network

    PlanBudgeting

    Time

    Schedule

    ProjectPla

    nningResult

    Product

    Anatomy

    Organic

    Integration

    Plan

    Integration

    Plan

  • 8/12/2019 Project Break Down Structure

    3/14

    A

    BB

    AB,

    CorporateResearch

    -3

    Purpose

    The Project Breakdown Structure (PBS) defines all Work

    Products, produced by a project.

    The purpose is to first focus on what the project shall

    produce, not the activities to perform.

  • 8/12/2019 Project Break Down Structure

    4/14

    A

    BB

    AB,

    CorporateResearch

    -4

    Input & Output

    INPUT

    Product Requirements Specification

    Project Breakdown Structure from earlier versions of the product andprevious projects, if available

    Know-how from experienced personnel

    Architecture

    Organizational Demands

    OUTPUT

    Project Breakdown Structure including;

    Technical Product Breakdown Structure

    Management Product Breakdown Structure

    Quality Product Breakdown Structure

    The PBS is used as input when defining the Work Breakdown Structurelater in the planning process.

  • 8/12/2019 Project Break Down Structure

    5/14

    A

    BB

    AB,

    CorporateResearch

    -5

    Work Products

    A project always delivers tangible things like documents, code,

    models, executables, plans etc. which all are Work Products. Some examples;

    Customer deliverables

    software on a CD-ROM, user documentation etc.

    Software components

    source code files, DLLs, executables etc.

    Development components

    design models, prototypes, tools etc.

    Management artifacts

    plans, budgets, progress reports etc.

    Quality assessment artifacts

    test results, inspection reports etc.

  • 8/12/2019 Project Break Down Structure

    6/14

    A

    BB

    AB,

    CorporateResearch

    -6

    Project Breakdown Structure

    The Project Breakdown Structure should identify all Work

    Products of the project and the final product.

    The highest level represents the total set of Work

    Products.

    At the lowest level every Work Product is either aManagement Product, a Technical Product or a Quality

    Product.

  • 8/12/2019 Project Break Down Structure

    7/14

    A

    BB

    AB,

    CorporateResearch

    -7

    Requirement-Work Product traceability matrix

    X

    X X

    X

    X X

    X

    X

    X

    X

    X

    X

    Req 1

    Req 2

    Req 3

    Req 4

    Req 5

    Req 6

    Req 7

    Req 8

    Req 9

    Req 10

    W

    P1

    W

    P2

    W

    P3

    W

    P4

    W

    P5

    W

    P6

    W

    P7

    W

    P8

    W

    P9

    W

    P10

  • 8/12/2019 Project Break Down Structure

    8/14

    A

    BB

    AB,

    CorporateResearch

    -8

    Management Work Products

    The Management Work Products are those that;

    Assist in project management and control issues

    Gives the answer to the business requirements

    Typical Management Work Products are;

    Requirement specifications Project plans

    Risk list

    Status reports

    Budget specification

    Project (gate) assessments

    Minutes of meetings

  • 8/12/2019 Project Break Down Structure

    9/14

    A

    BB

    AB,

    CorporateResearch

    -9

    Technical Work Products

    The Technical Work Products are;

    Project deliverables, i.e. the final product

    Intermediate products needed during development

    The answer to the technical requirements

    Typical Technical Work Products are; Hardware and Software

    User documentation

    Prototypes

    Design models

    Education products

    Testing products

    Executables

  • 8/12/2019 Project Break Down Structure

    10/14

    A

    BB

    AB,

    CorporateResearch

    -10

    Quality Work Products

    The Quality Work Products;

    Exists to define, assure, verify and record quality issues

    Gives the answer to the quality requirements

    Typical Quality Work Products are; Test records

    Inspection (review) records

    Error (problem) reports

    Follow-up reports

  • 8/12/2019 Project Break Down Structure

    11/14

    A

    BB

    AB,

    CorporateResearch

    -11

    Summary

    The Project Breakdown Structure is a tree structure reflecting the

    Work Products on all levels produced by a project.

    The Project Breakdown Structure should contain all the items

    included in the final product, needed to build the final product and

    needed to support the development of the final product.

    The Work Breakdown Structure is later identified by defining what

    activities are needed to produce the Work Products to the required

    quality.

  • 8/12/2019 Project Break Down Structure

    12/14

    bb

  • 8/12/2019 Project Break Down Structure

    13/14

    A

    BB

    AB,

    CorporateResearch

    -13

    Revisions

    Rev. New Slide (N)

    Slide (S)

    Description Date

    Dept./Init.04 All Update from Version C 2004-01-08/ Fredrik

    Ekdahl

    05 Page17 Planning package should not include the

    work product picture redrawn

    2005-01-12 / Christer

    Persson

  • 8/12/2019 Project Break Down Structure

    14/14

    A

    BB

    AB,

    CorporateResearch

    -14

    Relation between PBS & WBS

    PBS

    WBS

    Work

    Product

    ActivityPlanning Package

    Planning

    Package

    Description

    What