  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    1/47

    project check listsbuildings

    use in conjunction with the

    2010standard specification

    for small building works

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    2/47

    INTRODUCTION

    It is difficult during a visit to a construction site to memorise all of the details that need to bechecked and while the obvious ones stand out, many other items that should be checked areforgotten. Superintendents may get distracted or over extended due to time constraints andoverlook items that may have more serious consequences later in the project.

    These Check Lists provide a guide to the inspections that are required on site for a particularproject. They are a prcis of the full clauses in the project specification and can be referredback to the specification if the full text of the particular item is required. The check Lists willremind you of virtually every potential problem in materials, workmanship and coordinationbetween trades.

    The Check Lists include a list of the Hold Points, Witness Points and Tests that are requiredto be signed off by the Superintendent on projects that include the Project Control section.The rest of the checks are simply dot points to jog the memory of the Superintendent.

    Project specific checks may be added to the Check Lists for individual projects and theexperience of Superintendents can be shared by the addition of particular checks on items oroperations that are generally of concern on site. In this case less experiencedSuperintendents can use these Check Lists to provide them with the back up of moreexperienced officers.

    Provide one copy of the Check Lists book to the Superintendent and one copy to theContractor for the particular project.

    HOW TO USE THESE CHECK LISTS

    Take photocopies of the relevant Check List sections before going on site and study these.This book of Check Lists is spiral bound to allow pages to be photocopied easily.

    Mark any items in the Check List that are of particular concern.

    At the project site, check off the work against the Check Lists and make notes of any actionrequired in the space provided.

    When the work is completed and the final check has been made sign off and date in the boxprovided. There is also space to provide comments.

    Keep a record of all of the completed Check Lists for future reference if required. Thesecould prove to be valuable if disputes arise on the project.

    There is no better way to document actual site conditions or details than by photographs, sodont forget to take a digital camera on site and take images to go with particular items in theCheck lists.

    FURTHER DEVELOPMENT

    If you have any suggestions to improve on these Check Lists or the system in general pleasecontact the Manager Documentation Services, 1st Floor Highway House, 14 PalmerstonCircuit, Palmerston. Tel; (08)894 65021 or email at [email protected]

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    3/47

    DEPARTMENT OF CONSTRUCTION & INFRASTRUCTURE

    CONSTRUCTION DIVISION

    CONTENTS

    1. GENERAL REQUIREMENTS

    2. SITE PREPARATION

    3. CONCRETE CONSTRUCTION

    4. TIMBER AND STEEL CONSTRUCTION

    5. BLOCK CONSTRUCTION

    6. INSULATION AND SARKING

    7. ROOFING

    8. DOORS AND WINDOWS

    9. CLADDING AND LINING

    10. SUSPENDED CEILINGS

    11. PLASTERING

    12. JOINERY AND FIXTURES

    13. TILING

    14. PAINTING

    15. FLOOR COVERINGS

    16. PLUMBING AND DRAINAGE

    17. ELECTRICAL INSTALLATIONS

    18. MECHANICAL INSTALLATIONS

    19. FENCES

    20. PAVING

    21. LANDSCAPE

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    4/47

    GENERAL REQUIREMENTS

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST GENERAL REQUIREMENTS

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS[Specification Checks]

    TIMBER GENERALLY_ Allowances made for unseasoned timber_ Durability class meets minimum requirements

    TESTS_ NATA registered authority

    COMPLETION_ Warranties provided in the name of the principal_ Instruction manuals provided_ Termite barrier certification provided_ Surveyors certificate provided when specified_ Services layout plan submitted_ Authorities approvals provided when specified

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    5/47

    GENERAL REQUIREMENTS

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    6/47

    DPICONSTRUCTION CHECKLIST AUG 2005>>

    SITE PREPARATION

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST SITE PREPARATION

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    If bad ground is encountered

    Adjoining structures before commencement of

    demolitionHazardous conditions or material is found

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    Proof of required density has been recieved

    COMPLIANCE CHECKS[Specification Checks]

    DEMOLITION_ Demolished materials are removed from site_ Dust protection provided as specified_ Temporary supports provided_ Weather protection provided where specified_ Security provided where specified

    TREES_ Trees to be retained are clearly marked_ Protection is provided retained trees

    ENVIROMENTAL PROTECTION_ Erosion control measures provided_ Dewatering is as specified

    SITE CLEARING_ Stumps grubbed out as specified_ Topsoil stockpiled and protected from contamination_ Surface graded to drain water away from buildings without ponding

    SURFACE PREPARATION_ Fill types are as specified

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    7/47

    SITE PREPARATION

    _ Placing is as specified_ Moisture content correct_ Required density achieved

    SANDLAYER_ Installed as specified

    PILING_ Bored piers installed as specified_ Screw in foundations are to required standards

    SERVICE TRENCHES_ Trench widths correct_ Correct backfill method used_ Backfill compacted to required density

    [Supervisor Specific Checks - Write in any specific

    checks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    8/47

    CONCRETE CONSTRUCTION

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - CONCRETE CONSTRUCTION

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Termite barrier and film underlay installed

    Completed formwork, and re-inforcement, cores

    and embedments fixed in placeCommencement of concrete placing

    Before core filling masonary

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    Hot weather mixing, prior approval required.

    Cores and imbedded items fixed to preventmovement during placing

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    TESTS Compressive strength

    COMPLIANCE CHECKS [Specification Checks]

    GROUND SLAB VAPOUR BARRIER_ Vapour barrier installed to specified standards_ J oints lapped and sealed as specified

    REINFORCEMENT_ Dowels in one piece with ends cut square and free of burrs_ Exposed end primed as specified

    EMBEDDED ITEMS_ Correct positioning of embedded items as specified_ Correct Corrosion protected fixings used as specified

    CONCRETE_ Correct concrete grade used as specified_ Grout is as specified

    _ Concrete placing is as specified_ Concrete protected from premature drying

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    9/47

    CONCRETE CONSTRUCTION

    FORMWORK_ Surface finish class is to required standard_ All formwork removed after curing

    J OINTS

    _ Construction, slip and movement joints installed as specified

    FINISH TO UNFORMED SURFACES_ Correct screeding method used_ Specified finish correct including levels and falls

    MISCELLANEOUS ITEMS_ Clothes hoist footing is as specified_ Splash pads installed correctly and as specified_ Mowing strips installed as specified_ Gas cylinder pad installed as specified

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    10/47

    TIMBER AND STEEL CONSTRUCTION

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - TIMBER AND STEEL CONSTRUCTION

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;]

    Spec.Ref. Item Checked Initial and date

    Commencement of shop fabrication

    Surface preparation prior to painting

    Steelwork and column bases erected on site

    Steel framing erected onsite prior to lining and orcladding

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    Shop drawings submitted with all specifiedinformationDo not attach cleats without prior approval. All

    temporary cleats to be removed on completionand make good any damaged surfaceDo not hand flame cut or otherwise enlarge anybolt holes without approval

    TESTS

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS

    _ Materials and components comply with specification requirements

    CONSTRUCTION_ Foundation bolts provided as specified_ Welds clean and primed_ Protective coating provided

    LIGHT STEEL FRAMING_ Fabrication is as specified_ Temporary earthing provided_ Steel battens fixed as specified

    TIMBER FRAMING

    _ Timber identified as specified_ Timber grades are as specified

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    11/47

    TIMBER AND STEEL CONSTRUCTION

    Fasteners_ Correct type_ Galvanized as specified- Adhesives are as specified

    Structural plywood

    - is specified type and grade

    Structural sheet flooring_ Level_ J unctions have a smooth and level finish

    Timber decking_ Securely nailed to bearers_ J oints are flush and over floor joists

    Fibre cement flooring_ Type and thickness is as specified_ Ends joined correctly

    _ Expansion joints installed as specifiedWall frames- sizes and grades are as specified- Damp proof course installed

    TIMBER ROOF TRUSSES_ Trusses marked as specified_ Certification provided_ Support trusses installed_ Ties and wind bracing provided

    MISCELLANEOUSRoof battens

    _ Correct type_ Fixed as specified

    Ceiling battens_ Correct type_ Fixed as specified

    [Supervisor Specific Checks Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    12/47

    TIMBER AND STEEL CONSTRUCTION

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    13/47

    BLOCK CONSTRUCTION

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - BLOCK CONSTRUCTION

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ Materials and components comply with specification requirements

    _ Steel components_ Masonry units_ Flashing and damp proof courses_ Mortar materials

    CONSTRUCTION_ J oints installed where specified_ Perpends vertically aligned_ Unpainted facework clean as specified

    DAMP PROOF COURSES_ Installed where specified

    CONTROL OF MOVEMENT

    _ Blockwork control joints installed as specified_ Flexible ties and anchors provided_ J oint materials are as specified_ Bed joint reinforcement installed

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    14/47

    BLOCK CONSTRUCTION

    STEEL LINTELS_ Correct material_ Installed as specified

    REINFORCED MASONRY_ Cleaning holes provided_ Bond beam installed as specified_ Starter bars secure_ Lintel blocks installed as specified_ Core filling grout is as specified

    - Core holes_ Bond beams_ Lintels

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate section

    under the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    15/47

    INSULATION AND SARKING

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - INSULATION AND SARKING

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Sarking, vapour barrier and insulation inspectionrequired before it is concealed or covered up.

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS_ Compliance with standards as specified_ Support wires secure as specified

    BULK INSULATION_ Check insulation installed tight and supported

    WALL SARKING_ Sarking installed to form weather proof seal

    ROOF SARKING_ Sarking covers whole of roof_ Sarking lapped at 150mm. Min.

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks can

    be listed here or inserted into the location in theprevious checklist.]

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    16/47

    INSULATION AND SARKING

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    17/47

    ROOFING

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST ROOFING

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Inspect substructure before roof sheeting issecured

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIAL AND COMPONENTS_ Materials moisture free and undamaged_ Ensure approved metal fixings are to be used only_ Roof screw type, including cyclone washers corrosion resistant

    ROOF STRUCTURE_ Alignment correct

    METAL FASCIA AND BARGE

    _ Fixing clips in place and fixed correctly

    METAL ROOFING_ Visible accessories have same finish as roof sheets_ Valleys turned up at ridge_ Pans turned down into gutters_ Eaves and ridge fillers fitted

    ROOF PLUMBING_ Flashings and cappings, correct material and fixings_ Gutters, size, fixings and overflows correct_ Downpipes, size and fixings correct_ Swarf and debris removed from roof

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    18/47

    ROOFING

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]t

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    19/47

    DOORS AND WINDOWS

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - DOORS AND WINDOWS

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Submit plans for window installation

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ Comply with specification requirements

    _ Flashings_ Metal finishes_ Glass_ Doorsets_ Windows

    CONSTRUCTION_ Flashing and weatherings in place to avoid water penetration_ All doorsets and windows installed plumb, level, straight and true_ Doorsets and windows adequately fixed or anchored to building structure

    STEEL DOOR FRAMES_ Correct frames and necessary accessories used_ All welds ground smooth and welded joints galvanised prior to priming_ Ensure all frames are in masonry, and packed behind fixing points

    TIMBER DOORS_ Ensure correct door type is used ( NT designated or other)_ All areas subject to paint removal, primed prior to hanging

    DOOR FURNITURE_ Door stops installed_ Door seals secured to external doors and adjusted correctly_ Correct hinges to suit door as specified

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    20/47

    DOORS AND WINDOWS

    SLIDING INTERNAL DOORS_ All accessories including wheel carriages are appropriate to the size and mass of door

    SECURITY SCREEN DOORS_ Infill mesh secured to extruded aluminium frames

    _ Hinges and pneumatic closer functioning correctly

    ROLLER SHUTTERS_ Manual operation fixings and operation handle functioning_ Motorised operation Operating switch secure and functioning

    LOCKSETS_ Mounting height correct_ Ensure all passage, privacy and key-lockable sets are functioning correctly_ 2 keys provided for each lockset

    CONSTRUCTION_ All fixings not visible on exposed side

    - Aluminium screen mesh tightly strung and fasten with plastic continuous splinematerial

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks can

    be listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    21/47

    CLADDING AND LINING

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - CLADDING AND LINING

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    Approval of the ceiling set out priorcommencing installation

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ Flashing material as specified_ Sarking material as specified_ All materials free from corrosion

    CLADDING_ Materials used are specified

    PLASTERBOARD

    _ Installation as specified_ Flush jointing materials correct_ Control joints in position_ Framed construction_ Masonry construction

    FIBRE CEMENT SHEETING_ Correct screws used_ Control J oints flushed and finished_ V joints flushed and finished

    TONGUE AND GROOVE LINING_ All boards fixed with a continuous grain pattern

    _ Visible nail heads treated as specified

    PLASTIC LAMINATE

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    22/47

    CLADDING AND LINING

    _ J oins sealed

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate section

    under the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks required

    for this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    23/47

    SUSPENDED CEILINGS

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - SUSPENDED CEILINGS

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Inspect suspension system prior to installation ofpanels or lining.

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    Approval of the ceiling set out priorcommencing installation

    Suspension member co-incide with grid lines

    Opposite margins equal

    Technical data provided on loadings

    Approved specialist fixers carrying out

    installation

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ All materials are as specified

    _ Materials comply with Australian Standards_ Check fastener type

    CONSTRUCTION_ Support members galvanised and adjustable_ Check for looseness or rattling of components_ Bracing fitted to prevent lateral movement_ Fasteners not visible_ Bulkheads comply with strength requirements

    CEILING PANELS_ Tiles painted before installation_ Panel lock clips fitted if required

    _ Tiles seated evenly within grid_ No visible damage to tile, edges etc.

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    24/47

    SUSPENDED CEILINGS

    FLUSH CEILING_ Flush jointing materials finish_ Control joints in position

    TRIM

    _ Check all accessories and trims are provided_ Openings provided for light fittings, services, etc._ Access panels provided and correctly finished

    FINAL CHECK_ Ceiling complete No visible defects

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Check - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    25/47

    PLASTERING

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST PLASTERING

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ Lime putty mixes mixed minimum 16 hours before use_ Gauged mixes as specified

    SUBSTRATE_ Defects in substrate repaired_ Substrate requires second coat_ Loose material and dust removed from substrate_ Embedded items sheathed_ Metal laths fixed as specified

    PLASTERING_ Number of coats and thickness is as specified_ Curing even and within required timeframe_ V joints installed as specified_ Movement joints installed as specified_ Correct finish as specified or as shown on drawings

    [Supervisor Specific Checks] Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    26/47

    PLASTERING

    [Project Specific Checks] Project specific checks canbe listed here or inserted into the location in theprevious checklist

    [Project Officer to insert any special checks requiredfor this project]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    27/47

    J OINERY AND FIXTURES

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - JOINERY AND FIXTURES

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ All materials are as specified_ Moisture content checked_ Timber finished to required dimensions

    CONSTRUCTION_ Components manufactured square and installed plumb_ Fasteners and adhesives used correctly_ No visible fixings except where specified

    CUPBOARD AND DRAWER UNITS_ Plinth material and installation as specified_ Carcasses, drawer fronts, shelves and doors material and installation as specified_ Door hinges as specified_ Self closing action and hold open function operating as specified_ Drawer units operating smooth and true.

    BENCHTOPS_ Materials are as specified

    CEILING ACCESS_ Access panel provided as specified

    FIRE FIGHTING_ Extinguishers and location signs in position as per Australian Standards_ Fire blanket and location signs in position as per Australian Standards

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    28/47

    J OINERY AND FIXTURES

    DISPLAY BOARDS_ Specified display board supplied_ White board screw fixed to wall as specified_ Pin boards screw fixed to wall as specified

    CLOTHES HOISTS_ Specified clothes hoist supplied_ Clothes hoist installed in required position

    GRAB RAILS_ Grab rail installed as specified

    LETTER BOXES_ Letter box complies with current standard_ Lock supplied and operating. (if required)

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate section

    under the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks required

    for this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    29/47

    TILING

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CONSTRUCTION CHECK LIST TILING

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Completion of water proof membrane

    Initial or trial setout

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTS

    Give sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ All materials are as specified

    SAMPLES_ Sample tiles and accessories provided as requested

    WATERPROOFING_ Materials as specified_ Membrane turned down into floor wastes and puddle flanges_ Hobs; Membrane extended as specified_ Membrane fully cured before tile installation_ All floors and wall to floor junctions sealed

    TILING_ Tiles cut neatly to fit around fixtures_ Traffic kept off of floors until bedding attains a workable strength_ Tiles set out to give uniform widths as specified_ Falls and levels correct

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    30/47

    TILING

    - Preparation of tiles as specified_ Floor finish dividers in place as specified_ All sealed joints finished flush with tile surface as specified_ Movement joints installed as specified

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]t

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    31/47

    PAINTING

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST PAINTING

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Inspect substrate prior to commencement of firstcoat

    Inspect prior to final coat application

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    List of paint trade names and manufacturersupplied

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ Paint material is of premium quality and from an approved manufacturer_ Paint is new, manufacturer labelled and unopened_ All paint containers are APAS approved (Australian Paint Approvals Scheme)

    PAINTING_ Substrate clean and sound

    _ Free of mould growth_ Damaged surfaces patched and primed- Ensure clear timber finishes are complete before commencing opaque finishes in the same

    area- All door furniture, switch plates, light fittings and other fixtures removed prior to painting, and

    refixed on completion of painting_ Filler used matches the substrate for transparent finishes_ First coat applied immediately before substrate contamination can occurEnsure each coat of paint or clear finish is;_ Uniform in colour, thickness and texture_ Free from runs, sags, blisters or other discontinuities_ Exposed roof trim, timber doors including tops and bottoms primed with approved sealer before

    fixing

    _ Galvanised or Zinc surfaces that have been cut or welded primed with approved sealer_ Any damaged surfaces restored to original condition_ Any visible defects

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    32/47

    PAINTING

    ONSITE CHECKLIST_ Refer to attached onsite checklist

    [Supervisor Specific Checks - Write in any specific checks here,

    or insert them in the appropriate section under the previousheadings and or checkpoints.]

    [Project Specific Checks - Project specific checks can be listedhere or inserted into the location in the previous checklist.]

    [Project Officer to insert any special checks required for this

    project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    33/47

    PAINTING

    PAINTING CHECKLIST

    External

    walls

    External

    trims

    External

    fixtures

    Internalwalls

    (wetareas)

    Internalwalls

    (generally)

    Internalceilings

    (wetareas)

    Internal

    ceilings(generally)

    Internal

    trims

    Internalfixtures

    andjoinery

    Scrapebackrequired

    Substrateaccepted

    Preparationapproved

    Rub down

    Other

    Priming andpatching

    Undercoat

    1st coatfinished

    Finishingcoat

    Extra coatRequired

    Anyimperfections

    Site clean

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    34/47

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    35/47

    FLOOR COVERINGS

    _ Sheets run parallel with long sides of floor_ Correct adhesive used for specified applications

    J OINTS_ Welding joints fixed as specified

    _ J unctions finish flush with adjoining surfaces_ Finished surface level, free of air bubbles, humps and depressions

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    36/47

    PLUMBING AND DRAINAGE

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - PLUMBING AND DRAINAGE

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Inspection of work ready for testing

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    commence work notice lodged and approved

    Drawings received and approved

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    Sanitary pipes

    Waterpipes

    COMPLIANCE CHECKS [Specification Checks]

    CONTRACTOR SUBMISSIONS_ "As installed" drawings submitted

    MATERIALS AND COMPONENTS_ Water supply pipes materials as specified_ Exposed piping, fittings and supports finished as specified_ Sanitary fixtures and tapware installed as specified

    CONSTRUCTION_ Piping installed in straight lines and to uniform grades_ Piping support installed to prevent water hammer and vibration_ Piping concealed where practicable

    STORMWATER_ Temporary covers on openings_ Completed work flushed with water and clean_ spigot ends same direction as water flow_ Subsoil drains materials as specified_ Trenches back filled_ Pit covers installed as specified

    WASTEWATER_ Temporary cover on openings

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    37/47

    PLUMBING AND DRAINAGE

    _ Completed work flushed with water and clean_ Septic tank materials and standards are as specified_ Vent pipe correctly installed

    FRESHWATER

    _ Tap locations correct as specified_ All accessories and fittings correctly placed as specified_ Water heater type confirmed and installed as specified_ Isolation valve to water heater correctly installed_ All pipelines flushed and left clean

    FIRE HOSE REELS_ Fire hose reel type and locations as specified

    GAS_ Piping installed in straight lines and uniform grades_ Warning tape on all buried pipework as specified_ Manufacturers certificate with AGA/ALPGA approval for appliance and gas type

    _ Appliance installed as specified_ Compliance plate installed_ Certificate of approval received prior to practical completion

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks can

    be listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    38/47

    ELECTRICAL INSTALLATIONS

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - ELECTRICAL INSTALLATIONS

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Inspection of trench excavations andunderground or concealed conduits beforecovering

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    GENERAL_ All installations meet specified standards_ All work complies with specified regulations_ All materials and components meet specified requirements

    INSTALLATION_ Concealed cables, conduits including underground cables installed as specified, and

    checked prior to concealment

    _ Accessories installed as specified

    CONSUMER MAINS AND METERING_ Consumers mains installed and connected to main service complying with regulatory

    standards_ Kwh meter installed by specified supply authority_ Meter box installed to regulatory standards

    DISTRIBUTION BOARD_ Distribution board installed correctly as specified

    ACCESSORIES_ GPO'S and light switches materials and installation as specified

    _ Mounting heights correct as specified_ Ceiling fans installed as specified_ Smoke alarms installed correctly and as specified

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    39/47

    ELECTRICAL INSTALLATIONS

    TELECOMMUNICATIONS CABLING_ Pre wiring complete prior to installation of linings, paving and or landscaping_ Telephone wiring complete as specified

    TELEVISION_ Antennae conforms to specified standards_ Antennae correctly positioned

    COMMISSIONING_ Any visual defects noticed_ Complete installation handed over in working order

    [Supervisor Specific Checks - Write any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks] Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    40/47

    MECHANICAL INSTALLATIONS

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST - MECHANICAL INSTALLATIONS

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    AIR CONDITIONERS_ Split systems installed and tested as specified_ Room air conditioners installed as specified

    INSTALLATION_ Anti vibration mounts correctly installed_ Wiring installed as specified_ Any exposed wiring covered as specified_ Exposed pipework covered as specified_ Unit has recommended clearance requirements for airflow and maintenance_ External plant fitted as specified_ Connection of RAC is correct and as specified

    CONDENSATE DRAINS_ Drains installed to required standards and codes_ Drain size and type installed as specified

    FRESH AIR_ Air supply through unit to air-conditioned spaces meets specified standards

    DUCTWORK_ Ductwork materials installed as specified_ Fixed without sagging or restriction to airflow

    FANS_ Fan has quiet operation and free from vibration

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    41/47

    MECHANICAL INSTALLATIONS

    _ Fan installation and positioning is as specified

    COMMISIONING_ Any visual defects noticed

    [Supervisor Specific Checks - Write any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    42/47

    FENCES

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST FENCES

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ Materials and components comply with specification requirements

    CONSTRUCTION_ Vegetation cleared from fence alignment_ Fence lines, gate posts and bracing panels marked out clear and correct_ Footings have a firm base and vertical sides_ Vertical posts follow natural contours of ground_ Concrete footings finished with a weathered top and falls from post to ground level_ Drain holes provided where specified_ Mowing strip installed as specified

    GATES_ Gates correctly installed as specified_ Hand access holes provided for external access

    FENCE TYPES_ Correct type_ Installation is as specified

    [Supervisor Specific Checks - Write any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    43/47

    FENCES

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    44/47

    PAVING

    DEPARTMENT OF PLANNIONG AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST PAVING

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    HOLD POINTSObtain the superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    COMPLIANCE CHECKS [Specification Checks]

    MATERIALS AND COMPONENTS_ Mortar materials and mix proportions correct as specified

    CONSTRUCTION_ Paving evenly graded_ Falls are even and to drainage outlets_ No visual ponding

    BASE COURSE_ Material type, particle size and clay content correct as specified_ Base compacted to a firm and even surface_ Any soft areas visible_ Moisture content adjusted as required to facilitate compaction_ Base course minimum thickness is as specified

    ASPHALT PAVING_ Hot mix materials and thickness is as specified_ Finished surface levels and falls correct

    UNIT PAVING_ Paving units are of specified material_ Cut pavers maintain sharp edges and accurate joints and margins_ Concrete edge restraint provided as specified_ Concrete to required grade and standard_ Minimum thickness as specified_ Control joints correctly placed as specified

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    45/47

    PAVING

    _ Expansion joints installed correctly as specified_ Correct finishing method used as specified

    GRAVEL DRIVEWAY_ Approved materials used

    _ Minimum thickness and falls are correct

    [Supervisor Specific Checks - Write in any specificchecks here, or insert them in the appropriate sectionunder the previous headings and or checkpoints.]

    [Project Specific Checks - Project specific checks canbe listed here or inserted into the location in theprevious checklist.]t

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    46/47

    LANDSCAPE

    DEPARTMENT OF PLANNING AND INFRASTRUCTURECONSTRUCTION DIVISION

    CHECK LIST LANDSCAPE

    PROJ ECT SPEC.NO.

    Checked by Title

    Work lot Date

    WITNESS POINTSGive sufficient notice so that inspection may be made at the following stages;

    Spec.Ref. Item Checked Initial and date

    Inspection of planting and garden edge set outs

    Inspection of irrigation system for testing

    HOLD POINTSObtain the Superintendents approval for the following stages;

    Spec.Ref. Item Checked Initial and date

    Drawings submitted for approval

    TESTSGive sufficient notice so that the Superintendent may witness testing;

    Spec.Ref. Item Checked Initial and date

    Topsoil tested and documentation received

    Mulch tested and documentation received

    Fill irrigation pipe work and test at the requiredpressure

    COMPLIANCE CHECKS [Specification Checks]

    List of compliance checks to be finalized.

  • 7/28/2019 Proj Chk Lists Sml Bldg Works

    47/47

    LANDSCAPE

    [Supervisor Specific Checks Write in any specificchecks here, or insert them in the appropriate section

    under the previous headings or checkpoints.]

    [Project Specific Checks Project specific checks canbe listed here or inserted into the location in theprevious check list.]

    [Project Officer to insert any special checks requiredfor this project.]

    Action Requi red - ITC issued on items that do not comply

    Reported to: Date:

    Final Check

    Made by: Date:

    Comments