REHABILITATION OF SELECTED CONCRETE STRUCTURES IN JUBAIL DESALINATION PLANT (PHASE I & II) & HOUSING COMPOUND PROGRESS OF WORK NEWSLETTER MARCH 2008

Upload: others

Post on 03-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

Rehabilitation of Selected concRete StRuctuReS in Jubail deSalination Plant (PhaSe i & ii) & houSing comPound

PRogReSS of WoRK

neWSletteR

MARCH 2008

Page 2: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

CONT

ENTS

EAST

ERN

PROV

INCE

PROJECT OVERVIEW 04

EXECUTIVE SUMMARY 06

SCOPE Of WORk 08

ORgANIzATION CHART 010

ONgOINg WORkS 012

MANPOWER HISTOgRAM 014

CONTRACT I & II MONTHLY INVOICE 015

PROgRESS PHOTOS 016

SWCC

NEW

SLET

TER

Page 3: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

PROJ

ECT

OVER

VIEW

04 05

Project Name: Rehabilitation of Selected Concrete Structures in Jubail Desalination Plant (Phase I & II) & Housing Compound

Client: Saline Water Conversion Corporation (SWCC)

Consultant:Alrabiah & Partners Co. (ARP) in association with COWI

Contract Value:Contract I : SR 61,716,510.28Contract II : SR 98,554,636.25

Contract Signature: Contract I : feb 19, 2005Contract II : feb 11, 2006

Site Handing Over Date: Contract I : feb 26, 2005Contract II : feb 18, 2006

Project Completion Date:Contract I : Dec 31, 2007 Contract II : May 21, 2009

EAST

ERN

PROV

INCE

SWCC NEWSLETTERSWCC NEWSLETTER

Page 4: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

EAST

ERN

PROV

INCE

06 07

EXEC

UTIV

E SU

MM

ARY

The Saline Water Conversion Corp. (SWCC) Jubail Desalination Plants Phase I & II A/B are considered to be among the kingdom's most strategic plants. Phase I is the sole supplier of potable water to Jubail Industrial City, and Phase II A & B to Riyadh City.

SWCC Jubail Plants were constructed more than twenty five years ago. Over the years, the hot & humid / harsh climatic environment in the Arabian gulf Coast has led to a rapid acceleration in concrete deterioration which imperiled the integrity and effectiveness of the structures.

Alrabiah Consulting Engineer, assigned by SWCC, conducted an investigation and set a rehabilitation program to restore confidence in the plant structures. Later on, Specialized Contractors were called in to rehabilitate / reconstruct the Jubail facilities. Bids were opened on 24th feb, 2004; Almabani general Contractors won the project for a total amount of SR 239,187,664.80. Lack of allocated funds, forced SWCC to award 60% of the original scope and in two contracts.

Almabani general Contractors with Saudi Condreco formed a joint venture named ALMACON to carry out the execution of both contracts:

• Contract I:Amounting toSR61,716,510.28 , it tackled themosturgent& severely deteriorated structures, such as Phase I Intake, Desalination Units & Phase II A & Pump Pits, C6 Cable Vaults and Cable Tunnels.This contract started in feb. 2005 with an initial duration of 20 months and it was extended twice (6mos. + 8mos.) by SWCC, to meet operational constraints & high demand for water & power. It was completed in December 2007.

• ContractII:AmountingtoSR98,554,636.25,ittackledSelectedStructures,such as Phase II Intakes, Road & Pipe Bridges, Evaporator Slabs, Common Drainage Channels, Cable tunnels, Service Trenches etc..This contract started in feb. 2006 with a total duration of 39 months and is expected to be completed in May 2009.

Once more AgC proved its capabilities by attending to the most challenging task of both projects, which are the Shutdown works. The Client has to create “Windows” in its operational schedule, where plants will suspend their operation and allow for carrying out the works. Proper planning, timely mobilization of resources, close monitoring and prompt decisions are the key elements for completion of shut down activities on time. AgC successfully completed all Shutdowns as scheduled.

SWCC announced new tender to rehabilitate the remaining structures not covered by either Contracts. Bids submission are due in May 2008.

SWCC NEWSLETTERSWCC NEWSLETTER

Page 5: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

EAST

ERN

PROV

INCE

08 09

SCOP

E Of

WOR

kCO

MBI

NED

BOTH

CON

TRAC

TS I

& II

The scope of work includes, but not limited to the following:

1- Demolition and Reconstruction of 1 no. Intake Structure Phase I and 4 nos. Intake Structures Phase II. Works included: dismantling & refixing of Sea Water Pumps, Traveling Screens, Chlorine Dosing System etc.; also included are the enabling works like erection / removal of temporary supports, scaffoldings cofferdams & dewatering.

2- Demolition and Reconstruction of Cable Tunnels & Cable Vaults of Phase I to II. Works include relocation of high voltage cables.

3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in the Boiler Area Phase I & II.

4- Repair of Condenser Pits, Turbine Drain Tank Pit & Water Treatment Tank foundations in Power Plant of Phase I & II.

5- Repair of delaminated concrete @ Transformer Yard, Phase I.

6- Demolition and Reconstruction of Common Drainage Channel & Desalination Units. Discharge Outlets of Phase I & II.

7- Demolition and Reconstruction of Road (6 nos.) & Pipe Header Bridges (8 nos.) structural components (spandrel beam, piers abutments & top- slab). Works included scaffolding / staving and cofferdams to repair the piers.

8- Reconstruction of 46 nos. Desalination Units (pumps, support walls, pipe header pits, evaporator unit floor slab, drainage and steel / column support pedestals).

9- Reconstruction of roof slab of three (3) Blending Stations.

10- Repair of Product Water Tank valve pits & valve boxes @ Phase I & II.

11- Repair of slab & equipment foundations of Seawater Booster Pumps at Phase II.

12- Reconstruction of acid discharge channel @ Power Utility Structure Building at Phase II.

13- Other electro-mechanical works including dismantling & refixing of all equipment/plants such as pumps, equipment & motors along Desalination Units, Boiler Area & Power Plant, traveling screens, pipes etc. that were blocking the repair/reconstruction activities.

SWCC NEWSLETTERSWCC NEWSLETTER

Page 6: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

010SWCC NEWSLETTER

ORgA

NIzA

TION

CHA

RT Project ManagerElie A. Chrabieh

QA/QC MANAGERSANJEEV NAYAk

SAFETY OFFICERS.N.M. RAJU

LOGISTICS OFFICEREDWARD

E/M ENGINEERPARAMESWARAN PRASAD

ELECTRO/MECHANICALMURTAz ALI

FRP PIPESENgINEER HASSABO

STEEL WORKSHOPfOREMAN

E & MAUTOCAD

FM. COATINGfOREMAN

QA/QC DOCUMENTCONTROLLERSEBASTIAN

SAFETY INSPECTORISMAIL

LAB TECHNICIAN

SIRAJ

LAB TECHNICIANASSISTANT

MATHEW THOMAS

LAB TECHNICIANHELPERSHIRAz

SR. QC INSPECTOR

JERRY

SAFETY INSPECTORWEBSTER

QC INSPECTOR

ANDY

QC INSPECTOR

RODERIC

QC INSPECTOR

zAHID

QC INSPECTOR

ARIEL

COMMERCIAL MANAGERANTHONY PETASSIS

CONSTRUCTION MANAGERfADI ABU CHACRA

SITE ENGINEER 2MICHEAL

DESALS PHASE - IIg. fOREMAN

COMMON DRAINAGEfOREMAN

MAKE UP PUMPSfOREMAN

SITE COORDINATORENg'R SULAIMAN gEAgEA

SITE ENGINEER 3AHMAD

COMMON DRAINAGEfOREMAN

EVAPORATORS SLABSfOREMAN

CABLE TUNNELfOREMAN

SITE ENGINEER 1SHOkRALLAH

INTAKE STRUCTURESg. fOREMAN

BRIDGESfORMAN

PHASE - IfOREMAN

ASST. COM. MANAGERJOSEPH

SR. QUANTITYSURVEYORCAPARAS

PAYMENTAPPLICATION

SHAMSUL ALAM

PLANNING ENG'R

PHILIP ANgELO

PLANNING ASST.

ARTHUR

PERMIT RECIEVER

RODNEY

SAUDIREPRESENTATIVE

STORE KEEPERELVIS

REPAIR SHOPBADAWI

MECHANICS

STORE HELPERISIDRO

ACCOUNTANTANAND

CAMPAzHARI

CASHIERRAfY

PROCUREMENTAMJAD

TRASPORTATIONEQUIPMENT

DRIVERS

PURCHASERARBAB

PERSONNELAHMED MUkHTAR

QTY. SURVEYORENCINAASBUILT DRAWING

ARJANEQTY. SURVEYOR

QUADRI

QTY. SURVEYORISHfAQUDDIN

QTY. SURVEYORMAJEED

QTY. SURVEYORSARPARAJ

TIME KEEPERAzIz

ENGINEERING MANAGERSAMIR SAIfI

Page 7: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

EAST

ERN

PROV

INCE

013012

ONgO

INg

WOR

kSOn Line Works;Rehabilitation of the following structures:

*Common drainage channel*Cable tunnels & valve pits*C-5 Desalination Units evaporator floor slab *Road bridge at Phase II

Shut Downs Works; Rehabilitation of the following structures:

*Phase-II Intake Structure #13*Chlorination Area #13*Pipe Header Bridges [2 units]

SWCC NEWSLETTERSWCC NEWSLETTER

Page 8: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

014

EAST

ERN

PROV

INCE

SWCC NEWSLETTER

fIRST CONTRACT MONTHLY INVOICE

SECOND CONTRACT MONTHLY INVOICE

MAN

POW

ER H

ISTO

gRAM

Page 9: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

016 017

EAST

ERN

PROV

INCE

CONC

RETE

REP

AIR

SWCC NEWSLETTERSWCC NEWSLETTER

PROg

RESS

PHO

TOS

Page 10: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

CONC

RETE

REP

AIR

EAST

ERN

PROV

INCE

019BR

IDgE

S018

PROg

RESS

PHO

TOS

SWCC NEWSLETTERSWCC NEWSLETTER

Page 11: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

CONC

RETE

REP

AIR

SCUB

A TE

AM

EAST

ERN

PROV

INCE

021020

PROg

RESS

PHO

TOS

SWCC NEWSLETTERSWCC NEWSLETTER

Page 12: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

WAT

ER P

UMP

REHA

BILI

TATI

ON

EAST

ERN

PROV

INCE

023022

PROg

RESS

PHO

TOS

SWCC NEWSLETTERSWCC NEWSLETTER

Page 13: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

PHAS

E ON

E CO

MPL

ETIO

N

EAST

ERN

PROV

INCE

024 025

PROg

RESS

PHO

TOS

SWCC NEWSLETTERSWCC NEWSLETTER

Page 14: PRogReSS of WoRK neWSletteR › almabanimedia › PDF › Newsletters › 200… · 3- Demolition and Reconstruction of Service Trenches, equipment & column support foundations in

PHAS

E ON

E CO

MPL

ETIO

N

EAST

ERN

PROV

INCE

026 027

PROg

RESS

PHO

TOS