    PLANNING (APQP)

    Based on AIAG Advanced Product Quality Planningand Control Plan Reference Manual

    Presented by Diane MaguireSeptember 2010

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    2/12

    ro uc ua y ann ng yc e

    Sept. 2010MEE 487/488Slide 2

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    3/12

    Identify the inputs / outputs of the 5APQP phases.

    with Capstone Projects.

    Sept. 2010MEE 487/488Slide 3

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    4/12

    e o e

    W at is APQP?

    defining and establishing the steps necessary to assure that aproduct satisfies the customer.

    communication with everyone involved to assure that allrequired steps are completed on time.

    Effective product quality planning depends on a companys topmanagement commitment to the effort required in achievingcustomer satisfaction.

    Sept. 2010MEE 487/488Slide 4

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    5/12

    y s a an mpor an

    e cost o a pro uct s comm tte at t e ear y stages

    of a development cycle even though they are not expended until later.

    The cost of fixing a design and faulty decisions at later stages isexponentially greater than at an earlier stage.

    The opportunity costs of being late to market are very high.

    Cross-functional teams typically provide a better quality solution tocomplex dynamic product development problems thansingle individuals.

    Early simultaneous involvement in product development bycross-functional teams using structured development process savestime and money over the product life cycle.

    Sept. 2010MEE 487/488Slide 5

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    6/12

    un amen a s o ua y ann ng

    rganize t e team Define the scope

    - - Training m r l inv lv m n Simultaneous Engineering Control plans

    Concern Resolution Timing plan and chart

    Sept. 2010MEE 487/488Slide 6

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    7/12

    Product Quality Planning Timing Chart

    Sept. 2010MEE 487/488Slide 7

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    8/12

    : an an e neINPUTS Objective:

    Voice of the Customer

    Market Research (Build Timing and Volume Expectations) Historical Warranty and Quality Information Team Experience Business Plan Marketing Strategy

    Develop a Plan that meetscustomers requirements

    ro uc rocess enc mar a a Product/Process Assumptions Product Reliability Studies Customer Inputs

    Design Goals Reliability and Quality Goals Preliminary Bill of Material Preliminary Process Flow Chart

    Preliminary List of Special Product and Process Characteristics Product Assurance Plan Management Support ( program timing and support resources required)

    Sept. 2010MEE 487/488Slide 8

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    9/12

    : es gn an eve opment

    Objectives:

    Design Goals Reliability and Quality Goals Preliminary Bill of Material

    Detailed Review of Engineering Requirements

    Feasibility Analysis

    Preliminary List of Special Product and Process Characteristics Product Assurance Plan Management Support ( program timing and support resources required)

    OUTPUTS

    Design Failure Mode and Effects Analysis (DFMEA) Design for Manufacturability and Assembly Design Verification Design Reviews ro o ype u nc u ng a on ro an Engineering Drawings (Including Math Data) Engineering Specifications Material Specifications Drawing and Specification Changes

    Sept. 2010MEE 487/488Slide 9

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    10/12

    PHASE 3: Process Desi n and Develo ment

    INPUTS Objective: es gn a ure o e an ects na ys s Design for Manufacturability and Assembly

    Design Verification Design Reviews Prototype Build (Including a Control Plan) Engineering Drawings (Including Math Data)

    Develop an Effective ManufacturingSystem

    Material Specifications Drawing and Specification Changes

    OUTPUTS

    Packaging Standards Product/Process Quality System Review Process Flow Chart Floor Plan Layout Characteristics Matrix Process Failure Mode and Effects Analysis (PFMEA) Pre-Launch Control Plan (Including Error Proofing Devices)

    Measurement Systems Analysis Plan Preliminary Process Capability Study Plan Management Support (Including operator staffing and training plan)

    Sept. 2010MEE 487/488Slide 10

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    11/12

    PHASE 4: Product and Process Validation

    Objective:

    Packaging Standards Product/Process Quality System Review Process Flow Chart Floor Plan Layout

    Validate Manufacturing Process

    Process Failure Mode and Effects Analysis (PFMEA) Pre-Launch Control Plan (Including Error Proofing Devices) Process Instructions Measurement Systems Analysis Plan

    Preliminary Process Capability Study Plan Management Support (Including operator staffing and training plan)

    OUTPUTS

    Production Trials Measurement System Evaluation Preliminary Process capability Study

    Production Validation Testing Packaging Evaluation Production Control Plan Quality Planning Sign Off and Management Support

    Sept. 2010MEE 487/488Slide 11

  • 7/28/2019 Product Quality Planning [Compatibility Mode]

    12/12

    PHASE 5: Feedback, Assessment andCorrective Action

    Production Trials Measurement System Evaluation Preliminar Process ca abilit Stud

    ec ve:

    Evaluate Manufacturing Output

    Production Part Approval Production Validation Testing Packaging Evaluation

    Production Control Plan

    OUTPUTS

    Reduced Variation

    Improved Customer Satisfaction Improved Delivery and Service Effective Use of Lessons Learned

    Sept. 2010MEE 487/488Slide 12