PRODML SIG. Team and General SIG Meetings October 13-14, 2009 Schlumberger SIS Offices, Houston. General SIG Status. SIG Team Structure. Steering Committee Operations Team Use Case and Marketing Team Co-Chairs: Laurence Ormerod, (open) Specifications and Architecture Team - PowerPoint PPT PresentationTRANSCRIPT
PRODML SIG
Team and General SIG MeetingsOctober 13-14, 2009
Schlumberger SIS Offices, Houston
General SIG Status
3
SIG Team Structure
• Steering Committee– Operations Team
• Use Case and Marketing Team– Co-Chairs: Laurence Ormerod, (open)
• Specifications and Architecture Team– Co-Chairs: Bill King and Bill McKenzie
• Deployment Support Team– Co-Chairs: Duncan Ord, (open)
• Energistics – Alan, Gary, Jana, and Robin [from PDS]
Specifications Team
5
PRODML Standards: Release Schedule
Target Date 2009
Actual Date Release Item
End Jan Early Feb PRODML Services Version 2.0 Candidate ReleaseSAM and GDA services Measurement Object Schema (Context Free Schema)
End Feb End March PRODML Data and Services Version 1.1Resolve namespace issue caused by incompatibility with WITSML Consider removing WITSML specific services
End March Mid June PRODML Services Version 2.0Introduction of GDA/SAM service
End of June Mid-October PRODML Data Version 1.2Add wellTest options Clarify volume report
Q4 PRODML Data Version 1.3Deferred production Alarms and events Well test – transient (from 08) NOJV (from 08) PVT and lab sampling
Q4 PRODML Services Version 2.1Additional SAM services
6
PRODML Services V2.0
PRODML Implementation Demos
The next slide illustrates the Distributed Temperature Survey demonstration. Other current demonstrations are Shell’s automated well test validation demo, Chevron/Moblize’s integrated demo of WITSML and PRODML Standards, and Pioneer’s asset team production monitoring interface demo.
8
Shell 2009: V2.0 Services, Proof of Concept Distributed Temperature Reconciliation
Workflow automation (above)Orchestration (right)Sequence diagram (left)
Gas Lift Design
Representative WorkflowLaurence Ormerod, Weatherford
10
Gas Lift Design Process Outline
Completion Design:tubulars and GL valvedepths variablesGL Co may advise
?
?
√
Installation, withBlank GL mandrelsDepth “as installed”Completion Co.
Drill well:Results inform completion design
Known
GL Design – uses installed mandrel depths, spec. valvesGL Co may specify
ValvesInstalledby slickline.Well operating
Valve Design