procedure for japan customs approval

17
Japanese customs Approval Procedure Japanese customs Approval Procedure SGS SGS Calibration Calibration Services Services SGS SGS Calibration Calibration Services Services June, 2011 1

Upload: argonaftis

Post on 16-Sep-2015

675 views

Category:

Documents


35 download

DESCRIPTION

PROCEDURE

TRANSCRIPT

  • Japanese customs Approval ProcedureJapanese customs Approval Procedure

    SGSSGS CalibrationCalibration ServicesServicesSGS SGS CalibrationCalibration ServicesServices

    June, 2011

    1

  • Requirement in Japan customsRequirement in Japan customs

    Japan customs regulationsJapan customs regulations

    Any gas tanker to enter Japanese port for cargo operation

    Tank calibration table- Modification

    for cargo operation=>Pre approval f C S

    CTS system- Every 3 years- Any replacement

    for tank table and CTS

    2

  • Common requirements for CTS and tank tableCommon requirements for CTS and tank table

    Tank table Calibration by 3rd party during shipbuilding

    N lib i f k l h i difi i f k No re-calibration of tank unless there is modification of tank Just re-confirm of tank table every 10 years

    CTS (Level, temp and pressure)( , p p ) Certification by 3rd party during shipbuilding Periodical re-verification every 3 years

    Re erification hen there is modification or replacement Re-verification when there is modification or replacement Occasionally 3 year inspection without tank entry

    3

  • Japanese customs approval job allocationJapanese customs approval, job allocation

    S SEvery ten years, to be renewed only by document

    Calibration

    Sworn Surveyor renewed only by document if there is no modification of tank

    Table

    CTMSCTMS FAT Report

    Application letter

    Must be included..

    Sworn SurveyorShip-owner or his agent

    CTMS Verification Report

    Supporting Document

    Sworn SurveyorSworn Surveyor

    4

  • Required data in Supporting documentRequired data in Supporting document

    1. Name of vessel2. Name of applicant (owner or operator)3. Type of cargo tank (Prismatic, spherical, etc.)4 T t l & ti l it f t k4. Total & partial capacity of cargo tanks5. Number of cargo tanks6. Manufacturer / type of level, temperature and pressure gauges6. Manufacturer / type of level, temperature and pressure gauges7. Serial No. of level, temperature, pressure gauges8. Type of pressure transmitter / display and measurable range of pressure gauge9. Type of temperature prove and display10. Accuracy test report for CTMS along with certificates of calibrator11 Actual measured data11. Actual measured data12. Cargo tank gauging tables13. Date / place of tank calibration and CTMS verification

    5

    14. Drawing of ship ( General Arrangement )

  • Japanese customs approval processJapanese customs approval process

    Initial approval ( First approval after shipbuilding)

    TankTank CTMSCTMS ReviewReview

    pp ( pp p g)

    ApplicationApplication TankTankCalibrationCalibrationCTMSCTMS

    VerificationVerificationReviewReview

    By CustomsBy Customs ApprovalApproval

    Renew of approval ( Intermediate verification every two years)

    CTMSCTMS R iR i

    Renew of approval ( Intermediate verification , every two years)

    ApplicationApplicationCTMSCTMS

    VerificationVerificationReviewReview

    By CustomsBy Customs ApprovalApproval

    6

  • ProcedureProcedure

    TankTank CTMSCTMS ReviewReviewApplicationApplication Tank Tank CalibrationCalibrationCTMSCTMS

    VerificationVerificationReviewReview

    By CustomsBy Customs ApprovalApproval

    1. Surveyor will present the basic information about tank table and CTS system

    ApplicationApplication

    to ships owner or owners agent.

    2. Submission of application letter with drawing to Japanese Customs BureauS can be done only by Ship owner or owners agent.

    3. Documents for explaining CTS system and tank table are to be submitted byth thi d t i d d tthe third party independent surveyor.

    4. If required from customs, the surveyor will explain to Japan customs directly.

    7

  • Procedure

    CTMSCTMS ReviewReview

    Procedure

    ApplicationApplication CalibrationCalibration CTMSCTMSVerificationVerificationReviewReview

    By CustomsBy Customs ApprovalApproval

    Tank CalibrationTank Calibration

    1. Tank Calibration at Site.

    2. Submission of the actual calibration result, designed value, its method& 3 copies of cargo tank gauging tables.

    8

  • Procedure

    CTMSCTMS ReviewReview

    Procedure

    ApplicationApplication CalibrationCalibration CTMSCTMSVerificationVerificationReviewReview

    By CustomsBy Customs ApprovalApproval

    CTMS VerificationCTMS Verification

    1. CTMS Verification test at Site.

    C S f2. Reporting CTMS Verification test results.

    3. Submission of CTMS Verification test report to Japanese Customs Bureaui J tvia Japanese agent.

    9

  • Procedure

    CTMSCTMS ReviewReview

    Procedure

    ApplicationApplication CalibrationCalibration CTMSCTMSVerificationVerificationReviewReview

    By CustomsBy Customs ApprovalApproval

    Review by CustomsReview by Customs

    C SGS S f SGSExplanation to Japanese Customs Bureau by SGS Japan or SNKK as a partner of SGS, if required.

    10

  • Procedure

    CTMSCTMS ReviewReview

    Procedure

    ApplicationApplication CalibrationCalibration CTMSCTMSVerificationVerificationReviewReview

    By CustomsBy Customs ApprovalApproval

    ApprovalApproval

    1. Additionally sending calibration table to ship owner or owners agent for local offices of Japanese customs.( f f ff(Number of copies depend on numbers of local customs offices.

    - Min 1 to Max 15 copies for LNG/LPG)

    2 D li f d t bl t Shi i Shi d A t2. Delivery of approved tables to Ship owner via Ship yard or Agent.

    11

  • Documents for Japan customs approvalDocuments for Japan customs approval

    Initial approval Renewal of approval pp( First approval after shipbuilding)

    Method for tank calibration

    pp(Intermediate CTS verification )

    Certificates for used Method for tank calibration Detail data of Tank calibration Tank calibration result

    S b i i f k bl

    Certificates for used instruments

    Method for CTS verificationCTS t ti d t Submission of tank tables

    Certificates for used instruments

    CTS testing data Certificates for CTS

    Method for CTS verification CTS testing data Certificates for tank calibration Certificates for tank calibration

    and CTS

    Only by the company who Any third party can do but

    12

    Only by the company who did tank calibration

    Any third party can do but preferably original body

  • Updated Japan customs regulationUpdated Japan custom s regulation

    Effective from August 1, 2010

    Changed ;T o(2) Year alidation Three(3) Year alidationTwo(2) Year validation Three(3) Year validation

    One year extendable without ifi ti

    Delete the extension regulationverification regulation

    No marking expiration date Marking expiration date

    Already approved vessel A l i ld l ti till tti l

    13

    Applying old regulation till getting new approval

  • 12

    Positions for customs approval?Positions for customs approval?

    SGS SNKK IntertekNKKK

    These companies are exactly SAME POSITION asIndependent calibration bodies forCalibration and CTMS verification activity.

    Calibration BodyCalibration Body

    Japanese Customs

    Approval BodyApproval Body

  • 13

    Frequent Questions Frequent Questions --1 1

    Is Approval of Japanese customs bureau for thetable and CTMS verification report required inevery case of the gaseous vessel?

    Independent surveyor (NKKK, SNKK, SGS, Intertek or other Surveyor company)s reports table & report are essential to get an approval without exception.

    What is meaning of the NKKKs stamp?

    It means just NKKKs stamp for their report, not the approvalfrom the customs. NKKK also should submit their report to customs to obtain the bureaus approval. It is same as SGS, SNKK, Intertek

  • 14

    Frequent Questions Frequent Questions --22

    How about times which required to obtain approval?Is it same for all surveyor companies like SGS, SNKK, NKKK, Intertek?

    These days, so many vessels are in line at the office of the customs. Normally it will take more than one month. But in emergency case, the date can be minimized under the special situation like urgently fixed port entering schedule.The required time will not be different to each surveyors company in that Japanese customs do not give any inequality for the approval.

  • When you need to be sure aboutWhen you need to be sure aboutWhen you need to be sure aboutWhen you need to be sure about

    SAFESAFE ACCURATEACCURATE C lib tiC lib ti FASTFAST HIHI--TECHTECH

    CalibrationCalibration

    HIHI--TECHTECH

    - Please contact the below persons

    : [email protected]

    [email protected] ( MP : 82 17 552 0490, T: 82 51 630 7061 )

    14