Sector Ports & Harbors Project Type Fish Ports Project Title Philippine Nationwide Fish Ports Packages I, II, and III Project Location Sual, Lucena, Camaligan (Luzon Is.), Iloilo (Panay Is.), Zamboanga, Davao, Gen. Santos (Mindanao) Client Philippines Fishery Development Authorities, Dept. of Agriculture Project Period 1980 – 2010 General Santos Fish Port Tuna landing at Gen. Santos Fish Port Auction of sardines at Market Hall Problems addressed by the Project Fish production of Philippines was growing from 0.4 million tons/year in 1970’s to more than 2 million tons/year in 2010 with drastic increase of commercial fishery production. Including aqua-culture, the Philippines ranked 5th among the top fish producing countries in the world. The Government of the Philippines has continuously sought improvement of fishery industries: in 1970’s when the fish port facilities were absolutely lacking, in 1980’s when promoting export of high value frozen prawn and big size fresh tuna, in 1990’s when targeting reduction of spoilage, preservation of freshness, improvement of hygienic fish handling, and in 2000’s fishery resource management and development of new fish grounds. Service Provided OC Global was continuously serving the development of Philippine Fish Ports starting construction management of Manila Capital Region’s Navotas Fish Port in 1970’s, and succeeding Nationwide development of Fish Ports Packages I, II, and III which were implemented in 1980’s, 1990,s and 2009-2010 respectively. The fish ports and the relevant facilities are summarized in the following Table: Package Period Fund Services rendered Fish Ports Major Facilities M/P F/S D/D C/M EIA Reclamation Dredging Pier/ Quay Breakwater Slipway/ Ship-repair Fish Market Cold Storage/ Freezer Ice Making Solar Power I 1980- 1990 OECF & GOP - Sual - - Lucena - Camaligan - - - - Iloilo - Zamboanga - II 1992- 2000 OECF & GOP Davao - - Gen. Santos - - Cadiz Surigao & Others - - III 2009- 2010 JICA - - Iloilo - - Camaligan - - - - - Lucena - - - - Sual - - - - - Davao/ Bislig - Municipal Fish Ports - - M/P:Master Plan, F/S: Feasibility Study, D/D: Detailed Design, C/M: Construuction Management, EIA: Environmental Impact Assessment, GOP: Government of Philippines Launching Caissons for Breakwater of Iloilo Fish Port. This is the first caisson type structure in Philippines

Upload: phungthu

Post on 16-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Problems addressed by the Project Service Provided · Sector Ports & Harbors Project Type Fish Ports Project Title Philippine Nationwide Fish Ports Packages I, II, and III Project

Sector Ports & Harbors

Project Type Fish Ports

Project Title Philippine Nationwide Fish Ports Packages I, II, and III Project

LocationSual, Lucena, Camaligan (Luzon Is.), Iloilo (Panay Is.), Zamboanga, Davao, Gen.

Santos (Mindanao)

Client Philippines Fishery Development Authorities, Dept. of Agriculture

Project Period 1980 – 2010

General Santos Fish Port Tuna landing at Gen. Santos Fish Port Auction of sardines at Market Hall

Problems addressed by the Project

Fish production of Philippines was growing from 0.4 million tons/year in 1970’s to more than 2 million tons/year in 2010 with drastic increase of commercial fishery production. Including aqua-culture, the Philippines ranked 5th among the top fish producing countries in the world.

The Government of the Philippines has continuously sought improvement of fishery industries: in 1970’s when the fish port facilities were absolutely lacking, in 1980’s when promoting export of high value frozen prawn and big size fresh tuna, in 1990’s when targeting reduction of spoilage, preservation of freshness, improvement of hygienic fish handling, and in 2000’s fishery resource management and development of new fish grounds.

Service Provided

OC Global was continuously serving the development of Philippine Fish Ports starting construction management of Manila Capital Region’s Navotas Fish Port in 1970’s, and succeeding Nationwide development of Fish Ports Packages I, II, and III which were implemented in 1980’s, 1990,s and 2009-2010 respectively. The fish ports and the relevant facilities are summarized in the following Table:

Package Period Fund

Services rendered

Fish Ports

Major Facilities

M/P F/S D/D C/M EIA Reclamation DredgingPier/Quay

BreakwaterSlipway/

Ship-repairFish

Market

Cold Storage/ Freezer

Ice Making

Solar Power

I1980-1990

OECF & GOP

○ ○ ○ ○ -

Sual ○ ○ ○ - ○ ○ ○ ○ -

Lucena ○ ○ ○ ○ ○ ○ ○ ○ -

Camaligan ○ - ○ - - ○ ○ ○ -

Iloilo ○ ○ ○ ○ ○ ○ ○ ○ -

Zamboanga ○ ○ ○ ○ ○ ○ ○ ○ -

II1992-2000

OECF & GOP

○ ○ ○ ○ ○

Davao ○ ○ ○ ○ - ○ ○ ○ -

Gen. Santos ○ ○ ○ ○ - ○ ○ ○ -

Cadiz Surigao & Others

○ ○ ○ ○ - ○ ○ ○ -

III2009-2010

JICA ○ ○ - - ○

Iloilo - ○ ○ - ○ ○ ○ ○

Camaligan ○ - - - - ○ ○ -

Lucena - - ○ - ○ ○ ○ -

Sual - - ○ - - ○ ○ ○ -

Davao/ Bislig ○ ○ ○ ○ ○ ○ ○ ○ -

Municipal Fish Ports

○ ○ ○ ○ - ○ ○ ○ -

M/P:Master Plan, F/S: Feasibility Study, D/D: Detailed Design, C/M: Construuction Management, EIA: Environmental Impact Assessment, GOP: Government of Philippines

Launching Caissons for Breakwater of Iloilo Fish Port. This is the first caisson type structure in Philippines