Page 1: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

12009-04-23 Problematic soils - a euphemism ..

Geoteknikdagen 2009-06-12

Problematic soils -

a euphemism for problematic geo-engineers?

Jørgen S. Steeenfelt

COWI

Page 2: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

22009-04-23 Problematic soils - a euphemism ..

Outline - introduction

• Problematic soils?- does the term make sense?- what are the clues?- global/local validity

• Is it a euphemism?- soul searching question for all

• Case histories- Rødsand 2 Offshore Wind Farm - Ruwais Sulphur Extension

• Closing remarks

Page 3: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

32009-04-23 Problematic soils - a euphemism ..

Problematic soils?

• 3rd Int. Conf. Problematic Soils, Adelaide 2010

Paper aspects

• Identification of problem soils

• Test methods

• Engineering geological aspects

• Avoiding distress to infrastructure

• Case studies

• Peat and organic soils• Volcanic soils• Expansive soils• Collapsible soils• Carbonate rich soils• Lateritic soils• Tailings• Deep fills• Dispersive soils• Unsaturated soils

Page 4: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

42009-04-23 Problematic soils - a euphemism ..

How about closer to home?

• Danish Code of Practice- only indirect reference (GC 3)

• Tertiary clays• Palaeogene clays• Chalk with cavities• Soils with incr. k

with depth below GWT

Page 5: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

52009-04-23 Problematic soils - a euphemism ..

How about closer to home?DS 415 (Geotechnical Category 3)

• Multi-storey basements

• Structures with large differential water pressures

• Temporary or permanent GW-lowering involving serious risk of damage to structures or soil strata

• Fills and pavements subjected to significant dynamic loading

• Machine foundations subject to significant dynamic exitation

• Structures with extreme cyclic loading

• Larger bridges and tunnels

Page 6: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

62009-04-23 Problematic soils - a euphemism ..

Postulate:problematic = failure to recognize or understand

• Local, comparable experience

• Importance of adequate and timelyground investigations

• Difficulties in specifying, testing and interpreting lab. and field tests

• Confusion of measured, derived, characteristic & design values

• Geological set-up and stratification

• Application of propertheoretical framework

• Abuse of numerical tools(garbage in garbage out)

Page 7: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

72009-04-23 Problematic soils - a euphemism ..

Euphemism?

• Problematic soils?

• Challenging soils

No!Yes!

Avnstrøm (DGF's 40th anniversary): Øresund soil conditions - straight forward; no work for geo-engineers!

Page 8: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

82009-04-23 Problematic soils - a euphemism ..

Challenge is our middle name-not problematic

Page 9: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

92009-04-23 Problematic soils - a euphemism ..

Case histories

Rødsand 2Offshore Wind Farm

Page 10: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

102009-04-23 Problematic soils - a euphemism ..

Location of Rødsand 2 offshore wind farm

Page 11: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

112009-04-23 Problematic soils - a euphemism ..

Project with 90 wind turbines (2.3 MW)

• Client: E.ON with Grontmij Carl Bro as consultant

• Contractor: Aarsleff-Bilfinger Berger JV with COWI as designer

• Certifying body: DNV

Page 12: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

122009-04-23 Problematic soils - a euphemism ..

Ground conditions: predominantly glacial deposits, clay till/sand till

Extent of site assessment data

• 183 CPTs tests- depth 2.9 ± 2.4 m; 86 outside footprint

• 37 vibrocores

• 80 geotechnical boreholes- majority to 7 m depth

• 200 UU tests - in lieu of field vane testing

• 19 triaxial CU tests

• supplementary soil investigations by ABJV- geotechnical boreholes with SPT

Page 13: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

132009-04-23 Problematic soils - a euphemism ..

Foundation in Clay till/sand till business as usual?

• CPT tests very shallow

• Stop on Rf (<0.8 MPa)

Row 2

-12

-10

-8

-60 500 1000 1500

cu [kPa]

Level[m]

Foundationlevel

• Design Basis:cu = 200 (250) kPa below CPT/borehole data

• Need for confirmation

• Correlation of SPT - su

• Drained strength parameters from CU triax

Page 14: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

142009-04-23 Problematic soils - a euphemism ..

Comparison of UU and CU

0

5

10

15

20

0 200 400 600 800 1000

Undrained shear strength (kPa)

Dep

th b

elow

sea

bed

(m)

Page 15: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

152009-04-23 Problematic soils - a euphemism ..

Foundation in Clay till/sand till Triaxial CU-tests

• Individual tests vary

tr' = 24.4 to 39.5°c' = 23 to 116 kPa

• Plot minimum and maximum failure points

• Agree on design values

0

250

500

750

1000

0 500 1000 1500

MIT stress s (kPa)

t (kPa)

Maximum failureMinimum failureFi =33, c' =25

Page 16: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

162009-04-23 Problematic soils - a euphemism ..

Foundation in Clay till/sand till business as usual?

• Steel, concrete, challenging soil= wind power in near future

• Foundations on chalk & Palaeogene deposits pending

Page 17: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

172009-04-23 Problematic soils - a euphemism ..

Case histories

Ruwais Sulphur extensionPile load testing

Page 18: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

182009-04-23 Problematic soils - a euphemism ..

Ruwais Sulphur Expansion - Abu Dhabi

Future structureExisting structure

Page 19: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

192009-04-23 Problematic soils - a euphemism ..

DesignConcrete Design

Mooring Dolphins

Precast shell with cast-in steel girders

Shell positioned on top of the piles

Filled with in-situ concrete -> Reduces the weight during construction

Page 20: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

202009-04-23 Problematic soils - a euphemism ..

Pile Design

Tubular steel piles - Ø1067 mm, 22 mm (Dolphins)- Ø 914 mm, 19 mm (Trestle & Pivot)

Raking 1:4

Vertical capacity: Fleming et al.s = 0.41 sqrt(UCS/1 MPa)

Horizontal capacity: p-y curves- sand acc. to API for superficial deposits- weak rock acc. to Reese (1977)

Page 21: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

212009-04-23 Problematic soils - a euphemism ..

Quadrant beam and pivot foundation

Page 22: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

222009-04-23 Problematic soils - a euphemism ..

c d

Pile installation procedure

Temporary casing driven to bedrock

Coring rock socket

Flush & clean

Tremie concrete socket

Place pile with spacers

Fill annulus with sand

Retract temp. casing

Pour mass concrete

Page 23: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

232009-04-23 Problematic soils - a euphemism ..

Pile installation and testing offshore

Ø762 mm

Wirth drilling rig

Loading platform

Page 24: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

242009-04-23 Problematic soils - a euphemism ..

Unconfined compressive strength of bedrock

Soil parameters

-25

-20

-15

-10

-5

00 5 10 15 20 25

UCS (MPa)Le

vel (

m)

Page 25: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

252009-04-23 Problematic soils - a euphemism ..

How do we trust the design assumptions?

Comparable experience

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

0 1 2 3 4 5 6 7 8 9 10

UCS [MPa]

Dep

th [m

]

0

2

4

6

8

10

12

14

16

0 2 4 6 8 10 12 14

Bearing Capacity [MN]

Dep

th b

elow

top

of ro

ck [m

]

Shaft adhesionFleming

Shaft adhesionTomlinson

Shaft adhesionAASHTO

Design profile

10 - 16.5 MN

Page 26: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

262009-04-23 Problematic soils - a euphemism ..

Dolphins

Non-linear springs

FEM analysis

Breasting Dolphins and Mooring Dolphins:

– FEM program Robot

– Three- dimensional space frame / plate model

– Governing forces in piles and cappingbeam

Design application

Page 27: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

272009-04-23 Problematic soils - a euphemism ..

Available borehole information

N

N

New facility

Page 28: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

282009-04-23 Problematic soils - a euphemism ..

Principle of load testing

Page 29: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

292009-04-23 Problematic soils - a euphemism ..

Evaluation of load testing

ultmob

mob

ult

mob

34

-1

0

1

2

3

4

5

0 2 4 6 8 10 12 14Tension load on trial pile (MN)

Top

of ro

ck s

ocke

t (m

m)

Top rock socket Appendix A

Pile head - elastic Appendix

ult = 832 kPa

ult = 3.5 mm

(Design ult 615 kPa)

Page 30: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

302009-04-23 Problematic soils - a euphemism ..

Evaluation of onshore load testing

0

200

400

600

800

1000

0 1 2 3 4 5 6

Depth below top of trial pile (m)

Mob

ilize

d sh

ear s

tres

s (k

Pa) 2L-14

2L-122L-81L-41L-2

Page 31: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

312009-04-23 Problematic soils - a euphemism ..

Evaluation of onshore load testing

0.0

0.1

0.2

0.3

0.4

0.5

0.6

1 10 100

Time (minutes)

Cre

ep d

ispl

acem

ent (

mm

)Extensometer 1

Pile head

0.33 mm/lct

0.07 mm/lct

Page 32: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

322009-04-23 Problematic soils - a euphemism ..

Evaluation of onshore load testing

0

2

4

6

8

600 700 800 900 1000

Ultimate shear stress ult (kPa)

Ulti

mat

e di

spla

cem

ent

ult (

mm

)

dult derivedAverage stress in L2-14

max. pile displ.Design UCS char.

UCS average

Conclusion

• Pile capacity >> design

• Pile system works

• Offshore tests confirm this

• Tension pull out not an issue

• Results forms back-bone data

Page 33: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

332009-04-23 Problematic soils - a euphemism ..

Evaluation of 762 mm offshore pile capacity (MN)

Char. shear stress Design Onshore test

615 kPa 832 kPa

Cone Pile diameter 3.3 5.9

uplift Socket diam. 4.2 7.7

no Pile diameter 4.3 8.0

uplift Socket diam. 5.5 10.5

Ø762 mm net capacity > 7.2 MN

Page 34: Problematic soils - a euphemism for problematic geo-engineers? · 1 2009-04-23 Problematic soils - a euphemism .. Geoteknikdagen 2009-06-12 Problematic soils - a euphemism for problematic

342009-04-23 Problematic soils - a euphemism ..

Keep challenges at bay!

• Problems challenges engineering solutions

• Soil - structure - water - environment interaction

• Have fun with your projects