![Page 1: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/1.jpg)
1
Preservation Role in Risk-Based
Inspections
Glenn A. Washer, PhD
University of Missouri
Columbia, MO
November 13, 2013
Midwest Bridge Preservation Partnership
![Page 2: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/2.jpg)
NCHRP 12-82
2
This investigation was sponsored by TRB under the
NCHRP Program. Data reported are work in
progress. The contents of this presentation has not
been reviewed by the project panel or NCHRP, nor
do they constitute a standard, specification, or
regulation.
![Page 3: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/3.jpg)
NCHRP 12-82 Goals
• Goal: Improve the safety and reliability of bridges – focusing inspection efforts where most needed
• Optimize the use of resources – Better match inspection requirements to
inspection needs
– Develop a rational process for assessing inspection needs using reliability theories
3
![Page 4: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/4.jpg)
Agenda
• What is Risk-Based Inspection
• How does Preservation fit in?
• Conclusion
4
![Page 5: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/5.jpg)
Risk-Based Bridge Inspection
• Inspections that consider
– The reliability of bridge elements • Likelihood of deterioration and damage
• Condition, design, materials and loading
– The consequences of that damage • Minor serviceability issues, safety issue?
• Inspection interval and scope
– Match inspection requirements with inspection needs for a bridge
5
![Page 6: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/6.jpg)
Motivation
6
Time to corrosion initiation for RC Typical lifetime performance
![Page 7: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/7.jpg)
Example Guidelines
• ASME (2007). Inspection Planning Using Risk-Based Methods, The American Society of Mechanical Engineers: 92.
• API (2002). "Risk-Based Inspection, API Recommended Practice 580." 45. (updated)
• API (2008). "Risk-Based Inspection Technology, API Recommended Practice 581.“
• (2003). Surveys Using Risk-Based Inspection for the Offshore Industry Houston, TX, American Bureau of Shipping: 62.
• INTERIM ADVICE NOTE 148/12, Risk Based Principal Inspection Intervals
• Transport Wales Framework Lot 5,Task Order 5/2, BD 63/07 Risk Based Inspections Guidance Note February 2010
• NRC docs
7
![Page 8: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/8.jpg)
Definitions
• Reliability: Ability of an item, component or
system to operate safely under designated
operating conditions for a designated period
of time or number of cycles.
• Risk: Combination of the probability of an
event and its consequence.
8
![Page 9: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/9.jpg)
Risk – Based Approaches
9
R = POF x C
R = Likelihood x C
R = Frequency x C
R = Occurrence x C
Consequences:
• Economic
• Environmental
• Safety
Requires time interval
![Page 10: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/10.jpg)
Reliability-Based Inspection
(RBI) • What can go wrong?
– Identify damage modes for elements
– Deterioration mechanisms
• How likely is it? • Categorization based on reliability characteristics of
bridge elements
• Based on expert judgment and expert elicitations • Past experience
• Analysis of existing or potential damage modes
• Deterioration data if available (and relevant)
• Preservation activities
• What are the consequences? – How important is it?
10
![Page 11: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/11.jpg)
Factors in RBI
• Damage Modes and deterioration mechanisms
– Attributes affecting likelihood
• Occurrence factor (POF)
• Consequences
– Experience, redundancy, situation (ADT, traffic speed), analysis, etc.
11
![Page 12: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/12.jpg)
Damage Modes
12
Damage Mode: Section Loss
Det. Mechanism: Corrosion Damage Mode: Impact?
Det. Mechanism: Impact
![Page 13: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/13.jpg)
Identifying Damage Modes
13
http://thewritepractice.com/emergency-your-creativity-is-dying/
Cause of death Likelihood (%)
Heart attack ●●●●●○○○○○
Hit by car ●●●○○○○○○○
Murdered ●●○○○○○○○○
Brain Aneurism ○○○○○○○○○○
Lightning ○○○○○○○○○○
![Page 14: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/14.jpg)
Concept - Likelihood
14
![Page 15: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/15.jpg)
Concept - Likelihood
15
Bad attributes Unique
![Page 16: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/16.jpg)
Where does a bridge fall on
the distribution?
16
25.221.618.014.410.87.23.60.0
80
70
60
50
40
30
20
10
0
CR=4
Fre
qu
en
cy
Loc 1.544
Scale 0.7701
N 357
Histogram of CR=4Lognormal Yr. in Condition Rating
Years
![Page 17: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/17.jpg)
Concept - Consequences
• Water = low consequence
• Nuclear waste = Severe
17
![Page 18: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/18.jpg)
Consequences…
18
• Ex. Multi-girder 3 span PS vs. pin and hanger in two-girder (fracture critical) bridge
• Low, moderate, high and severe
• Design characteristics, scenario, documented experience, calculation
![Page 19: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/19.jpg)
Risk Matrix
• Plot values of likelihood and consequence
• Components in the top right corner are “high risk”
• High likelihood may not mean high risk, if consequence is small
• High consequence may not be high risk, if the likelihood is low
19
![Page 20: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/20.jpg)
Preservation Effect
20
Conditio
n
Time (yrs)
Preservation
Effect
Failure
![Page 21: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/21.jpg)
Preservation Effect
21
Conditio
n
Time (yrs)
Preservation
Effect
Failure
![Page 22: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/22.jpg)
Example
22
![Page 23: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/23.jpg)
Potential Benefits of RBI • Better, more effective and purposeful inspections
– Inspection plan (scope and interval) supported by engineering assessment by RAP
• Vs. Calendar-based inspection strategy
– Rational inspection strategies • Flexible intervals based on need and engineering analysis
• Allocate resources more effectively
– Focus inspections resources where most needed
• Value-added to preservation activities
• Improved bridge reliability and safety
23
![Page 24: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/24.jpg)
Preservation Role in RBI
• Preservation can reduce the POF and
thereby reduce the risk
– Reduce unnecessary inspections
– Focus inspection where most needed
– Allocate resources more effectively
24
![Page 25: Preservation Role in Risk-Based Inspections · PDF file"Risk-Based Inspection, API Recommended Practice 580." 45. (updated) • API (2008). "Risk-Based Inspection Technology, API Recommended](https://reader030.vdocuments.us/reader030/viewer/2022021421/5a8f4c6c7f8b9af27f8d53e1/html5/thumbnails/25.jpg)
Questions
• Questions?
25