Page 1: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

AeroMetric, Inc. Presents:An Airports GIS Lecture Series

Presenter

Todd G. Johnson, Airport Solutions Specialist

4-States Airport Conference September 16, 2013

ClickHere To

Start

Airports GIS:Project Creation& Data Submittal

Page 2: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

4-States Airport Conference September 16, 2013

Presenter

Todd G. Johnson, Airport Solutions Specialist

AeroMetric, Inc. Presents:An Airports GIS Lecture Series

Airports GIS:Project Creation& Data Submittal

Page 3: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Presentation Topics

Airports GIS Program Update (as of 16 Sept 13) Why Do YOU Need to Understand Airports GIS? What Are the Benefits of Using Airports GIS Why Should YOU Use Airports GIS? Types of AGIS Survey and Data Collection Projects Airport Project Scenarios – Group Participation What Can You Do to Prepare for Your eALP

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS: PROJECT CREATION & DATA SUBMITTAL

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Page 4: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

FAA Airports GIS Program Update(as of 16 Sept 2013)

Presented by:Todd G. Johnson

Airport Solutions Specialist

FAA AIRPORTS GIS PROJECT CREATION & DATA SUBMITTAL

Page 5: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

FAA SW Region eALP pilot airports creating eALPs on AGIS test (beta) system

AC 150/5300-18B Change 1 should be published by FAA very soon Minor editorial corrections Updates to CAD standard guidelines – i.e. line

types, lineweights, and color definitions to align with National CAD Standard/FAA-STD-002g

Addition of TERPS symbology to Chap 5 Tables Removed all references to the DMT tool Values updated due align with AIXM updates –

aeronautical information standards

Presented by:Todd G. Johnson

Airport Solutions Specialist

FAA AIRPORTS GIS & THE NEW DESIGN/AS-BUILT WORKFLOW

FAA AIRPORTS GIS NEWS WIRE

Page 6: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

“Why Do YOU Need to Understand Airports GIS?”

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Page 7: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS

Page 8: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Presented by:Todd G. Johnson

Airport Solutions Specialist

FAA AIRPORTS GIS PROJECT CREATION & DATA SUBMITTAL

“Today, airport sponsors must follow AC 150/5300-18 data collection standards and data submittal requirements for:

- Any project changing safety-critical data as identified in Table 4-1 of the AC - including runway end position, profiles, and NAVAIDS;

- The collection and processing of all data resulting from design, construction, or planning activities, requiring the development of or revision of existing instrument approaches;

- Projects modifying the non-safety-critical data in the airport layout plan; and

- Projects involving only non-safety-critical data, unless the airport falls into the transition period specified in the Airports GIS Transition Policy…”

Requirements of AC 150/5300-18

FAA Airports GIS Transition Policy for Non-Safety Critical

ProjectsAug 23, 2012

Page 9: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Presented by:Todd G. Johnson

Airport Solutions Specialist

FAA AIRPORTS GIS PROJECT CREATION & DATA SUBMITTAL

“For projects involving safety critical data (Table 1), all NPIAS airports are required to incorporate Airports GIS immediately. Master Plans or ALP updates that include aerial photography or obstruction surveys must be in conformance with the current versions of AC 150/5300-17 and -18.”

TransitionPolicy

Page 10: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Presented by:Todd G. Johnson

Airport Solutions Specialist

FAA AIRPORTS GIS PROJECT CREATION & DATA SUBMITTAL

Table 1

Page 11: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

How many people DO NOT KNOW how to create, or have never created, a project in Airports GIS?

Audience Poll

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Page 12: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Federal & FAA Guidance/Requirements

CFR Title 14 Part 77.9 states that any person/organization who intends to sponsor any of the following construction or alterations must notify the Administrator of the FAA:

• When requested by the FAA

• Any construction or alteration located on a public use airport or heliport regardless of height or location

FAA Advisory Circular 150/5300-18B states that the “…use of these guidelines is MANDATORY for the collection of geospatial airport and aeronautical data funded under Federal grant assistance programs. “

Mandatory terms such as "shall" or "must" used herein apply only to those who purchase the collection of geospatial airport and aeronautical data using Airport Improvement Program (AIP) or Passenger Facility Charge Program (PFC) funds, or those who seek to demonstrate compliance by use of the specific method described by this AC.” (Extracted from Page 1 of AC 150/5300-18B)

Page 13: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Because We Have the Technology

Page 14: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

The FAA’s Airports GIS Data Integration Plan

AirportsGIS

NFDC

5010

AeroNavServices

SOAR II

eALPs/MPs

ATO

AMD

Mods to

Standards

Page 15: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

What Are the Benefits of Using Airports GIS?

Page 16: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Benefits of Airports GISEliminate Duplicate Surveys

↓↓ ($) Reduce Costs for Airport Data Collection ($) ↓↓

Provides a Centralized Repository for ALL Airport Data

Single Source for Managing Critical Airport Projects

Helps the Airport & FAA Manage Airport Safety Critical Data

eALP Development, Coordination and Standardization

Data Supports Other Essential Lines of Business

Supports FAA NextGen / Airport Mapping dBase

What Are The Benefits of Airports GIS?

Page 17: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Safety and Liability Scenario

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Why Should YOU Use Airports GIS?

Page 18: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

SAFETY & LIABILITY SCENARIO

40:1 Approach/Departure Surface

RUNWAY

Ultimately, the FAA wants to keep things like this from happening!

Runway Extension Scenario

Standard runway with no obstacles within the 40:1 approach/departure surface.

No modifications have been made.GREAT LANDING CHARLIE!

Page 19: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Runway Extended

The airport has extended one runway end by 500 ft. due to identified RSA issues, and did not coordinate the construction through the appropriate channels.

The previous “tree” obstruction now penetrates the runway’s 40:1 approach/departure surface!

Let’s see what happens…

RUNWAY

500 ft.

SAFETY & LIABILITY SCENARIO

Page 20: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Excerpt - FAR Part 77

- Airport owners must have their plans on file with the FAA

- Minimum Requirements are planned runway end coordinates, elevation, and type of approach for any new runway or runway extension.

Penalty for Failure to Provide Notice Persons who knowingly and willingly fail to give such

notice are subject to criminal prosecution.

SAFETY & LIABILITY SCENARIO

Page 21: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

What Types of Projects Can Be Created in Airports GIS?

Ah dunno!

GIS whut?

Who’d a thunk it?

Page 22: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project CreationAirport & Project Types

Shortest Type

Longest Type

Most Common

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

• There are THREE types of projects that can be created

Page 23: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project Examples New Airport Survey Project (Reviewed by FAA)

Airside/Landside construction in or near airport safety critical zones Taxiway Construction or modifications in or near airport safety critical zones Airport Airspace Analysis (AAA) data & features for existing/non-modified runways PACS/SACS installations or relocations Master Plan survey project that includes safety critical “As-Built Data”

Existing Airport Data Project (Not Reviewed by FAA) Airport Planning Data – Does not require FAA review New airport facility construction outside critical areas

Support buildings, terminals, roads, utilities, etc. Apron construction or modifications Any “Non-Safety Critical” survey or airport planimetric data

Any survey data that is NOT REQUIRED to be reviewed and approved FAA

Design/As-Built Airport Data Project (Reviewed by FAA) New airport or runway construction Runway shifts, extensions, or modifications NAVAID installations/relocations (includes both radiating and VGSI)

Page 24: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project CreationAirport & Project Types

Most Common

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

• There are THREE types of projects that can be created

Page 25: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project CreationNew Airport Survey Project

• Most Common Type of Airports GIS Project

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Page 26: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project CreationAirport & Project Types

Shortest Type

Most Common

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Existing Airport Data Project

Page 27: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project CreationExisting Airport Data Project

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

• Shortest Airports GIS Project Type• Step 1 - Project Creation / Assign Access• Step 2 - Survey Data is Submitted• Step 3 - Project Creator Accepts the Data

• Project Complete• Submitted Data Must Meet the Following Requirements

• Existing or Translated Data• Must be compliant with ALL current FAA AC guidelines,

specifications, and accuracies• FAA Spec 405/most WAAS data is not AC-18B compliant

• Data must be traceable back to the original survey• Source documentation must show the who, what, where,

when, and how• If submitted data contains any “Safety Critical Data”, must have

proof that it went through the NGS review process• Planned Data

• Does not require NGS/FAA review• The only way to get this type of data in for eALP

Page 28: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project CreationAirport & Project Types

Shortest Type

Longest Type

Most Common

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Design/As-Built Airport Data Project

Page 29: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airports GIS Project CreationDesign/As-Built Airport Data Project

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

• Longest Type of Airports GIS Project• Could last 2-years or more• Used for New or Modified Instrument Procedure Design (IPD)

• Some Examples of Design/As-Built Airport Projects• New runway construction• Runway extensions, reductions, shifts, or relocations• New NAVAID installations or relocations

• http://www.faa.gov/airports/engineering/training/agis/media/videos/design_as_built_workflow.mp4

Its own separate2-hour lecture

Page 30: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Which Airports GIS projects types should be created?

New Airport Survey Project?Existing Airport Data Project?Design/As-Built Airport Data Project?

Airport Project Scenario #1

Full Master Plan PACS/SACS to be installed New Airport Airspace Analysis (AAA) No changes to airport safety critical features

210

New Project Planned Data = ExistingNew Project

w/ MP

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS:PROJECT CREATION SCENARIOS

PACS/SACS installation is ALWAYS it’s own NEW Airport Data Project!

Page 31: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Airport Project Scenario #2

RSA Issues Construction Project Offset runway 500’ 2 Years Out

PACS/SACS to be installed MP Update (ALP) AIP Funded Project

Design/As-Built Project

New ProjectNew Project Planned Data=Existing

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS:PROJECT CREATION SCENARIOS

Which Airports GIS projects types should be created?

New Airport Survey Project?Existing Airport Data Project?Design/As-Built Airport Data Project?

211

REQUIRES AIRPORTS GIS

Page 32: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Which Airports GIS projects types should be created?

New Airport Survey Project?Existing Airport Data Project?Design/As-Built Airport Data Project?

Airport Project Scenario #3

New Apron Construction AIP Funded Project

010

Landside = Existing

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS:PROJECT CREATION SCENARIOS

Submit only non-safety critical data, and/or NGS validated safety critical data, and/or planning data to an Existing Data Project

REQUIRES AIRPORTS GIS

Page 33: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Which Airports GIS projects types should be created?

New Airport Survey Project?Existing Airport Data Project?Design/As-Built Airport Data Project?

Airport Project Scenario #4

Audience Participation Projects

???

AIRPORTS GIS:PROJECT CREATION SCENARIOS

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Page 34: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Questions on previous topics? Airports GIS Project Types

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Page 35: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

What Can You Do to Prepare for Your eALP?

Page 36: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

The airports starting block for getting

AIRPORT SAFETY CRITICAL DATA into Airports GIS!

FAA AC 150/5300-18B COMPLIANTAIRPORT AIRSPACE ANALYSIS (AAA)

This data used by FAA AeroNav Services for:

Instrument ProcedureDesigns (IPD) & reviews(Approach & Departure)

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Page 37: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

FAA AC 150/5300-18B AAASAFETY CRITICAL FEATURES

Table 4-1 Airport-Related Safety Critical Data• Airport Airspace

• Part 77 and Obstruction Identification Surfaces (OIS)• Reportable AAA Obstacles/Obstructions

• Significant obstacles within Approach/Departure areas• Obstacles within circling areas

• On-Airport Navigational Aids (NAVAIDS)• Runways, Runway Ends/Threshold Locations & Elevations

• Includes all published take-off & landing distances• Touch-down zone elevations (TDZE)• Displaced landing threshold locations/elevations

• Heliport Data - Locations/Elevations Including TLOF/FATO• Airport Elevation/ARP

• Must survey end points and centerline profiles of all landing surfaces to validate airport elevation

• Data used to create base elevation of AAA surfaces• Not a complete list – must include several non-safety

critical features/data to support AeroNav Services IPD

Page 38: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

AIRPORT AIRSPACE ANALYSIS (AAA)PRE-AAA OBS MITIGATION (LIDAR)

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Hailey (Sun Valley), Idaho - Part 77

Page 39: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Topics Covered

Airports GIS Program Update (as of 16 Sept 13) Why Do YOU Need to Understand Airports GIS? What are the Benefits of Using Airports GIS Why Should YOU Use Airports GIS? Types of AGIS Survey and Data Collection Projects Airport Project Scenarios – Group Participation What Can You Do to Prepare for Your eALP

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS: PROJECT CREATION & DATA SUBMITTAL

Page 40: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Online Educational ResourcesFAA Airports GIS Video Training Series https://www.faa.gov https://airports-gis.faa.gov/public http://www.faa.gov/airports/planning_capacity/airports_gis_electr

onic_alp/

FAA NextGen Implementation Plan for 2012 (eBook) http://

www.faa.gov/nextgen/implementation/media/NextGen_Implementation_Plan_2012.pdf

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

AIRPORTS GIS: PROJECT CREATION & DATA SUBMITTAL

Page 41: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

Final Questions & Answers…

AIRPORTS GIS: PROJECT CREATION

& DATA SUBMITTAL

Presented by:Todd G. Johnson

Airport Solutions Specialist

Page 42: Presenter Todd G. Johnson, Airport Solutions Specialist 4-States Airport ConferenceSeptember 16, 2013 Click Here To Here To Start

AeroMetric, Inc. Presents:An Airports GIS Lecture Series

Presenter

Todd G. Johnson, Airport Solutions Specialist

[email protected]

or

AzAA Spring Conference - Page, AZ April 7, 2013

Airports GIS:Project Creation& Data Submittal