presentation style best practise of implementing tool for modelling
TRANSCRIPT
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
1/30
BEST PRACTICE:STREAMLINE EA
IMPLEMENTATION USINGTOOLING
MICHAELA CATOPRINCIPAL SYSTEM CONSULTANTSWEDEN
POWERDESIGNER
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
2/30
2 Sybase Confidential June 26, 2012
Are you prepared to move to the nextstep?
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
3/30
3 Sybase Confidential June 26, 2012
Here today?
Methodology
Method
Process
Tool
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
4/30
4 Sybase Confidential June 26, 2012
GOAL INCREASE PRODUCTIVITY
Methodology
Method
Process
Tool
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
5/30
5 Sybase Confidential June 26, 2012
Before you start
Think:
Change management80/20
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
6/30
6 Sybase Confidential June 26, 2012
PREREQUISITES FORIMPLEMENTATION PROJECT
Method and methodology Scope of implementation (as is or)
Gap analysis (tool methodology, new tool old tool)
Management commitment and involvement
Project organization and method Project goals and measurements linked to overall businessgoals, i.e., operational excellence
Success measurement
Before beginning implementation, the following need to be in place
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
7/307 Sybase Confidential June 26, 2012
Time to start
Prepare your roll-out plan:Project setup
Bridging gapTraining
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
8/308 Sybase Confidential June 26, 2012
Do your analyzes!
Methodology Power
Designer
Old toolGAP GAP
Competence
UsersGAP
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
9/309 Sybase Confidential June 26, 2012
Use gap analysis to decide how PowerDesigner can bestsupport methodology
If PowerDesigner replaces an old tool, perform an analysisto determine gaps
PREREQUISITES: GAP ANALYSIS
Methodology PD Old toolGAP GAP
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
10/3010 Sybase Confidential June 26, 2012
Be clear on roles and responsibilities
Who can take decisions?
Who talks to who?
Who should be trained?
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
11/3011 Sybase Confidential June 26, 2012
Configuration project
Educationproject
SetupMethodology
Support
ProjectOffice
Method/methodology
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
12/3012 Sybase Confidential June 26, 2012
IMPLEMENTATION PROJECTS(CONTD)
Methodology support project Customize PowerDesigner to support method
Report templates
Model templates
Guidelines (documentation, best practices)
Education project Configuration team
Setup/configuration
All users Method/methodology
Basic tool knowledge
Tool with methodology
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
13/3013 Sybase Confidential June 26, 2012
IMPLEMENTATION PROJECTS
Project office Project methodology
Decision maker
Project/implementation support
Setup project
Set up/install (standalone or license server, setup package)
Integrate with companys existing environment
Customize PowerDesigner (preferences, default paths,and other general common configurations)
Give access to user/user groups
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
14/3014 Sybase Confidential June 26, 2012
Take care of the end-users
Lower barriers
Show benefits
Support is vital
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
15/3015 Sybase Confidential June 26, 2012
Team of power usersduring implementation
(one from each user group)
Support during implementation(FAQs, documentation, etc.)
Support team/sMethodology
supportconfig. team
Setup team
IMPLEMENTATION ORGANIZATION
Prerequisite of implementation:Reponsible for methodology, creating requirement spec,deciding scope, tool configuration, and education
Responsible for communication,implementation, and projects(works in conjunction withmethodology team)
Center ofexcellence
Methodologyteam
Power userteam
Configurationteam
Educationteam
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
16/3016 Sybase Confidential June 26, 2012
SUPPORT DURING IMPLEMENTATION
All parts and projects require startup support consisting of: Customization and common configuration documentation
Guidelines
Product support
Central support to provide contact information andinstance guidance
Startup support increases comfort with the tool and successof the project
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
17/3017 Sybase Confidential June 26, 2012
Roll out
Methodology support
Customized for your enviorment
PROCESS FLOW
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
18/3018 Sybase Confidential June 26, 2012
PROCESS FLOW:ROLLOUT PROJECT
Startconfiguration
projects
Workshops(basic training,
what to do)
Configuration work(consultant needs
or training forconfiguration teamin PowerDesigner)
Get methods and
requirements frommethodology team
The method has to be inplace and requirements
should reflect its usein the tool
Set upimplementation
projects
Set up projects
Set organization anddecision process
Populate with chosencandidates
Set timeframe foreach project
Educateimplementation
team
Educate all projectmembers
in the methodology(see prerequisites)
Integratewith education
How to work inPowerDesigner
according tomethodology
Company-specificadjustments
Common templates
Kickoff
Information
about whatis comingregarding
method, tool,and training
Education
Rollout
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
19/30
19 Sybase Confidential June 26, 2012
Training
Project members
PowerUsers
End users
PROCESS FLOW
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
20/30
20 Sybase Confidential June 26, 2012
PROCESS FLOW:CONFIGURATION/EDUCATION PROJECT
Integratewith education/
documentRollout
Educatemethod and
modeling
Decide scope,
customization(general to tool, support
for methodology)
Customize PD
to meetrequirements for
methodology
Integrate PDto companyenvironment
Customize tooland package
setupconfiguration
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
21/30
21 Sybase Confidential June 26, 2012
Teamwork is important
Stearing commity Configuration teamSS
Education team
S
CUSTOMER SYBASE
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
22/30
22 Sybase Confidential June 26, 2012
CUSTOMER-SYBASEIMPLEMENTATION ROLES
Sybase provides:
Training for trainers and the configuration team
Advice/knowledge of combining method and tool
Competence and support during the configuration phase PowerDesigner expert
Sybase should be part of the steering committee andconfiguration team and act as advisors to the education team
Stearing committte Configuration teamSS
Education team
S
The division of roles between the customer and Sybase depends on the customers
knowledge of PowerDesigner and to what extent it should be customized
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
23/30
23 Sybase Confidential June 26, 2012
Summary: Risks
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
24/30
24 Sybase Confidential June 26, 2012
IMPLEMENTATION RISKS
Management commitment Ensure that management is committed
Agree on measurement
Include management on steering committee
Success criteria
Agree on clear success criteria
Prerequisites
Make sure all prerequisites are in place
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
25/30
25 Sybase Confidential June 26, 2012
IMPLEMENTATION RISKS(CONTD)
Time Avoid new methods
Always implement tool using existing methods
Adoption
Ensure that method and customization are partof training get it right from the beginning
Use templates, customizations, and documentationto support best practice
Support team and superusers for the method tool
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
26/30
26 Sybase Confidential June 26, 2012
Summary: Success criterias
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
27/30
27 Sybase Confidential June 26, 2012
Success criterias 1:2
To meet goal of increased productivity by means of using PowerDesigner.Some critical success factors to point out for the implementation:
A well defined decisionprocess.
A clear and efficient methodologyhas to be created and thoroughlyworked through.
The scope of the project has
to be well defined, but still retainflexibility to be able to meet upwith futher requirements thatwill improve ease of work.
Management team should be set upwith full authority to make necessarydecisions.
Team specific formethod/methodology has to be inplace the with necessary authority.
Management team has to be wellinformed and the cooperationbetween management team andmethod team has to be efficient.
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
28/30
28 Sybase Confidential June 26, 2012
Success criterias 2:2
The end users must veryquickely get the feeling thatthis will ease and improvetheir work.
Education should be
(carried out in a way) so that itis evident that the work of theend user is well understoodby the teacher and their dailyworks should also be reflectedin education material.
Clear support structure bothfor projects and users duringthe implementation project
and after.
Methodology team has to finish theirwork with customization, templatesand documentation before the enduser start their education.
Methodology team has to finish theirwork and clearly document howmethod tool are meant to work.Teacher has to have a good knowledgeboth about the methodology and thetool and be able to convey it to theusers.
Information about contact personstheir scope and authorities mustspread through out the organisationand project. Set up a support stuctureto bring security to the users andgarantee follow up. This conserns bothtool and methodology.
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
29/30
Discussion
-
7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling
30/30