    BEST PRACTICE:STREAMLINE EA

    IMPLEMENTATION USINGTOOLING

    MICHAELA CATOPRINCIPAL SYSTEM CONSULTANTSWEDEN

    POWERDESIGNER

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    2/30

    2 Sybase Confidential June 26, 2012

    Are you prepared to move to the nextstep?

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    3/30

    3 Sybase Confidential June 26, 2012

    Here today?

    Methodology

    Method

    Process

    Tool

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    4/30

    4 Sybase Confidential June 26, 2012

    GOAL INCREASE PRODUCTIVITY

    Methodology

    Method

    Process

    Tool

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    5/30

    5 Sybase Confidential June 26, 2012

    Before you start

    Think:

    Change management80/20

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    6/30

    6 Sybase Confidential June 26, 2012

    PREREQUISITES FORIMPLEMENTATION PROJECT

    Method and methodology Scope of implementation (as is or)

    Gap analysis (tool methodology, new tool old tool)

    Management commitment and involvement

    Project organization and method Project goals and measurements linked to overall businessgoals, i.e., operational excellence

    Success measurement

    Before beginning implementation, the following need to be in place

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    7/307 Sybase Confidential June 26, 2012

    Time to start

    Prepare your roll-out plan:Project setup

    Bridging gapTraining

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    8/308 Sybase Confidential June 26, 2012

    Do your analyzes!

    Methodology Power

    Designer

    Old toolGAP GAP

    Competence

    UsersGAP

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    9/309 Sybase Confidential June 26, 2012

    Use gap analysis to decide how PowerDesigner can bestsupport methodology

    If PowerDesigner replaces an old tool, perform an analysisto determine gaps

    PREREQUISITES: GAP ANALYSIS

    Methodology PD Old toolGAP GAP

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    10/3010 Sybase Confidential June 26, 2012

    Be clear on roles and responsibilities

    Who can take decisions?

    Who talks to who?

    Who should be trained?

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    11/3011 Sybase Confidential June 26, 2012

    Configuration project

    Educationproject

    SetupMethodology

    Support

    ProjectOffice

    Method/methodology

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    12/3012 Sybase Confidential June 26, 2012

    IMPLEMENTATION PROJECTS(CONTD)

    Methodology support project Customize PowerDesigner to support method

    Report templates

    Model templates

    Guidelines (documentation, best practices)

    Education project Configuration team

    Setup/configuration

    All users Method/methodology

    Basic tool knowledge

    Tool with methodology

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    13/3013 Sybase Confidential June 26, 2012

    IMPLEMENTATION PROJECTS

    Project office Project methodology

    Decision maker

    Project/implementation support

    Setup project

    Set up/install (standalone or license server, setup package)

    Integrate with companys existing environment

    Customize PowerDesigner (preferences, default paths,and other general common configurations)

    Give access to user/user groups

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    14/3014 Sybase Confidential June 26, 2012

    Take care of the end-users

    Lower barriers

    Show benefits

    Support is vital

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    15/3015 Sybase Confidential June 26, 2012

    Team of power usersduring implementation

    (one from each user group)

    Support during implementation(FAQs, documentation, etc.)

    Support team/sMethodology

    supportconfig. team

    Setup team

    IMPLEMENTATION ORGANIZATION

    Prerequisite of implementation:Reponsible for methodology, creating requirement spec,deciding scope, tool configuration, and education

    Responsible for communication,implementation, and projects(works in conjunction withmethodology team)

    Center ofexcellence

    Methodologyteam

    Power userteam

    Configurationteam

    Educationteam

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    16/3016 Sybase Confidential June 26, 2012

    SUPPORT DURING IMPLEMENTATION

    All parts and projects require startup support consisting of: Customization and common configuration documentation

    Guidelines

    Product support

    Central support to provide contact information andinstance guidance

    Startup support increases comfort with the tool and successof the project

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    17/3017 Sybase Confidential June 26, 2012

    Roll out

    Methodology support

    Customized for your enviorment

    PROCESS FLOW

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    18/3018 Sybase Confidential June 26, 2012

    PROCESS FLOW:ROLLOUT PROJECT

    Startconfiguration

    projects

    Workshops(basic training,

    what to do)

    Configuration work(consultant needs

    or training forconfiguration teamin PowerDesigner)

    Get methods and

    requirements frommethodology team

    The method has to be inplace and requirements

    should reflect its usein the tool

    Set upimplementation

    projects

    Set up projects

    Set organization anddecision process

    Populate with chosencandidates

    Set timeframe foreach project

    Educateimplementation

    team

    Educate all projectmembers

    in the methodology(see prerequisites)

    Integratewith education

    How to work inPowerDesigner

    according tomethodology

    Company-specificadjustments

    Common templates

    Kickoff

    Information

    about whatis comingregarding

    method, tool,and training

    Education

    Rollout

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    19/30

    19 Sybase Confidential June 26, 2012

    Training

    Project members

    PowerUsers

    End users

    PROCESS FLOW

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    20/30

    20 Sybase Confidential June 26, 2012

    PROCESS FLOW:CONFIGURATION/EDUCATION PROJECT

    Integratewith education/

    documentRollout

    Educatemethod and

    modeling

    Decide scope,

    customization(general to tool, support

    for methodology)

    Customize PD

    to meetrequirements for

    methodology

    Integrate PDto companyenvironment

    Customize tooland package

    setupconfiguration

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    21/30

    21 Sybase Confidential June 26, 2012

    Teamwork is important

    Stearing commity Configuration teamSS

    Education team

    S

    CUSTOMER SYBASE

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    22/30

    22 Sybase Confidential June 26, 2012

    CUSTOMER-SYBASEIMPLEMENTATION ROLES

    Sybase provides:

    Training for trainers and the configuration team

    Advice/knowledge of combining method and tool

    Competence and support during the configuration phase PowerDesigner expert

    Sybase should be part of the steering committee andconfiguration team and act as advisors to the education team

    Stearing committte Configuration teamSS

    Education team

    S

    The division of roles between the customer and Sybase depends on the customers

    knowledge of PowerDesigner and to what extent it should be customized

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    23/30

    23 Sybase Confidential June 26, 2012

    Summary: Risks

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    24/30

    24 Sybase Confidential June 26, 2012

    IMPLEMENTATION RISKS

    Management commitment Ensure that management is committed

    Agree on measurement

    Include management on steering committee

    Success criteria

    Agree on clear success criteria

    Prerequisites

    Make sure all prerequisites are in place

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    25/30

    25 Sybase Confidential June 26, 2012

    IMPLEMENTATION RISKS(CONTD)

    Time Avoid new methods

    Always implement tool using existing methods

    Adoption

    Ensure that method and customization are partof training get it right from the beginning

    Use templates, customizations, and documentationto support best practice

    Support team and superusers for the method tool

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    26/30

    26 Sybase Confidential June 26, 2012

    Summary: Success criterias

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    27/30

    27 Sybase Confidential June 26, 2012

    Success criterias 1:2

    To meet goal of increased productivity by means of using PowerDesigner.Some critical success factors to point out for the implementation:

    A well defined decisionprocess.

    A clear and efficient methodologyhas to be created and thoroughlyworked through.

    The scope of the project has

    to be well defined, but still retainflexibility to be able to meet upwith futher requirements thatwill improve ease of work.

    Management team should be set upwith full authority to make necessarydecisions.

    Team specific formethod/methodology has to be inplace the with necessary authority.

    Management team has to be wellinformed and the cooperationbetween management team andmethod team has to be efficient.

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    28/30

    28 Sybase Confidential June 26, 2012

    Success criterias 2:2

    The end users must veryquickely get the feeling thatthis will ease and improvetheir work.

    Education should be

    (carried out in a way) so that itis evident that the work of theend user is well understoodby the teacher and their dailyworks should also be reflectedin education material.

    Clear support structure bothfor projects and users duringthe implementation project

    and after.

    Methodology team has to finish theirwork with customization, templatesand documentation before the enduser start their education.

    Methodology team has to finish theirwork and clearly document howmethod tool are meant to work.Teacher has to have a good knowledgeboth about the methodology and thetool and be able to convey it to theusers.

    Information about contact personstheir scope and authorities mustspread through out the organisationand project. Set up a support stuctureto bring security to the users andgarantee follow up. This conserns bothtool and methodology.

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    29/30

    Discussion

  • 7/31/2019 Presentation Style Best Practise of Implementing Tool for Modelling

    30/30