Page 1: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

PRESENTATIONPRESENTATION

ONON

ENSURING SAFETY IN ENSURING SAFETY IN ELECTRICITY DISTRIBUTIONELECTRICITY DISTRIBUTION

02 MAY 200902 MAY 2009

WESCOWESCO

Page 2: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

ACCIDENTS AND REASONS ACCIDENTS AND REASONS THEREOF THEREOF

• Unauthorised persons working on Unauthorised persons working on line/equipmentsline/equipments

• Working without obtaining proper line clearanceWorking without obtaining proper line clearance

• Working without using safety appliancesWorking without using safety appliances

• Working without proper instructions of superiorsWorking without proper instructions of superiors

• Wrong feedback from persons who receive the Wrong feedback from persons who receive the line clearanceline clearance

• Negligence, carelessness, haste and Negligence, carelessness, haste and overconfidenceoverconfidence

• Intoxication while workings on live lines, lack of Intoxication while workings on live lines, lack of knowledge of system networkknowledge of system network

Page 3: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

• Improper coordinationImproper coordination

• Low clearance arising out of road widening Low clearance arising out of road widening and heighteningand heightening

• Excessive sag of line conductorExcessive sag of line conductor

• Construction of building in close vicinity of Construction of building in close vicinity of high voltage & low voltage lineshigh voltage & low voltage lines

• Attempt to steal electricity (hooking )Attempt to steal electricity (hooking )

• Long service connection lines without proper Long service connection lines without proper supportssupports

• Ignorance of consumer and publicIgnorance of consumer and public

• Down end / snap conductors not dealt Down end / snap conductors not dealt properlyproperly

ACCIDENTS AND REASONS THEREOF ACCIDENTS AND REASONS THEREOF Contd…..Contd…..

Page 4: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

PRECAUTIONS TO BE OBSERVED FOR PRECAUTIONS TO BE OBSERVED FOR AVOIDING ACCIDENTSAVOIDING ACCIDENTS

• Till LC is received from all sources every line or equipment shall be treated as live

• Relay coordination should be ensured with OPTCL & other CPPs for clearance of faulty feeder at shortest possible time

• All consumers irrespective of category should be instructed not to connect Generators, Inverters etc. without any express permission from the utility company

• Hang danger board at all strategic places to ensure safety at work spot

• Enforcing safety rules and procedures• No compromise / second thought on using safety

appliances• State own authorities like PWD, NH, roads and buildings

and other agencies should take approprite approval before executing their projects

• Safety rules and procedures should be displayed at conspicious places, print and electronic media for awareness of the consumer and general public

Page 5: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

• Barbed/ wall fencing should be mandatory for the existing sub-stations and new sub-stations including grid sub-stations

• Anti climbing fencing is to be mandatory in all supports carring live as well as dead HV & LV lines

• Constuction of building beneath / close to the vicinity of HV and LV lines is to prohibited

• Pamphlets / Guide book should be distributed among employees as a ready reckoner.

• Enforcing provisions contained in IE rules and acts should be stringent

• Periodical checking and assessment of safety rules and procedures should be enforced by appropriate authority

PRECAUTIONS TO BE OBSERVED FOR PRECAUTIONS TO BE OBSERVED FOR AVOIDING ACCIDENTS Contd…..AVOIDING ACCIDENTS Contd…..

Page 6: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

• Workmen shall be properly trained

• Proper dress for workmen

• Solitary execution of works by workmen should not be encouraged.

• For new lines and substations proper clearance and distance should be maintained

• For temporary earthing should be enhforced before taking on the works

• Procedure of line clearance both at the time of obtaining the LC and returning the LC should be adhered to.

• Check list before working on line should be prepared

PRECAUTIONS TO BE OBSERVED FOR PRECAUTIONS TO BE OBSERVED FOR AVOIDING ACCIDENTS Contd…..AVOIDING ACCIDENTS Contd…..

Page 7: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

SAFETY SLOGANS

THE FOLLOWING SLOGANS SHOULD BE DISPLAYED AT EVERY SUB-STATIONS AND GRID SUB-STATIONS AND ALSO SELECTED PLACES ALONG THE LINE:

• No job is so urgent or no service is so important that it prevents you taking time to do safely

• Accidents do not happen, they are caused

• Work safe today-Be back tomorrow

• Monkey business has no business in any business

• Learn first aid, you may save several lives

Page 8: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

• Men who knows Electricity best –Respect it

• Bright people use right tools

• Safety is everybody’s job

• Employing ELCBs at service connections is mandatory

• Do not locateplug points close to floor level-children may play with them

• Do not locate operating rods below vent pipes of DTRs

• Always be alert . Nobody will be hurt

• Do not expect your subordinate working atop to greet you when you arrive

SAFETY SLOGANSContd….

Page 9: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

SAFETY PRECAUTIONS FOR PROTECTION AGAINST ELECTRIC

SHOCK• Unauthorised persons shall not attempt

replacement of transformer fuses• Other than utility employees shall not try to

replace street lights or set right service wires• Inform nearest utility office if loose or hanging

wires are noticed• While drilling bore wells ensure that the casing

pipes do not touch live wires while they are being lifted up

• Do not touch low lying or snapped conductor• Do not lean against electric poles• Do not stand beneath overhead lines while

heavy winds are blowing

Page 10: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

WHAT IS NECESSARY TO IMPROVE

SAFETY? •Attitude to achieve safety

•Proper use of safety devices

•Proper training for all

•Proper up-keeping of safety tools

•Constant improvement upon the safe working practices

•Analyse the cause of accidents and prevent re-occurance

•Strictly follow the safety rules

Page 11: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

RESPONSIBILITY OF EMPLOYEES• Report : Potential Hazards• Observe : Safety rules procedures and

other code of practice• Use : with all care of the tools,

equipment, safety equipment and protective clothing provided by the company.

• Participate : In safety training courses when called upon to do so

• Make use : Of the knowledge imparted during the safety training

• Take : An active and personals intrest in promoting consiousness for

health and safety

Page 12: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

REPORTED ACCIDENT CASES AS PER PUBLICATION IN

“PRAGATIBADI” DATED 17/4/09

Human Animal Human Animal2003-04 27 26 - 12 132004-05 30 28 9 17 182005-06 45 42 6 9 152006-07 45 35 20 18 202007-08 51 39 35 20 33

Year No of Accident Cases Fatal Accidents

As per WESCO Record

Page 13: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

MAINTENANCE OF DISTRIBUTION SYSTEM AND REDUCTION OF

ACCIDENTS THEREOFItem Item details Action taken as on 30/3/09 Remarks with programme for

periodic rectification action

Inspection of HT/LT lines, cutting of tree branches touching the lines

This is a continuous process. Prunning of treebraches are taken up in a planned way toensure minimum load shedding.

Replacement of damaged stays Whenever such cases are noticed, it is beingreplaced.

Repairing of tilted poles if any On priority it is being done.Restringing of conductors where there is inadequate clearance as per I.E. rules

Restringing of conductors are being taken upto increase the clearance. There are also veryold lines with long span and due sagging theclearance becomes inadequate. In order toavoid this we are in process to replace suchconductors with new conductors and to setclearance we are putting intermitant poles.

Maintenance

Page 14: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

Item Item details Action taken as on 30/3/09 Remarks with programme for periodic rectification action

Replacement of damaged stays. Whenever such cases are noticed, it is beingreplaced.

Repairing /Replacement of damaged A.B. switches.

All Damaged AB switches are beingreplaced/repaired. Maintenance of ABSwitches is now done on regular basis

Checking/ replacement of jumpers Done Periodically.

Operation of breakers at 33/11Kv S/S HT Maintenance team has taken up the jobof maintaining Breakers as well asinstallation of new Breakers at 33/11kv s/sand as of now 75% s/s are with Breakers.Work still on Progress

Maintenance of S/S (both 11/0.4 KV and 33/11KV

Page 15: PRESENTATION ON ENSURING SAFETY IN ELECTRICITY DISTRIBUTION 02 MAY 2009 WESCO

Item Item details Action taken as on 30/3/09 Remarks with programme for periodic rectification action

Proper up keeping of maintenance of registers of 33/11Kv s/s

It is being done. However to maitainuniformity common formats are preparedand will be supplied as registers to all s/s byend of May-2009

A time schedule for periodical inspection of distribution lines and S/S

Every year the JE & SDO make their shedule for checking lines & s/s synchrinising with the shut down taken by Gridco/OPTCL as well as DISCOM, so that there will not be any additional shutdowns.

General