1 Present Condition
Electricity Demand Projection 2009-20193
Generation Capacity Addition 2009-20195
2
Java-Bali Electricity System – October 20092
Java-Bali Capacity Balance 2009-20194
Transmission and Distribution Development 2009-20196
Fuel Mix in Java-Bali System7
2nd Fast Track Program8
West Java Grid Development9
E L E C T R I C I T Y F O R A B E T T E R L I F E
NAD74,91%
NAD74,91%
Sumut69,32%Sumut69,32%
Sumbar68.72%Sumbar68.72%
Riau + Kepri54,66%
Riau + Kepri54,66%
Sumsel49,80%Sumsel49,80%
Bengkulu50.08%
Bengkulu50.08%
Babel72,45%Babel
72,45%
Lampung47,66%
Lampung47,66%
Jakarta100%
Jakarta100%
Banten72,11%Banten72,11%
Jabar64,95%Jabar
64,95% Jateng70,60%Jateng70,60%
Jambi48.85%Jambi
48.85%
Jogya79,64%Jogya
79,64%
Jatim71,08%Jatim
71,08%
Bali74,42%
Bali74,42%
NTB31.99%
NTB31.99%
NTT24.24%
NTT24.24%
Kalbar45,65%Kalbar45,65%
Kalteng44,33%Kalteng44,33%
Kalsel71,39%Kalsel
71,39%
Kaltim68,37%Kaltim68,37%
Sulut66,62%Sulut
66,62%
Gorontalo48,70%
Gorontalo48,70%
Sulteng47,64%Sulteng47,64%
Sultra38,21%Sultra
38,21%
Sulsel54,90%Sulsel
54,90%
Malut47,81%Malut
47,81%
Maluku55,36%Maluku55,36%
Papua + Irjabar32,05%
Papua + Irjabar32,05%
Category :Category :
> 60 %
41 - 60 %
20 - 40 %
Present Condition
National Electrification Ratio 2009 : 65%
Source: ESDM3
E L E C T R I C I T Y F O R A B E T T E R L I F E
Java-Bali Electricity System – as of October 2009
Normal : No load curtailment, operation reserve > biggest unit Alert : No load curtailment, operation reserve < biggest unit Deficit : Rotating load curtailment
4
SURALAYA
CILEGON
M.TAWAR
GANDUL
CIBATU
CIBINONG
CIRATA
SAGULING
DEPOK
BEKASICAWANG
TASIKMALAYA
BANDUNGSELATAN
MANDIRANCAN
UNGARAN
T.JATI
PEDAN
KEDIRIPAITON
GRATI
KRIAN
GRESIK
KEMBANGAN
GLNUK
PMRON
BTRTI
KAPAL
NGARA
ANTRI GNYAR
AMPLA
NSDUA
GTENG
STBDO
BWNGI
BDWSO
JMBER
TNGULLMJNG
GNDING
PBLGO
PAKIS
WLNGI
KKTES
KBAGN
BNGIL
BNGIL
SKLNG
KBAGN
BNRAN
GLTMR
BKLAN
SPANG
PMKSN
SMNEP
LNGAN
NGBNG
MKRTO
NGOROKTSNO
SBLTN
TUBAN
BABAT
DWIMA
BJGRO
NGAWI
MNRJO
RBANG
BLORA
CEPU
SRGEN
PWRDI
KDMBO
PATIJPARA
KUDUSTBROKKRPYKWLERI
KLNGU
GRUNG
DIENG
WSOBO
WALIN
PWRJO
WATES
MDARI
KNTUG
WNGIRI
WNSRI
PALUR
JAJAR
MJNGO
KBSENBRBES
KBSEN
RWALO
CLCAP
GBONG
KBMEN
MRICA
MNANGBNJARCAMIS
JTBRG
HRGLS
SRAGI
SKMDIINDMY
SBANGPWKTA
CKPAY
PBRAN
GARUT
DRJAT
CKSKA
RCKEK
KMJNG
CGRLG
UBRNG
PDLRGDAGO
KSBRU
RGDLK
KNGAN
BBKAN
MLBNG
ARJWN
PMPEK
SMDRA
SNTSA
CNJUR
LBSTUPRATU
UBRUG
SALAK
BGBRUBUNAR
RKBTGMENES
TNAGA
BLRJA
P
P
PP
P
TLGNG
TLGNG
TUREN
PBIAN
UBUD
CLGONGU
GU GU
MKRNG PRIOK
GU
GU
MRGEN
MSPTI
PLOSO
PCTAN
NGJUK
SMANMDLAN
SLRJO
deficitdeficit
alertalert
Bottleneck on IBT 500/150 kV
Deficit in Bali subsystem and bottleneck on Java-Bali
150 kV submarine cable
BNTUL
SMANU
NDC PL BL
JAMALIJAMALI
Capacity BalanceCapacity Balance
NDC: Net Dependable CapacityPL: Peak LoadBL: Balance
NDC: Net Dependable CapacityPL: Peak LoadBL: Balance
E L E C T R I C I T Y F O R A B E T T E R L I F E
-
10,000.0
20,000.0
30,000.0
40,000.0
50,000.0
60,000.0
70,000.0
80,000.0
90,000.0
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
GWh
West Java
Electricity Demand Projection 2009-2019
5
0
50,000
100,000
150,000
200,000
250,000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
GWh
Java-Bali
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Indonesia
Electricity demand projection is calculated per PLN’s region using demand forecast modelling to consider economic growth per customer sector, electrification ratio target and big customer waiting list in a region.
Electrification ratio and economic growth is based on the National Electricity Master Plan (RUKN), which will increase from 65% in 2009 to 91% in 2019. This projection is calculated based on the assumption of economic growth 6.2% per year.
LPEM UI study: For 1% economic growth need an input of electricity growth 1.5 – 2% (elasticity). PLN average elasticity is 1.5.
Electricity demand in Indonesia will increase at 9.2% per year (Java-Bali 8.97% and West Java 8.72%).
E L E C T R I C I T Y F O R A B E T T E R L I F E
Demand Forecast of West Java
======================= ========== ========== =========== =========== =========== =========== =========== =========== =========== =========== =========== ===========Calendar Year 2008*) 2009**) 2010#) 2011 2012 2013 2014 2015 2016 2017 2018 2019
======================= ========== ========== =========== =========== =========== =========== =========== =========== =========== =========== =========== ===========
Total Population (10^3) 46,559.2 47,186.9 47,810.5 48,428.9 49,044.3 49,641.1 50,270.9 50,850.2 51,441.9 52,024.3 52,597.5 53,153.2 - Growth Rate (%) 1.38 1.35 1.32 1.29 1.27 1.22 1.27 1.15 1.16 1.13 1.10 1.06 Growth of Total GDP (%) 5.8 4.5 5.8 6.1 6.1 6.1 6.1 6.1 5.8 5.8 5.8 5.8 Electrification Ratio (%) 64.4 66.8 69.8 73.1 76.7 80.4 84.3 88.4 92.5 96.8 100.0 100.0
Energy Sales (GWh) 34,051.0 36,533.1 39,101.6 42,571.2 46,542.5 50,880.6 55,619.3 60,795.6 66,182.9 72,043.9 78,420.1 85,356.6 - Growth Rate (%) 5.30 7.29 7.03 8.87 9.33 9.32 9.31 9.31 8.86 8.86 8.85 8.85 -- Residential 10,710.0 11,440.7 12,201.2 13,390.4 14,691.6 16,115.1 17,672.4 19,376.0 21,152.2 23,087.2 25,195.2 27,491.7 -- Commercial 2,632.3 2,790.0 3,018.1 3,279.0 3,618.8 3,993.6 4,406.8 4,862.3 5,337.6 5,858.8 6,430.4 7,057.2 -- Public 929.0 1,031.0 1,118.4 1,218.2 1,327.0 1,445.4 1,574.4 1,715.0 1,860.4 2,018.2 2,189.4 2,375.0 -- Industrial 19,779.6 21,271.4 22,763.9 24,683.6 26,905.2 29,326.6 31,965.8 34,842.3 37,832.7 41,079.7 44,605.0 48,432.7
Power Contracted (MVA) 13,224.2 13,800.1 14,589.0 15,592.8 16,479.3 17,422.9 18,426.8 19,494.2 20,574.0 21,718.2 22,789.7 23,573.1 -- Residential 5,851.8 6,128.8 6,489.2 6,892.0 7,321.0 7,777.6 8,263.6 8,780.7 9,304.6 9,860.3 10,309.0 10,433.4 -- Commercial 1,569.4 1,593.7 1,704.4 1,831.0 1,968.1 2,116.4 2,276.6 2,449.6 2,626.3 2,816.1 3,019.9 3,238.8 -- Public 556.6 583.0 618.1 658.0 700.9 747.2 796.9 850.2 904.6 962.7 1,024.8 1,091.1 -- Industrial 5,246.4 5,494.7 5,777.4 6,211.8 6,489.3 6,781.7 7,089.7 7,413.7 7,738.5 8,079.1 8,435.9 8,809.7
Number of Customer 8,146,194 8,582,395 9,102,295 9,682,419 10,299,568 10,956,109 11,654,559 12,397,597 13,150,262 13,948,675 14,607,607 14,837,408 -- Residential 7,684,353 8,095,724 8,581,619 9,123,316 9,699,208 10,311,451 10,962,341 11,654,317 12,354,999 13,097,808 13,697,263 13,863,447 -- Commercial 242,218 255,188 274,099 295,578 318,721 343,654 370,514 399,447 428,943 460,586 494,531 530,941 -- Public 208,626 219,797 234,359 250,721 268,224 286,946 306,974 328,397 350,179 373,404 398,166 424,568 -- Industrial 10,997 11,686 12,219 12,803 13,416 14,058 14,731 15,436 16,140 16,877 17,647 18,453
Total Production (GWh) 37,077.7 39,996.8 42,696.2 46,368.0 50,569.9 55,265.4 60,392.9 65,991.9 71,816.4 78,150.9 85,049.1 92,572.1 Energy Requirement (GWh) 37,004.9 39,924.0 42,618.5 46,283.5 50,477.8 55,164.8 60,282.9 65,871.7 71,685.6 78,008.5 84,894.2 92,403.4 Station Use (%) - - - - - - - - - - - - T & D Losses (%) +) 7.98 8.49 8.25 8.02 7.80 7.77 7.74 7.71 7.68 7.65 7.63 7.63 PS GI&Dis (%) 1) 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 0.2 Load Factor (%) 83.58 83.61 80.33 80.25 80.21 80.18 80.15 80.12 80.09 80.07 80.04 80.02 Peak Load (MW) 5,064 5,461 6,068 6,596 7,197 7,868 8,602 9,403 10,236 11,143 12,130 13,207
======================= ========== ========== =========== =========== =========== =========== =========== =========== =========== =========== =========== ===========
Annual growth rate of sales = 8.85% (Energy sales in 2009 is about 36.5 TWh and 85.4 TWh in year of 2019)Electrification ratio = 100% in year of 2018Additional customer = 650.000 customer/yearAdditional peak load = 700 MW/year
E L E C T R I C I T Y F O R A B E T T E R L I F E
Java-Bali Capacity Balance 2009-2019
7
No. Supply and Demand 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 20191 Demand
Energy Sales GWh 106,956 115,099 125,199 136,807 149,618 163,688 179,053 195,314 213,020 232,167 252,547 Growth % 5.7 7.6 8.8 9.3 9.4 9.4 9.4 9.1 9.1 9.0 8.8 Production GWh 123,066 132,867 145,113 158,410 173,097 189,215 206,801 225,396 245,150 267,184 290,639 Load Factor % 79.5 77.5 76.5 75.5 75.0 75.0 75.0 75.0 75.0 75.0 75.0 Peak Load MW 17,671 19,571 21,654 23,951 26,347 28,800 31,477 34,307 37,314 40,667 44,237
2 Supply MWInstalled Capacity 21,936 21,503 21,425 21,425 21,425 21,425 21,425 21,425 21,425 21,425 21,425
PLN 18,071 17,638 17,560 17,560 17,560 17,560 17,560 17,560 17,560 17,560 17,560 IPP 3,865 3,865 3,865 3,865 3,865 3,865 3,865 3,865 3,865 3,865 3,865 Retired -300 -433 -78 0 0 0 0 0 0 0 0
3 Capacity Addition3.1
Ongoing Project MW 1,445 4,084 2,036 243 1,360 - - - - - - Plan
Upper Cisokan PS PS - - - - - 500 500 - - - - Muara Tawar Add-On 2,3,4 CCPP - - 150 - 1,050 - - - - - - Bojanegara (LNG Terminal) CCPP - - - - - - - - 750 1,500 - New CCPP CCPP - - - - - - - - - 750 - New GTPP GTPP - - - - - - 600 600 600 600 600 New SCPP (Indramayu) SCPP - - - - - 1,000 1,000 - - - 4,000 GeoPP FTP2 - PLN GeoPP - - - - 60 220 260 110 110 - - Kesamben HEPP - - - - - - - - 37 - - Kalikonto-2 HEPP - - - - - - - 62 - - - Matenggeng PS PS - - - - - - - - 443 443 - Grindulu PS PS - - - - - - - - - 500 500
3.2Ongoing Project MW 110 150 660 2,250 250 - - - - - - Plan
Banten SCPP - - - - - - 660 - - - - Madura (2x300 MW) SCPP - - - - - 600 - - - East Bali SCPP - - - - 200 - - - - - - Sumatera Mine Mouth SCPP - - - - - - - 1,800 1,200 - - Central Java SCPP (Infrastructure) SCPP - - - - - 1,000 1,000 - - - - GeoPP FTP2 - IPP GeoPP - - - 175 310 445 55 235 330 545 370 Rajamandala HEPP - - - - - - - 30 - - - Jatigede HEPP - - - - - - - - 110 - - Cikotok HEPP - 4 - - - - - - - - - Girimukti, Cianjur HEPP - 8 - - - - - - - - -
4 Total Supply 23,551 27,364 30,133 32,801 36,031 39,196 43,271 46,708 50,287 54,625 60,095 5 Reserve Margin % 33 40 39 37 37 36 37 36 35 34 36 6 Potential Project
West Java SCPP (Ex. Tj Jati A) SCPP - - - - - - 660 - - - -
PLN
IPP
E L E C T R I C I T Y F O R A B E T T E R L I F E
1,699
4,241
3,152
1,470
3,748
2,391 2,789
1,600 2,438
4,650
6,093
117
475
1,261
2,983
2,430
2,680 2,568
3,441 2,465
1,116
907
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
IPP
PLN
Generation Capacity Addition in Java-Bali System [2009-2019]
Capacity addition in Java-Bali up to 2019 = 38,600 MW or 3.500 MW per year.
PLN = 26.100 MW, and IPP = 12.500 MW Ongoing Project = 12.600 MW (PLN = 9.200 MW, IPP =
3.400 MW]
Source: Draft RUPTL 2010-2019
MW
8
E L E C T R I C I T Y F O R A B E T T E R L I F E
2nd Fast Track Program
9
Region Hydro Electric
Combine Cycle
Geothermal Steam Turbine
Total
Java 1,000 1,200 1,525 2,000 5,725
Outside Java 174 426 2,058 2,294 4,952
Total 1,174 1,626 3,583 4,294 10,677
Portion 11% 15% 34% 40% 100%
Type of Power Plant
PLN + IPP PLN IPP
Capacity(MW)
Capacity(MW)
Investment(Mil. USD)
Capacity(MW)
Investment(Mil. USD)
Steam turbine 4,294 3,064 4,039 1,230 2,031
Combine cycle 1,626 1,200 1,020 426 362
Geothermal 3,583 977 1,537 2,606 6,057
Hydro electric 1,174 1,174 1,010
Total 10,677 6,415 7,605 4,262 8,450
MW
E L E C T R I C I T Y F O R A B E T T E R L I F E
0
500
1,000
1,500
2,000
2,500
3,000
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Jaringan TM Jaringan TR Trafo Distribusi-
2,000
4,000
6,000
8,000
10,000
12,000
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
500/150 kV 150/70 kV 150/20 kV 70/20 kV
-
200
400
600
800
1,000
1,200
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
500 kV AC 500 kV DC 150 kV 70 kV
Source: Draft RUPTL 2010-2019 10
Transmissions (kms)
kms MVA
Substations (MVA)
Distribution
Transmission and Distribution Development in Java-Bali System 2009-2019
T/L development = 6.600 km
Substation = 77.000 MVA
Distribution
Medium Voltage = 98.000 km
Low voltage = 174.000 km
Dist. Transformer = 21.000 MVA
New Customers =17.000.000
T/L development = 6.600 km
Substation = 77.000 MVA
Distribution
Medium Voltage = 98.000 km
Low voltage = 174.000 km
Dist. Transformer = 21.000 MVA
New Customers =17.000.000
E L E C T R I C I T Y F O R A B E T T E R L I F E
HSD (Oil)2%
MFO (Oil)0%Gas
18%
LNG5%
Coal58%
Hydro2%
Pumped Storage
2%
Geothermal13%
2019
HSD (Oil)7%
MFO (Oil)6%Gas
23%
Coal51%
Hydro6%
Geothermal7%
2009
Fuel Mix in Java-Bali System
Source: Draft RUPTL 2010-2019
Energy Production: 123.1 TWh Energy Production: 290.6 TWh
11
E L E C T R I C I T Y F O R A B E T T E R L I F E
12
West Java Sub-system – Coverage Area
Bandung Raya : Bandung City Cirata : Purwakarta, Subang, Indramayu,
Padalarang Tasikmalaya : Tasikmalaya, Garut, Banjar, Ciamis Cirebon : Cirebon, Jatibarang Cibatu : Bekasi Industrial Area, Tambun Cikarang
and Karawang Bogor : Kota Bogor, Puncak Area, Sukabumi,
Cianjur
E L E C T R I C I T Y F O R A B E T T E R L I F E
West Java Grid
13
f
iI
Ii
I
MLBNG
PRKAN
SMDNG
CKSKA
GARUT
KMJNG
DRJAT
KNGAN
PLMAN
SMDRA
PMPEK
ARJWN
CKRNG
SRAGI
BBKAN BRBES
MDCAN
PWKTA
JTLHR
DWUAN
RGDLK
HRGLS
INDMY
BKASI
CIBNG
TSMYACAMIS
UBRNG
MJLYA
BDSLN
STOSA
CKLNG
SGLNG
CRATA
PDLRG
PEDAN
BNJAR
JTBRG
PGDRN
MNANG
CGRLG
KDPTN
SKMDI
DAGO
CKPAY
WYNDU
RCKBA
CNJUR A
A
SBANG
MKSRI
PRURI
PYNYG
PRMYA
MLIGI
PLTU KANCI
DGPKR
LGDAR
KSBLM
TLJBE
ARCKEK
MTWAR
CBATU
DEPOK
INDRM
KRTMR
TSMYA-7
CKJNG
LMJAN
GU
BOGOR
KRCDG
INBRN
SOUTH
CBRUM
CBBAT
BDTMR
PASIA
CGNEA
CURUG
KRPYG
PNDLI
TGHRG
PNDLI
A
PBRAN
BKASI
PDKLP
JBEKA
GDMKR
CKLDO
TMBUN
FAJAR
PNCOL TYGRIKe Jtrgn
DRJAS
P
P
PTUHA P
KSBRU
PLTU JAB-UT
P
SKTNIBKUTR
P
CKDNG
A GHEJO
P
P
A
UJBRG
CibatuCibatu
TasikmalayaTasikmalaya
Bandung Raya
Bandung Raya
CirebonCirebon
CirataCirata
E L E C T R I C I T Y F O R A B E T T E R L I F E
Strengthening of West Java Grid [1/2]
14
Bandung Raya Sub System to supply Bandung CityBandung Selatan Substation , 500 kV, 2x500 MVA (existing)Kamojang Geothermal = 200 MW, Darajat Geothermal = 275 MW Wayang Windu Geothetmal = 220 MWUjung Berung Substation 500 kV, 2x 500 MVA (2012)
Cirata Sub System to supply: Purwakarta, Subang, Indramayu, PadalarangCirata Substation, 500 kV, 2x500 MVAIndramayu Steam Coal Power Plant 3 x 300 MW (2010)
Tasikmalaya Sub System to supply: Tasikmalaya, Garut, Banjar, CiamisGITET Tasikmalaya 1x500 MVA
E L E C T R I C I T Y F O R A B E T T E R L I F E
Strengthening of West Java Grid [2/2]
15
Cirebon Sub System to supply : Cirebon, Jatibarang GITET Mandirancan 1x500 MVAIBT-2 Mandirancan 1x500 MVA (2010)PLTU IPP Cirebon 1x660 MW (2011)
Cibatu Sub System to supply : Bekasi Industrial Area , Tambun, Cikarang and KarawangGITET Cibatu 3x500 MVAIBT-4 Cibatu 1x500 MVA (2011)PLTGU IPP Cikarang Listrindo
Bogor Sub System to supply Kota Bogor, Puncak Area, Sukabumi, CianjurPLTP Gunung Salak 300 MWPLTU Pelabuhan Ratu 2x300 MW (2011)
E L E C T R I C I T Y F O R A B E T T E R L I F E
West Java Grid
16
P
P
P
P
P
P
250 MW
0 MW
75 MW 47 MW63 MW20 MW
275 MW
163 MW
58 MW
220 MW
450 MW
136 MW
369 MW 190
MW 200 MW
280 MW
Sub Sistem Bandung Raya
MW
MW MW
UJBRG
KRCDG
BDSLN
WYNDU
TSBRU
MW
CAMIS BNJARGARUT
HRGLSSKMDI
JTBAR
CRATA
BDUTR
CNJUR
TSBRU-7
TSMYA
CGRLG1
CRATA-7
MTWAR-7
CBATU-7
BKASI-7
P
LGDARPTUHA
PKANCI
SGLNG-7 BDSLN-7
Sub Sistem Cirebon
Sub Sistem Tasik-Garut-BnjarP
P
DRJAT
PBRAN
PJABUT
Sub Sistem Bogor-Skbmi
P
JABSEL
CBATU
MDRCN-7
PDLRG
BKASI
MDRCN
SRAGI
KMJNG
RCKEK
CKSKA
ARJWN
PWKTA
JTLHR CKMPY
KSBRU
DWUAN
Sub Cirata Pwkta
Sub Sistem Cikrng-Cbatu
SKTNI
GHEJO
UJBRG7UJBRG5
E L E C T R I C I T Y F O R A B E T T E R L I F E
17
Thank You…Thank You…Thank You…Thank You…