presentation on dgh program to ind ii board 2012 04
TRANSCRIPT
April 2012
Investing in Connectivity:
Proposed DGH Support for MP3EI
2
Connectivity in the Road Sector Faces Strategic Challenges
Low competitiveness of road infrastructure v. SEA region
Current policies are not creating a sustainable modern highway system
Development of high-capacity expressway network is lagging demand
Rising funding allocation needs to expand even further
Road program delivery needs more efficiency and accountability
Change in business model needed
3
Proposed Support for DGH and BPJT
Road Network Planning (Bipran, BPJT)
• - Long-term Masterplan for Road Infrastructure
• - Investment pipeline to improve connectivity in MP3EI corridors
Improved delivery of national road programs (Bintek, Wilayah-Balai)
• - Longer road life, whole life costing
• Asset management devolved to balai
4
The Recommended Six (6) Economic Corridors :
1
2
3
4
5
6
Economic Corridor Mega Hub Hub Potential Area for Development
4
Logistics is part of the supply
chain (supply chain):
1. procurement activities
2. storage
3. delivery / transportation
and service
1
2
3 6
4
5
Eastern Sumatera-North West Java
Northern Java
Kalimantan
Western Sulawesi
East Java-Bali-NT
Papua
Source: Coord. Ministry of Economic
MP3EI Economic Corridors – 12,000 km National Arterial Roads
5
Road Connectivity – Estimated Current and Target Service Levels
0,0 1,0 2,0 3,0 4,0 5,0 6,0
Trans-Sumatra
Trans-Java
Kalimantan
Sulawesi
Bali-NTT
Papua-Maluku
12
34
56
Trip time hr/100 km*
Normalized Trip Times on Economic Corridor Arterial Roads- 2011
Road Trip Time Nautical Add-on
Target Service level
1-1.5 hr/100 km
* Corridor distance
shorter than Arterial
road distance
6
DGH Masterplan for Road Infrastructure 2010-14 Incremental Widening to Minimum Width Standard
3.690
1.430
2.780
3.160
987
1.905
- 2.000 4.000 6.000 8.000 10.000
Sumatra
Java
Kalimantan
Sulawesi
NTT
Maluku-Papua
Road Length, km
Total Length
Improvedlength
• Budget IDR 7 trillion/yr
• Covers 47% of network in 5 yr
• Increments to 4.5, 6 or 7 m width
But comes at high cost:
• No distance saving, little speed
improvement
• Investment repeated in 5-10 yrs
• High cost = 40-60% of full
construction for 20-yr life
• Defers achieving modern asset
• Compounds land issues
7
DGH Support on Road Network Planning
Proposed outputs:
• Long-term 50-yr strategy to plan optimal road infrastructure for sustaining development
• 20-yr pipeline of investment projects in each economic corridor, staged to optimise benefits and spread funding requirements
• Journey time used to define connectivity and infrastructure plan outcomes
• Expressway network defined as backbone of trans-regional connectivity, with staged implementation
• Modernise arterial road network gradually through full renewal of roadway and alignment
Jalan yang belum terbangun digambarkan dengan garis putus-putus
Samarinda
Balikpapan
Banjarmasin
Palangkaraya
Pontianak
Nunukan
Enttikong Putusibau
Aruk
Tayan
Malinau
Tj. Selor
Ng Badau
TRANS KALIMANTAN NATIONAL ROAD PROGRAM
Simanggaris
Expressway >= 7 m 6 m 4.5 – 6 m Not Connected Sea Port
Road standard
Strategic Options
(1) Widen existing road
(2) Realign and rebuild – “road renewal”;
(3) Highway on future expressway location
(4) Expressway in new location
Improving connectivity:
Kalimantan Economic Corridor
Corridor plan evaluates options when
generating project pipeline and
investment profile for Economic
Corridor:
staged over 5, 10,
15 & 20 year periods
9
Improving Connectivity: Trans-Sumatra - Corridor Plan for Staged Development of Capacity in Parallel Facilities over long-term 20-yr period
ARTERIAL NATIONAL ROAD WIDTH
Width m 14
10
7
6
5
101 102 103 104 105 106 107 108 109 110 111 112 113
B Aceh Medan Pekanba Palembg Lampung
Length km 644 694 754 443 0
Total distance 2536 1892 1198 443
EXPRESSWAYDual C'way
Renstra period color code
Baseline
2010-2014
2015-2019
2020-2024
2025-2029
101 102 103 104 105 106 107 108 109 110 111 112 113
B Aceh Medan Pekanba Palembg Lampung
Length km 460 564 610 380 0
Distance km 2014 1554 990 380
2029 2024 2019 2019
2014 2024
2019
2010 Road W
idth
Lampung Medan B Aceh Pekanbaru
10
Corridor Plan Output - Trans-Sumatra Example: Linkage of Development Outcomes and Financing Plan
– Long-term 20-yr Period
1,8 3 3 3 3 1,7 3,6 0 2,6
47,9
58,6
20,2
7
1,5
0
0
10
20
30
40
50
60
70
80
R1 R2 R3 R45-Y
ear
Sp
en
din
g e
stim
ate
(ID
R T
)
RENSTRA PERIOD
Financing Plan
Rd Presv Rd Widening Exwy GOI Exwy PrivSec
0
10
20
30
40
50
60
70
2010 2015 2020 2025 2030
TRA
VEL
TIM
E (h
r)
Connectivity: Travel Time from South to
North
B Aceh
Medan
Pekanb
Palem
Boukh
11
Accelerating Expressway Development
• Development expected to accelerate – but land and private finance risks will dictate
• Need broader financing modality, better use of available public funds
0
500
1000
1500
2000
2500
3000
3500
1980 1990 2000 2010 2020 2030
Tota
l le
ngt
h, k
m
Operational Implementing Planned
IndII Support:
• Assist delivery of Trans-Sumatra & East Java expressways
• Define “expressway” classification in Road Law
• Update long-term plan for expressway network
• Advice on viability gap funding & PPP modalities
• Support project preparation with VGF
• Management: Strengthen BPJT, consider expressway authority
12
0
10
20
30
40
50
60
70
80
90
2005 2010 2015 2020 2025A
nn
ual
Exp
en
dit
ure
IDR
t
Total Highway Expenditure to Meet Connectivity Goals - Long-term Plan to 2029
Exw-PS
Exw-GOI
Devel-DGH
Presvn - DGH
Mgt - DGH
0,0
1,0
2,0
3,0
4,0
2000 2010 2020 2030 2040
Avg
Tri
p T
ime
(h
r/1
00
km
) Economic Corridor avg trip time
0
10000
20000
30000
2005 2010 2015 2020 2025Ne
two
rk le
ngt
h a
t Lo
S (k
m)
Expanding Level of Service
Exway
LOS-A
Funding Forecasts to Achieve Connectivity Goals and Modernisation of Road Network
• Long range forecasts of
funding requirements built
from the investment pipeline
• Supports scenario planning
- pace of development
- public-private share
• Modernising whole network
in 15 yr requires allocations
to double
Plan forecast
IndII Support for DGH - 1
Enhance Planning of National Road Development: - Expedite national connectivity and mobility
- Reform road development planning process - Efficient deployment of expanded private and public funds - Accelerate development of expressway network
• Build comprehensive process for planning road network development with expenditure forecasts and pipeline of projects
• Prepare long-range capacity expansion profiles for six economic corridors, include pipeline of projects and financing plan
• Develop an optimal 20-yr strategy for financing development of the expressway and arterial road networks
• Assist BPJT to build capacity for processing the enlarged expressway development program, and transactions with viability gap funding
14
DGH Support for Network Planning: Activity packaging
Package 1: Connectivity in Eastern Indonesia • Preparation of 20-yr investment plans for 4 MP3EI
corridors (Kalimantan, Sulawesi, NTT, Maluku-Papua) • Prepare 5-year pipeline of capacity expansion projects on
arterial road network & budget estimates • Planning procedures upgraded to include strategy on
capacity expansion and road renewal Package 2: Connectivity in Sumatra and Java
• Advisory support on expressway package preparation for E Java and Sumatra corridors, including financing
• Classification and updating of expressway plan • Capacity & policy support to Bipran and BPJT • Preparation of 20-yr investment plans for MP3EI corridors
IndII Support for DGH - 2
Improve efficiency national road program delivery: - Reduced life-cycle costs, improved performance and life of road assets
- Improved design and delivery of projects; - Improved management of road and bridge assets; and - Improved transparency and accountablity for performance
• Implement new design guide – longer life pavements
• Prepare road renewal project pipeline for heavily trafficked corridors in East Sumatra and Java (Balais 3, 4 and 5)
• Build balai capacity for managing national road network - devolved road management process, new system and.
• Assist 1-3 Balais with preparation of 3-year programs 2013-15 using new system;
• Apply new project design methods, contract preparation and supervision in selected heavy traffic corridors.
Approach for Support to DGH and MPW
• Facilitate delivery of DGH program: • Working with Directorates to design and implement program
• Demonstrating applications and reforms through outputs
• Supporting MTEF budget preparations in 2012, 2013 & 2014
• Progressive engagement: • Hold-points for review after initial stage and annual stages
• Governance: • Building reliable data & information database for shared use
• Deploy strategic KPI for travel time, asset age and activity costs
• Launch public disclosure – possibly under CoST Initiative
• Support MPW administrative reform measures
17
Terima kasih